<iati-activities version="2.03" generated-datetime="2026-09-30T10:54:31"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P132982</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Results-based Road Maintenance and Safety Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives are to: (a) maintain the condition and improve the safety of Borrower's Primary Road and Primary-Secondary Road networks, and (b) strengthen sustainable and efficient road asset management and safety practices, for the benefit of road-users.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Results-Based Road Maintenance and Safety Project for Albania are to: (a) maintain the condition and improve the safety of the Borrower?s primary road and primary-secondary road networks, and (b) strengthen sustainable and efficient road asset management and safety practices, for the benefit of road users. There are four components to the project, the first component being maintenance works and monitoring. The objective of this component is to provide periodic and routine maintenance of Project roads. The second component is the institutional reforms. The objective of this component is to support institutional reforms at both ARA and MOTI, aimed at enhancing capacity in road safety and road asset management on a country level. This is a DLI-based component, and financing is linked to the accomplishment of agreed disbursement linked indicators. The third component is the sector reforms. The objective of this component is to support transport sector reforms. Financing under this component will be based on standard Bank Investment Project Financing (IPF) disbursement procedures, and it will be fully financed out of the IBRD loan, with the Government financing only the Value Added Tax (VAT). The component will provide financing to address sector reforms, which would include, but not limited to, technical and advisory assistance to GoA to finalize the Transport Sector Strategy and associated implementation plan; and technical and analytical support for medium term budget planning. Finally, the fourth component is the project management and audit.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0011237"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0011236"><narrative>Albanian Road Authority</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-01-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-03-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Artan Guxho</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aguxho@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363243" />
            <name><narrative>Sarande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.87556 20.00528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363276" />
            <name><narrative>Muzine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.93167 20.20556</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363320" />
            <name><narrative>Konispol</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.65889 20.18139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363341" />
            <name><narrative>Kakavije</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.90778 20.35833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781988" />
            <name><narrative>Pogradec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.9025 20.6525</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782061" />
            <name><narrative>Peshkopi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.685 20.42889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782393" />
            <name><narrative>Maliq</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.70583 20.69972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782661" />
            <name><narrative>Kukes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.07694 20.42194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783263" />
            <name><narrative>Elbasan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.1125 20.08222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783408" />
            <name><narrative>Corovode</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.50417 20.22722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000829448" />
            <name><narrative>Bllate</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.34222 20.07083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183708" />
            <name><narrative>Vore</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.39083 19.655</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183719" />
            <name><narrative>Vlore</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.46667 19.48972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183751" />
            <name><narrative>Vidhas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.07861 19.98889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183757" />
            <name><narrative>Vermosh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.59278 19.68056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183809" />
            <name><narrative>Uznove</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.69722 19.98028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183824" />
            <name><narrative>Ulez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.68278 19.89333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183875" />
            <name><narrative>Tirana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.3275 19.81889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183929" />
            <name><narrative>Tamare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.46333 19.5625</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184001" />
            <name><narrative>Skuraj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.68861 19.79639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184074" />
            <name><narrative>Shkozet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.10056 19.57306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184081" />
            <name><narrative>Shkoder</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.06828 19.51258</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184099" />
            <name><narrative>Shijak</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.34556 19.56722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184252" />
            <name><narrative>Rrogozhine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.07639 19.66528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184304" />
            <name><narrative>Rinas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.43083 19.70889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184388" />
            <name><narrative>Puke</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.04444 19.89972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184497" />
            <name><narrative>Peqin</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.04611 19.75111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184652" />
            <name><narrative>Muriqan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.015 19.40306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184697" />
            <name><narrative>Mjede</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.99694 19.6125</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184702" />
            <name><narrative>Milot</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.68389 19.71556</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184747" />
            <name><narrative>Melgushe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.98929 19.52013</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184806" />
            <name><narrative>Mamurras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.5775 19.69222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184808" />
            <name><narrative>Maminas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.37917 19.6075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184862" />
            <name><narrative>Lushnje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.94194 19.705</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184935" />
            <name><narrative>Lezhe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.78361 19.64361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184948" />
            <name><narrative>Levan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.43972 19.80722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185011" />
            <name><narrative>Lac</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.01056 19.64028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185087" />
            <name><narrative>Krrabe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.21556 19.97139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185102" />
            <name><narrative>Krahes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.43861 19.84444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185133" />
            <name><narrative>Koplik</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.21361 19.43639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185211" />
            <name><narrative>Kavaje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.18556 19.55694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185318" />
            <name><narrative>Kafarraj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.6375 19.51</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185404" />
            <name><narrative>Hani Hotit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.33667 19.43417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185408" />
            <name><narrative>Hamallaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.47389 19.54917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185638" />
            <name><narrative>Fushe-Kruje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.47833 19.71778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185670" />
            <name><narrative>Fier-Cifci</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.71667 19.56667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185728" />
            <name><narrative>Durres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.32306 19.44139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185938" />
            <name><narrative>Bushat</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.95972 19.53417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003186084" />
            <name><narrative>Berat</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.70583 19.95222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003186177" />
            <name><narrative>Arrez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.91361 19.90917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003343671" />
            <name><narrative>Shemri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.46444 19.71972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783493" />
            <name><narrative>Burrel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.61028 20.00889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782910" />
            <name><narrative>Kalimash</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.08139 20.30833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782874" />
            <name><narrative>Kapshtice</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.6025 21.01</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782771" />
            <name><narrative>Kolsh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.07806 20.34194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782335" />
            <name><narrative>Mbrakull</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.62917 20.06667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781980" />
            <name><narrative>Polican</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.13 20.35028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781938" />
            <name><narrative>Pretushe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.81917 20.72639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781921" />
            <name><narrative>Perrenjas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.85667 20.0625</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781906" />
            <name><narrative>Qafe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.94444 20.03722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781443" />
            <name><narrative>Tepelene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.29583 20.01917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781337" />
            <name><narrative>Tushemisht</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.90028 20.71917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184196" />
            <name><narrative>Selenice</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.65139 19.97778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000834300" />
            <name><narrative>Thane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.03694 20.0125</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000834285" />
            <name><narrative>Plepa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.39694 20.35361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184136" />
            <name><narrative>Shengjin</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.81361 19.59389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865098" />
            <name><narrative>Bogove</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.57111 20.15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865075" />
            <name><narrative>Korce</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.74806 20.04083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21023" percentage="94" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="86.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="4" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="4" xml:lang="en"><narrative>Job Creation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">22426521.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">22426521.99</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-16028338</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">184026</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">9000794</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">11391183</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">19798177</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">9245193</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">14091670</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-6137566</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-184026</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-200878</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-117581</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-114767</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-124027</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-121224</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-115767</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-147534</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-145907</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-169612</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-231497</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-170870</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-155511</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-144654</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-242662</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-966400</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1188682</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1220761</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1095066</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-863666</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-723985</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-688591</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1901436</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1905829</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1991401</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1766322</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1759658</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1719425</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1820697</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1888807</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1893684</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-11236"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132982"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P132982?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132982"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Accident Information Database enhanced and in use by end of Year 2
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of national road network for which condition survey data obtained and entered into RMS database.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Actual achieved target is the IRI and Deflection measures obtained by ARA, via Monitoring Consultant (the Final report). These measurements were part of the OPRCs&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1240.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social Transparency System being used to monitor feedback trends, with issues being closed out and monthly reports being prepared.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of national road network for which condition survey data obtained and entered into RMS database.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="3400.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of project roads under routine maintenance through Performance Based Contracts
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The length of roads under routine maintenance varied due to the fact that kilometers of national roads have been in and out the OPRCs, i.e.: in case ARA had to invest in a road section it was removed temporarily from OPRCs, and may be added later on, or removed permanently. The minimum length of roads under OPRCs was 1,240, and the max 1,335 km&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of project roads under routine maintenance through Performance Based Contracts
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="1335.00">

</target>
<actual value="1335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Safety Media Campaign developed and in use.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social Transparency System being used to monitor feedback trends, with issues being closed out and monthly reports being prepared.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
iRAP surveys completed showing an improvement in Safety Star ratings across the project roads.
</narrative></title>
<baseline year="2015" iso-date="2015-12-30" value="Report on Star Rating from First Year Survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-30" />
<period-end iso-date="2022-12-30" />
<target value="A better value than the original Star Rating">

</target>
<actual value="Report Star Rating from October 2018 (better ratings)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fatalities on an annual basis across the National road network.
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2022-12-30" />
<target value="250.00">

</target>
<actual value="227.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Accident Information Database enhanced and in use by end of Year 2
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fatalities on an annual basis across the National road network.
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2022-12-30" />
<target value="250.00">

</target>
<actual value="227.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Accident Information Database enhanced and in use by end of Year 2
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Finalize Beneficiary Impact Assessments and Completion Reports
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of Transport Sector Strategy
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Safety Media Campaign developed and in use.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
iRAP surveys completed showing an improvement in Safety Star ratings across the project roads.
</narrative></title>
<baseline year="2015" iso-date="2015-12-30" value="Report on Star Rating from First Year Survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-30" />
<period-end iso-date="2022-12-30" />
<target value="A better value than the original Star Rating">

</target>
<actual value="Report Star Rating from October 2018 (better ratings)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation and implementation of fully-costed multi-year maintenance plans, on an annual basis
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of Transport Sector Strategy
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2020-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation and implementation of fully-costed multi-year maintenance plans, on an annual basis
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Safety Media Campaign developed and in use.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fatalities on an annual basis across the National road network.
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="227.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Finalize Beneficiary Impact Assessments and Completion Reports
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The STS platform, on which the beneficiary report would be based upon,&amp;nbsp;&amp;nbsp;was developed and functional only in the last year of the project. However the STS is now able to generate reports on complaints, feedback and information received and also register the ARA responses, actions and feedback to the public.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Finalize Beneficiary Impact Assessments and Completion Reports
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social Transparency System being used to monitor feedback trends, with issues being closed out and monthly reports being prepared.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of Transport Sector Strategy
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2020-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of project roads under routine maintenance through Performance Based Contracts
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="1335.00">

</target>
<actual value="1335.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Condition, as a function of the average IRI of the project road network, does not deteriorate (IRI measured as m/km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="2022-12-30" />
<target value="4.5">

</target>
<actual value="3.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of national road network for which condition survey data obtained and entered into RMS database.
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="3400.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
iRAP surveys completed showing an improvement in Safety Star ratings across the project roads.
</narrative></title>
<baseline year="2015" iso-date="2015-12-30" value="Report on Star Rating from First Year Survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Report Star Rating from October 2018 (better ratings)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation and implementation of fully-costed multi-year maintenance plans, on an annual basis
</narrative></title>
<baseline year="2015" iso-date="2015-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-01" />
<period-end iso-date="2022-12-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Condition, as a function of the average IRI of the project road network, does not deteriorate (IRI measured as m/km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="2022-12-30" />
<target value="4.5">

</target>
<actual value="4.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Condition, as a function of the average IRI of the project road network, does not deteriorate (IRI measured as m/km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="3.6">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P078933</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Education Excellence and Equity Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to support the Recipient's Program: (a) to improve quality of learning conditions for students; (b) to increase enrollment of students in general secondary education; and (c) to initiate higher education reform.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Education Excellence and Equity Project (EEE) for Albania will support the government in the implementation of the first phase of Albania's National Education Strategy (NES). The objective of EEE is improved quality of learning conditions for all students and increased enrollment in general secondary education, especially for the poor. The priority areas of the proposed project are: (i) strengthening leadership, management and governance oft he education system, (ii) improving conditions for teaching and learning, (iii) improving and rationalizing education infrastructure, and (iv) setting the stage for higher education reform.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2006-05-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-06-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Keiko Inoue</narrative></person-name><telephone>+1-202-473-1000</telephone><email>kinoue@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003186145" />
            <name><narrative>Ballsh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.598888 19.73472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003343977" />
            <name><narrative>Frakulla e Vogel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.62389 19.541109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185728" />
            <name><narrative>Durres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.323059 19.441389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782582" />
            <name><narrative>Lazarat</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.046669 20.147499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782070" />
            <name><narrative>Permet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.233608 20.351669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782061" />
            <name><narrative>Peshkopi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.685001 20.42889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781988" />
            <name><narrative>Pogradec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.9025 20.6525</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184081" />
            <name><narrative>Shkoder</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.068279 19.512581</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002525810" />
            <name><narrative>Lukove</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.992222 19.913891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183651" />
            <name><narrative>Zall-Mner</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.453331 19.898331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183684" />
            <name><narrative>Xhafzotaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.34444 19.547501</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183814" />
            <name><narrative>Ura Vajgurore</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.76889 19.877781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183875" />
            <name><narrative>Tirana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.327499 19.81889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184935" />
            <name><narrative>Lezhe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.783611 19.64361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185082" />
            <name><narrative>Kruje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.509171 19.79278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185270" />
            <name><narrative>Kamez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.381672 19.760281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185672" />
            <name><narrative>Fier</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.723888 19.55611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007932375" />
            <name><narrative>Bajram Curri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.357342 20.07679</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782756" />
            <name><narrative>Korce</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.61861 20.78083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782685" />
            <name><narrative>Krume</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.196941 20.41333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782661" />
            <name><narrative>Kukes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.076939 20.42194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11220" percentage="35" xml:lang="en"/><sector vocabulary="1" code="11321" percentage="30" xml:lang="en"/><sector vocabulary="1" code="11420" percentage="20" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="17" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="50" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="17" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="4" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="21" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="17" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="17" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="17" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="4" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="17" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="17" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="17" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="4" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="17" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="4" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">238095.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">238095.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">238095.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">238095.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">238095.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">238095.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">476190.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">476190.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">476190.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">476190.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">476190.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">476190.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">476190.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">595238.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">595238.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">595238.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">595238.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">595238.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">595238.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">83333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">238095.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">238095.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">238095.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">476190.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">476190.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">476190.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">476190.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">476190.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">476190.49</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">595238.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">595238.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">595238.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">383053.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">383053.14</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P078933"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P078933?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P078933"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revised secondary education curriculum implemented in schools
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative>New indicator added by team for record keeping</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-29" />
<target value="100%">

</target>
<actual value="100%">
<comment><narrative>
All secondary schools have implemented a new curriculum.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the decentralization pilot
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="Evaluation of the decentralization pilot">
<comment><narrative>
target not met
</narrative></comment>
</target>
<actual value="No pilot in place.">
<comment><narrative>
target not met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with functioning board
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="70.00">
<comment><narrative>
target surpassed
</narrative></comment>
</target>
<actual value="90.00">
<comment><narrative>
target surpassed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of primary schools using new curriculum and textbooks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="95%">
<comment><narrative>
target met in 2007
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in level of teachers' satisfaction in their working conditions
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="Satisfaction level: 29% high; 57% moderate; and 14% low."><comment><narrative>2006 data</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2013-06-30" />
<target value="upward from previous year">
<comment><narrative>
target met in 2012.
</narrative></comment>
</target>
<actual value="39% high;48% moderate; 13% low.">
<comment><narrative>
Achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in level of teachers' satisfaction in their working conditions
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="Satisfaction level: 29% high; 57% moderate; and 14% low."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2013-06-30" />
<target value="upward from previous year">

</target>
<actual value="39% high; 48% moderate; 13% low.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Student-computer ratio in secondary education disaggregated by regions
</narrative></title>
<baseline year="2006" iso-date="2006-02-01" value="61 (urban 46, rural 133)"><comment><narrative>2005/2006 data provided during November 2009 supervision mission</narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-01" />
<period-end iso-date="2013-06-30" />
<target value="30">
<comment><narrative>
target exceeded by 2009
</narrative></comment>
</target>
<actual value="16 (urban 14, rural 18)">
<comment><narrative>
Achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of school principals trained in management and education leadership
</narrative></title>
<baseline year="2006" iso-date="2006-05-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-03" />
<period-end iso-date="2011-12-31" />
<target value="70">

</target>
<actual value="100%">
<comment><narrative>
Achieved.
By 2008 all principals and deputy principals had been trained in school management.  All secondary school principalshavealso beentrained in curriculum mgmt and administration.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities which develop strategic plans
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="100%">
<comment><narrative>
target met by 2009
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
target met.
(2011-12 school year data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the revision of higher education law
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="Implementation of Law">

</target>
<actual value="Law approved">
<comment><narrative>
Progressing satisfactorily.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progression rate from basic to secondary education
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="80.30"><comment><narrative>2005/2006 data provided on November 2009</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="90.00">
<comment><narrative>
target exceeded by 2010
</narrative></comment>
</target>
<actual value="91.20">
<comment><narrative>
Achieved.
(2011 data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progression rate from basic to secondary education
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="80.30"><comment><narrative>2005/2006 data provided on November 2009</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="90.00">
<comment><narrative>
target exceeded by 2010
</narrative></comment>
</target>
<actual value="92.00">
<comment><narrative>
Achieved.
(2011 data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of schools and clusters of schools engaged in school improvement activities
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="400">
<comment><narrative>
target not met
Activity dropped in August 2010 as part of prioritization of activities.
</narrative></comment>
</target>
<actual value="0">
<comment><narrative>
Not achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the revision of higher education law
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="Implementation of Law">

</target>
<actual value="Law in draft form">
<comment><narrative>
Progressing satisfactorily.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities with external governing boards
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-29" />
<target value="50%">
<comment><narrative>
target exceeded by 2009
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Achieved.
(2011-12 school year data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of primary schools using new curriculum and textbooks
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="60%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="95%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in basic education dropout rate
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0.94"><comment><narrative>2005-2006 data provided by MOES in Nov. 2009 as no baseline data was available during appraisal.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="3.00">
<comment><narrative>
Target set before baseline was available based on acceptable int'l standards.  Once baseline data was available, it was lower thantarget.
</narrative></comment>
</target>
<actual value="0.43">
<comment><narrative>
Achieved.
(2010-11 school year data).  
Official MoES data but, as stated earlier, we believe it to be incorrect.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2011-10-31" />
<target value="20,429.00">

</target>
<actual value="12,509.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities which develop strategic plans
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="100%">
<comment><narrative>
target met by 2009
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Achieved.
(2011-12 school year data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in level of teachers' satisfaction in their working conditions
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="Satisfaction level: 29% high; 57% moderate; and 14% low."><comment><narrative>2006 data</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="upward from previous year">

</target>
<actual value="39% high;48% moderate; 13% low.">
<comment><narrative>
Achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of schools and clusters of schools engaged in school improvement activities
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="400">
<comment><narrative>
Activity dropped in August 2010 as part of prioritization of activities.
</narrative></comment>
</target>
<actual value="0">
<comment><narrative>
Not achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Student-computer ratio in secondary education disaggregated by regions
</narrative></title>
<baseline year="2006" iso-date="2006-02-01" value="61 (urban 46, rural 133)"><comment><narrative>2005/2006 data provided during November 2009 supervision mission</narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-01" />
<period-end iso-date="2011-12-31" />
<target value="30">

</target>
<actual value="16 (urban 14, rural 18)">
<comment><narrative>
Achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of teachers who participate in continuous professional development
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="70%">
<comment><narrative>
target not met
</narrative></comment>
</target>
<actual value="2%">
<comment><narrative>
target not met.  Data not cumulative.  
MoES claims that all teachers participate in training every year, as required by law.However, only 2% of those were financed with project money.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement in secondary education enrollment rate, disaggregated by region and income groups
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="55% (75% in Tirana, less than 50% in some regions)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="70% overall">

</target>
<actual value="60.5% NER; 76.1% GER;">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2013-06-30" />
<target value="">

</target>
<actual value="518.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Standard deviation of per student expenditure in basic education by regions
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="3745"><comment><narrative>(2007 data as baseline data was not available at time of preparation)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="2500">
<comment><narrative>
target not met
</narrative></comment>
</target>
<actual value="8900">
<comment><narrative>
Not achieved.
MoES explains that the number of students fluctuated significantly since the collection of the baseline due to:  in2009 basic education increased from 8 to 9 yrs adding new students to the system;   demographic changes downward in the studentpopulation since 2007 reduced the number of students; and increase enrollment in private schools.  At the same time, higherexpenditures tend to be in more remote areas due to the cost of transportation, lower student-teacher ratios, and printing oftextbooks for minority students (which costs more).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of school principals trained in management and education leadership
</narrative></title>
<baseline year="2006" iso-date="2006-05-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-03" />
<period-end iso-date="2013-06-30" />
<target value="70%">
<comment><narrative>
target surpassed by 2008
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
target surpassed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities with external governing boards
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-29" />
<target value="50%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement in secondary education enrollment rate, disaggregated by region and income groups
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="55% (75% in Tirana, less than 50% in some regions)"><comment><narrative>2005/2006 data provided by MOES on November 2009 show:  53% overall (25% in rural and 85% in urban)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="70% overall">
<comment><narrative>
target exceeded.
</narrative></comment>
</target>
<actual value="60.5% NER; 76.1% GER;">
<comment><narrative>
2009 data based on old census.  MoES has not  provided official new data; unofficial data shows target has been met but MoES hasnot authorized their use. (PAD doesn't specify whether the target was for NER or GER but given the baseline data, the team assumesthetarget is for NER. As such, the target hasn't been met.)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of schools and clusters of schools engaged in school improvement activities
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="400">
<comment><narrative>
target not met
Activity dropped in August 2010 as part of prioritization of activities.
</narrative></comment>
</target>
<actual value="0">
<comment><narrative>
target not met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revised secondary education curriculum implemented in schools
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-29" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progression rate from basic to secondary education
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="80.30"><comment><narrative>2005/2006 data provided on November 2009</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="90.00">
<comment><narrative>
target met in 2010
</narrative></comment>
</target>
<actual value="91.44">
<comment><narrative>
Achieved.
(2011 data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Standard deviation of per student expenditure in basic education by regions
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="3745"><comment><narrative>(2007 data as baseline data was not available at time of preparation)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="2500">

</target>
<actual value="">
<comment><narrative>
Unavailable.
MoES calculates the data to cover all pre-university expenditures.  It was agreed that the data would bere-calculatedandpresented to the Bank in the next month.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional qualified primary teachers resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative>Core indicator added after approval and revised in August 2010 at the request of the Bank's Education Board -- to replace &quot;declinein shortfall of qualified teachers at the primary level.&quot;</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2011-10-31" />
<target value="20429.00">
<comment><narrative>
Project target is 70% cumulatively.
</narrative></comment>
</target>
<actual value="12509.00">
<comment><narrative>
Not achieved.
[NOTE:  MoES informs that this number may involve duplications as they do not keep a record of the names ofindividual teachers whoundergo training.]
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative>Indicator revised in August 2010 at the request of the Bank's Education Board - replaces &quot;decline in short fall of classrooms inprimary education.&quot;</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2011-12-31" />
<target value="0.00">
<comment><narrative>
30 new or rehabilitated schools
</narrative></comment>
</target>
<actual value="112.00">
<comment><narrative>
Progressing satisfactorily.
In addition, 20 new laboratories were finalized.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of schools and clusters of schools engaged in school improvement activities
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of students in schools with mutiple shifts (basic/secondary)
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="36% (basic) / 15% (secondary)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="25% (basic) / 8% (secondary)">

</target>
<actual value="13.9% (basic)/5.6% (secondary)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities which develop strategic plans
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="100%">
<comment><narrative>
target met in 2009
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Achieved.
(2011-12 school year data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Standard deviation of per student expenditure in basic education by regions
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="3745"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="2500">

</target>
<actual value="8900">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of students in schools with mutiple shifts (basic/secondary)
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="36% (basic) / 15% (secondary)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="25% (basic) / 8% (secondary)">
<comment><narrative>
target met in 2009
</narrative></comment>
</target>
<actual value="15.6% (basic)/ 7.9% (secondary)">
<comment><narrative>
Achieved.
(2011-12 school year  data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with functioning board
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="70.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional qualified primary teachers resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative>Core indicator added after approval and revised in August 2010 at the request of the Bank's Education Board -- to replace &quot;declinein shortfall of qualified teachers at the primary level.&quot;</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2011-10-31" />
<target value="20429.00">
<comment><narrative>
target not met.
Project target is 70% cumulatively.
</narrative></comment>
</target>
<actual value="12509.00">
<comment><narrative>
target not met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with functioning board
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="70.00">
<comment><narrative>
target surpassed
</narrative></comment>
</target>
<actual value="92.00">
<comment><narrative>
Achieved.
(2010-11 school year data).  While MoES reports this info., the team believes that this is about the percentage ofschools w/ boards, not necessarily functioning boards.  Also, MoEs did not explain why the data has been revised downwards giventhat it is for the 2010 school year.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of school principals trained in management and education leadership
</narrative></title>
<baseline year="2006" iso-date="2006-05-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-03" />
<period-end iso-date="2013-06-30" />
<target value="70">
<comment><narrative>
target surpassed by 2008
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Achieved.  Up until 2010, MoES retrained a small group of principals every year.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Standard deviation of per student expenditure in basic education by regions
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="3745"><comment><narrative>(2007 data as baseline data was not available at time of preparation)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="2500">
<comment><narrative>
target not met
</narrative></comment>
</target>
<actual value="8900">
<comment><narrative>
Not achieved.  Data shows an increasing trend and MoES explains that is the result of higher teacher salaries, plus bonus fortransport for rural areas.  In most cases, the data shows greater expenditures in rural areas, than urban areas.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progression rate from basic to secondary education
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="80.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="90.00">

</target>
<actual value="92.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Student-computer ratio in secondary education disaggregated by regions
</narrative></title>
<baseline year="2006" iso-date="2006-02-01" value="61 (urban 46, rural 133)"><comment><narrative>2005/2006 data provided during November 2009 supervision mission</narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-01" />
<period-end iso-date="2013-06-30" />
<target value="30">
<comment><narrative>
target exceeded by 2009
</narrative></comment>
</target>
<actual value="14 (urban 14, rural 13)">
<comment><narrative>
target surpassed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities which develop strategic plans
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of schools with functioning board
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="70.00">
<comment><narrative>
target met in 2007
</narrative></comment>
</target>
<actual value="92.00">
<comment><narrative>
Achieved.
(2010-11 school year data).  While MoES reports this info., the team believes that this is about the percentage ofschools w/ boards, not necessarily functioning boards.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of students in schools with mutiple shifts (basic/secondary)
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="36% (basic) / 15% (secondary)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="25% (basic) / 8% (secondary)">
<comment><narrative>
target exceeded by 2009
</narrative></comment>
</target>
<actual value="13.9% (basic)/5.6% (secondary)">
<comment><narrative>
target surpassed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in level of teachers' satisfaction in their working conditions
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="Satisfaction level: 29% high; 57% moderate; and 14% low."><comment><narrative>2006 data</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2013-06-30" />
<target value="upward from previous year">
<comment><narrative>
target met in 2012.
</narrative></comment>
</target>
<actual value="39% high; 48% moderate; 13% low.">
<comment><narrative>
Achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the decentralization pilot
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="Evaluation of the decentralization pilot">

</target>
<actual value="Pre-university law approved but no pilot in place.">
<comment><narrative>
Partially achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the revision of higher education law
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="Implementation of Law">

</target>
<actual value="Law starting implementation but financing part of it will not be implemented in 2013-14 academic year">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of teachers who participate in continuous professional development
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="70%">
<comment><narrative>
target not met
</narrative></comment>
</target>
<actual value="8%">
<comment><narrative>
Not achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional qualified primary teachers resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative>Core indicator added after approval and revised in August 2010 at the request of the Bank's Education Board -- to replace &quot;declinein shortfall of qualified teachers at the primary level.&quot;</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2011-10-31" />
<target value="20429.00">
<comment><narrative>
target not met.
Project target is 70% cumulatively.
</narrative></comment>
</target>
<actual value="12509.00">
<comment><narrative>
Not achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities with external governing boards
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="50%">
<comment><narrative>
target met in 2009
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Achieved.
(2011-12 school year data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of universities with external governing boards
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-29" />
<target value="50%">
<comment><narrative>
target exceeded by 2009
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
target surpassed.
(2011-12 school year data)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in basic education dropout rate
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0.94"><comment><narrative>2005-2006 data provided by MOES in Nov. 2009 as no baseline data was available during appraisal.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2010-12-31" />
<target value="3.00">
<comment><narrative>
Target set before baseline was available based on acceptable int'l standards.  Once baseline data was available, it was lower thantarget.
</narrative></comment>
</target>
<actual value="0.43">
<comment><narrative>
Achieved.
(2010-11 school year data).  
Official MoES data but, as stated earlier, we believe it to be incorrect.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement in secondary education enrollment rate, disaggregated by region and income groups
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="55% (75% in Tirana, less than 50% in some regions)"><comment><narrative>2005/2006 data provided by MOES on November 2009 show:  53% overall (25% in rural and 85% in urban)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="70% overall">
<comment><narrative>
target exceeded.
</narrative></comment>
</target>
<actual value="76.1% overall (gross)">
<comment><narrative>
Achieved (based on old census).
MoES agreed to provide revised data on the basis of the new census in November 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative>Indicator revised in August 2010 at the request of the Bank's Education Board - replaces &quot;decline in short fall of classrooms inprimary education.&quot;</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2013-06-30" />
<target value="0.00">
<comment><narrative>
No baseline in original design but established at 30 new or rehabilitated schools during implementation.
</narrative></comment>
</target>
<actual value="400.00">
<comment><narrative>
Progressing satisfactorily.
118 additional classrooms still under construction.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of teachers who participate in continuous professional development
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="70%">

</target>
<actual value="2%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of primary schools using new curriculum and textbooks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="95%">
<comment><narrative>
target surpassed by 2007
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
target surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Student-computer ratio in secondary education disaggregated by regions
</narrative></title>
<baseline year="2006" iso-date="2006-02-01" value="61 (urban 46, rural 133)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-02-01" />
<period-end iso-date="2013-06-30" />
<target value="30">

</target>
<actual value="14 (urban 14, rural 13)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the revision of higher education law
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="Implementation of Law">

</target>
<actual value="Law starting implementation but financing part of it will not be implemented in 2013-14 academic year">
<comment><narrative>
target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of primary schools using new curriculum and textbooks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="95%">
<comment><narrative>
target surpassed by 2007
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Achieved.  However, MoES is doing further revisions to primary level curriculum to ensure vertical and horizontal alignment butthese changes have not been rolled out to schools yet.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement in secondary education enrollment rate, disaggregated by region and income groups
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="55% (75% in Tirana, less than 50% in some regions)"><comment><narrative>2005/2006 data provided by MOES on November 2009 show:  53% overall (25% in rural and 85% in urban)</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="70% overall">

</target>
<actual value="76.1% overall">
<comment><narrative>
Achieved.
New data should be available in 2012, when census is finalized.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in basic education dropout rate
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="3.00">

</target>
<actual value="0.37">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in basic education dropout rate
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0.94"><comment><narrative>2005-2006 data provided by MOES in Nov. 2009 as no baseline data was available during appraisal.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="3.00">
<comment><narrative>
Target set before baseline was available based on acceptable int'l standards.  Once baseline data was available, it was lower thantarget.
</narrative></comment>
</target>
<actual value="0.37">
<comment><narrative>
Achieved.
(2010-11 school year data).  
Official MoES data but, as stated earlier, we believe it to be incorrect.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of school principals trained in management and education leadership
</narrative></title>
<baseline year="2006" iso-date="2006-05-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-03" />
<period-end iso-date="2013-06-30" />
<target value="70%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the decentralization pilot
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="Evaluation of the decentralization pilot">

</target>
<actual value="No pilot in place.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of teachers who participate in continuous professional development
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2011-12-31" />
<target value="70%">

</target>
<actual value="8%">
<comment><narrative>
Not achieved.
(2010-11 school year data)
MoES informs that this figure was is low because it only accounts for training paid underthe Project. However, all secondary teachers were trained on new curriculum paid by MoES's budget and 2,500 teachers are trainedyearly to obtain certification and salary increases.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on the decentralization pilot
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="Evaluation of the decentralization pilot">
<comment><narrative>
target not met
</narrative></comment>
</target>
<actual value="No pilot in place.">
<comment><narrative>
Partially achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-08-02" value="0.00"><comment><narrative>Indicator revised in August 2010 at the request of the Bank's Education Board - replaces &quot;decline in short fall of classrooms inprimary education.&quot;</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-02" />
<period-end iso-date="2013-06-30" />
<target value="0.00">
<comment><narrative>
No baseline in original design but established at 30 new or rehabilitated schools during implementation.
</narrative></comment>
</target>
<actual value="518.00">
<comment><narrative>
revised target not met.  22 schools completed, compared to 30 schools established during implementation
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of students in schools with mutiple shifts (basic/secondary)
</narrative></title>
<baseline year="2006" iso-date="2006-06-01" value="36% (basic) / 15% (secondary)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-01" />
<period-end iso-date="2013-06-30" />
<target value="25% (basic) / 8% (secondary)">
<comment><narrative>
target exceeded by 2009
</narrative></comment>
</target>
<actual value="15.6% (basic) /7.9% (secondary)">
<comment><narrative>
Achieved.
(2011-12 school year  data)
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P178202</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>First Resilience and Green Development - DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The program development objective is to: (i) strengthen resilience of the government sector and households; (ii) strengthen the energy market framework and scale up renewable energy and energy efficiency; and (iii) protect the environment and reduce the country's carbon footprint.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the First Resilience and Green Development : Development Policy Loan for Albania is to: (i) strengthen resilience of the government sector and households; (ii) strengthen the energy market framework and scale up renewable energy and energy efficiency; and (iii) protect the environment and reduce the country's carbon footprint. The operation supports the national strategy for development and integration (NSDI) and economic reform program (ERP) through actions that build the resilience of Albania's economy and support green development by increasing reliance on renewable energy (RE) and energy efficiency and protecting the environment and reducing greenhouse gas (GHG) emissions. The operation supports strategic area of the forthcoming NSDI. In particular, the first pillar of the operation focuses on improving resilience of the government sector and households by helping government to create more fiscal space, better manage climate-related risks (including risks to public investments), helping households insure against earthquakes and better targeting transfers to those with disabilities. The second pillar supports greater reliance on renewables to better meet current and future demand through market-based provision of additional RE (i.e., hydro, wind, and solar) and the operationalization of a single energy wholesale market that brings together producers and distributors. The third pillar supports improving environmental sustainability through the adoption of legislation limiting the use of plastic bags and the giving of responsibility for the recycling of packaging to producers.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0051303"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0051302"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-12-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-03-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hilda Shijaku</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hshijaku@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3183875" />
                <name><narrative>Tirana</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>41.3275 19.81889</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="23" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="22" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="22" xml:lang="en"/><sector vocabulary="1" code="23210" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="11" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LW" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Wind</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="22" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000524" percentage="11" xml:lang="en"><narrative>Disability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="11" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="11" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="11" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="11" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="22" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="22" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="11" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="22" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="11" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="11" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="11" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="11" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="22" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="11" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="11" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="11" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="22" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="11" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="22" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="11" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="22" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="11" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="22" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="22" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="22" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="11" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="33" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="13" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">120000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">120000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">120000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51302"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">122531227</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51302"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-303841</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51302"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-3191348</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51302"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-2590105</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51302"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-2232552</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51302"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-1877228</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51302"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178202"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178202?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178202"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of social assistance beneficiaries subject to earthquake insurance for whom funds have been allocated for earthquake insurance premiums in the 2026 Budget, including for women-headed households
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The installed capacity of energy produced by renewables excluding hydro (in MW)
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="200.00">

</target>
<actual value="160.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of verified Annual MRV reports submitted by the Government
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2024-12-31" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of climate informed new public investment (PI) included in the MTBP as a percentage of total PI submitted.
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The volume traded through ALPEX as a share of total demand
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="20.00">

</target>
<actual value="10.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CIT and Property Tax revenues as percent of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2.61"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="2.86">

</target>
<actual value="2.79">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of applicants for disability benefits assessed through the new system
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="47.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2023-12-29" />
<target value="92.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Producer responsibility organization(s), licensed and operational, represent at least 50 percent of packaging placed on the Albanian market
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P169524</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Albania Fiscal Sustainability and Growth Development Policy Financing</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The program development objective is to support Albania in (i) strengthening the transparency and sustainability of its public finances, (ii) enhancing finance for recovery and growth and (iii) supporting key sectoral opportunities for sustainable growth.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Fiscal Sustainability and Growth Development Policy Financing in Albania is to support Albania in: (i) strengthening the transparency and sustainability of its public finances; (ii) enhancing finance for recovery and growth; and (iii) supporting key sectoral opportunities for sustainable growth. As a pre-condition for a resilient recovery, the first pillar of this operation supports Albania in adopting key reforms strengthening the transparency and sustainability of its public finances. It reinforces Albania's revenue raising capacity to build fiscal space and bring down government debt. This pillar supports publication of Albania's first full tax expenditure review and institutionalization of regular publications going forward. Fiscal transparency can play an important role in disciplining policy and ensuring that budgetary resources are deployed more effectively, which is particularly valuable in the current crisis context of unprecedented fiscal measures to support the economy. The second pillar assists Albania in enhancing finance for recovery and growth. To fund the investments needed to upgrade Albania's growth model, this pillar strengthens the mobilization of private capital while contributing to sustainable business growth and job creation. This pillar bolsters Albania's non-performing loans (NPL) resolution framework. The third pillar supports key sectoral opportunities for sustainable growth. The aim is to enable the creation of more and better jobs, by strengthening the vitality and sustainability of Albania's growth model. First, by broadening access to high-speed internet in rural areas, this operation supports investments to rebuild better by connecting more Albanians with the opportunities of the digital economy. Second, by strengthening sustainable management of Albania's forest resources, this pillar protects key economic sectors that rely on the richness of Albania's natural landscape assets and services, including the tourism sector and Albania's large agricultural sector.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0039914"><narrative>The Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0039915"><narrative>Ministry of Finance and Economy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-03-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-12-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hilda Shijaku</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hshijaku@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3183875" />
                <name><narrative>Tirana</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>41.3275 19.81889</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="24010" percentage="44" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="17" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="11" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15142" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="11.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FK" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Capital Markets</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="11" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="22" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="11" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="11" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="11" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="22" xml:lang="en"><narrative>Public Finance Management</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">80000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">80000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">80000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-200000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-520330</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-398200</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1083556</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2304733</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2531022</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2661508</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2678998</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2147020</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2019453</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1651823</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4704000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-4704000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-4704000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-4704000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-39915"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169524"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P169524?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169524"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total gross revenue collected through LTO (percent of total gross revenue collected by the GDT)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="38.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="42.00">
<comment><narrative>
&lt;p&amp;gt;Not Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of registered investment funds
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="8.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adult population with a debit card (percent)
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="49.3 (women: 43.8)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="52.0 (women: 46.5)">
<comment><narrative>
&lt;p&amp;gt;Exceeded for women.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="52.5 (women 53.1)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Published periodic PPP monitoring report (at least third report published)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;em&amp;gt;Achieved. Current status (2022): A third PPP monitoring report, covering 2020, was published in June 2021. A fourth report, covering 2021, was published in November 2022.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hectares of forests with adopted forest management plan
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="400000.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="454364.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Published periodic tax expenditure review (at least second review published)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;em&amp;gt;Achieved. Current status (2022): A second tax expenditure review was published in December 2021; a third review is under preparation.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Debtor-creditor agreements negotiated and signed using the out of court framework (percent of Q3-2019 large multi-lender corporate NPLs)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="25.00">
<comment><narrative>
&lt;p&amp;gt;Not Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of outstanding corporate bonds (m ALL)
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="7441.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="8929.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="10014.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of internet providers offering internet services through electricity companys cable network
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1.00">
<comment><narrative>
&lt;p&amp;gt;&lt;em&amp;gt;Achieved. OST had an ongoing contract with a local operator at the end of 2021 and signed one more in 2022.&lt;/em&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P177845</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Improving Equitable Access To High Standard Public Services Through Govtech</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase the equitable access to and quality of selected digital services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Based on the identification of key development problems and the Program's Theory of Change, the Government of Albania and World Bank Task Team have identified a set of components and activities. The activities are structured around four Results Areas (RA):RA1: Enhancing E-Service Quality and User Experience, which aims to improve the quality and usability of priority services; RA2: Improving Digital Skills and Digital Inclusion, which aims to improve the acquisition of numerical, literacy and digital skills and to ensure the all citizens, especially the vulnerable, receive assistance in access public services;RA3: Strengthening Priority Service Delivery Enablers, which improves the governance of data, builds accountability, and supports the establishment of an e-procurement platform and the update of the public procurement regulatory and procedural framework and the expansion and upgrade of the AFMIS at both central and local government levels.RA4 : Increased Access to, Quality of, and Efficiency of Selected Local Administrative Services which supports the digitalization of services . The IPF Sub-Component provides the necessary technical assistance, capacity building and change management and communications support to achieve the Program RAs. It also supports the functioning of a Coordinating Unit (CU) which will ensure results-focused data collection and utilization throughout implementation.The Program is aligned with three priorities of the National Strategy for Development and Integration (NSDEI) (2022-2030): (i) strengthening local governments for sustainable economic development; (ii) equality and gender justice; and (iii) digitalization. It also contributes to the EU Digital decade objective on the digitalization of municipal services. Lastly, the Program will support the newly adopted Cross-Cutting Strategy on Decentralization and Local Governance 2023-2030 and the Public Procurement Law.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0050845"><narrative>Ministry of Finance and Economy</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0050846"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0050844"><narrative>National Agency for Information Society</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-10-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-03-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Onur Erdem</narrative></person-name><telephone>+1-202-473-1000</telephone><email>oerdem@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3183875" />
                <name><narrative>Tirana</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>41.3275 19.81889</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15124" percentage="28" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="24" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="23" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="28.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="17.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="7.00000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="67" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="10" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="63" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="23" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="42" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="13" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="13" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="13" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="23" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="23" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="23" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="67" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="63" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000661" percentage="23" xml:lang="en"><narrative>Skills Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="23" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="1" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="32" xml:lang="en"><narrative>ICT Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="63" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="10" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">727272.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">727272.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">36712756.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">36712756.23</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">65000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">168863</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">1921860</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">427040</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">4024120</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1004355</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">373287</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">477408</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">223914</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">3246880</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">10324395</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">329259</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2368767</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">134931</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">3262167</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-168863</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-144703</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-183414</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-216747</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-223914</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-214485</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-90304</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-257342</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-50844"><narrative>National Agency for Information Society</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177845"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177845?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177845"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in % of eligible digital services connected to the enhanced SQDNE monitoring system
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 of eligible digital services connected to the enhanced SQDNE service delivery monitoring system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="60% of eligible digital services connected to the enhanced SQDNE service delivery monitoring system.">

</target>
<actual value="Y2 target was achieved, as the SQDNE upgrade was completed. Y3 and Y5 targets were achieved ahead of time, as 90% of public services (1,141 services) are monitored through SQDNE 2.0.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Early grade students in schools with functioning SmartLabs acquiring basic minimum digital competencies.
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="No Grade 2 students currently completing digital skills programs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="50% of Grade 2 students achieving level 2 or above on ICT Curriculum Assessment Framework">

</target>
<actual value="The Y3 target was achieved ahead of time. The Directorate of Quality Assessment at ASCAP evaluated 2 schools with collective classes, the 9-year schools “Mustafa Matohiti,” ZVAP Patos, and “Muhamet Xhaferri,” ZVAP Sarandë–Delvinë–Konispol. A report was prepared for the schools with collective classes, ASCAP also compiled and finalized the ICT Teaching Methodology for Collective Classes.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LG services re-engineered and implemented on e-Albania 2.0
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are re-engineered and implemented on e-Albania 2.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="10 priority LG services (total) are re-engineered and implemented on e-Albania 2.0">

</target>
<actual value="The Y2 target was achieved (DLR 9.1) as the list of priority LG services for digitalization was approved on 24 December, 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of life events-based service groups implemented on E-Albania.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="No life-events on e-Albania."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="6 priority LEs (total) implemented at Level 4">

</target>
<actual value="Progress has been made on the Y1 target as part of the e-Albania upgrade, which is expected to be completed by the end of the CY, and it also includes the regrouping of e-services in Life Events at Level 2 (Y3 target). The now expanded CU is planning to hire a dedicated Manager for Life Events, who will expedite progress on the 4 Life Events at Level 4 (Y1 and Y4 target).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-07-15" />
<target value="10">
<comment><narrative>
This is a CRI introduced with the AF. The baseline is yet to be established.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened data protection and interoperability
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="Albanian interoperability framework (2014) not updated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="GDPR-compliant data processing agreements implemented in E-Albania (AKSHI) and in 5 other institutions.">

</target>
<actual value="Y2 target was achieved and Y3 target is on track to be achieved ahead of time, as the GDPR complaint data processing agreements were already drafted.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishing and utilizing the AI-powered e- procurement platform
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="The new e-procurement platform is not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="The e-procurement platform is using AI at selected stages of the public procurement process [DLR 8.5]">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015), but progress has been made, as a dedicated Working Group is drafting the ToRs for the e-procurement platform.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishing and utilizing the AI-powered e- procurement platform
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="The new e-procurement platform is not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="The e-procurement platform is using AI at selected stages of the public procurement process [DLR 8.5]">

</target>
<actual value="Progress has been made towards the Y2 target, as a dedicated Working Group is finalizing the ToRs for the e-procurement platform.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LG services re-engineered and implemented on e-Albania 2.0
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are re-engineered and implemented on e-Albania 2.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="10 priority LG services (total) are re-engineered and implemented on e-Albania 2.0">

</target>
<actual value="The Y2 target was achieved (DLR 9.1) as the list of priority LG services for digitalization was approved on 24 December, 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LG services re-engineered and implemented on e-Albania 2.0
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are re-engineered and implemented on e-Albania 2.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="10 priority LG services (total) are re-engineered and implemented on e-Albania 2.0">

</target>
<actual value="Progress on the Y3 target has been made. In February 2026, AKSHI and the MSLG organized a workshop with all stakeholders to discuss plans for LG service re-engineering.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved accessibility and customer service for LG services
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are integrated into the central OCCC"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="8 priority LG services covered by the OCCC and YIC, and 70% tickets for priority LG services resolved through OCCC as per service standard on time">

</target>
<actual value="There is no Y2 target for this indicator.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved accessibility and customer service for LG services
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are integrated into the central OCCC"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="8 priority LG services covered by the OCCC and YIC, and 70% tickets for priority LG services resolved through OCCC as per service standard on time">

</target>
<actual value="This is delayed due to delays on the establishment of the YIC at the central level due to legal barriers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Foundational digital infrastructure for LG digital services established and LGs integrated into central government platforms
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="Fragmented, non-existent and/or outdated digital infrastructure for LG service delivery and core functions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2026-07-15" />
<target value="50% LGs using new/extended digital infrastructure which reduces paper usage and GHG emissions and includes hardware meeting ENERGY STAR requirements [DLR 9.3]">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015), but progress has been made an conceptualizing the workforce plan.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Foundational digital infrastructure for LG digital services established and LGs integrated into central government platforms
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="Fragmented, non-existent and/or outdated digital infrastructure for LG service delivery and core functions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2026-07-15" />
<target value="50% LGs using new/extended digital infrastructure which reduces paper usage and GHG emissions and includes hardware meeting ENERGY STAR requirements [DLR 9.3]">

</target>
<actual value="Progress has been made towards the Y2 target. A diagnostic of LG workforce capabilities and gaps in underway, which will inform the workforce plan.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-07-15" />
<target value="10">
<comment><narrative>
This is a CRI introduced with the AF. The baseline is yet to be established.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-07-15" />
<target value="10">
<comment><narrative>
This is a CRI introduced with the AF. The baseline will be established by the MTR.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access: Increase in the usage of digitally enabled services (disaggregated by gender)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Overall cumulative baseline is 1,412,421 consisting of: (i) No. of applications via online e-Albania: 940,186 (monthly average between June 2022- May 2023); No. of applications via e-Albania for Mobile 472,235 (monthly average between June 2022- May 2023); No of beneficiaries of SmartLabs: 0 (May 2023). No. of selected local government service applications via e-Albania online/mobile: baseline 0, given that the selected services are not reengineered and online  (August 2024)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="25% increase on the baseline">

</target>
<actual value="The Y2 target was met ahead of time, as reported in the previous ISR.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central government PFM and PIM strengthened through updated processes and upgraded central AFMIS
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="The central AFMIS is upgraded and not sufficiently integrated with other systems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-07-15" />
<target value="Central AFMIS upgraded with priority functionalities and fully integrated with other systems">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015), but progress has been made, as the firm is currently being hired to conduct the diagnostic.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central government PFM and PIM strengthened through updated processes and upgraded central AFMIS
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="The central AFMIS is upgraded and not sufficiently integrated with other systems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-07-15" />
<target value="Central AFMIS upgraded with priority functionalities and fully integrated with other systems">

</target>
<actual value="Progress has been made on targets for Y2 and Y3. AKSHI convened a multi stakeholder workshop in January 2026 to discuss the central-level upgrade and local-level roll-out of AFMIS. A firm was hired to conduct a an AFMIS needs assessment and implementation roadmap, which will inform the system's design with a focus on scalability and interoperability. The high-level interministerial working group and the upcoming technical working group will oversee the needs assessment process and the development of the AFMIS Terms of Reference.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
LG PFM and PIM strengthened through updated processes and the expanded AFMIS to LGs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="PFM and PIM processes in LGs are fragmented and disparate, and climate change is not included in project appraisal. There is no AFMIS in place for LGs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2028-07-15" />
<target value="50% of participating LGs conduct their PFM processes (including climate risk screening of public investments)">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
LG PFM and PIM strengthened through updated processes and the expanded AFMIS to LGs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="PFM and PIM processes in LGs are fragmented and disparate, and climate change is not included in project appraisal. There is no AFMIS in place for LGs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2028-07-15" />
<target value="50% of participating LGs conduct their PFM processes (including climate risk screening of public investments)">

</target>
<actual value="Progress has been made on targets for Y2 and Y3. AKSHI convened a multi stakeholder workshop in January 2026 to discuss the central-level upgrade and local-level roll-out of AFMIS. The current AFMIS needs assessment will inform the system's design with a focus on scalability and interoperability. The high-level interministerial working group and the upcoming technical working group will oversee the needs assessment process and the development of AFMIS technical Terms of Reference.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access: Increase in the usage of digitally enabled services (disaggregated by gender)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Overall cumulative baseline is 1,412,421 consisting of: (i) No. of applications via online e-Albania: 940,186 (monthly average between June 2022- May 2023); No. of applications via e-Albania for Mobile 472,235 (monthly average between June 2022- May 2023); No of beneficiaries of SmartLabs: 0 (May 2023). No. of selected local government service applications via e-Albania online/mobile: baseline 0, given that the selected services are not reengineered and online  (August 2024)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="25% increase on the baseline">

</target>
<actual value="The Y2 target was met ahead of time, as reported in the previous ISR.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access: Increase in the usage of digitally enabled services (disaggregated by gender)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Overall cumulative baseline is 1,412,421 consisting of: (i) No. of applications via online e-Albania: 940,186 (monthly average between June 2022- May 2023); No. of applications via e-Albania for Mobile 472,235 (monthly average between June 2022- May 2023); No of beneficiaries of SmartLabs: 0 (May 2023). No. of selected local government service applications via e-Albania online/mobile: baseline 0, given that the selected services are not reengineered and online  (August 2024)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="25% increase on the baseline">

</target>
<actual value="On track to meet Y3 target, but revisions to the M&amp;E plan planned during the MTR in order to improve and streamline its M&amp;E plan and to ensure its relevance to measure the PDO in light of progress hitherto in the implementation of the Program supported activities (e.g. the upgrade of e-Albania).">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Equitable Access: Improved access to digitally-enabled services by target groups: (i) general population; (ii) poor; (iii) elderly; (iv) lower educated women; and (v) disabled
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="(i) general population: 53%; (ii) poor: 37%; (iii) elderly: 14%; (iv) lower educated women: 21%; and (v) disabled: 10%. 

Baseline for selected local government services will be established in Y3."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2029-07-15" />
<target value="15% increase on baseline (cumulative national and local services)">

</target>
<actual value="There is no Y2 target for this PDO indicator. However, there has been progress towards its achievement, as the upgrade of e-Albania is underway, which will improve equitable access.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Equitable Access: Improved access to digitally-enabled services by target groups: (i) general population; (ii) poor; (iii) elderly; (iv) lower educated women; and (v) disabled
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="(i) general population: 53%; (ii) poor: 37%; (iii) elderly: 14%; (iv) lower educated women: 21%; and (v) disabled: 10%. 

Baseline for selected local government services will be established in Y3."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2029-07-15" />
<target value="15% increase on baseline (cumulative national and local services)">

</target>
<actual value="There is no Y3 target for this PDO indicator. However, there has been progress towards its achievement, as the upgrade of e-Albania is underway, which will improve equitable access.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Multi-functional YICs established and fully operational.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="10 TOM prototypes produced.">

</target>
<actual value="Progress towards Y1 and Y2 targets was made, as the YIC ToRs were completed. However, the vendor to establish the YIC was not yet hired, as no procurements could be conducted during the election period.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quality 2: Decrease in average time taken to deliver selected digital services linked to six priority LEs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Average time taken to deliver selected digital services linked to the six priority LEs: 7 days and 14.5 hours (or 182.5 hours)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="20% decrease on the baseline average time taken to deliver selected digital services linked to the six priority LEs">

</target>
<actual value="The first target for this PDO indicator is in Y3. However, there has been progress towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that include the establishment of the Life Events.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quality 2: Decrease in average time taken to deliver selected digital services linked to six priority LEs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Average time taken to deliver selected digital services linked to the six priority LEs: 7 days and 14.5 hours (or 182.5 hours)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="20% decrease on the baseline average time taken to deliver selected digital services linked to the six priority LEs">

</target>
<actual value="The first target for this PDO indicator is in Y3. However, there has been progress towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that include the establishment of the Life Events.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality 1: New Digital Service Standards implemented
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Digital Service Standards are not updated, there is no system for assessing compliance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="80% of highly used services at central level and 50% of highly used services at local level apply 10 Digital Service Standards">

</target>
<actual value="Measuring progress on this PDO indicator will be possible after the completion of the e-Albania upgrade. However, there has been progess towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that will enable in the future monitoring compliance with the service standards, as well as measuring the subsequent targets of this PDO indicator.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality 1: New Digital Service Standards implemented
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Digital Service Standards are not updated, there is no system for assessing compliance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="80% of highly used services at central level and 50% of highly used services at local level apply 10 Digital Service Standards">

</target>
<actual value="Measuring progress on this PDO indicator will be possible after the completion of the e-Albania upgrade. However, there has been progess towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that will enable in the future monitoring compliance with the service standards, as well as measuring the subsequent targets of this PDO indicator.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved student usage of SmartLabs
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Up to 70% of Grade 1-3 learners at schools with SmartLabs are using Labs consistently throughout school year">

</target>
<actual value="The Y2 target was achieved, as the training of 200 principals and 600 teachers was completed in December 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved student usage of SmartLabs
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Up to 70% of Grade 1-3 learners at schools with SmartLabs are using Labs consistently throughout school year">

</target>
<actual value="The Y3 target is on track to be achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Online and Mobile E-Albania upgraded based on agile UX, with new functionalities and compliant with eligible accessibility standards
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 new functionalities (E-Albania last upgraded in 2018)Online and Mobile e-Albania not compliant with latest digital service accessibility standards667 services available (0 climate change related) and 344,711 monthly average applications made on E-Albania Mobile"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="Number of service applications through e-Albania Mobile, including for climate-related services, increased by 25%">

</target>
<actual value="Y1 and Y2 targets are on track to be achieved, as work on the re-design plan and the upgrade of e-Albania is underway.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Early grade students in schools with functioning SmartLabs acquiring basic minimum digital competencies.
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="No Grade 2 students currently completing digital skills programs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="50% of Grade 2 students achieving level 2 or above on ICT Curriculum Assessment Framework">

</target>
<actual value="The Y2 target was achieved, as both the ICT equipment and furniture for the SmartLabs was delivered to the schools.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Online and Mobile E-Albania upgraded based on agile UX, with new functionalities and compliant with eligible accessibility standards
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 new functionalities (E-Albania last upgraded in 2018)Online and Mobile e-Albania not compliant with latest digital service accessibility standards667 services available (0 climate change related) and 344,711 monthly average applications made on E-Albania Mobile"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="Number of service applications through e-Albania Mobile, including for climate-related services, increased by 25%">

</target>
<actual value="Y1 and Y2 were achieved. Target Y3 is on track to be achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened data protection and interoperability
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="Albanian interoperability framework (2014) not updated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="GDPR-compliant data processing agreements implemented in E-Albania (AKSHI) and in 5 other institutions.">

</target>
<actual value="Y2 target was achieved and Y3 target is on track to be achieved ahead of time, as the GDPR complaint data processing agreements were already drafted.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened data protection and interoperability
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="Albanian interoperability framework (2014) not updated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="GDPR-compliant data processing agreements implemented in E-Albania (AKSHI) and in 5 other institutions.">

</target>
<actual value="Y3 target is on track to be achieved ahead of time, as the GDPR complaint data processing agreements were already drafted and are being coordinated with the Information and Data Protection Commissioner, to ensure full alignment with Albania's data privacy legislation amended since the formulation of this DLR during Program preparation.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Early grade students in schools with functioning SmartLabs acquiring basic minimum digital competencies.
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="No Grade 2 students currently completing digital skills programs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="50% of Grade 2 students achieving level 2 or above on ICT Curriculum Assessment Framework">

</target>
<actual value="The Y3 target was achieved ahead of time. The Directorate of Quality Assessment at ASCAP evaluated 2 schools with collective classes, the 9-year schools “Mustafa Matohiti,” ZVAP Patos, and “Muhamet Xhaferri,” ZVAP Sarandë–Delvinë–Konispol. A report was prepared for the schools with collective classes, ASCAP also compiled and finalized the ICT Teaching Methodology for Collective Classes.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in Open Data availability and usage
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="20 institutions and 8 ministries publish OD but not according to OD good practice. OD portal not upgraded based on UX.Monthly average Open Data Portal downloads is 400 (TBC) (as of November 2022)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="70% increase in monthly average downloads from OD Portal.">

</target>
<actual value="Y1, Y2 and Y3 targets were met, as the ODRA and the inventory of datasets in 5 institutions was completed and the Open Data portal was updated.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in Open Data availability and usage
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="20 institutions and 8 ministries publish OD but not according to OD good practice. OD portal not upgraded based on UX.Monthly average Open Data Portal downloads is 400 (TBC) (as of November 2022)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="70% increase in monthly average downloads from OD Portal.">

</target>
<actual value="Y4 target is on track to be achieved ahead of time. AKSHI is coordinating with the institutions to ensure that they publish the datasets in line with the recommendations and the Open Data standards.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Omnichannel Contact Center fully functional
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Omnichannel Contact Center not in place.AVA not in place and not embedded in Omnichannel Contact Center."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="60% of Contact Center tickets resolved as per service standard amount of time.">

</target>
<actual value="Y1 target was achieved, as the Omnichannel Contact Center ToR was completed. The vendor has not yet been hired to establish the OCCC (Y2 target), as no procurements could be conducted during the election period.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Omnichannel Contact Center fully functional
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Omnichannel Contact Center not in place.AVA not in place and not embedded in Omnichannel Contact Center."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="60% of Contact Center tickets resolved as per service standard amount of time.">

</target>
<actual value="The vendor has not yet been hired to establish the OCCC (Y2 target), but the procurement is planned to be launched this CY.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the number of data exchange use cases and transactions through the Government Gateway
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="168 data exchange use cases and 20.1 million annual GG transactions (as of November 2022)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="30% increase in use cases and 20% increase in GG transactions">

</target>
<actual value="Progress on this IRI was made, as the upgrade of GG is underway (expected to be completed by mid-2026), which will enable increase in use cases and transactions.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the number of data exchange use cases and transactions through the Government Gateway
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="168 data exchange use cases and 20.1 million annual GG transactions (as of November 2022)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="30% increase in use cases and 20% increase in GG transactions">

</target>
<actual value="Progress on this IRI was made, as the upgrade of GG is underway (expected to be completed by mid-2026), which will enable increase in use cases and transactions.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in % of eligible digital services connected to the enhanced SQDNE monitoring system
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 of eligible digital services connected to the enhanced SQDNE service delivery monitoring system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="60% of eligible digital services connected to the enhanced SQDNE service delivery monitoring system.">

</target>
<actual value="Y2 target was achieved, as the SQDNE upgrade was completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in % of eligible digital services connected to the enhanced SQDNE monitoring system
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 of eligible digital services connected to the enhanced SQDNE service delivery monitoring system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="60% of eligible digital services connected to the enhanced SQDNE service delivery monitoring system.">

</target>
<actual value="Y2 target was achieved, as the SQDNE upgrade was completed. Y3 and Y5 targets were achieved ahead of time, as 90% of public services (1,141 services) are monitored through SQDNE 2.0.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of life events-based service groups implemented on E-Albania.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="No life-events on e-Albania."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="6 priority LEs (total) implemented at Level 4">

</target>
<actual value="Progress has been made on the Y1 target as part of the e-Albania upgrade, which is expected to be completed by the end of the CY, and it also includes the regrouping of e-services in Life Events at Level 2 (Y3 target). The now expanded CU is planning to hire a dedicated Manager for Life Events, who will expedite progress on the 4 Life Events at Level 4 (Y1 and Y4 target).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of life events-based service groups implemented on E-Albania.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="No life-events on e-Albania."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="6 priority LEs (total) implemented at Level 4">

</target>
<actual value="Progress has been made on the Y3 target as part of the e-Albania upgrade, which is expected to be completed by the end of the CY, and it also includes the regrouping of e-services in Life Events at Level 2 (Y3 target).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Multi-functional YICs established and fully operational.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="10 TOM prototypes produced.">

</target>
<actual value="Progress towards Y1 and Y2 targets was made, as the YIC ToRs were completed. However, the vendor to establish the YIC was not yet hired, as no procurements could be conducted during the election period.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Multi-functional YICs established and fully operational.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="10 TOM prototypes produced.">

</target>
<actual value="Progress towards Y1 and Y2 targets was made, as the YIC ToRs were completed. However, the vendor to establish the YIC was not yet hired, due to legal barriers of municipalities transferring the former ADISA premises to AKSHI, where the YICs will be housed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Priority GovTech enabling reforms adopted
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Priority GovTech institutional enablers not approved."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="New Digital Strategy 2027-2031 approved.">

</target>
<actual value="The Y2 target is on track, as the transposition of EU Directive 2016/2102 was drafted and is expected to be approved by end of 2025 CY.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Priority GovTech enabling reforms adopted
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Priority GovTech institutional enablers not approved."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="New Digital Strategy 2027-2031 approved.">

</target>
<actual value="The Y2 and Y3 targets were achieved, as the laws were adopted. The Y4 target is expected to be achieved ahead of time.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizen feedback mechanism on digital services is fully functional (i.e., feedback collected, analyzed, acted upon, disclosed)
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="CivicTech tool in place.81% user satisfaction with e-Albania"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Dashboard and reports on citizen feedback updated and made public on a quarterly basis.Increase by 10% in user satisfaction with e-Albania.">

</target>
<actual value="Progress has been made towards the Y1 and Y2 targets as part of the e-Albania upgrade, which is expected to be completed by the end of the CY.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizen feedback mechanism on digital services is fully functional (i.e., feedback collected, analyzed, acted upon, disclosed)
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="CivicTech tool in place.81% user satisfaction with e-Albania"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Dashboard and reports on citizen feedback updated and made public on a quarterly basis.Increase by 10% in user satisfaction with e-Albania.">

</target>
<actual value="Progress has been made towards the Y1 and Y2 targets as part of the e-Albania upgrade, which is expected to be completed by the next ISR.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change mitigation  and adaptation (cross-cutting) increased.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0% of Program-related ICT expenditures comply with highest energy standards, other green procurement criteria, or relevant climate resilience criteria."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="100% of annual Program-related expenditures on ICT hardware related to Local Governments and new procurement platform are ENERGY STAR certified, 30% of annual procurements apply other green procurement criteria, 100% of new ICT hardware apply climate resilience criteria">

</target>
<actual value="Y2 target was achieved, as all the ToRs incorporated these climate change related criteria.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change mitigation  and adaptation (cross-cutting) increased.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0% of Program-related ICT expenditures comply with highest energy standards, other green procurement criteria, or relevant climate resilience criteria."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="100% of annual Program-related expenditures on ICT hardware related to Local Governments and new procurement platform are ENERGY STAR certified, 30% of annual procurements apply other green procurement criteria, 100% of new ICT hardware apply climate resilience criteria">

</target>
<actual value="Y3 target is on track to be achieved, as all the ToRs incorporated these climate change related criteria.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Omnichannel Contact Center fully functional
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Omnichannel Contact Center not in place.AVA not in place and not embedded in Omnichannel Contact Center."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="60% of Contact Center tickets resolved as per service standard amount of time.">

</target>
<actual value="The vendor has not yet been hired to establish the OCCC (Y2 target), but the procurement is planned to be launched this CY.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Foundational digital infrastructure for LG digital services established and LGs integrated into central government platforms
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="Fragmented, non-existent and/or outdated digital infrastructure for LG service delivery and core functions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2026-07-15" />
<target value="50% LGs using new/extended digital infrastructure which reduces paper usage and GHG emissions and includes hardware meeting ENERGY STAR requirements [DLR 9.3]">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015), but progress has been made an conceptualizing the workforce plan.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in % of eligible digital services connected to the enhanced SQDNE monitoring system
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 of eligible digital services connected to the enhanced SQDNE service delivery monitoring system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="60% of eligible digital services connected to the enhanced SQDNE service delivery monitoring system.">

</target>
<actual value="Y2 target was achieved, as the SQDNE upgrade was completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishing and utilizing the AI-powered e- procurement platform
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="The new e-procurement platform is not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="The e-procurement platform is using AI at selected stages of the public procurement process [DLR 8.5]">

</target>
<actual value="Progress has been made towards the Y2 target, as a dedicated Working Group is finalizing the ToRs for the e-procurement platform.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishing and utilizing the AI-powered e- procurement platform
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="The new e-procurement platform is not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="The e-procurement platform is using AI at selected stages of the public procurement process [DLR 8.5]">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015), but progress has been made, as a dedicated Working Group is drafting the ToRs for the e-procurement platform.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the number of data exchange use cases and transactions through the Government Gateway
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="168 data exchange use cases and 20.1 million annual GG transactions (as of November 2022)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="30% increase in use cases and 20% increase in GG transactions">

</target>
<actual value="Progress on this IRI was made, as the upgrade of GG is underway (expected to be completed by mid-2026), which will enable increase in use cases and transactions.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Equitable Access: Improved access to digitally-enabled services by target groups: (i) general population; (ii) poor; (iii) elderly; (iv) lower educated women; and (v) disabled
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="(i) general population: 53%; (ii) poor: 37%; (iii) elderly: 14%; (iv) lower educated women: 21%; and (v) disabled: 10%. 

Baseline for selected local government services will be established in Y3."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2029-07-15" />
<target value="15% increase on baseline (cumulative national and local services)">

</target>
<actual value="There is no Y3 target for this PDO indicator. However, there has been progress towards its achievement, as the upgrade of e-Albania is underway, which will improve equitable access.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality 1: New Digital Service Standards implemented
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Digital Service Standards are not updated, there is no system for assessing compliance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="80% of highly used services at central level and 50% of highly used services at local level apply 10 Digital Service Standards">

</target>
<actual value="Measuring progress on this PDO indicator will be possible after the completion of the e-Albania upgrade. However, there has been progess towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that will enable in the future monitoring compliance with the service standards, as well as measuring the subsequent targets of this PDO indicator.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Foundational digital infrastructure for LG digital services established and LGs integrated into central government platforms
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="Fragmented, non-existent and/or outdated digital infrastructure for LG service delivery and core functions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2026-07-15" />
<target value="50% LGs using new/extended digital infrastructure which reduces paper usage and GHG emissions and includes hardware meeting ENERGY STAR requirements [DLR 9.3]">

</target>
<actual value="Progress has been made towards the Y2 target. A diagnostic of LG workforce capabilities and gaps in underway, which will inform the workforce plan.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of life events-based service groups implemented on E-Albania.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="No life-events on e-Albania."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="6 priority LEs (total) implemented at Level 4">

</target>
<actual value="Progress has been made on the Y3 target as part of the e-Albania upgrade, which is expected to be completed by the end of the CY, and it also includes the regrouping of e-services in Life Events at Level 2 (Y3 target).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved accessibility and customer service for LG services
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are integrated into the central OCCC"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="8 priority LG services covered by the OCCC and YIC, and 70% tickets for priority LG services resolved through OCCC as per service standard on time">

</target>
<actual value="There is no Y2 target for this indicator.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved accessibility and customer service for LG services
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are integrated into the central OCCC"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="8 priority LG services covered by the OCCC and YIC, and 70% tickets for priority LG services resolved through OCCC as per service standard on time">

</target>
<actual value="This is delayed due to delays on the establishment of the YIC at the central level due to legal barriers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in Open Data availability and usage
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="20 institutions and 8 ministries publish OD but not according to OD good practice. OD portal not upgraded based on UX.Monthly average Open Data Portal downloads is 400 (TBC) (as of November 2022)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="70% increase in monthly average downloads from OD Portal.">

</target>
<actual value="Y1, Y2 and Y3 targets were met, as the ODRA and the inventory of datasets in 5 institutions was completed and the Open Data portal was updated.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in Open Data availability and usage
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="20 institutions and 8 ministries publish OD but not according to OD good practice. OD portal not upgraded based on UX.Monthly average Open Data Portal downloads is 400 (TBC) (as of November 2022)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="70% increase in monthly average downloads from OD Portal.">

</target>
<actual value="Y4 target is on track to be achieved ahead of time. AKSHI is coordinating with the institutions to ensure that they publish the datasets in line with the recommendations and the Open Data standards.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Online and Mobile E-Albania upgraded based on agile UX, with new functionalities and compliant with eligible accessibility standards
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 new functionalities (E-Albania last upgraded in 2018)Online and Mobile e-Albania not compliant with latest digital service accessibility standards667 services available (0 climate change related) and 344,711 monthly average applications made on E-Albania Mobile"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="Number of service applications through e-Albania Mobile, including for climate-related services, increased by 25%">

</target>
<actual value="Y1 and Y2 targets are on track to be achieved, as work on the re-design plan and the upgrade of e-Albania is underway.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quality 2: Decrease in average time taken to deliver selected digital services linked to six priority LEs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Average time taken to deliver selected digital services linked to the six priority LEs: 7 days and 14.5 hours (or 182.5 hours)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="20% decrease on the baseline average time taken to deliver selected digital services linked to the six priority LEs">

</target>
<actual value="The first target for this PDO indicator is in Y3. However, there has been progress towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that include the establishment of the Life Events.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Early grade students in schools with functioning SmartLabs acquiring basic minimum digital competencies.
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="No Grade 2 students currently completing digital skills programs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="50% of Grade 2 students achieving level 2 or above on ICT Curriculum Assessment Framework">

</target>
<actual value="The Y2 target was achieved, as both the ICT equipment and furniture for the SmartLabs was delivered to the schools.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened data protection and interoperability
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="Albanian interoperability framework (2014) not updated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="GDPR-compliant data processing agreements implemented in E-Albania (AKSHI) and in 5 other institutions.">

</target>
<actual value="Y3 target is on track to be achieved ahead of time, as the GDPR complaint data processing agreements were already drafted and are being coordinated with the Information and Data Protection Commissioner, to ensure full alignment with Albania's data privacy legislation amended since the formulation of this DLR during Program preparation.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the number of data exchange use cases and transactions through the Government Gateway
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="168 data exchange use cases and 20.1 million annual GG transactions (as of November 2022)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2028-03-16" />
<target value="30% increase in use cases and 20% increase in GG transactions">

</target>
<actual value="Progress on this IRI was made, as the upgrade of GG is underway (expected to be completed by mid-2026), which will enable increase in use cases and transactions.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central government PFM and PIM strengthened through updated processes and upgraded central AFMIS
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="The central AFMIS is upgraded and not sufficiently integrated with other systems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-07-15" />
<target value="Central AFMIS upgraded with priority functionalities and fully integrated with other systems">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015), but progress has been made, as the firm is currently being hired to conduct the diagnostic.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Omnichannel Contact Center fully functional
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Omnichannel Contact Center not in place.AVA not in place and not embedded in Omnichannel Contact Center."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="60% of Contact Center tickets resolved as per service standard amount of time.">

</target>
<actual value="Y1 target was achieved, as the Omnichannel Contact Center ToR was completed. The vendor has not yet been hired to establish the OCCC (Y2 target), as no procurements could be conducted during the election period.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality 1: New Digital Service Standards implemented
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Digital Service Standards are not updated, there is no system for assessing compliance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="80% of highly used services at central level and 50% of highly used services at local level apply 10 Digital Service Standards">

</target>
<actual value="Measuring progress on this PDO indicator will be possible after the completion of the e-Albania upgrade. However, there has been progess towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that will enable in the future monitoring compliance with the service standards, as well as measuring the subsequent targets of this PDO indicator.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved student usage of SmartLabs
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Up to 70% of Grade 1-3 learners at schools with SmartLabs are using Labs consistently throughout school year">

</target>
<actual value="The Y2 target was achieved, as the training of 200 principals and 600 teachers was completed in December 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change mitigation  and adaptation (cross-cutting) increased.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0% of Program-related ICT expenditures comply with highest energy standards, other green procurement criteria, or relevant climate resilience criteria."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="100% of annual Program-related expenditures on ICT hardware related to Local Governments and new procurement platform are ENERGY STAR certified, 30% of annual procurements apply other green procurement criteria, 100% of new ICT hardware apply climate resilience criteria">

</target>
<actual value="Y2 target was achieved, as all the ToRs incorporated these climate change related criteria.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizen feedback mechanism on digital services is fully functional (i.e., feedback collected, analyzed, acted upon, disclosed)
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="CivicTech tool in place.81% user satisfaction with e-Albania"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Dashboard and reports on citizen feedback updated and made public on a quarterly basis.Increase by 10% in user satisfaction with e-Albania.">

</target>
<actual value="Progress has been made towards the Y1 and Y2 targets as part of the e-Albania upgrade, which is expected to be completed by the end of the CY.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
LG PFM and PIM strengthened through updated processes and the expanded AFMIS to LGs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="PFM and PIM processes in LGs are fragmented and disparate, and climate change is not included in project appraisal. There is no AFMIS in place for LGs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2028-07-15" />
<target value="50% of participating LGs conduct their PFM processes (including climate risk screening of public investments)">

</target>
<actual value="Y2 target has not yet been achieved (the AF became effective on August 11, 2015).">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quality 2: Decrease in average time taken to deliver selected digital services linked to six priority LEs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Average time taken to deliver selected digital services linked to the six priority LEs: 7 days and 14.5 hours (or 182.5 hours)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="20% decrease on the baseline average time taken to deliver selected digital services linked to the six priority LEs">

</target>
<actual value="The first target for this PDO indicator is in Y3. However, there has been progress towards its achievement, as the upgrade of e-Albania and the redevelopment of e-services are underway, two projects that include the establishment of the Life Events.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved student usage of SmartLabs
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Up to 70% of Grade 1-3 learners at schools with SmartLabs are using Labs consistently throughout school year">

</target>
<actual value="The Y3 target is on track to be achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Priority GovTech enabling reforms adopted
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Priority GovTech institutional enablers not approved."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="New Digital Strategy 2027-2031 approved.">

</target>
<actual value="The Y2 and Y3 targets were achieved, as the laws were adopted. The Y4 target is expected to be achieved ahead of time.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access: Increase in the usage of digitally enabled services (disaggregated by gender)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="Overall cumulative baseline is 1,412,421 consisting of: (i) No. of applications via online e-Albania: 940,186 (monthly average between June 2022- May 2023); No. of applications via e-Albania for Mobile 472,235 (monthly average between June 2022- May 2023); No of beneficiaries of SmartLabs: 0 (May 2023). No. of selected local government service applications via e-Albania online/mobile: baseline 0, given that the selected services are not reengineered and online  (August 2024)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2029-07-15" />
<target value="25% increase on the baseline">

</target>
<actual value="On track to meet Y3 target, but revisions to the M&amp;E plan planned during the MTR in order to improve and streamline its M&amp;E plan and to ensure its relevance to measure the PDO in light of progress hitherto in the implementation of the Program supported activities (e.g. the upgrade of e-Albania).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Priority GovTech enabling reforms adopted
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="Priority GovTech institutional enablers not approved."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="New Digital Strategy 2027-2031 approved.">

</target>
<actual value="The Y2 target is on track, as the transposition of EU Directive 2016/2102 was drafted and is expected to be approved by end of 2025 CY.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central government PFM and PIM strengthened through updated processes and upgraded central AFMIS
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="The central AFMIS is upgraded and not sufficiently integrated with other systems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-07-15" />
<target value="Central AFMIS upgraded with priority functionalities and fully integrated with other systems">

</target>
<actual value="Progress has been made on targets for Y2 and Y3. AKSHI convened a multi stakeholder workshop in January 2026 to discuss the central-level upgrade and local-level roll-out of AFMIS. A firm was hired to conduct a an AFMIS needs assessment and implementation roadmap, which will inform the system's design with a focus on scalability and interoperability. The high-level interministerial working group and the upcoming technical working group will oversee the needs assessment process and the development of the AFMIS Terms of Reference.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizen feedback mechanism on digital services is fully functional (i.e., feedback collected, analyzed, acted upon, disclosed)
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="CivicTech tool in place.81% user satisfaction with e-Albania"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2028-03-15" />
<target value="Dashboard and reports on citizen feedback updated and made public on a quarterly basis.Increase by 10% in user satisfaction with e-Albania.">

</target>
<actual value="Progress has been made towards the Y1 and Y2 targets as part of the e-Albania upgrade, which is expected to be completed by the next ISR.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-07-15" />
<target value="10">
<comment><narrative>
This is a CRI introduced with the AF. The baseline will be established by the MTR.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Multi-functional YICs established and fully operational.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="10 TOM prototypes produced.">

</target>
<actual value="Progress towards Y1 and Y2 targets was made, as the YIC ToRs were completed. However, the vendor to establish the YIC was not yet hired, due to legal barriers of municipalities transferring the former ADISA premises to AKSHI, where the YICs will be housed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Online and Mobile E-Albania upgraded based on agile UX, with new functionalities and compliant with eligible accessibility standards
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0 new functionalities (E-Albania last upgraded in 2018)Online and Mobile e-Albania not compliant with latest digital service accessibility standards667 services available (0 climate change related) and 344,711 monthly average applications made on E-Albania Mobile"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2027-03-15" />
<target value="Number of service applications through e-Albania Mobile, including for climate-related services, increased by 25%">

</target>
<actual value="Y1 and Y2 were achieved. Target Y3 is on track to be achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change mitigation  and adaptation (cross-cutting) increased.
</narrative></title>
<baseline year="2022" iso-date="2022-11-15" value="0% of Program-related ICT expenditures comply with highest energy standards, other green procurement criteria, or relevant climate resilience criteria."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-15" />
<period-end iso-date="2029-07-15" />
<target value="100% of annual Program-related expenditures on ICT hardware related to Local Governments and new procurement platform are ENERGY STAR certified, 30% of annual procurements apply other green procurement criteria, 100% of new ICT hardware apply climate resilience criteria">

</target>
<actual value="Y3 target is on track to be achieved, as all the ToRs incorporated these climate change related criteria.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Equitable Access: Improved access to digitally-enabled services by target groups: (i) general population; (ii) poor; (iii) elderly; (iv) lower educated women; and (v) disabled
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="(i) general population: 53%; (ii) poor: 37%; (iii) elderly: 14%; (iv) lower educated women: 21%; and (v) disabled: 10%. 

Baseline for selected local government services will be established in Y3."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2029-07-15" />
<target value="15% increase on baseline (cumulative national and local services)">

</target>
<actual value="There is no Y2 target for this PDO indicator. However, there has been progress towards its achievement, as the upgrade of e-Albania is underway, which will improve equitable access.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LG services re-engineered and implemented on e-Albania 2.0
</narrative></title>
<baseline year="2024" iso-date="2024-07-15" value="0 LG services are re-engineered and implemented on e-Albania 2.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-15" />
<period-end iso-date="2029-07-15" />
<target value="10 priority LG services (total) are re-engineered and implemented on e-Albania 2.0">

</target>
<actual value="Progress on the Y3 target has been made. In February 2026, AKSHI and the MSLG organized a workshop with all stakeholders to discuss plans for LG service re-engineering.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
LG PFM and PIM strengthened through updated processes and the expanded AFMIS to LGs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="PFM and PIM processes in LGs are fragmented and disparate, and climate change is not included in project appraisal. There is no AFMIS in place for LGs."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2028-07-15" />
<target value="50% of participating LGs conduct their PFM processes (including climate risk screening of public investments)">

</target>
<actual value="Progress has been made on targets for Y2 and Y3. AKSHI convened a multi stakeholder workshop in January 2026 to discuss the central-level upgrade and local-level roll-out of AFMIS. The current AFMIS needs assessment will inform the system's design with a focus on scalability and interoperability. The high-level interministerial working group and the upcoming technical working group will oversee the needs assessment process and the development of AFMIS technical Terms of Reference.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P170891</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Albania National Water Supply and Sanitation Sector Modernization Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objectives are to improve operational and financial performance of water supply and sanitation (WSS) utilities and increase access to safely managed water supply services in the Republic of Albania.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the National Water Supply and Sanitation Sector Modernization Program (NWSSSMP) for Albania are to improve operational and financial performance of water supply and sanitation (WSS) utilities and increase access to safely managed water supply services in the Republic of Albania. The government program comprises a public investment program and a set of policy and regulatory instruments framed by a broader, decade-long water sector reform process, which the Ministry of Infrastructure and Energy (MoIE) and Agency of Water Supply, Sewerage, and Waste Infrastructure (AKUM) have been steering with strong leadership since 2016-17, gaining commitment from all sector stakeholders in the country. The NWSSMP will help put in place the relevant processes and mechanisms to further develop and roll out existing tools and the development of new policy guidelines, working simultaneously at the national and local (and/or regional) levels, while the investment project financing (IPF) component and other donors will provide technical assistance (TA) for specific outputs required, and institutional strengthening.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0041361"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0041361"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0041362"><narrative>Ministry of Infrastructure and Energy</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-05-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-05-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hector Alexander Serrano</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hserrano@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3183875" />
                <name><narrative>Tirana</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>41.3275 19.81889</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="14020" percentage="33" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="27" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="27" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="65.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="27" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="60" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="60" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="27" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="67" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="27" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="30" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="30" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="27" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="67" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">416666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">40635900.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">40635900.99</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">75000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">184293</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">2889270</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">1977390</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">11332070</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">6809400</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">3219817</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">4269667</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">3682193</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-184293</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-78528</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-142662</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-158738</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-166111</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-426348</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-423597</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-41362"><narrative>Ministry of Infrastructure and Energy</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-41363"><narrative>National Agency of Water Supply, Sewerage and Waste Infrastructure (AKUM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170891"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P170891?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170891"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved sector financing instruments and incentives for improved performance adopted
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved financial viability of the WSS sector (as reflected in National Aggregated Score for Direct Operating Cost Coverage)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="81.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="91.20">
<comment><narrative>
As mentioned in previous ISRs the baseline needs to be updated to 94.6 as a result of the verification report issued by IVA on 2022. Target by project closing is 104.6. This percentage is calculated as the ration between annual water fees collected and annual operational costs.
</narrative></comment>
</target>
<actual value="101.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities receiving investment allocation based on eligibility and performance
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Performance Monitoring/Benchmarking system established and operationalized (and annual report with key KPIs in public domain)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">
<comment><narrative>
System is in place and publishing will be monitored yearly.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Utility Corporate Governance and Citizen Engagement requirements approved (PAP measure)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Business Plan guideline for tariff reviews approved by ERRU
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-01-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Business Plan guideline for tariff reviews approved by ERRU
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-01-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new functional connections providing safe and reliable water services in vulnerable households
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="3,000.00">

</target>
<actual value="104">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new functional connections providing safe and reliable water services in vulnerable households
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="3,000.00">

</target>
<actual value="104">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved financial viability of the WSS sector (as reflected in National Aggregated Score for Direct Operating Cost Coverage)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="81.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="91.20">
<comment><narrative>
Note that baseline used is 94.6.
</narrative></comment>
</target>
<actual value="101.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved financial viability of the WSS sector (as reflected in National Aggregated Score for Direct Operating Cost Coverage)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="81.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="91.20">
<comment><narrative>
As mentioned in previous ISRs the baseline needs to be updated to 94.6 as a result of the verification report issued by IVA on 2022. Target by project closing is 104.6. This percentage is calculated as the ration between annual water fees collected and annual operational costs.
</narrative></comment>
</target>
<actual value="101.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved sector financing instruments and incentives for improved performance adopted
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved sector financing instruments and incentives for improved performance adopted
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="5342">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="5342">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved continuity of water supply services (number of urban areas with minimum 18 hours of water supply)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="35.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved continuity of water supply services (number of urban areas with minimum 18 hours of water supply)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="35.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Utilities meeting at least 75 percent of their targets in Performance Agreements
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2027-12-31" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Utilities meeting at least 75 percent of their targets in Performance Agreements
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2027-12-31" />
<target value="90.00">
<comment><narrative>
As per MTR it was agreed with the Goverment to change the description of this indicator to reflect the growing requirements of the performance angreements. New indicator would read as &quot;Percentage of Utilities meeting at least 50 percent of their targets in Performance Agreements&quot; new end target of 50%.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS utilities with agreed operational staff certified as per regulations on certification
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Certification Program launched
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Certification Program launched
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">
<comment><narrative>
As MTR this indicator will be changed to reflect the formal administrative process that will conclude with the submission to MoIE of the Certification Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines for on-site sanitation issued by AKUM
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines for on-site sanitation issued by AKUM
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS utilities/municipalities from within the 10 largest energy consumers with at least 20% energy savings in their operation of the services
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities submitting Business Plans to ERRU for approval
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities submitting Business Plans to ERRU for approval
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">
<comment><narrative>
Methodology was approved by ERRU on November 2025. As per MTR end target will be revised to 40% to account for delays in its approval.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Utility Corporate Governance and Citizen Engagement requirements approved (PAP measure)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Utility Corporate Governance and Citizen Engagement requirements approved (PAP measure)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS Utilities/Municipalities undertaking community outreach and WASH IEC and behavior change communication (BCC) campaigns with households of Roma minorities and other vulnerable groups
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2026-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS Utilities/Municipalities undertaking community outreach and WASH IEC and behavior change communication (BCC) campaigns with households of Roma minorities and other vulnerable groups
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2026-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities receiving investment allocation based on eligibility and performance
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities receiving investment allocation based on eligibility and performance
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">
<comment><narrative>
Description and end target to be revised as following aggregation at least 1 utility regional water utility will meet this target.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Performance Monitoring/Benchmarking system established and operationalized (and annual report with key KPIs in public domain)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">
<comment><narrative>
System is in place and publishing will be monitored yearly.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new functional connections providing safe and reliable water services in vulnerable households
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="3,000.00">

</target>
<actual value="104">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Performance Monitoring/Benchmarking system established and operationalized (and annual report with key KPIs in public domain)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">
<comment><narrative>
System is in place and publishing will be monitored yearly.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS utilities with agreed operational staff certified as per regulations on certification
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS utilities with agreed operational staff certified as per regulations on certification
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="70.00">
<comment><narrative>
To be deleted as the indicator on the certification program will be changed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of energy efficiency audits undertaken in WSS Utilities
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="12.00">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of energy efficiency audits undertaken in WSS Utilities
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="12.00">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS utilities/municipalities from within the 10 largest energy consumers with at least 20% energy savings in their operation of the services
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS utilities/municipalities from within the 10 largest energy consumers with at least 20% energy savings in their operation of the services
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of newly created and existing management positions filled by women through internal promotion or external recruitment among utilities participating in the Program
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of newly created and existing management positions filled by women through internal promotion or external recruitment among utilities participating in the Program
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 1 WSS Utility aggregation process supported under the Program
</narrative></title>
<baseline year="2020" iso-date="2020-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-16" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 1 WSS Utility aggregation process supported under the Program
</narrative></title>
<baseline year="2020" iso-date="2020-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-16" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of energy efficiency audits undertaken in WSS Utilities
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="12.00">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 1 WSS Utility aggregation process supported under the Program
</narrative></title>
<baseline year="2020" iso-date="2020-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-16" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="5342">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS utilities with agreed operational staff certified as per regulations on certification
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="70.00">
<comment><narrative>
To be deleted as the indicator on the certification program will be changed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Certification Program launched
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved continuity of water supply services (number of urban areas with minimum 18 hours of water supply)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="35.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS Utilities/Municipalities undertaking community outreach and WASH IEC and behavior change communication (BCC) campaigns with households of Roma minorities and other vulnerable groups
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2026-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of energy efficiency audits undertaken in WSS Utilities
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="12.00">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Utilities meeting at least 75 percent of their targets in Performance Agreements
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2027-12-31" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines for on-site sanitation issued by AKUM
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of newly created and existing management positions filled by women through internal promotion or external recruitment among utilities participating in the Program
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Utility Corporate Governance and Citizen Engagement requirements approved (PAP measure)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Business Plan guideline for tariff reviews approved by ERRU
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-01-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS utilities/municipalities from within the 10 largest energy consumers with at least 20% energy savings in their operation of the services
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities receiving investment allocation based on eligibility and performance
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">
<comment><narrative>
Description and end target to be revised as following aggregation at least 1 utility regional water utility will meet this target.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Certification Program launched
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">
<comment><narrative>
As MTR this indicator will be changed to reflect the formal administrative process that will conclude with the submission to MoIE of the Certification Program
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Utilities meeting at least 75 percent of their targets in Performance Agreements
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2027-12-31" />
<target value="90.00">
<comment><narrative>
As per MTR it was agreed with the Goverment to change the description of this indicator to reflect the growing requirements of the performance angreements. New indicator would read as &quot;Percentage of Utilities meeting at least 50 percent of their targets in Performance Agreements&quot; new end target of 50%.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved continuity of water supply services (number of urban areas with minimum 18 hours of water supply)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="35.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of newly created and existing management positions filled by women through internal promotion or external recruitment among utilities participating in the Program
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Business Plan guideline for tariff reviews approved by ERRU
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-01-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved financial viability of the WSS sector (as reflected in National Aggregated Score for Direct Operating Cost Coverage)
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="81.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="91.20">
<comment><narrative>
Note that baseline used is 94.6.
</narrative></comment>
</target>
<actual value="101.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 1 WSS Utility aggregation process supported under the Program
</narrative></title>
<baseline year="2020" iso-date="2020-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-16" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of WSS Utilities/Municipalities undertaking community outreach and WASH IEC and behavior change communication (BCC) campaigns with households of Roma minorities and other vulnerable groups
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2026-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new functional connections providing safe and reliable water services in vulnerable households
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="3,000.00">

</target>
<actual value="104">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities submitting Business Plans to ERRU for approval
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">
<comment><narrative>
Methodology was approved by ERRU on November 2025. As per MTR end target will be revised to 40% to account for delays in its approval.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved sector financing instruments and incentives for improved performance adopted
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New Performance Monitoring/Benchmarking system established and operationalized (and annual report with key KPIs in public domain)
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">
<comment><narrative>
System is in place and publishing will be monitored yearly.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2020" iso-date="2020-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-09" />
<period-end iso-date="2027-12-31" />
<target value="40,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="5342">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WSS Utilities submitting Business Plans to ERRU for approval
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2025-12-31" />
<target value="60.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines for on-site sanitation issued by AKUM
</narrative></title>
<baseline year="2022" iso-date="2022-02-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-07" />
<period-end iso-date="2027-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P174595</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Building Resilient Bridges</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[(a) to enhance resilience to climate change and natural hazards of Albania's critical bridge infrastructure and (b) to improve road and bridge asset management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The program has the following components and activities throughout both phases: Component 1 will finance: (i) the rehabilitation or reconstruction of priority bridges and culverts on the national road network to improve the bridge resilience to withstand futurenatural disasters and climate change. Rehabilitation includes replacement in-situ of the existing bridges deteriorated parts, and structures. Rehabilitation also includes the upgrade or retrofit in-situ of the existing bridges to accommodate new operational requirements such as increased road capacity and traffic levels, enhancing road safety, and improving resilience to changes in climate conditions (by increasing headroom and flow capacity) and to natural disasters (earthquakes). Reconstruction is considered in the cases of fully depreciated existent bridges. Construction of new bridges and access and exit lines is envisaged when bridge rehabilitation or in-situ reconstruction is not technically possible, or the dimensions of the bridge would not suffice for the climate adaptation; (ii) bridge designs for the rehabilitation or reconstruction; (iii) supervision; (iv) equipment for data collection and monitoring; (v) climate resilience and road safety studies and audits for the bridge designs; and (vi) road safety audits during project works/project completion, and at 3-6 months in operations. Component 2 will finance: (i) technical assistance activities and training aimed at strengthening the capacity of the ARA at managing road and bridge assets, including, aligning the Albanian bridge design codes, construction and maintenance, with European standards and international practices with specific focus  on resilience to climate change and natural disasters, and road safety; (ii) equipment for the upgrade of the bridge management system (BMS) as part of the Road Asset Management System (RAMS); (iii) the training of the ARA's staff to undergo bridge operations; (vi) capacity building for the ARA to develop an internship program and training for women students or graduates to reduce the gender gap in the construction sector; and (vii) technical assistance for supporting the ARA to develop with the MoIE a Service Level Requirement with KPIs to improve budget planning for maintenance.  Component 3 will finance: (i) incremental operating costs for project implementation in the ARA by the Project Implementation Team (PIT), including overall project administration and management, financial management, including financial audits, procurement, contract administration, and management of social and environmental safeguards; (ii) the collection and analysis of project data for the project monitoring and evaluation including to report on the progress of the project indicators in the results framework; and (iii) equipment to sustain and facilitate PIT to complete its functions, including but not limited to transportation means, information technology (IT), and office equipment.  ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0046388"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0046388"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0046388"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0046387"><narrative>Albanian Road Authority</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-11-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-03-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Erik Nora</narrative></person-name><telephone>+1-202-473-1000</telephone><email>enora@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783754" />
            <name><narrative>Republic of Albania</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41 20</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="75" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="19" xml:lang="en"/><sector vocabulary="1" code="21024" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="93.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="20" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="20" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="20" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="20" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="73" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="100" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="100" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="20" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="100" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="20" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="87" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">122222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">122222.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">458333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">687500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1054166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1054166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1222222.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">611111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">611111.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">122222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">122222.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">458333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">458333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">687500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">916666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1054166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1054166.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1222222.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">611111.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">611111.12</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">43002887.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">43002887.43</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">55000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">140571</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1833218</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">2761060</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">7262263</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-140571</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-92321</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-116743</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-137913</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-238297</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-238536</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-46387"><narrative>Albanian Road Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174595"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174595?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174595"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridges for which designs have been audited for Road Safety, ensuring road safety considerations for vulnerable users
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
This indicator will measure if bridge designs incorporate appropriate road safety measures. The designs have to incorporate international best practices to make bridge designs and associated structures safe for pedestrians (i.e. including sidewalks and other measures).
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female last-year university students and graduates recruited for a 6-month paid internship program at the MoIE in the areas of engineering/similar male-dominated fields
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="15.00">
<comment><narrative>
MoIE will establish an Internship program and will recruit female interns  each year. This indicator will measure the success of the Internship program.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data collected for establishing a Disaster Loss Database
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="Yes">
<comment><narrative>
This indicator will measure the compliance of the ARA with Law No. 45/2019 “On Civil Protection” regarding the collection of DLD.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridge designs which have been publicly consulted and surveyed
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
This indicator will measure the level of citizen engagement involved in the project design phase.
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service Level Requirements designed
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the agreements reached between the MoIE and the ARA regarding budget allocation for adequate road asset maintenance and management.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data collected for establishing a Disaster Loss Database
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="Yes">
<comment><narrative>
This indicator will measure the compliance of the ARA with Law No. 45/2019 “On Civil Protection” regarding the collection of DLD.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service Level Requirements designed
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the agreements reached between the MoIE and the ARA regarding budget allocation for adequate road asset maintenance and management.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance Redress Mechanism complaints addressed and closed out
</narrative></title>
<baseline year="2023" iso-date="2023-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-20" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
A Grievance Redress Mechanism will be established for the Project. The logbook of grievances will be reviewed and updated regularly.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-14" />
<period-end iso-date="2031-03-15" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RAMS/BMS and remote sensing data used for a bridge management and maintenance medium-term budget planning
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="RAMS/BMS and remote sensing data not in use"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="RAMS/BMS and remote sensing data used for a trial bridge management and maintenance medium-term budget planning">
<comment><narrative>
This indicator ensures the correct implementation of the BMS and remote sensing data to monitor bridge management and maintenance. It evaluates the ARA's ability to produce RAMS/BMS informed budget plans.
</narrative></comment>
</target>
<actual value="RAMS/BMS and remote sensing data not in use">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridge designs completed following international guidelines on resilience to climate and natural hazards
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="15.00">
<comment><narrative>
This indicator will measure the capacity of the ARA to deliver bridge climate and disaster resilient-designs.
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Females employed permanently in the ARA in roles that are male dominated, e.g. engineers, technical planners in the Road Asset Management System, etc.
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="3.00">
<comment><narrative>
The ARA will recruit three females in traditionally male-dominated roles, e.g. engineers and technical planners.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridges for which citizen comments and requests have been incorporated in their designs
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="50.00">
<comment><narrative>
This indicator will measure the ARA's capacity to manage the construction companies involved in the project, making the companies compliant with the requirements stipulated in the initial designs, and including technically feasible demands by the community.
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-14" />
<period-end iso-date="2031-03-15" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road condition data inputted into the RAMS/BMS in a reliable and systematic manner.
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="1,000.00">
<comment><narrative>
This indicator will measure the progress for implementing a systemic approach for collecting data by the ARA. Reports for roads and bridges will follow minimum data requirements, collected at suitable levels of accuracy, using reliable methods of collection, appling appropriate data formats and ensuring proper quality control procedures.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance Redress Mechanism complaints addressed and closed out
</narrative></title>
<baseline year="2023" iso-date="2023-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-20" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
A Grievance Redress Mechanism will be established for the Project. The logbook of grievances will be reviewed and updated regularly.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="350000.00">
<comment><narrative>
The indicator measures the number of direct beneficiaries that experience improved access to transport infrastructure and services that have been built or rehabilitated through a WBG-financed project (including highways, rural roads, urban and interurban roads, mass transit systems, ports/waterways, railways, and airports). Beneficiaries typically experience reductions in cost and time to travel and/or improvements in safety, as well as increased access to markets, job opportunities, and health and education services. In urban areas, beneficiaries include the increase in the number of users of improved services. In rural areas, beneficiaries include the increase in the number of people who live in proximity to improved services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridges for which designs have been audited for climate resilience before construction
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
This indicator will measure if designs incorporate climate adaptation measures associated to the bridge infrastructure and its surroundings. Audits will be conducted during the design phase.
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The ARA Staff trained for the procurement and implementation of bridge operations
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="30.00">
<comment><narrative>
The ARA Staff will be specifically trained to be able to plan, prioritize, and manage a large ongoing bridge maintenance and bridge renewal program, in a sustainable manner. The staff will be specifically trained in all the areas specified in the learning agendao successfully develop bridge operations. This indicator will measure the learning component of the program in phase 1.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="350000.00">
<comment><narrative>
The indicator measures the number of direct beneficiaries that experience improved access to transport infrastructure and services that have been built or rehabilitated through a WBG-financed project (including highways, rural roads, urban and interurban roads, mass transit systems, ports/waterways, railways, and airports). Beneficiaries typically experience reductions in cost and time to travel and/or improvements in safety, as well as increased access to markets, job opportunities, and health and education services. In urban areas, beneficiaries include the increase in the number of users of improved services. In rural areas, beneficiaries include the increase in the number of people who live in proximity to improved services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RAMS/BMS and remote sensing data used for a bridge management and maintenance medium-term budget planning
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="RAMS/BMS and remote sensing data not in use"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="RAMS/BMS and remote sensing data used for a trial bridge management and maintenance medium-term budget planning">
<comment><narrative>
This indicator ensures the correct implementation of the BMS and remote sensing data to monitor bridge management and maintenance. It evaluates the ARA's ability to produce RAMS/BMS informed budget plans.
</narrative></comment>
</target>
<actual value="RAMS/BMS and remote sensing data not in use">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges rehabilitated, reconstructed, or constructed following international guidelines  on resilience to climate and natural disasters
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="30.00">
<comment><narrative>
Bridges to be rehabilitated/reconstructed/constructed will incorporate climate and natural disaster aspects into their designs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridges for which citizen comments and requests have been incorporated in their designs
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="50.00">
<comment><narrative>
This indicator will measure the ARA's capacity to manage the construction companies involved in the project, making the companies compliant with the requirements stipulated in the initial designs, and including technically feasible demands by the community.
</narrative></comment>
</target>
<actual value="13.33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female last-year university students and graduates recruited for a 6-month paid internship program at the MoIE in the areas of engineering/similar male-dominated fields
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="15.00">
<comment><narrative>
MoIE will establish an Internship program and will recruit female interns  each year. This indicator will measure the success of the Internship program.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridge designs which have been publicly consulted and surveyed
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
This indicator will measure the level of citizen engagement involved in the project design phase.
</narrative></comment>
</target>
<actual value="13.33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridges for which designs have been audited for Road Safety, ensuring road safety considerations for vulnerable users
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
This indicator will measure if bridge designs incorporate appropriate road safety measures. The designs have to incorporate international best practices to make bridge designs and associated structures safe for pedestrians (i.e. including sidewalks and other measures).
</narrative></comment>
</target>
<actual value="13.33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Females employed permanently in the ARA in roles that are male dominated, e.g. engineers, technical planners in the Road Asset Management System, etc.
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="3.00">
<comment><narrative>
The ARA will recruit three females in traditionally male-dominated roles, e.g. engineers and technical planners.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The ARA Staff trained for the procurement and implementation of bridge operations
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="30.00">
<comment><narrative>
The ARA Staff will be specifically trained to be able to plan, prioritize, and manage a large ongoing bridge maintenance and bridge renewal program, in a sustainable manner. The staff will be specifically trained in all the areas specified in the learning agendao successfully develop bridge operations. This indicator will measure the learning component of the program in phase 1.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges rehabilitated, reconstructed, or constructed following international guidelines  on resilience to climate and natural disasters
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="30.00">
<comment><narrative>
Bridges to be rehabilitated/reconstructed/constructed will incorporate climate and natural disaster aspects into their designs.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road condition data inputted into the RAMS/BMS in a reliable and systematic manner.
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="1,000.00">
<comment><narrative>
This indicator will measure the progress for implementing a systemic approach for collecting data by the ARA. Reports for roads and bridges will follow minimum data requirements, collected at suitable levels of accuracy, using reliable methods of collection, appling appropriate data formats and ensuring proper quality control procedures.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges rehabilitated, reconstructed, or constructed following international guidelines  on resilience to climate and natural disasters
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="30.00">
<comment><narrative>
Bridges to be rehabilitated/reconstructed/constructed will incorporate climate and natural disaster aspects into their designs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges rehabilitated, reconstructed, or constructed following international guidelines  on resilience to climate and natural disasters
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="30.00">
<comment><narrative>
Bridges to be rehabilitated/reconstructed/constructed will incorporate climate and natural disaster aspects into their designs.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RAMS/BMS and remote sensing data used for a bridge management and maintenance medium-term budget planning
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="RAMS/BMS and remote sensing data not in use"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="RAMS/BMS and remote sensing data used for a trial bridge management and maintenance medium-term budget planning">
<comment><narrative>
This indicator ensures the correct implementation of the BMS and remote sensing data to monitor bridge management and maintenance. It evaluates the ARA's ability to produce RAMS/BMS informed budget plans.
</narrative></comment>
</target>
<actual value="RAMS/BMS and remote sensing data not in use">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RAMS/BMS and remote sensing data used for a bridge management and maintenance medium-term budget planning
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="RAMS/BMS and remote sensing data not in use"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="RAMS/BMS and remote sensing data used for a trial bridge management and maintenance medium-term budget planning">
<comment><narrative>
This indicator ensures the correct implementation of the BMS and remote sensing data to monitor bridge management and maintenance. It evaluates the ARA's ability to produce RAMS/BMS informed budget plans.
</narrative></comment>
</target>
<actual value="RAMS/BMS and remote sensing data not in use">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="350000.00">
<comment><narrative>
The indicator measures the number of direct beneficiaries that experience improved access to transport infrastructure and services that have been built or rehabilitated through a WBG-financed project (including highways, rural roads, urban and interurban roads, mass transit systems, ports/waterways, railways, and airports). Beneficiaries typically experience reductions in cost and time to travel and/or improvements in safety, as well as increased access to markets, job opportunities, and health and education services. In urban areas, beneficiaries include the increase in the number of users of improved services. In rural areas, beneficiaries include the increase in the number of people who live in proximity to improved services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2031-03-31" />
<target value="350000.00">
<comment><narrative>
The indicator measures the number of direct beneficiaries that experience improved access to transport infrastructure and services that have been built or rehabilitated through a WBG-financed project (including highways, rural roads, urban and interurban roads, mass transit systems, ports/waterways, railways, and airports). Beneficiaries typically experience reductions in cost and time to travel and/or improvements in safety, as well as increased access to markets, job opportunities, and health and education services. In urban areas, beneficiaries include the increase in the number of users of improved services. In rural areas, beneficiaries include the increase in the number of people who live in proximity to improved services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridge designs completed following international guidelines on resilience to climate and natural hazards
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="15.00">
<comment><narrative>
This indicator will measure the capacity of the ARA to deliver bridge climate and disaster resilient-designs.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bridges for which designs have been audited for climate resilience before construction
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2029-03-30" />
<target value="100.00">
<comment><narrative>
This indicator will measure if designs incorporate climate adaptation measures associated to the bridge infrastructure and its surroundings. Audits will be conducted during the design phase.
</narrative></comment>
</target>
<actual value="13.33">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P096643</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Business Environment Reform and Institutional Strengthening</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The overall objective of the BERIS is to assist the Government to: (i) facilitate business entry and operations in the formal economy; and (ii) strengthen the enterprise sector's capability to increase exports towards the region and EU markets.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Albania Business Environment Reform and Institutional Strengthening Project aims to assist the Government to: (1) facilitate business entry and operations in the formal economy; and (2) strengthen the enterprise sector's capability to increase exports towards region and European Union (EU) markets. The project consists of the following three components: (1) Facilitating business entry and operations by improving quality of business regulations, including their potential impact on market competition; (2) Strengthening the enterprise sector's capability to export to regional and EU markets by developing further the Metrology, Standards, Testing and Quality system; and (3) Project coordination support component.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2006-06-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-10-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Evis Sulko</narrative></person-name><telephone>+1-202-473-1000</telephone><email>esulko@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183875" />
            <name><narrative>Tirana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.327499 19.81889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15126" percentage="80" xml:lang="en"/><sector vocabulary="1" code="15113" percentage="20" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="20" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="40" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="20" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="20" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="20" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="20" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">8333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">8333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">16666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">183333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">216666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">216666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">216666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">216666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">216666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">216666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">263333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">263333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">263333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">25000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">141442.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">141442.38</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P096643"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P096643?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P096643"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Government officials trained in RIA and other regulatory review techniques
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="42.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditation assessors trained (by the project)
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="69.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditation assessors trained (by the project)
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="100.00">
<comment><narrative>
The project financed a significant amount of hands-on training for DA staff. The target was greatly exceeded due to the extensionof the contract approved after the Jan 2012 restructuring.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adopted standards made available electronically
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="77.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditation assessors trained (by the project)
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="69.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditations granted in accordance with the  EA standards
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="3.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="24.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="14.00">
<comment><narrative>
Cumulative. The number of accreditation services provided decreased to 14 from 17 in September as the accreditation of fivetestinglaboratories expired and one laboratory was accredited (DA reports the number of accredited certification accreditationbodies, accreditation of which are granted and valid).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of RIA pilots carried out
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="3.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kind of measurements in which GDM is able to provide calibration services
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="4.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Cumulative. The numbers include dimensional, mass, electricity, flow, pressure, temperature, volume, acceleration, time andfrequency, humidity, roughness, hardness, magnetism, viscosity, acoustics, optics, vibrations, ionizing, radiation, chemistry
</narrative></comment>
</target>
<actual value="20.00">
<comment><narrative>
(cumulative)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Workshops organized by METE to discuss Government#s progress in business environment reforms with relevant stakeholders, including progress made in BERIS-supported reforms
</narrative></title>
<baseline year="2006" iso-date="2006-12-20" value="5.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-20" />
<period-end iso-date="2012-06-30" />
<target value="17.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of inspection agencies
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2012-06-30" />
<target value="20.00">
<comment><narrative>
The target is &lt;20.
</narrative></comment>
</target>
<actual value="33.00">
<comment><narrative>
The number of agencies will go down to 11 upon the expected approval of all the amendments by the Council of Ministers by June 30,2012. [EVIS PROVIDE LIKELIHOOD, ANY RISKS?]
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Senior manager time dealing with state administration
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="16.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2012-06-30" />
<target value="13.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditation assessors trained (by the project)
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="69.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Workshops organized by METE to discuss Government#s progress in business environment reforms with relevant stakeholders, including progress made in BERIS-supported reforms
</narrative></title>
<baseline year="2006" iso-date="2006-12-20" value="5.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-20" />
<period-end iso-date="2011-12-31" />
<target value="17.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="16.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of RIA pilots carried out
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="3.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of RIA pilots carried out
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="3.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
The project implemented the targeted number of RIA pilots on 3 pieces of legislation: the Inspection Law, the Law of VeterinaryServices and the draft law of on Environmental Protection. Of the 42 Government officials trained trained in the RIA techniques, 23participants were involved in 5 sessions of each of the three RIA pilots.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Government officials trained in RIA and other regulatory review techniques
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="90.00">

</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditations granted in accordance with the  EA standards
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="24.00">

</target>
<actual value="23.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kind of measurements in which GDM is able to provide calibration services
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="4.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Cumulative. The numbers include dimensional, mass, electricity, flow, pressure, temperature, volume, acceleration, time andfrequency, humidity, roughness, hardness, magnetism, viscosity, acoustics, optics, vibrations, ionizing, radiation, chemistry
</narrative></comment>
</target>
<actual value="20.00">
<comment><narrative>
(cumulative)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Government officials trained in RIA and other regulatory review techniques
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="90.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="42.00">
<comment><narrative>
The component indicator has not been fully met at the time of writing this ISR due to pending adoption of Decree instituting theRIA. The targeted training included systematic training of Government officials in RIA techniques by trained METE staff that METEwas to organize on its own funds upon the adoption of the Decree. At the same time, besides the 42 officials trained in the RIAtechniques under the consultancy financed by the project, other TA not included in the value included the following; (a)involvement of 23 of these 42 participants in 5 sessions for each of the three RIA pilots (drafting of the Inspection Law, Law onVeterinary Services and draft of the Environmental Protection Law; (b) promoting the implementation of light RIA in two workshopsin the last quarter of 2011 among 20 deputy ministers and general secretaries, 95 directors and heads of legal and policydepartments from all line ministries, leaders of independent institutions, and business people; (c) ongoing training of METE staffthat worked on the project (EVIS is this correct?).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Senior manager time dealing with state administration
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="16.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2011-12-31" />
<target value="13.00">

</target>
<actual value="0.00">
<comment><narrative>
(to be measured in  end of the project).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adopted standards made available electronically
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="77.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Senior manager time dealing with state administration
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="16.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2012-06-30" />
<target value="13.00">

</target>
<actual value="0.00">
<comment><narrative>
The ultimate  outcome of the project work (licensing, inspection, RIA reform) in the business regulation was to be assessed basedon a small business survey, a public administration survey and self-assessment. The data will be available in July 2012. Otherevidence - Doing Business, USAID reports - show that senior management is dealing less with state administration. [EVIS PLS PROVIDESPECIFIC EXAMPLES
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Use of MSTQ services, measured as number of calibration services provided
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="26.00"><comment><narrative>Year-to-date data</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="650.00">
<comment><narrative>
Year-to-date data
</narrative></comment>
</target>
<actual value="180.00">
<comment><narrative>
Year-to-date data
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of RIA pilots carried out
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kind of measurements in which GDM is able to provide calibration services
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="30.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditations granted in accordance with the  EA standards
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="3.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="24.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="23.00">
<comment><narrative>
The indicator reflects the number of accreditations granted by DA and still valid. DA has maintained its performance at asignificantly higher level thanks to the capacity building efforts financed by the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adopted standards made available electronically
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="77.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kind of measurements in which GDM is able to provide calibration services
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="4.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="30.00">
<comment><narrative>
The target was corrected from 50 to 30 in the Jan 2012 restructuring based on how many more types of measurements GDM couldperformbased on the equipment procured. The original target was not correct based on the procurement plan (that dropped someequipment dueto delays). The numbers include dimensional, mass, electricity, flow, pressure, temperature, volume, acceleration,timeand frequency,humidity, roughness, hardness, magnetism, viscosity, acoustics, optics, vibrations, ionizing, radiation, chemistry.
</narrative></comment>
</target>
<actual value="28.00">
<comment><narrative>
The GDM has significantly increased its capacity to provide a more diverse type of measurements based on the equipment boughtunderthe project and EU IPA funds, as well as capacity building efforts. The GDM expects to fully meet the target at projectclosure. [EVIS I DO NOT EXACTLY KNOW HOW TO ADD THE TYPE OF MEASUREMENTS HERERE. IS NO. NOT SUFFICIENT? i WOULD HOWEVER SAY HOWMCUH GDM EXPECTS TO EXCEED THE TARGET ONCE THE EQUIPMENT HAS BEEN DELIVERED]
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business satisfaction with quality of regulation
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="3.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2012-06-30" />
<target value="2.50">
<comment><narrative>
Whereby 1 is very satisfied... 6 is very dissatisfied.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
The ultimate  outcome of the project work (licensing, inspection, RIA reform) in the business regulation was to be assessed basedon a small business survey, a public administration survey and self-assessment. The data is not available at the time of writingthisISR due to [why not?]. The data is supposed to be available in [when]. Other evidence - Doing Business, USAID reports - showthat businesses are more satisfied with quality of regulation. For example, [give examples/proxies].
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Senior manager time dealing with state administration
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="16.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2011-12-31" />
<target value="13.00">

</target>
<actual value="0.00">
<comment><narrative>
(to be measured in  end of the project).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Workshops organized by METE to discuss Government#s progress in business environment reforms with relevant stakeholders, including progress made in BERIS-supported reforms
</narrative></title>
<baseline year="2006" iso-date="2006-12-20" value="5.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-20" />
<period-end iso-date="2011-12-31" />
<target value="17.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="16.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Senior manager time dealing with state administration
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="16.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2011-12-31" />
<target value="13.00">

</target>
<actual value="0.00">
<comment><narrative>
(to be measured in  end of the project).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business satisfaction with quality of regulation
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="3.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2011-12-31" />
<target value="2.50">
<comment><narrative>
Whereby 1 is very satisfied... 6 is very dissatisfied.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
To be measured in the end of the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditation assessors trained (by the project)
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Workshops organized by METE to discuss Government#s progress in business environment reforms with relevant stakeholders, including progress made in BERIS-supported reforms
</narrative></title>
<baseline year="2006" iso-date="2006-12-20" value="5.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-20" />
<period-end iso-date="2011-12-31" />
<target value="17.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="16.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kind of measurements in which GDM is able to provide calibration services
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="4.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Cumulative. The numbers include dimensional, mass, electricity, flow, pressure, temperature, volume, acceleration, time andfrequency, humidity, roughness, hardness, magnetism, viscosity, acoustics, optics, vibrations, ionizing, radiation, chemistry
</narrative></comment>
</target>
<actual value="20.00">
<comment><narrative>
(cumulative)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Government officials trained in RIA and other regulatory review techniques
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="42.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Use of MSTQ services, measured as number of calibration services provided
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="26.00"><comment><narrative>Year-to-date data</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="650.00">
<comment><narrative>
Year-to-date data
</narrative></comment>
</target>
<actual value="180.00">
<comment><narrative>
Year-to-date data
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business satisfaction with quality of regulation
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="3.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2011-12-31" />
<target value="2.50">
<comment><narrative>
Whereby 1 is very satisfied... 6 is very dissatisfied.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
To be measured in the end of the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of inspection agencies
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2012-06-30" />
<target value="20.00">

</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adopted standards made available electronically
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="77.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business satisfaction with quality of regulation
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="3.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2011-12-31" />
<target value="2.50">
<comment><narrative>
Whereby 1 is very satisfied... 6 is very dissatisfied.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
To be measured in the end of the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Use of MSTQ services, measured as number of calibration services provided
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="26.00"><comment><narrative>Year-to-date data</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="650.00">
<comment><narrative>
Year-to-date data
</narrative></comment>
</target>
<actual value="180.00">
<comment><narrative>
Year-to-date data
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adopted standards made available electronically
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="77.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Use of MSTQ services, measured as number of calibration services provided
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="400.00">

</target>
<actual value="300.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Government officials trained in RIA and other regulatory review techniques
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="42.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Workshops organized by METE to discuss Government#s progress in business environment reforms with relevant stakeholders, including progress made in BERIS-supported reforms
</narrative></title>
<baseline year="2006" iso-date="2006-12-20" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-20" />
<period-end iso-date="2012-06-30" />
<target value="17.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business satisfaction with quality of regulation
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="3.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2012-06-30" />
<target value="2.50">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of RIA pilots carried out
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2010-12-31" />
<target value="3.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
Cumulative
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditations granted in accordance with the  EA standards
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="3.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="24.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="14.00">
<comment><narrative>
Cumulative. The number of accreditation services provided decreased to 14 from 17 in September as the accreditation of fivetestinglaboratories expired and one laboratory was accredited (DA reports the number of accredited certification accreditationbodies, accreditation of which are granted and valid).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Use of MSTQ services, measured as number of calibration services provided
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="26.00"><comment><narrative>Year-to-date data</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2012-06-30" />
<target value="400.00">
<comment><narrative>
The original YTD target was increased from 650 to 800 based on more accurate estimates of how performance will improve based onequipment bought on project andEU IPA funds, as well as capacity building efforts. The new mid-year target is thus 400.
</narrative></comment>
</target>
<actual value="300.00">
<comment><narrative>
The GDM has increased the number of calibration services to businesses on a yearly basis from 2006 (26) until now (300 at the endof April 2012) based on the equipment bought, capacity building and awareness raising efforts financed by the project. Thisindicatoris a proxy for measuring the increase of the business sector's capacity for exports. The GDM expects to fully meet thetarget at project closure.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accreditations granted in accordance with the  EA standards
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="3.00"><comment><narrative>Cumulative</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2011-12-31" />
<target value="24.00">
<comment><narrative>
Cumulative
</narrative></comment>
</target>
<actual value="14.00">
<comment><narrative>
Cumulative. The number of accreditation services provided decreased to 14 from 17 in September as the accreditation of fivetestinglaboratories expired and one laboratory was accredited (DA reports the number of accredited certification accreditationbodies, accreditation of which are granted and valid).
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P096263</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Land Administration and Management Project (LAMP)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to: (i) improve the efficiency and effectiveness of land administration and management through enhanced tenure security and improved urban planning; and (ii) rebuild physical assets and restore essential services in the flood affected areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The overall goal of the long term land administration and management program is to facilitate the development of an efficient land and property markets through enhancing tenure security and improving land administration and management services. The long term program is expected to be implemented through 3 phases of 4 year each. The Land Administration and Management Project (LAMP) is the first phase of such a program. The specific objective of the project is to improve the efficiency and effectiveness of land administration and urban management through enhancing tenure security, improving urban planning, land management and development control, supporting property valuation and taxation, and financing investments in urban infrastructure and services. There are three components to the Project. The first component, security of tenure and registration of immovable property rights, is designed to improve service delivery, efficiency and transparency of the Immovable Property Registration Office and complete most of the first registration of immovable property rights. This component will cover the entire country but initially, will concentrate on urban and peri-urban areas. The second component, urban land management, is to strengthen the capacity of municipalities in urban land management through the support to: (1) establishing a market-responsive, participatory urban planning and development control system via technical assistance to revisions in urban planning law and development of regulatory plans for participating cities; and (2) mobilizing municipal revenues and correcting property market distortions through property valuation and taxation. The objective of the third component is to enable proactive urban growth management and enhancing urban land market efficiency by prioritizing and implementing selected infrastructure investments and services, in accordance with strategic investment plans. This component will also support the implementation of the address system.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2007-03-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-02-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Kathrine M. Kelm</narrative></person-name><telephone>+1-202-473-1000</telephone><email>kkelm@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782756" />
            <name><narrative>Korce</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.61861 20.78083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184081" />
            <name><narrative>Shkoder</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.068279 19.512581</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184935" />
            <name><narrative>Lezhe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.783611 19.64361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185728" />
            <name><narrative>Durres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.323059 19.441389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184862" />
            <name><narrative>Lushnje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.94194 19.705</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="43032" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="78.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BG" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Law and Justice</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="38" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="38" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="25" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="29" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="12" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="16" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000334" percentage="12" xml:lang="en"><narrative>Housing Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="13" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="4" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P096263"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P096263?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P096263"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment in priority infrastructure and services completed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="4.00">
<comment><narrative>
Assumes completion of 4 subprojects at $800,000 equivalent of which 50% financed by IBRD.
</narrative></comment>
</target>
<actual value="4.00">
<comment><narrative>
Completed.

Note: In the last ISR, this indicator was reported in terms of the total investment instead of number of subprojects.The total investment for 4 projects is $3.2 million, and not $32 million noted in the last ISR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural land protected by rehabilitated drainage pumps
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline begins at date of restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="9100.00">
<comment><narrative>
Target date revised. (Value is in hectares of agricultural land).
</narrative></comment>
</target>
<actual value="10600.00">
<comment><narrative>
All stations except Cas DPS  completed, but some repairs have been performed and the station is working at about 50% of capacity(700 ha).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water testing equipment installed and in use in Shkodra
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline is project restructuring date.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2012-12-15" />
<target value="150000.00">

</target>
<actual value="150000.00">
<comment><narrative>
Completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water Supply Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in time to register property transaction
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="47.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="5.00">
<comment><narrative>
Target is 5 days as per the 2011 Restructuring Paper.
</narrative></comment>
</target>
<actual value="9.80">
<comment><narrative>
This data from the new IT system. The value of the indicator has increased from 9.0 to 9.8 days because it reflects data fromTirana and 4 additional district offices, and, therefore, is more representative.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities in which New Street Addressing &amp; Building Numbering System Implemented
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>As of restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2013-06-30" />
<target value="10.00">

</target>
<actual value="13.00">
<comment><narrative>
Target achieved and exceeded by 30%.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Flood Drainage Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">
<comment><narrative>
Target date revised.
(Value represents drainage pumping stations that will be rehabilitated).
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
One station should be operational by June 2013.  The other two will likely require  beyond the present closing date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local offices that received training.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">
<comment><narrative>
Target date revised.
</narrative></comment>
</target>
<actual value="5.00">
<comment><narrative>
Training coincides with the roll-out of the IT system, and will be completed alongside the roll-out in the remaining 5 offices.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline is project restructuring date.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2012-12-15" />
<target value="150000.00">
<comment><narrative>
Residents in Shkodra benefitting from flood protection services.
</narrative></comment>
</target>
<actual value="150000.00">
<comment><narrative>
Completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water Supply Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">
<comment><narrative>
Target date revised. 
(Value represents pumping stations that will be rehabilitated).
</narrative></comment>
</target>
<actual value="2.00">
<comment><narrative>
Two have been completed.  Trush Station is under rehabilitation and is expected to be completed before Project closing date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that complete the regulatory plans.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2011-02-11" />
<target value="8.00">
<comment><narrative>
target already achieved
</narrative></comment>
</target>
<actual value="8.00">
<comment><narrative>
All 8 Territorial Plans prepared under the project have been completed and accepted by the National Territorial Planning Agencyandthe respective municipalities.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment in priority infrastructure and services completed
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2013-06-30" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Customer satisfation of the IPRO is improved (on a scale from &quot;Very Poor, Poor, Average, Good, Very Good, and Excellent&quot;) to the level of &quot;Very Good&quot;
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="Very poor"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="Very good">

</target>
<actual value="Good">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of titles issued in urban and rural areas.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="400000.00">
<comment><narrative>
Expect to reach 330,000 by end June and full target shortly after project closure.
</narrative></comment>
</target>
<actual value="207483.00">
<comment><narrative>
507274 in progress, of which 402503 up to stage of public viewing, 343856 completed and 273582 kartela printed and handed over toIPRO.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline is project restructuring date.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2012-12-15" />
<target value="150000.00">
<comment><narrative>
Target already achieved
</narrative></comment>
</target>
<actual value="150000.00">
<comment><narrative>
Emergency rehabilitation works are completed in the main storm-water section of Shkodra where more than 150,000 residents willbenefit from drainage services and flood protection.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of titles issued in urban and rural areas.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="400,000.00">

</target>
<actual value="207,483.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of automated offices
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">
<comment><narrative>
Target date revised.
</narrative></comment>
</target>
<actual value="5.00">
<comment><narrative>
Roll-out in progress for additional five offices.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in time to register property transaction
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="47.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="5.00">
<comment><narrative>
Target date revised
</narrative></comment>
</target>
<actual value="8.00">
<comment><narrative>
The number of days comes from the Tirana's cadastral zones in the new IT system.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Flood Drainage Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that complete the regulatory plans.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2011-02-11" />
<target value="8.00">
<comment><narrative>
All 8 Territorial Plans have been completed.
</narrative></comment>
</target>
<actual value="8.00">
<comment><narrative>
Completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of titles issued in urban and rural areas.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="400000.00">
<comment><narrative>
Target date revised.
</narrative></comment>
</target>
<actual value="127838.00">
<comment><narrative>
Continued progress in finalizing titles.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Customer satisfation of the IPRO is improved (on a scale from &quot;Very Poor, Poor, Average, Good, Very Good, and Excellent&quot;) to the level of &quot;Very Good&quot;
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="Very poor"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="Very good">
<comment><narrative>
Target date is revised.
</narrative></comment>
</target>
<actual value="Good">
<comment><narrative>
Based on the 2012 customer satisfaction survey.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local offices that received training.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water testing equipment installed and in use in Shkodra
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="1.00">

</target>
<actual value="0.00">
<comment><narrative>
This activity has not been implemented, so far, due to the inability of the Shkodra Water Supply Utility to provide the list andspecifications for the related equipment
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that complete the regulatory plans.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2011-02-11" />
<target value="8.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2012-12-15" />
<target value="150,000.00">

</target>
<actual value="150,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural land protected by rehabilitated drainage pumps
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline begins at date of restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="9100.00">
<comment><narrative>
Target date revised. 
(Value is in hectares of agricultural land).
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
Velipoije Pumping Station should be operational by June 2013.  Cas and Tale are delayed due to contractor inability to perform.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in time to register property transaction
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="47.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="5.00">

</target>
<actual value="6.00">
<comment><narrative>
This is data from the IT-enabled offices.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment in priority infrastructure and services completed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="4.00">
<comment><narrative>
Assumes completion of 4 subprojects at $800,000 equivalent of which 50% financed by IBRD.
</narrative></comment>
</target>
<actual value="4.00">
<comment><narrative>
Completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that received training in procurement and financial management
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of titles issued in urban and rural areas.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="400000.00">
<comment><narrative>
Target date revised.
</narrative></comment>
</target>
<actual value="161361.00">
<comment><narrative>
Continued progress in finalizing titles.

26% increase since last ISR. 40% achievement vs. overall target.

Note: The last ISRstated the actual figure as 12,783,800 when it should have been 127,838.00 titles.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that completed interim reforms and qualified for the first phase of investments
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water Supply Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that complete the regulatory plans.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2011-02-11" />
<target value="8.00">
<comment><narrative>
All 8 Territorial Plans have been completed.
</narrative></comment>
</target>
<actual value="8.00">
<comment><narrative>
Completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completed municipal investments
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-30" />
<target value="4.00">
<comment><narrative>
Assumes completion of 4 subprojects at $800,000 equivalent of which 50% financed by IBRD. Component C is closing on June 30, 2013
</narrative></comment>
</target>
<actual value="4.00">
<comment><narrative>
All four municipal investment projects have been completed and handed over and have satisfactorily completed their performanceperiod.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Customer satisfation of the IPRO is improved (on a scale from &quot;Very Poor, Poor, Average, Good, Very Good, and Excellent&quot;) to the level of &quot;Very Good&quot;
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="Very poor"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="Very good">
<comment><narrative>
2014 customer survey is underway
</narrative></comment>
</target>
<actual value="Good">
<comment><narrative>
Based on the 2012 customer satisfaction survey.

The 2014 customer service is planned to for March and April, and its results willbe available by the end of May 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Flood Drainage Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">
<comment><narrative>
Target date revised.
(Value represents drainage pumping stations that will be rehabilitated).
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
The work in Velipoja will be completed by mid-November, 2013. The target date for Cas and Tale has been extended to May 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that implemented the new address system
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>As of restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2013-06-30" />
<target value="13.00">
<comment><narrative>
Component C is closing on June 30, 2013
</narrative></comment>
</target>
<actual value="13.00">
<comment><narrative>
Bidding documents for additional street addressing were submitted on December 10, leaving insufficient time to proceed.  Projecttarget has already been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water Supply Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">
<comment><narrative>
Target date revised. 
(Value represents pumping stations that will be rehabilitated).
</narrative></comment>
</target>
<actual value="2.00">
<comment><narrative>
Works for two pumping stations was completed in December 2012. Works on Trush -- the third station -- is about 55% complete, andthe revised date of completion is December 15, 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of automated offices
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of automated offices
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that received training in procurement and financial management
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in time to register property transaction
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="47.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="5.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities in which New Street Addressing &amp; Building Numbering System Implemented
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2013-06-30" />
<target value="10.00">

</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water testing equipment installed and in use in Shkodra
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="1.00">

</target>
<actual value="0.00">
<comment><narrative>
This activity has not started, due to the lack of interest  from the Shkodra Water Supply Utility.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural land protected by rehabilitated drainage pumps
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="9,100.00">

</target>
<actual value="10,600.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that completed interim reforms and qualified for the first phase of investments
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of automated offices
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">
<comment><narrative>
Target date revised.
</narrative></comment>
</target>
<actual value="5.00">
<comment><narrative>
Roll-out in progress for additional five offices.

The remaining 5 offices have local servers but have not been connected to thecentral server yet. This is expected to be completed by the next mission.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural land protected by rehabilitated drainage pumps
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline begins at date of restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="9100.00">
<comment><narrative>
Target date revised. (Value is in hectares of agricultural land).
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
The work in Velipoja will be completed by the end of November 2013. The target date for Cas and Tale has been extended to May 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that received training in procurement and financial management
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Flood Drainage Pumping Stations Rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>Baseline as of project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2014-06-30" />
<target value="3.00">

</target>
<actual value="2.00">
<comment><narrative>
The Cas DPS is will not be completed by the closing date. Contractor has performed repair works to the existing pumps and increasedthe station capacity to 50%.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Customer satisfaction of the IPRO is improved (on a scale from &quot;Very Poor, Poor, Average, Good, Very Good, and Excellent&quot;) to the level of &quot;Very Good&quot;
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="Very poor"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="Very good">
<comment><narrative>
Target date revised.
</narrative></comment>
</target>
<actual value="Good">
<comment><narrative>
Survey for 2012 has been implemented and the final report will be issued by end Dec 2012. The findings will be reflected inthenextISR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local offices that received training.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">
<comment><narrative>
Target date revised.
</narrative></comment>
</target>
<actual value="5.00">
<comment><narrative>
Training coincides with the roll-out of the system and will continue in the next five offices.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities in which New Street Addressing &amp; Building Numbering System Implemented
</narrative></title>
<baseline year="2011" iso-date="2011-01-21" value="0.00"><comment><narrative>As of restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-21" />
<period-end iso-date="2013-06-30" />
<target value="10.00">

</target>
<actual value="13.00">
<comment><narrative>
Target achieved and exceeded by 30%.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local offices that received training.
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">
<comment><narrative>
Training coincides with the roll-out of the IT system.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that completed interim reforms and qualified for the first phase of investments
</narrative></title>
<baseline year="2007" iso-date="2007-01-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-03" />
<period-end iso-date="2014-06-30" />
<target value="10.00">

</target>
<actual value="10.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P086807</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Integrated Coastal Zone Management &amp; Clean-Up Project (APL #1)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to assist the Government of Albania in developing, on a sustainable basis, tourism in the South Albania coast by improving critical public environmental infrastructure and municipal services, remediating and containing pollution hazards from a former chemical plant in Porto Romano near Durres, improving community infrastructure and enhancing architectural and cultural resources.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The overall objective of the Integrated Coastal Zone Management and Clean-Up Project is to protect the coastal natural resources and cultural assets, and promote sustainable development and management of the Albanian coast. To this end, institutional and policy framework for an integrated coastal zone management (ICZM) will be established, and a broader regulatory capacity will be strengthened at the central, regional, and local levels for protection of coastal and marine natural resources. Project components will: 1) enhance the capacity of the Albanian authorities in the management of coastal resources, developing adequate operational policy, legal, and regulatory framework, as well as financial/economic instruments for the ICZM; strengthen institutional capacity to increase the effectiveness of regulatory, planning, and management functions of the ICZM at the central, regional, and local levels; strengthen coastal water quality monitoring network; and strengthen protected areas management in Butrint National Park, and enhance the knowledge base, while raising public awareness on coastal issues; 2) assist southern coastal municipalities and communes in preserving, protecting, and enhancing coastal natural resources, and cultural assets to improve the environmental conditions of the coastal area, and to encourage community support for a sustainable coastal zone management. This component will support improvements in solid waste management in the south coastal zone; in the transformation of the Port of Saranda into a ferryboat and passenger terminal; and the establishment of a Coastal Village Conservation and Development Program (CVCDP); 3) mitigate soil and groundwater contamination in the chemical plant at Porto Romano, seriously contaminated within the Balkans. The component seeks to build capacity and awareness on hazardous waste management, in pursuit of adequate environmental monitoring, to include remediation and clean-up works, land-use planning, and resettlement plan implementation; and 4) support project management, coordination, monitoring and evaluation, through technical assistance, training, and the provision of incremental operational costs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0000594"><narrative>Ministry of Fiinance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0000594"><narrative>Ministry of Fiinance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0000595"><narrative>Ministry of Urban Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-05-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2005-06-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Adriana Jordanova Damianova</narrative></person-name><telephone>+1-202-473-1000</telephone><email>adamianova@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002525810" />
            <name><narrative> Lukovë</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.992222 19.913891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595331" />
            <name><narrative> Ksamil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.76889 19.99972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183686" />
            <name><narrative> Vuno</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.139721 19.693609</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183686" />
            <name><narrative>Vuno</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.139721 19.693609</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183721" />
            <name><narrative> Vlore District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.333328 19.549999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183721" />
            <name><narrative>Vlore District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.333328 19.549999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185803" />
            <name><narrative> Dhermi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.15139 19.638889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344952" />
            <name><narrative> Qarku i Vlores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.166672 19.799999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007874164" />
            <name><narrative> Butrint National Park</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.75943 20.03467</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185377" />
            <name><narrative>Himare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.101669 19.74472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185377" />
            <name><narrative> Himare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.101669 19.74472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184455" />
            <name><narrative>Piqeras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.014439 19.891109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184455" />
            <name><narrative> Piqeras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.014439 19.891109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184419" />
            <name><narrative> Porto-Romano</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.366669 19.42889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184370" />
            <name><narrative>Qeparo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.056938 19.821939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184370" />
            <name><narrative> Qeparo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.056938 19.821939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363257" />
            <name><narrative> Bajkaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.948608 20.038891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363245" />
            <name><narrative>Sarande District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.833328 20.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363245" />
            <name><narrative> Sarande District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.833328 20.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363200" />
            <name><narrative> Xarrë</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.728329 20.05444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184576" />
            <name><narrative>Orikum Municipality</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.333328 19.466669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184576" />
            <name><narrative> Orikum Municipality</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.333328 19.466669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184555" />
            <name><narrative>Palase</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.166672 19.62389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184555" />
            <name><narrative> Palase</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.166672 19.62389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14020" percentage="15" xml:lang="en"/><sector vocabulary="1" code="14030" percentage="15" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="30" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="15" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="21040" percentage="15" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="15" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="15" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="10" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="29" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="15" xml:lang="en"><narrative>Air quality management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">89142.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">89142.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">89142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">433333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">433333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">433333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">300000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">300000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">300000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2005-06-30"/><value value-date="2005-06-30">17500000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-1651849</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-01-31"/><value value-date="2006-01-31">304370</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-02-28"/><value value-date="2006-02-28">952378</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-11-30"/><value value-date="2006-11-30">418644</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">519392</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-07-31"/><value value-date="2007-07-31">183545</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-11-30"/><value value-date="2007-11-30">80627</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-12-31"/><value value-date="2007-12-31">809745</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">88000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">84312</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">383590</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">70400</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">77127</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">-5176</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">-250430</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">111484</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">345457</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">81908</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">18284</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">204207</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">8371</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">154630</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">164388</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">82137</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">228192</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">20155</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">30209</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">252062</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">16102</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">8894</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">3633</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">908793</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">7912</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">320000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">353092</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">383923</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">41824</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">34431</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">23938</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">161148</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">395407</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">257808</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">32727</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">72738</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">192538</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">44917</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">37365</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">103839</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">86319</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">119870</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">30739</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">557482</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">578189</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">124880</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">112941</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">58130</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">417755</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">416741</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">65904</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">42166</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">47470</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">94763</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">97560</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">43337</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">39293</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">301581</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">34789</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">73244</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">375840</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">586272</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">257720</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">47025</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">362746</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">524345</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">95134</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">197848</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">133546</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">217055</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">36456</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">386611</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">401223</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">58054</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">215101</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1338912</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">497765</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">46836</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">138295</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">36759</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">367445</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">93798</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">55989</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">189121</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">226713</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">103603</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">358601</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">163906</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1288026</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">1131085</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">844537</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">107135</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">56400</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">9444</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">411324</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">84866</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">57087</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">152879</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">118085</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-03-31"/><value value-date="2006-03-31">-28180</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-09-30"/><value value-date="2006-09-30">-28861</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-03-31"/><value value-date="2007-03-31">-21919</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-09-30"/><value value-date="2007-09-30">-23730</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">-19560</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">-20517</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">-13854</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">-15514</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-15574</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-16491</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-20252</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-23084</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-22638</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-25987</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-27954</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-31263</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-37410</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-43809</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-47840</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-46961</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-54213</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-51588</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-48416</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-26172</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-50073</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-49172</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-35860</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-32287</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-29704</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-13522</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-39546</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-21589</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-19658</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-15224</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-13042</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-10336</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-7827</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5222</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2676</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-825143</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-728245</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-731678</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-705181</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-743957</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-759360</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-732926</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-727524</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-717497</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-720104</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-740210</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-746397</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-745101</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-720715</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-676605</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-695588</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-689046</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-695776</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-698710</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-686559</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-16314</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-595"><narrative>Ministry of Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P086807"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P086807?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P086807"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reconstruction of the water supply and sewer networks in Saranda.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Inadequate water supply and sanitation system in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Execution of water supply and sanitation works completed including wastewater outlet, 12.5 km main trunk and reservoir rehabilitation to improve storage capacity.">

</target>
<actual value="Target achieved. Construction works for both the water supply and sewage 100% complete. 
Execution of water supply and sanitationworks completed including 1.9 km waste water outlet and 2.1 km sewer line within the town;12, 9 km Navarica main trunk replaced,improving existing water supply capacity and extension of distribution network in tourist area.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rehabilitation of Port of Saranda facilities to facilitate tourism access to the Southern Coast.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="N/A Saranda's old passenger port facilities in operation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Target achieved. Completion of passenger port rehabilitation infrastructure as per the design parameters; Port facilitiesoperational.">

</target>
<actual value="Fully achieved. Rehabilitation of Passenger Port facilities is 100% completed. A new quay wall of 180 m and depth 9 m, includingport surface facilities are fully operational.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Remediation of contaminated sites through removal and containment of hazardous materials in Porto Romano to reduce human health hazards
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Contaminated materials from the site removed and safely stored (baseline at restructuting); Containment of on-site contaminationnot addressed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Safe landfill facility for encapsulation of 45,000 m3 of hazardous waste on one of the hazardous sites constructed.">

</target>
<actual value="The target is fully achieved. Remediation and cleanup of hotspots sites is 100% complete with safe disposal and encapsulation atthe CDF (Confined Disposal facility) of more than 45,000 m3 hazardous waste.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Remediation of contaminated sites through removal and containment of hazardous materials in Porto Romano to reduce human health hazards
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Contaminated materials from the site removed and safely stored (baseline at restructuting); Containment of on-site contaminationnot addressed"><comment><narrative>At project restructuring in 2010</narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Safe landfill facility for encapsulation of 45,000 m3 of hazardous waste on one of the hazardous sites constructed.">
<comment><narrative>
Encapsulation of contaminated material and safe disposal is completed. Target is fully met.
</narrative></comment>
</target>
<actual value="The target is fully achieved. Remediation and cleanup of hotspots sites is 100% complete with safe disposal and encapsulation atthe CDF (Confined Disposal facility) of more than 45,000 m3 hazardous waste.">
<comment><narrative>
Porto Romano cleanup is completed. Site monitoring is carried by the Regional Environmental Agency on bi-annual basis.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Newly built waste landfill and transfer station capacity to service the population of the Southern Coast
</narrative></title>
<baseline year="2005" iso-date="2005-02-24" value="0.00"><comment><narrative>There is no safe disposal of solid waste at the South Coast at the time of appraisal (2005) and restructuring (2010)</narrative></comment></baseline>
<period>
<period-start iso-date="2005-02-24" />
<period-end iso-date="2015-03-31" />
<target value="25000.00">
<comment><narrative>
25,000 cub m /year of household waste properly disposed in sanitary landfill.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
Construction of sanitary landfill is ongoing according to schedule with completion rate of 65%.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rehabilitation of Port of Saranda facilities to facilitate tourism access to the Southern Coast.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="N/A Saranda's old passenger port facilities in operation"><comment><narrative>Same at project restructuring.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Completion of passenger port rehabilitation infrastructure as per the design parameters; Port facilities operational">

</target>
<actual value="Fully achieved. Rehabilitation of Passenger Port facilities is 100% completed. A new quay wall and surface facilities are fullyoperational.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Resettlement of the families on the former site completed in accordance with the agreed Resettlement Action Plan and legal titles provided.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Resettlement Action Plan for Porto Romano completed prior to appraisal"><comment><narrative>Actions pending during restructuring. New deadline established by amendment of DCA.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Titles granted to four families">

</target>
<actual value="Completed. Resettlement Action Plan prepared and families resettled prior to construction works. Legal ownership titles weregranted to all families that filed title docuements with IPRO.">
<comment><narrative>
Completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical assistance for operation and maintenance of community waste supply systems and roads and  Roof &amp; Facade (R&amp;F) and small scale tourism provided to participating villages
</narrative></title>
<baseline year="2010" iso-date="2010-03-22" value="No TA in place prior to project restructuring."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-22" />
<period-end iso-date="2015-03-31" />
<target value="Target partially completed.
 a) TA for O&amp;M of village water supply system and road maintenance provided to vi llage participationin Round two of CVCD Program; b)TA provided for the design of R&amp;F and B&amp;B investments">

</target>
<actual value="Partially completed. Training on R&amp;F and B&amp;B carried out in 2013-2014. Training on O&amp;M for Water and Road subprojects droppedbecause these services are responsibilities of Local water supply entities. Local campaing for community awareness on solid wastemanagement completed in March 2015.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Newly built waste landfill and transfer station capacity to service the population of the Southern Coast
</narrative></title>
<baseline year="2005" iso-date="2005-02-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-02-24" />
<period-end iso-date="2015-03-31" />
<target value="25000.00">

</target>
<actual value="25000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Landfilling and encapsulation of 45,000 m3 of hazardous waste on one of the sites.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="No hazardous waste landfilled and encapsulated in Porto Romano."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="a) Execution of remediation works completed by December 2010 b) Site after-care program designed and agreed with Durresmunicipalityand MOEFW A c) Site monitoring infrastructure in place">
<comment><narrative>
Target fully met.
</narrative></comment>
</target>
<actual value="Completed. Construction of the CDF (Confined Disposal Facility) completed and contaminated soil and debris from the demolition ofbuildings in three Hot Spots are safely encapsulated. Aftercare management, maintenance and monitoring plan has been approved andsigned by MOEFWA, Durres municipality and Durres Regional Environmental Agency. The site monitoring infrastructure is in place.">
<comment><narrative>
Target met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved waste disposal infrastructure for the Southern Coast built in Saranda area with capacity of 25,000 m3 per year and the accompanying transfer station in Himare.
</narrative></title>
<baseline year="1969" iso-date="1969-12-31" value="No waste disposal infrastructure in place for the South Coast"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1969-12-31" />
<period-end iso-date="2015-03-31" />
<target value="Bajkaj landfill and Transfer Station in Himare operational">

</target>
<actual value="Completion and certification scheduled for December 2014. Construction works in Bajkaj landfill and Himara Transfer station werecompleted at 95% at the time of mission in mid November.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community-based investments in coastal villages have improved environmental infrastructure enabling sustainable tourism developmentin the Southern Coast
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="There are no specific investments targeting village infrastructure in the coasta l villages supporting sustainable tourismactivities."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Round two of community based infrastructure investments including Roof and Facades Rehabilitation and B&amp;B window implemented.">

</target>
<actual value="The target is fully achieved. Round 1 and Round 2 of the CVCD investments were completed with active participation of communities.Results from Round 1: Completed projects include: water supply for more than 400 families/ or 1200 residents in Gjilek; (ii) watersupply rehabilitated for 167 families/ or 500 residents in Vuno; (iii) improved network of sewage and water supply for 800households connected to the current system in Himara Municipality; (iv) water supply for all 380 families/or 1400 residents inPiqeras); water supply for all 355 families or 1300 residents in Shen Vasil. More than 50 hotels and businesses were connected tosewage collection network. More than access 6500 m roads were constructed and/or upgraded used by local residents and visitors ofthe area. Results from Round 2: Works are completed 100% and handover for 9 road/square rehabilitation and 5 water supply schemesin the participating villages. Ten villages, benefited from Round 2 investments (Dhermi, Ilias, Nivice Piqeras Ksamil Xarre,Pllake-Qenurio, Bajkaj-Palavli) of tortal of 18,400 inhabitants and 24,100 tourists. A total of 8.52 km of access roads have beenbuilt and village squares of total of 10.600 m2.
6 villages benefited from water supply investments (Ilias, Palase, Qeparo, Lukoveand Bajkaj-Palavli) of total of 7,050 inhabitants and 2,650 tourists. This includes 12.24 km of water main lines and new waterreservoirs in 5 villages (Palase-200 m3, Ilias-100 m3, Qeparo-300 m3, Lukove-250 m3 and Bajkaj- Palavli- 200 m3). In addition, 3existing reservoirs ere rehabilitated (100 m3 each) in Qeparo, Lukove and Bajkaj, contributing to increase reliability of watersupply. Targets on R&amp;F and &amp; B&amp;B is partially achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Protection and promotion of vernacular architecture of the South Coast
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="none"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-03-31" />
<target value="Up 62 houses included in the R&amp;F program.">

</target>
<actual value="The target is partially achieved. Project restructuring target set for the pilot R&amp;F was in the range 35-75 houses included in theR&amp;F rehabilitation program. Rehabilitation of 23 houses is completed. 4 more are under construction to be finished by the end ofDecember 2014.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement of the water supply and sewerage system in Saranda
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Existing water supply and sewege system ineffective to meet the waters supply and sanitation needs of Saranda"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Target fully met. Reconstruction of sewer networks (2.1 km of new sewer lines) and extension of wa ter supply (2.5 km).Construction of wastewater outlet from the WWTP in Saranda to the Chuka Channe l (2.8 km). [12.5 km] Navarica Trunk main replaced.">

</target>
<actual value="The target is achieved. Water supply has improved for 40,000 inhabitants of Saranda (number of population served is doubled duringthe summer season). Water capacity has increased to 70 l/sec. compared to 20  30 l/sec. before the investments. In addition watersupply of the Navarica village has improved, through the construction of 1 km new water pipe, serving 50 -70 households or about300 inhabitants.

Works were completed at 100% according to design parameters for both water supply and sewage. This includes: (a)Construction of wastewater outlet from the WWTP in Saranda to the Cuka Channel; (b) 2.1 km sewer line within the town; and 12.9 kmNavarica Trunk main replaced and 2.8 km water supply distribution network rehabilitated in tourist area. The rehabilitation ofexisting water reservoir in Qafa e Gjashtes and construction of new one in Lekuresi (Saranda) are under implementation with thesupport of KfW water supply project.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reconstruction of the water supply and sewer networks in Saranda.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Inadequate water supply and sanitation system in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Execution of water supply and sanitation works completed including wastewater outlet, 12.5 km main trunk and reservoir rehabilitation to improve storage capacity.">

</target>
<actual value="Target achieved. Construction works for both the water supply and sewage 100% complete. 
Execution of water supply and sanitationworks which were completed include 1.9 km waste water outlet and 2.1 km sewer line within the town;12.9 km Navarica main trunkreplaced, improving existing water supply capacity and extension of distribution network in tourist area.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Resettlement of the families on the former site completed in accordance with the agreed Resettlement Action Plan and legal titles provided.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Resettlement Action Plan for Porto Romano completed prior to appraisal"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Titles granted to four families">

</target>
<actual value="Completed. Resettlement Action Plan prepared and families resettled prior to construction works. Legal ownership titles weregranted to all families that filed title docuements with IPRO.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical assistance for operation and maintenance of community waste supply systems and roads and  Roof &amp; Facade (R&amp;F) and small scale tourism provided to participating villages
</narrative></title>
<baseline year="2010" iso-date="2010-03-22" value="No TA in place prior to project restructuring."><comment><narrative>TA is planned for CVCD round two.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-22" />
<period-end iso-date="2015-03-31" />
<target value="a) TA for O&amp;M of village water supply system and road maintenance provided to vi llage participation in Round two of CVCD Programb) TA provided for the design of R&amp;F and B&amp;B investments">

</target>
<actual value="Partially completed. Training on R&amp;F and B&amp;B carried out in 2013-2014. Training on O&amp;M for Water and Road subprojects droppedbecause these services are responsibilities of Local water supply entities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community-based investments in coastal villages have improved environmental infrastructure enabling sustainable tourism developmentin the Southern Coast
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="There are no specific investments targeting village infrastructure in the coasta l villages supporting sustainable tourismactivities."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Round two of community based infrastructure investments including Roof and Facades Rehabilitation and B&amp;B window implemented.">

</target>
<actual value="The target is fully achieved. Round 1 and Round 2 of the CVCD investments were completed with active participation of communities.Results from Round 1: Completed projects include: water supply for more than 400 families/ or 1200 residents in Gjilek; (ii) watersupply rehabilitated for 167 families/ or 500 residents in Vuno; (iii) improved network of sewage and water supply for 800households connected to the current system in Himara Municipality; (iv) water supply for all 380 families/or 1400 residents inPiqeras); water supply for all 355 families or 1300 residents in Shen Vasil. More than 50 hotels and businesses were connected tosewage collection network. More than access 6500 m roads were constructed and/or upgraded used by local residents and visitors ofthe area. Results from Round 2: Works are completed 100% and handover for 9 road/square rehabilitation and 5 water supply schemesin the participating villages. Ten villages, benefited from Round 2 investments (Dhermi, Ilias, Nivice Piqeras Ksamil Xarre,Pllake-Qenurio, Bajkaj-Palavli) of tortal of 18,400 inhabitants and 24,100 tourists. A total of 8.52 km of access roads have beenbuilt and village squares of total of 10.600 m2.
6 villages benefited from water supply investments (Ilias, Palase, Qeparo, Lukoveand Bajkaj-Palavli) of total of 7,050 inhabitants and 2,650 tourists. This includes 12.24 km of water main lines and new waterreservoirs in 5 villages (Palase-200 m3, Ilias-100 m3, Qeparo-300 m3, Lukove-250 m3 and Bajkaj- Palavli- 200 m3). In addition, 3existing reservoirs ere rehabilitated (100 m3 each) in Qeparo, Lukove and Bajkaj, contributing to increase reliability of watersupply. Targets on R&amp;F and &amp; B&amp;B is partially achieved.">
<comment><narrative>
Projects comprising CVCD-2 including 5 village water supply and 9 access roads are completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Landfilling and encapsulation of 45,000 m3 of hazardous waste on one of the sites.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="No hazardous waste landfilled and encapsulated in Porto Romano."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Target achieved: a) Execution of remediation works completed by December 2010 b) Site after-care program designed and agreed withDurres municipalityand MOEFW A c) Site monitoring infrastructure in place.">

</target>
<actual value="Completed. Construction of the Confined Disposal Facility (CDF) is completed. 45,000 m3 of contaminated soil and debris from thedemolition of buildings in three Hot Spots are safely encapsulated in CDF. Aftercare management, maintenance and monitoring planhas been approved and signed by MOEFWA, Durres municipality and Durres Regional Environmental Agency. The site monitoringinfrastructure is in place. Monitoring biannually is followed as per the plan.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coastal communities and Local Government Units participate in Coastal Vilage Conservation Development (CVCD) Program identification
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Communities actively participated in round one of the CVCD program"><comment><narrative>Prior to 2010 project restructuring majority of village project investments under CVCD-1 were successfully completed.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="1)Village infrastructure rehabilitation program completed 2)Roof and facade rehabilitation projects implemented in up to 75houses3) Up to 20 homeowners involved in B&amp;B services program">

</target>
<actual value="Achieved. Round 2 of CVCD includes 9 (nine) subprojects for the Rehabilitation of the villages Roads/Squares and 5 (five)subprojects for the Upgrade of the Water Supply system where Allonjia, Dhermi, Qeparo, Palasa, Ilias, Himara Nivica, Lukovacommune, PIqeras, Pllake Qenuiro (Alico commune), Xarra, Ksamili, Vergo commune, Bajkai and Palavli villages participated throughthe process of identification of investments, selection of contractors, supervision and co-financing. The owners of the 24 housecompleted under the R&amp;F and 4 houses under B&amp;B participated through the process of and contributed with own funds.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Protection and promotion of vernacular architecture of the South Coast
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="none"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-03-31" />
<target value="Up to 62 houses included in the R&amp;F program.">

</target>
<actual value="The target is partially achieved. Project restructuring target set for the pilot R&amp;F was in the range 35-75 houses . Desigs for 120houses for rehabiliation of Roof and Facades following local vernacular traditions were prepared in the R&amp;F rehabilitation program.Rehabilitation of 27 houses is fully completed with contributions from owners.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased access for international tourists and access of cruise liners to the Southern Coast
</narrative></title>
<baseline year="2005" iso-date="2005-04-25" value="Existing Passenger Port Terminal of Saranda is inadequate to provide access of cruise liners which is a constraint to increase thenumber of international tourists to the Southern Coast."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-25" />
<period-end iso-date="2015-03-31" />
<target value="A new 180 m birth front with 9 meter water depth, paving, drainage, fencing and utilities constructed.">

</target>
<actual value="The target is fully achieved. Rehabilitation of the Passenger Port Terminal is complete. 180 m new berth with waterfront depth of 9m and all auxiliary facilities are completed. The Port is operational. First large cruise boats visited Saranda in September andOctober 2014.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Risk assessment undertaken for the Porto Romano hot-spot.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="RA completed prior to design of encapsulation and containment of contaminated si te in Porto Romano">
<comment><narrative>
Completed.
</narrative></comment>
</target>
<actual value="Completed. Chemicals waste storage in Bishti Palles (Hot Spot 4) have been repackaged and eliminated in a specialized incinerationplant in Germany in May 2006. Investigations of contaminated soil, groundwater and building material in the hot spot sites in PortoRomano carried out in 2007 prior to design of Confined Disposal Facility.">
<comment><narrative>
Completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement of the water supply and sewerage system in Saranda
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Existing water supply and sewege system ineffective to meet the waters supply and sanitation needs of Saranda"><comment><narrative>Prior to and at project restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Reconstruction of sewer networks (2.1 km of new sewer lines) and extension of wa ter supply (2.5 km). Construction of wastewateroutlet from the WWTP in Saranda to the Chuka Channe l (2.8 km). [12.5 km] Navarica Trunk main replaced.">

</target>
<actual value="The target is achieved. Water supply has improved for 40,000 inhabitants of Saranda (number of population served is doubled duringthe summer season). Water capacity has increased to 70 l/sec. compared to 20  30 l/sec. before the investments. In addition watersupply of the Navarica village has improved, through the construction of 1 km new water pipe, serving 50 -70 households or about300 inhabitants.

Works were completed at 100% according to design parameters for both water supply and sewage. This includes: (a)Construction of wastewater outlet from the WWTP in Saranda to the Cuka Channel; (b) 2.1 km sewer line within the town; and 12.9 kmNavarica Trunk main replaced and 2.8 km water supply distribution network rehabilitated in tourist area. The rehabilitation ofexisting water reservoir in Qafa e Gjashtes and construction of new one in Lekuresi (Saranda) are under implementation with thesupport of KfW water supply project.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased access for international tourists and access of cruise liners to the Southern Coast
</narrative></title>
<baseline year="2005" iso-date="2005-04-25" value="Existing Passenger Port Terminal of Saranda is inadequate to provide access of cruise liners which is a constraint to increase thenumber of international tourists to the Southern Coast."><comment><narrative>Prior to and at project restructuring</narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-25" />
<period-end iso-date="2015-03-31" />
<target value="A new 180 m birth front with 9 meter water depth, paving, drainage, fencing and utilities constructed.">

</target>
<actual value="The target is fully achieved. Rehabilitation of the Passenger Port Terminal is complete. 180 m new berth with waterfront depth of 9m and all auxiliary facilities are completed. The Port is operational. First large cruise boats visited Saranda in September andOctober 2014.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coastal communities and Local Government Units participate in Coastal Vilage Conservation Development (CVCD) Program identification
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="Communities actively participated in round one of the CVCD program"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Traget substantially achieved. 1)Village infrastructure rehabilitation program completed 2)Roof and facade rehabilitation projectsimplemented in up to 62 houses; 3)Up to 20 homeowners involved in B&amp;B services program">

</target>
<actual value="Substantially achieved. Round 2 of CVCD includes 9 (nine) subprojects for the rehabilitation of the village roads and quares and 5(five) subprojects for the upgrade of the water supply systems in Allonjia, Dhermi, Qeparo, Palasa, Ilias, Himara Nivica, Lukovacommune, PIqeras, Pllake Qenuiro (Alico commune), Xarra, Ksamili, Vergo commune, Bajkai and Palavli villages. These villagesparticipated through the entire process of identification of investments, selection of contractors, supervision and co-financing.27 house were completed under the R&amp;F program and their owners participated in the process and contributed with own funds.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social &amp; Vulnerability Assessment carried out in accordance with  agreed Terms of Reference
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="No SVA available."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="SVA completed in accordance with TORs">

</target>
<actual value="Completed. SVA was based on TORs agreed with the Bank.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Risk assessment undertaken for the Porto Romano hot-spot.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="RA completed prior to design of encapsulation and containment of contaminated si te in Porto Romano">

</target>
<actual value="Completed. Chemicals waste storage in Bishti Palles (Hot Spot 4) have been repackaged and eliminated in a specialized incinerationplant in Germany in May 2006. Investigations of contaminated soil, groundwater and building material in the hot spot sites in PortoRomano carried out in 2007 prior to design of Confined Disposal Facility.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service contract signed with participating municipalities and communes for waste disposal.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="No provisions for commercial operation of the landfill facility (prior to and at restructuring)."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="Target substantially met. (1) Service contract signed with participating communities (2) Contract signed with landfill operator">

</target>
<actual value="The solid waste company was legally estabilished as a fully owned company by the Vlora Qark. Divestiture of shares tomunicipalities will be launched after completion of the new territorial division of the country. Service agreements were signedwith all municipalities in the service area of the landfill including the Saranda Municipality.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service contract signed with participating municipalities and communes for waste disposal.
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="No provisions for commercial operation of the landfill facility (prior to and at restructuring)."><comment><narrative>No prior experience in Albania with commercial operation of landfills.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="(1) Service contract signed with participating communities (2) Contract signed with landfill operator">

</target>
<actual value="The solid waste company has been legally estabilished and fully owned by the Vlora Qark. A MoU was signed in 2013 by muncipalitiesin the service area of the landfill, the signing of service agreements with municipalities is delayed due to perceived changes ofthe boundaries of municipalities after the new law on territorial and adminsiatrive division cames into effect.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social &amp; Vulnerability Assessment carried out in accordance with  agreed Terms of Reference
</narrative></title>
<baseline year="2005" iso-date="2005-04-24" value="No SVA available."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-04-24" />
<period-end iso-date="2015-03-31" />
<target value="SVA completed in accordance with TORs">
<comment><narrative>
Action completed.
</narrative></comment>
</target>
<actual value="Completed. SVA was based on TORs agreed with the Bank.">
<comment><narrative>
No further monitoring is required.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved waste disposal infrastructure for the Southern Coast built in Saranda area with capacity of 25,000 m3 per year and the accompanying transfer station in Himare.
</narrative></title>
<baseline year="1969" iso-date="1969-12-31" value="No waste disposal infrastructure in place for the South Coast"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1969-12-31" />
<period-end iso-date="2015-03-31" />
<target value="Target achieved. The landfill company has taken over the landfill infrastructure for operation. Staff of the company has beentrained. 
Bajkaj landfill and Transfer Station in Himare operational under these conditions.">

</target>
<actual value="Landfill construction and transfer station were completed including the works certification. The total capacity of the landfill is365,000 m3 which is sufficient for up to 17 yeasr of operation at 25,000 m3 waste annually. Both investments are under defectliability period.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P110845</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Disaster Risk Mitigation and Adaptation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Albania Disaster Risk Mitigation and Adapation Project (AL-DRMAP) is to strengthen institutional capacities (a) to reduce Albania's vulnerability to natural and man-made hazards; and (b) to limit human, economic, and financial losses due to these disasters.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Albania Disaster Risk Mitigation and Adaptation Project (AL-DRMAP) is to strengthen institutional capacities: (a) to reduce Albania's vulnerability to the natural and manmade hazards; and (b) to limit human, economic, and financial losses due to these disasters. There are five components to the project. The first component is the disaster risk management and preparedness. Its objective is to support capacity building for emergency response mechanism through provision of necessary equipment, and strengthening disaster risk mitigation planning. The second component is the strengthening of hydro meteorological services. Its objective is to support disaster risk reduction through provision of accurate hydro meteorological forecasts and services tailored to the needs of disaster risk managers in weather-sensitive sectors. The third component is the development of building. Its objective is to reduce risks from seismic activities through development of improved building codes and mechanisms for introduction of improved standards. The fourth component is the catastrophe insurance. Its objective is providing access to private catastrophe risk insurance to households and small and medium enterprises (SMEs). The fifth component is the project management. Its will finance some project management costs, such as procurement and financial management consultants, monitoring and evaluation activities, and incremental operating costs of managing the project and project reporting and audits.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2008-06-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Drita Dade</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ddade@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183875" />
            <name><narrative>Tirana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.327499 19.81889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="74020" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="17" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="33" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="17" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="17" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="33" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="17" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="17" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="17" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">116666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">36666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">810012.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">810012.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110845"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P110845?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110845"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EU-compatible building codes, including seismic compliance developed
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Outdated building codes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Revisions to building codes developed to comply with Eurocode 8">

</target>
<actual value="Eurocodes 0,1,2,3 and 8  have been finalized and the technical analysis is completed. MPWT prepared training materials, includingthe National Determined Parameters specific for Albania, and disseminated the Eurocode 8 (the European building code for design ofstructure for earthquake resistance funded by the DRMAP) in all 12 prefectures in Albania.">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(New Jan 2012) Hydromet monitoring network modernized
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Antiquated manual monitoring network"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="New monitoring stations installed and the old ones refurbished.">

</target>
<actual value="40 new monitoring stations installed and the old ones refurbished.">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency response equipment provided to the response units
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Emergency response equipment delivered to first responders">

</target>
<actual value="Rescue boats and emergency response vehicles were delivered.  The feasibility study for the integrated emergency call system 112was completed. Emergency Management Center was established in GDCE.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) All systems (products, distribution system, infraastructure, regulatory framework and public awareness mechanism) ready for the launch of the catastrophe insurance
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="No catastrophe insurance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Albania becomes a memeber of SEEC CRIF; catastrophe products developed; regulations and website ready to support catastropheinsurance">

</target>
<actual value="Albania is a member of the SEEC CRIF; catastrophe products are being developed; the draft regulations are ready; and the work onthe website is ongoing.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EU-compatible building codes, including seismic compliance developed
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Outdated building codes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Revisions to building codes developed to comply with Eurocode 8">

</target>
<actual value="Proposed revisions to building codes were developed to comply with Eurocode 8.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(New Jan 2012) Institutional capacity of hydromet service strengthened through training
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Limited access to international practices and knowledge"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Training to hydromet services staff provided">

</target>
<actual value="The hydrometeorological forecast training was provided to IGEWE staff.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(New Jan 2012) Institutional capacity of hydromet service strengthened through training
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Limited access to international practices and knowledge"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Training to hydromet services staff provided">

</target>
<actual value="Training to hydromet staff on forcasting was provided.">
<comment><narrative>
Target has been met. 10 staff were trained.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Revisions to Building Code, bringing them to EU standards (Eurocode 8) are ready for legal adoption
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Outdated building codes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-06-28" />
<target value="National plan of revisions developed and approved by MOPWT">

</target>
<actual value="National plan of revisions of building code has been developed. A special decree has been issued by MPWT to integrate Eurocode 8,0-4 into national legislation based on the national plan. The Eurocode 8 has been prepared with project funds and Eurocodes 0,1,2,and 3 were developed with MPWT budget:they are all ready for legal adoption. In addition, the National plan of revisions ofbuilding codes has been developed and is already under implementation by the MPWT. The Plan envisages the MPWT to complete thedevelopment ofthe remaining Eurocodes (4, 5, 6, 7,and 9) and seek the Council of Ministers and Parlament approvals within about oneyear, but in light of the on-going political elections, the timeline might be longer).">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Catastrophic risk insurance is available to businesses, households and government
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="No catastrophic insurance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="CAT insurance infrastructure and regulatory framework in place">

</target>
<actual value="The CRIF was establisged. The new draft insurance law is adequate and the draft regulation on the Risk-Based Supervision wasdeveloped. The work on the cat insurance infrastructure is ongoing.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Catastrophic risk insurance is available to businesses, households and government
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="No catastrophic insurance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-06-28" />
<target value="CAT insurance infrastructure and regulatory framework in place.">

</target>
<actual value="The CRIF has been established. Regional work on track to be completed by 2014.  Activities related to catastrophic risk insurancehave progressed very well and are currently ongoing under the regional SEEC CRIF program, which will continue to be implementedafterDRMAP closure. The draft law on insurance has been prepared and submitted by the FSA to the COM to initiate the approvalprocess. Comprehensive earthquake and flood insurance packages have been fully developed with view to provide homeowners and SMEswith high credit quality coverage.">
<comment><narrative>
The DRMAP supported the membership fee of Albania in CRIF and development of three main modules of an Interactive ConsumerAwareness and Education Website were successfully prepared and integrated into the consumers web application hosted by South EastEuropean Countries - SEEC CRIF (Europa RE) server.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Newly produced hydrometeorological products meet WMO standards
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Severe weather products and warnings tailored to users are not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-06-28" />
<target value="Hydromet data and alerts (flood and forest fire risk indexes) are disseminated to risk managers and data posted on IGEWE website">

</target>
<actual value="The digitalization of Hydro-meteorological data has been completed. 20 years of hydrological data and 10 years (2001-2011) ofmeteorological data have been digitized. The data has undergone quality analysis  and is ready to be published on the IGEWE websitefor user access. 40 Hydrometeorological observing stations have been installed and calibrated. Real time data are sent from thestations to the operational database in IGEWE. Hydromet data and alerts (flood and forest fire risk indexes) are alreadydisseminated to riskmanagers. The data meet WMO standards.">
<comment><narrative>
The indicator is likely to be achieved within project closure. Historical digitalized data and real time data will be posted onIGEWE website by June 28, 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) All systems (products, distribution system, infraastructure, regulatory framework and public awareness mechanism) ready for the launch of the catastrophe insurance
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="No catastrophe insurance"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Albania becomes a member of SEEC CRIF; catastrophe products developed; regulations and website ready to support catastropheinsurance">

</target>
<actual value="Albania is the first member of SEEC CRIF; catastrophe products have been developed for all SEE countries; the draft law oninsurance has been prepared and submitted for Government's approval;  and three main modules of an InteractiveConsumer Awarenessand Education Website to support catastrophe insurance has been developed.">
<comment><narrative>
Target has largely been met. All products have been developed, national draft laws on insurance prepared but they need theapprovalof all CRIF participating countries. It is expected that  products and systems will be made available by 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Disaster risk action plan and the prioritized investment program formulated
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="No strategy or investment plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-06-28" />
<target value="Strategy and investment program developed">

</target>
<actual value="UNISDR expert is reviewing the draft strategy and investment plan.">
<comment><narrative>
Target will likely be met by June 28, 2013 or shortly thereafter.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(New Jan 2012) Hydromet monitoring network modernized
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Antiquated manual monitoring network"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="New monitoring stations installed and the old ones refurbished.">

</target>
<actual value="The contract for the installation of the hydromet monitoring network was signed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Training for engineers program developed
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Training materials developed">

</target>
<actual value="Training materials were developed and training workshop was provided to about 1,000 engineers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Training for engineers program developed
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Training materials developed.">

</target>
<actual value="Training materials were developed and training was delivered in 12 prefectures. More than 1,000 practitioners were trained.">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Newly produced hydrometeorological products meet WMO standards
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Severe weather products and warnings tailored to users are not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Hydromet data and alerts (flood and forest fire risk indexes) are disseminated to risk managers and data posted on IGEWE website">

</target>
<actual value="The software for flood and wild fire monitoring was installed and daily bulletins are disseminated to GDCE. Contract for upgradingof hydromet monitoring network was signed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Disaster risk action plan and the prioritized investment program formulated
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="No strategy or investment plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Strategy and investment program developed">

</target>
<actual value="A consultant to assist in development of the strategy and investment program was selected and the contract is about to be signed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency response equipment provided to the response units
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-06-28" />
<target value="Emergency response equipment delivered to first responders">

</target>
<actual value="All equipment were procured and delivered to the respecitve units.">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Revised Jan 2012) Revisions to Building Code, bringing them to EU standards (Eurocode 8) are ready for legal adoption
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Outdated building codes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="National plan of revisions developed and approved by MOPWTT">

</target>
<actual value="The MPWT developed and approved a national plan of revisions to Eurocode 8 which are ready for legal adoption.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased availability of weather alerts (for floods and wild fires), real time data and historical data to multiple users
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Users do not receive tailored weather products"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-06-28" />
<target value="Fire, weather and flood forecasts distributed to users and historical data digitized">

</target>
<actual value="Fire, weather and flood forecasts is distributed to users and historical data digitized">
<comment><narrative>
Target has been met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased availability of weather alerts (for floods and wild fires), real time data and historical data to multiple users
</narrative></title>
<baseline year="2009" iso-date="2009-02-23" value="Users do not receive tailored weather products"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-23" />
<period-end iso-date="2013-02-28" />
<target value="Fire, weather and flood forecasts distributed to users and historical data digitized">

</target>
<actual value="The weather alerts for wild fire and flood weather products in a form of daily bulletins are transmitted daily to the GDCE. Thehistorical hydromet data is being scanned and digitized.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P107833</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SECONDARY AND LOCAL ROADS</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to improve access to essential services and economic markets, via the provision of all weather roads, for the resident population in the hinterland of the project roads.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Secondary and Local Roads Project for Albania is to improve access to essential services and economic markets, via the provision of all weather roads, for the resident population in the hinterland of the project roads. There are three components to the project. The first component is the civil works associated with the improvement of priority sections of the secondary. It will finance the civil works associated with improving selected priority sections of the secondary (regional) road network. Given the noted poor condition of this network, the interventions under this component are expected to be either rehabilitation or reconstruction. The second component is the civil works associated with the improvement of priority sections of the local (commune) road network. Finally, the third component is the implementation and institutional support. It  will finance the provision of technical support, goods (including vehicles, computers, air conditioning units, a generator, and office furniture), training, study tours, conferences and the financing of operational costs to assist the project implementing entity in the implementation of the project, specifically for: (i) the selection and employment of consultants services to supervise the civil works and improve the design for the duration of the project; (ii) the selection and employment of a technical assistant with a strong background in highway engineering for the duration of the project; (iii) training of the project implementing entity staff responsible for project implementation; (iv) the carrying out of a review of the functional classification for all levels of roads; and (v) an inventory of the core secondary and local road network.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2008-06-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Artan Guxho</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aguxho@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363200" />
            <name><narrative>Xarre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.728329 20.05444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363256" />
            <name><narrative>Pllake</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.80917 20.08111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363385" />
            <name><narrative>Ciuci</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.84333 20.034439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781993" />
            <name><narrative>Podgorie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.814999 20.79694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782383" />
            <name><narrative>Malqene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.939999 20.38722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782441" />
            <name><narrative>Lunxheri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.133331 20.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782671" />
            <name><narrative>Kuben</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.693329 20.360001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782748" />
            <name><narrative>Korite</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.547779 20.264999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865730" />
            <name><narrative>Berat County</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.633331 20.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183780" />
            <name><narrative>Velabisht</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.701672 19.93222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183879" />
            <name><narrative>Tirana District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.333328 19.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183959" />
            <name><narrative>Strum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.75111 19.737499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184081" />
            <name><narrative>Shkoder District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.068279 19.512581</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184609" />
            <name><narrative>Nenshat</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.930828 19.65</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184757" />
            <name><narrative>Mbreshtan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.715832 19.872219</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184791" />
            <name><narrative>Marinez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.740559 19.67333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184935" />
            <name><narrative>Lezhe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.783611 19.64361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185289" />
            <name><narrative>Kallmeti i Madh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.848888 19.686939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185504" />
            <name><narrative>Ura e Gorices</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.700001 19.933331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185674" />
            <name><narrative>Fier District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.716671 19.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865204" />
            <name><narrative>Valare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.125561 20.134171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000834052" />
            <name><narrative>Renz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.752499 20.387779</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003343744" />
            <name><narrative>Fierze</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.920559 19.846939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783346" />
            <name><narrative>Diber District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.75 20.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783325" />
            <name><narrative>Domaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.137779 20.491671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783265" />
            <name><narrative>Elbasan District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.083328 20</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783261" />
            <name><narrative>Erind</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.15694 20.16361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003186093" />
            <name><narrative>Belsh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.974998 19.881941</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185823" />
            <name><narrative>Vau i Dejes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.009998 19.62472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="34" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="66" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="13" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="20" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="13" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="13" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="53" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="13" xml:lang="en"><narrative>Job Creation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1344636.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1344636.07</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107833"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P107833?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107833"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportional reduction in travel time on project roads in free flowing conditions
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="40.00">

</target>
<actual value="60.00">
<comment><narrative>
Targets met and exceeded as according to the updated information from ADF during May mission
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportional reduction in travel time on project roads in free flowing conditions
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="40.00">

</target>
<actual value="60.00">
<comment><narrative>
Targets met and exceeded as according to the updated information from ADF during April 2013 mission
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in annual recurrent maintenance budget for National roads
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="21.50">
<comment><narrative>
The cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
</narrative></comment>
</target>
<actual value="22.00">
<comment><narrative>
The ADF has collected this information from MPWT/ARA and MoF.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of communities that have improved access to markets, social services and administrative centers by project end
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="50">
<comment><narrative>
This number has been used to define the share and no. of population with access to all season roads
</narrative></comment>
</target>
<actual value="81">
<comment><narrative>
This reflects that all 109.9 km of road has been substantially completed. This number has been used to define the share and no. ofpopulation with access to all season roads
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained to undertake maintenance
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="100.00">
<comment><narrative>
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
</narrative></comment>
</target>
<actual value="750.00">
<comment><narrative>
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced in2012 ISR
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in annual recurrent maintenance budget for National roads
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="21.50">
<comment><narrative>
he cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
</narrative></comment>
</target>
<actual value="22.00">
<comment><narrative>
ADF has collected official information from the Ministry of Finance and Ministry of Public Works and Transport, and presented inits May 2012 progress report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="106.20">

</target>
<actual value="109.90">
<comment><narrative>
the length of the road is slightly increased to accommodate community needs, and is expected to by the introduction of two newsections
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in the communities trained to procure contractors to undertake maintenance
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="100.00">
<comment><narrative>
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
</narrative></comment>
</target>
<actual value="520.00">
<comment><narrative>
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced inthis ISR
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained to undertake maintenance
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="100.00">
<comment><narrative>
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
</narrative></comment>
</target>
<actual value="520.00">
<comment><narrative>
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced inthis ISR
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System in place and functioning
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="Established">

</target>
<actual value="Established">
<comment><narrative>
ADF reported during April 2013 mission on the use of ROMAPS, inventory and prioritization system for the whole secondary and localroads network
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Proportional increase in traffic volumes on project roads - one year after scheme complettion
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="10%">

</target>
<actual value="21 %">
<comment><narrative>
Target was met and exceeded as reported in previous ISR, and updated with ADF during May. Updates to be sought during next missionin May.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of communities that have improved access to markets, social services and administrative centers by project end
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="50">
<comment><narrative>
This number has been used to define the share and no. of population with access to all season roads
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
This reflects that all 109.9 km of road has been substantially completed. This number has been used to define the share and no. ofpopulation with access to all season roads
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in annual recurrent maintenance budget for Local roads
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="21.50">
<comment><narrative>
The cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
</narrative></comment>
</target>
<actual value="41.30">
<comment><narrative>
ADF has collected official information from the Ministry of Finance and Ministry of Interior, and presented in its May 2012progress report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of communities that have improved access to markets, social services and administrative centers by project end
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="50">
<comment><narrative>
This number has been used to define the share and no. of population with access to all season roads
</narrative></comment>
</target>
<actual value="81">
<comment><narrative>
This reflects that all 109.9 km of road has been substantially completed. This number has been used to define the share and no. ofpopulation with access to all season roads
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Proportional increase in traffic volumes on project roads - one year after scheme complettion
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="10%">

</target>
<actual value="21%">
<comment><narrative>
Target was met and exceeded as reported in previous ISR, and updated with ADF during April 2013 mission.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System in place and functioning
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Established">

</target>
<actual value="">
<comment><narrative>
ADF progress report of May 2012, on the use of ROMAPS, inventory and prioritization system for the whole secondary and local roadsnetwork
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in annual recurrent maintenance budget for Local roads
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="21.50">
<comment><narrative>
The cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
</narrative></comment>
</target>
<actual value="41.30">
<comment><narrative>
ADF has collected official information from the Ministry of Finance and Ministry of Interior, and presented in its May 2012progress report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in road user perception of road quality
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="20.00">

</target>
<actual value="60.00">
<comment><narrative>
Results exceed the target. The ADF Beneficiary Assessment survey, showed that 97% of the interviewees asserted that the roadsafterinvestment were in good or very good condition, whereas previously 94% of interviewees asserted that the roads before theinvestment were in bad or very bad conditions. The difference between the two positions, on the 1 to 10 Likert scale correspond tolevel 6 (or 60% change).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System in place and functioning
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Established">

</target>
<actual value="Established">
<comment><narrative>
ADF progress report of May 2012, on the use of ROMAPS, inventory and prioritization system for the whole secondary and local roadsnetwork
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="106.20">

</target>
<actual value="109.90">
<comment><narrative>
the length of the road is slightly increased to accommodate community needs
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in annual recurrent maintenance budget for National roads
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="21.50">
<comment><narrative>
he cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
</narrative></comment>
</target>
<actual value="22.00">
<comment><narrative>
ADF has collected official information from the Ministry of Finance and Ministry of Public Works and Transport, and presented inits May 2012 progress report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="106.20">

</target>
<actual value="109.90">
<comment><narrative>
the length of the road is slightly increased to accommodate community needs
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportional reduction in travel time on project roads in free flowing conditions
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="40.00">

</target>
<actual value="60.00">
<comment><narrative>
Targets met and exceeded as according to the updated information from ADF during May mission
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in annual recurrent maintenance budget for Local roads
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="21.50">
<comment><narrative>
The cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
</narrative></comment>
</target>
<actual value="4100.00">
<comment><narrative>
The ADF has collected this information from MPWT/ARA and MoF.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in road user perception of road quality
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="20.00">

</target>
<actual value="60.00">
<comment><narrative>
Results exceed the target. The ADF Beneficiary Assessment survey, showed that 97% of the interviewees asserted that the roadsafterinvestment were in good or very good condition, whereas previously 94% of interviewees asserted that the roads before theinvestmentwere in bad or very bad conditions. The difference between the two positions, on the 1 to 10 Likert scale correspond tolevel 6 (or60% change).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained to undertake maintenance
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="100.00">
<comment><narrative>
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
</narrative></comment>
</target>
<actual value="520.00">
<comment><narrative>
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced inthis ISR
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in the communities trained to procure contractors to undertake maintenance
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="100.00">
<comment><narrative>
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
</narrative></comment>
</target>
<actual value="520.00">
<comment><narrative>
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced inthis ISR
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in the communities trained to procure contractors to undertake maintenance
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2013-06-30" />
<target value="100.00">
<comment><narrative>
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
</narrative></comment>
</target>
<actual value="750.00">
<comment><narrative>
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced in2012 ISR
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in road user perception of road quality
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="20.00">

</target>
<actual value="60.00">
<comment><narrative>
Results exceed the target. The ADF Beneficiary Assessment survey, showed that 97% of the interviewees asserted that the roadsafterinvestment were in good or very good condition, whereas previously 94% of interviewees asserted that the roads before theinvestmentwere in bad or very bad conditions. The difference between the two positions, on the 1 to 10 Likert scale correspond tolevel 6 (or60% change).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Proportional increase in traffic volumes on project roads - one year after scheme complettion
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="10%">

</target>
<actual value="">
<comment><narrative>
Target was met and exceeded as reported in previous ISR, and updated with ADF during May. Updates to be sought during next missionin May.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P102733</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Water Sector Investment Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDO) are to: (i) improve the quality of water and wastewater services in the Durres Water Utility Service Area; and(ii) improve the financial performance of Durres Water Utility.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Water Sector Investment Project for Albania is to improve the quality of water and wastewater services in the Durres water utility service area; and improve the financial performance of Durres water utility. There are four components to the project. The first component of the project is priority water supply investments. This component will finance: 1) six water supply production wells and a bulk water supply transmission pipeline that will provide up to 630l/s additional supply capacity to address the acute water shortages in the Durres utility service area; 2) ancillary investments, including elevated reservoirs, linking municipalities/communes within the Durres area and along the transmission pipeline route to the water supply system in a sustainable manner; and 3) priority investments in the water distribution network in Durres, as well as provision of leak detection equipment and pressure reducing valves to reduce losses. The second component of the project is wastewater network investments. This component will finance priority wastewater investments aimed at enhancing the existing sewerage network's capacity to handle the increased water supply in an environmentally and socially sustainable manner. The third component of the project is institutional development program, utility strengthening and water demand management. This component will support the Government's broad-based policy and reform agenda at the national level with specific interventions at the local level, focused on the Durres region and its utility on a pilot basis. The fourth component of the project is project implementation support. This component will support implementation of the project including salaries for Project Implementation Unit (PIU) staff, the PIU operating costs, provision of needed equipment, consultant services supporting project investment technical reviews, as well as overall project supervision, monitoring, evaluation and reporting.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0001562"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0001562"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0001563"><narrative>AKUM</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-07-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-12-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Patricia Lopez</narrative></person-name><telephone>+1-202-473-1000</telephone><email>plopez@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344947" />
            <name><narrative>Qarku i Durrësit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.48333 19.616671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14020" percentage="92" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="75" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="25" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">226591.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">226591.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">226591.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">226591.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">226591.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">226591.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1019662.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">2152620.84</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">2152620.84</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">2152620.84</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2152620.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2152620.84</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2039325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1246254.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1246254.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1246254.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1246254.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1246254.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">537175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">13974542.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">13974542.20</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">85300000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-1247749</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">214172</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">8162100</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">5058363</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">2226581</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">4468167</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">1660691</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">6815025</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">6408300</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">4769817</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">2593475</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">1470413</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">4198247</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">6481831</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">5903916</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1707611</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">2086906</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">2083727</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2807551</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">3408953</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1137684</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-62380</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-322</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-214172</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-33735</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-37220</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-36854</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-34589</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-45168</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-48529</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-75903</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-95698</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-130424</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-171614</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-215897</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-201620</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-286256</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-174764</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-156026</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-144449</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-188611</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1017296</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1459335</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1688426</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1575793</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1304883</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1024948</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-944458</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2522238</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2580578</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-2684833</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2751221</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2787432</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-1563"><narrative>AKUM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P102733"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P102733?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P102733"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 114% (48% female) from water services and 117% (48% female) from both water and wastewater services.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="385824.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional annual volume of wastewater that is appropriately collected,  treated and disposed
</narrative></title>
<baseline year="2017" iso-date="2017-05-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-26" />
<period-end iso-date="2017-05-26" />
<target value="1835400.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against targets is 104%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1905000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Households with individual metered connection in the Durres Service Area
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 90%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="85.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Financial Working Ratio
</narrative></title>
<baseline year="2013" iso-date="2013-04-25" value="1.69"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-04-25" />
<period-end iso-date="2017-05-26" />
<target value="1.05">
<comment><narrative>
&lt;p&amp;gt;Achievement against revised target is 76%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of sewerage network rehabilitated or constructed
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 100%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="35.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of water supply network rehabilitated
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 482%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="23.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Collection ratio
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="2017-05-26" />
<target value="92.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 76%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="91.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Annual Billed Volume by DWU
</narrative></title>
<baseline year="2017" iso-date="2017-05-26" value="7800000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-26" />
<period-end iso-date="2017-05-26" />
<target value="10000000.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 86%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8600000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 114%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="87885.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Duration of water supplied to households in project affected areas
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="2017-05-26" />
<target value="12.00">
<comment><narrative>
&lt;p&amp;gt;Achieved against revised target is 76%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="9.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of bulk water pipeline constructed
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 106%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Billing ratio
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="22.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="2017-05-26" />
<target value="35.00">
<comment><narrative>
&lt;p&amp;gt;Achieved against revised target is 25%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="26.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New household sewer connections constructed under the project
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 102%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3074.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries from improved wastewater collection and transportation facilities
</narrative></title>
<baseline year="2013" iso-date="2013-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-25" />
<period-end iso-date="2017-05-26" />
<target value="51600.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target is 132%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="68100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P055383</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Social Services Delivery Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to improve standards of living of poor and vulnerable population groups in Albania by: (a) increasing their access to well targeted and effective social care services; (b) assisting the Government to develop effective social care policy and improve its capacity for delivery and monitoring of social care services; and (c) improving the effeciency and effectiveness of the pension system in Albania, through: (i) improving pension system administration, (ii) institutional strengthening including improved capacity for pension policy development, and (iii) improving public understanding of the pension system.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Social Services Delivery Project for Albania aims to improve standards of living for the poor and vulnerable population groups by increasing their access to well-targeted and effective social care services; assisting the Government to develop, monitor, and evaluate more effective social policy; and improving capacity for planning, managing, and delivering social care services with increased involvement of local governments, communities, and civil society. There are four main project components. The first component develops the organizational, human, and material resources in the Government to design, monitor, and evaluate social policy. It has three sub-components. It supports the national statistical agency (INSTAT), assists the Ministry of Labor and Social Affairs (MOLSA), and strengthens the development and implementation of pension policy. The second component improves capacity for social services monitoring and administration, and social work training at central and regional levels. The third component has two components that fund community-based social services, and improve the capacity of staff in social service facilities and local government offices to respond more effectively to their clients' needs. The fourth component aims to ensure an efficient and effective implementation of project activities, and development of project management information systems and monitoring.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2000-09-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2001-06-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-03-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-03-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Lorena Kostallari</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lkostallari@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344952" />
            <name><narrative>Vlores County</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.166672 19.799999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344951" />
            <name><narrative>Tirana County</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.26667 19.783331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344950" />
            <name><narrative>Shkoder County</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.183331 19.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344947" />
            <name><narrative>Durres County</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.48333 19.616671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="57.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="48" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="6" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="6" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="29" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="2" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="26" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="11" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="6" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="22" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="6" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="6" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="6" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="40" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="2" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="6" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="2" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="6" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2001-06-01"/>
<period-end iso-date="2001-06-30"/>
<value currency="USD" value-date="2001-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-07-01"/>
<period-end iso-date="2001-07-31"/>
<value currency="USD" value-date="2001-07-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-08-01"/>
<period-end iso-date="2001-08-31"/>
<value currency="USD" value-date="2001-08-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-09-01"/>
<period-end iso-date="2001-09-30"/>
<value currency="USD" value-date="2001-09-30">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-10-01"/>
<period-end iso-date="2001-10-31"/>
<value currency="USD" value-date="2001-10-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-11-01"/>
<period-end iso-date="2001-11-30"/>
<value currency="USD" value-date="2001-11-30">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-12-01"/>
<period-end iso-date="2001-12-31"/>
<value currency="USD" value-date="2001-12-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-01-01"/>
<period-end iso-date="2002-01-31"/>
<value currency="USD" value-date="2002-01-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-02-01"/>
<period-end iso-date="2002-02-28"/>
<value currency="USD" value-date="2002-02-28">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-03-01"/>
<period-end iso-date="2002-03-31"/>
<value currency="USD" value-date="2002-03-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-04-01"/>
<period-end iso-date="2002-04-30"/>
<value currency="USD" value-date="2002-04-30">6666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-05-01"/>
<period-end iso-date="2002-05-31"/>
<value currency="USD" value-date="2002-05-31">6666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-06-01"/>
<period-end iso-date="2002-06-30"/>
<value currency="USD" value-date="2002-06-30">6666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-07-01"/>
<period-end iso-date="2002-07-31"/>
<value currency="USD" value-date="2002-07-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-08-01"/>
<period-end iso-date="2002-08-31"/>
<value currency="USD" value-date="2002-08-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-09-01"/>
<period-end iso-date="2002-09-30"/>
<value currency="USD" value-date="2002-09-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-10-01"/>
<period-end iso-date="2002-10-31"/>
<value currency="USD" value-date="2002-10-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-11-01"/>
<period-end iso-date="2002-11-30"/>
<value currency="USD" value-date="2002-11-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-12-01"/>
<period-end iso-date="2002-12-31"/>
<value currency="USD" value-date="2002-12-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-01-01"/>
<period-end iso-date="2003-01-31"/>
<value currency="USD" value-date="2003-01-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-02-01"/>
<period-end iso-date="2003-02-28"/>
<value currency="USD" value-date="2003-02-28">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-03-01"/>
<period-end iso-date="2003-03-31"/>
<value currency="USD" value-date="2003-03-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-04-01"/>
<period-end iso-date="2003-04-30"/>
<value currency="USD" value-date="2003-04-30">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">53333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">79000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">156666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">156666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">156666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">193333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">193333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">86900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">86900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">86900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-06-01"/>
<period-end iso-date="2001-06-30"/>
<value currency="USD" value-date="2001-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-07-01"/>
<period-end iso-date="2001-07-31"/>
<value currency="USD" value-date="2001-07-31">20000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-08-01"/>
<period-end iso-date="2001-08-31"/>
<value currency="USD" value-date="2001-08-31">20000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-09-01"/>
<period-end iso-date="2001-09-30"/>
<value currency="USD" value-date="2001-09-30">20000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-10-01"/>
<period-end iso-date="2001-10-31"/>
<value currency="USD" value-date="2001-10-31">20000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-11-01"/>
<period-end iso-date="2001-11-30"/>
<value currency="USD" value-date="2001-11-30">20000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-12-01"/>
<period-end iso-date="2001-12-31"/>
<value currency="USD" value-date="2001-12-31">20000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-01-01"/>
<period-end iso-date="2002-01-31"/>
<value currency="USD" value-date="2002-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-02-01"/>
<period-end iso-date="2002-02-28"/>
<value currency="USD" value-date="2002-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-03-01"/>
<period-end iso-date="2002-03-31"/>
<value currency="USD" value-date="2002-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-04-01"/>
<period-end iso-date="2002-04-30"/>
<value currency="USD" value-date="2002-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-05-01"/>
<period-end iso-date="2002-05-31"/>
<value currency="USD" value-date="2002-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-06-01"/>
<period-end iso-date="2002-06-30"/>
<value currency="USD" value-date="2002-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-07-01"/>
<period-end iso-date="2002-07-31"/>
<value currency="USD" value-date="2002-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-08-01"/>
<period-end iso-date="2002-08-31"/>
<value currency="USD" value-date="2002-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-09-01"/>
<period-end iso-date="2002-09-30"/>
<value currency="USD" value-date="2002-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-10-01"/>
<period-end iso-date="2002-10-31"/>
<value currency="USD" value-date="2002-10-31">60000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-11-01"/>
<period-end iso-date="2002-11-30"/>
<value currency="USD" value-date="2002-11-30">60000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-12-01"/>
<period-end iso-date="2002-12-31"/>
<value currency="USD" value-date="2002-12-31">60000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-01-01"/>
<period-end iso-date="2003-01-31"/>
<value currency="USD" value-date="2003-01-31">60000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-02-01"/>
<period-end iso-date="2003-02-28"/>
<value currency="USD" value-date="2003-02-28">60000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-03-01"/>
<period-end iso-date="2003-03-31"/>
<value currency="USD" value-date="2003-03-31">60000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-04-01"/>
<period-end iso-date="2003-04-30"/>
<value currency="USD" value-date="2003-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">170000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">170000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">170000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2013-03-30"/>
<value currency="USD" value-date="2013-03-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2013-03-30"/>
<value currency="USD" value-date="2013-03-30">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P055383"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P055383?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P055383"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with service user specific standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 8 residential care centers are assessed as meeting the relevant service user specific standards">
<comment><narrative>
Target met. 8 residential care centers are assessed as meeting the relevant service user specific standards.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved capacity in SII for pension policy development with actuarial projections and impact of reform options undertaken by SII -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="no unit"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="Actuarial Unit in SII established, projections drafted">

</target>
<actual value="">
<comment><narrative>
Achieved. The SII, through its unit, has drafted a number of projections, which are being used for the discussions on pensionpolicy development
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved capacity in SII for pension policy development with actuarial projections and impact of reform options undertaken by SII -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="no unit"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="Actuarial Unit in SII established, projections drafted">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="Unit in place and projections drafted.">
<comment><narrative>
Achieved. The SII, through its unit, has drafted a number of projections, which are being used for the discussions on pensionpolicy development
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with general standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 14 residential care centers meet the general social care services standards">
<comment><narrative>
target met. 14 residential care centers meet the general social care services standards.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity of Social Insurance Institute to detect and reduce fraud in the system, via securing all the historical contribution and work history records
</narrative></title>
<baseline year="2008" iso-date="2008-03-31" value="All contribution records are on paper"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-31" />
<period-end iso-date="2013-03-31" />
<target value="100% of all contribution records transferred from paper to electronic form">
<comment><narrative>
target partially met
</narrative></comment>
</target>
<actual value="Currently only 80% of records have been transferred from paper to electronic form.">
<comment><narrative>
Partially achieved. When the central archive will be fully functional, it is expected that all records will be transferred.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals who know their pension rights - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="80%"><comment><narrative>Defined based on the results of the first public opinion survey</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="90%">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="95%">
<comment><narrative>
Achieved. This is based on the second survey (just completed)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved capacity in SII for pension policy development with actuarial projections and impact of reform options undertaken by SII -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="no unit"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="Actuarial Unit in SII established, projections drafted">

</target>
<actual value="Unit is already in place and number of projections being drafted">
<comment><narrative>
target in met. The SII, through its unit, has drafted a number of projections, which are being used for the discussions on pensionpolicy development
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity of Social Insurance Institute to detect and reduce fraud in the system, via securing all the historical contribution and work history records
</narrative></title>
<baseline year="2008" iso-date="2008-03-31" value="All contribution records are on paper"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-31" />
<period-end iso-date="2013-03-31" />
<target value="100% of all contribution records transferred from paper to electronic form">

</target>
<actual value="Currently only 80% of records have been transferred from paper to electronic form.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduced number of documents required for applying for the pension benefit - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="8 on average"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="3">
<comment><narrative>
target partially met
</narrative></comment>
</target>
<actual value="5">
<comment><narrative>
Partly achieved. When the central archive will be fully functional, it is expected that target will be fully achieved (to beconformed during the ICR preparation)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Necessary legal framework introduced
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No proper legal framework in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="The Law on Social Assistance and Social Services enacted and implemented in all regions. All secondary legislation adopted andimplemented.">
<comment><narrative>
Target met. The legal framework enacted
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase access of vulnerable groups to daily social care services
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="2600.00"><comment><narrative>There were only 26 daily centers with a total of 1300 clients</narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="43.00">
<comment><narrative>
A total of 43 centers are in place, serving to 25,000 clients
</narrative></comment>
</target>
<actual value="43.00">
<comment><narrative>
A total of 43 centers are in place, serving to 25,000 clients
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of SII staff trained in undertaking actuarial projections - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="5">
<comment><narrative>
target partially met
</narrative></comment>
</target>
<actual value="2">
<comment><narrative>
Partly achieved.  Although 3 other experts started to be trained on actuarial projections, due to staff changes there are only 2permanent SII staff fully trained.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with general standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 14 residential care centers meet the general social care services standards">
<comment><narrative>
target met. 14 residential care centers meet the general social care services standards.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of contributors with accessible electronic individual records - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="400,000 (rural + urban)">

</target>
<actual value="300,000 (rural + urban)">
<comment><narrative>
The SII has started to register electronically the data on contributions, in order to transfer all database to the digitalarchive,when that will start functioning
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Periodic Household surveys to inform policy decisions
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="Limited Household Survey in 1998"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2012-09-30" />
<target value="A system of surveys is in place (including a HBS) and the data are fully utilized by the Government">
<comment><narrative>
Target met. Surveys in place and used as base for Gov. decisions
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduced number of documents required for applying for the pension benefit - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="8 on average"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="3">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase access of vulnerable groups to daily social care services
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="26.00"><comment><narrative>There were only 26 daily centers with a total of 1300 clients</narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="43.00">
<comment><narrative>
A total of 43 centers are in place, serving to 25,000 clients
</narrative></comment>
</target>
<actual value="43.00">
<comment><narrative>
Achieved. A total of 43 centers are in place, serving to 25,000 clients
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of contributors with accessible electronic individual records - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="400,000 (rural + urban)">

</target>
<actual value="360,000 (rural+urban)">
<comment><narrative>
On track. The SII is registering electronically the data on contributions, in order to transfer all database to the digitalarchive,when thatwill start functioning
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Periodic Household surveys to inform policy decisions
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="Limited Household Survey in 1998"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2012-09-30" />
<target value="A system of surveys is in place (including a HBS) and the data are fully utilized by the Government">
<comment><narrative>
Target met. Surveys in place and used as base for Gov. decisions
</narrative></comment>
</target>
<actual value="A system of surveys is in place (including a HBS) and the data are fully utilized by the Government">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of beneficiaries with eligibility and benefit levels checked -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="40,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-30" />
<target value="120,000">

</target>
<actual value="100,000">
<comment><narrative>
On track
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of SII staff trained in undertaking actuarial projections - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="5">

</target>
<actual value="2">
<comment><narrative>
Currently, there are 3 more staff being trained on the actuarial projections
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Prepare policy options for improving targeting of cash social assistance
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Options for improved targeting for the cash social assistance are identified and appraised">
<comment><narrative>
Target met. Options for improved targeting of cash social assistance are identified and implemented
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of beneficiaries with eligibility and benefit levels checked -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="40,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-30" />
<target value="120,000">

</target>
<actual value="120,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity of Social Insurance Institute to detect and reduce fraud in the system, via securing all the historical contribution and work history records
</narrative></title>
<baseline year="2008" iso-date="2008-03-31" value="All contribution records are on paper"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-31" />
<period-end iso-date="2013-03-31" />
<target value="100% of all contribution records transferred from paper to electronic form">

</target>
<actual value="On track. The process of transferring is ongoing and is expected to be completed within project closing date">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive social service strategy is adopted by the Government and is being implemented
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No strategy in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Strategy adopted and implementation ocurred as spelled out in the action plan">
<comment><narrative>
Target met. The strategy is approved and implemented as per the action plan
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of contributors with accessible electronic individual records - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="400,000 (rural + urban)">
<comment><narrative>
target partially met
</narrative></comment>
</target>
<actual value="360,000 (rural + urban)">
<comment><narrative>
Partially achieved. Expected to be fully achieved following project closure (end of March) when the archive will be fullyfunctioning.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Necessary legal framework introduced
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No proper legal framework in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="The Law on Social Assistance and Social Services enacted and implemented in all regions. All secondary legislation adopted and implemented.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved transparency and public understanding of the pension system - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="44%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="75%">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="75%">
<comment><narrative>
Target achieved. This is based on the second survey, which is just completed. It is expected that after the archive will befunctioning, the indicator will be further improved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Prepare policy options for improving targeting of cash social assistance
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Options for improved targeting for the cash social assistance are identified and appraised">
<comment><narrative>
Target met. Options for improved targeting of cash social assistance are identified and implemented
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of SII staff trained in undertaking actuarial projections - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="5">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with general standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 14 residential care centers meet the general social care services standards">
<comment><narrative>
target met. 14 residential care centers meet the general social care services standards.
</narrative></comment>
</target>
<actual value="14 residential care centers meet the general social care services standards.">
<comment><narrative>
target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design and implementation of local social care plans
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="8 regions have completed and are implementing the local social care plans">
<comment><narrative>
Target met. 8 regions have completed and are implementing the local social care plans
</narrative></comment>
</target>
<actual value="8 regions have completed and are implementing the local social care plans">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals/companies who indicate they have improved access to information about their benefits and contributions - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="50%"><comment><narrative>Defined based on the first public opinion survey results</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="75%">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="75%">
<comment><narrative>
Achieved. As per the second survey (just completed)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Prepare policy options for improving targeting of cash social assistance
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Options for improved targeting for the cash social assistance are identified and appraised">
<comment><narrative>
Target met. Options for improved targeting of cash social assistance are identified and implemented
</narrative></comment>
</target>
<actual value="Options for improved targeting of cash social assistance are identified and implemented">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals/companies who indicate they have improved access to information about their benefits and contributions - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="50%"><comment><narrative>Defined based on the first public opinion survey results</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="75%">

</target>
<actual value="60%">
<comment><narrative>
The value will be defined as per the results of the second survey, on-going
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central registry of contributors and beneficiaries introduced and operating - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="Established">

</target>
<actual value="Central Archive established. Last furniture under delivery.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved transparency and public understanding of the pension system - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="44%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="75%">

</target>
<actual value="75%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Necessary legal framework introduced
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No proper legal framework in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="The Law on Social Assistance and Social Services enacted and implemented in all regions. All secondary legislation adopted andimplemented.">
<comment><narrative>
Target met. The legal framework enacted
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of days for providing formal response to pension applications (positive or negative)less than 30 days on average - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="30 days">

</target>
<actual value="30">
<comment><narrative>
Achieved. The SII has reached an average no. of 30 days for the formal response to the applications
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase access of vulnerable groups to daily social care services
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="43.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of days for providing formal response to pension applications (positive or negative)less than 30 days on average - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="30 days">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="25">
<comment><narrative>
Achieved. The SII has reached an average no. of 25 days for the formal response to the applications
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of SII staff trained in undertaking actuarial projections - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="5">

</target>
<actual value="2">
<comment><narrative>
On track. Currently, there are 3 more staff being trained on the actuarial projections
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals who know their pension rights - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="80%"><comment><narrative>Defined based on the results of the first public opinion survey</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="90%">

</target>
<actual value="80%">
<comment><narrative>
The indicator will be updated following the second survey, which is on-going
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with service user specific standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 8 residential care centers are assessed as meeting the relevant service user specific standards">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design and implementation of local social care plans
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="8 regions have completed and are implementing the local social care plans">
<comment><narrative>
Target met. 8 regions have completed and are implementing the local social care plans
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central registry of contributors and beneficiaries introduced and operating - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="Established">

</target>
<actual value="Furniture is contracted, expected to be in place end of February. Meanwhile equipment is being contracted.">
<comment><narrative>
On track
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Periodic Household surveys to inform policy decisions
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="Limited Household Survey in 1998"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2012-09-30" />
<target value="A system of surveys is in place (including a HBS) and the data are fully utilized by the Government">
<comment><narrative>
Target met. Surveys in place and used as base for Gov. decisions
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive social service strategy is adopted by the Government and is being implemented
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No strategy in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Strategy adopted and implementation ocurred as spelled out in the action plan">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduced number of documents required for applying for the pension benefit - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="8 on average"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="3">

</target>
<actual value="8">
<comment><narrative>
On track. Although currently the number of documents is unchanged, the establishment of the archive database will reduce it to thetarget number
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design and implementation of local social care plans
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="8 regions have completed and are implementing the local social care plans">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of contributors with accessible electronic individual records - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="400,000 (rural + urban)">

</target>
<actual value="360,000 (rural + urban)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of days for providing formal response to pension applications (positive or negative)less than 30 days on average - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="30 days">

</target>
<actual value="30">
<comment><narrative>
target already met. The SII has reached an average no. of 30 days for the formal response to the applications
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Necessary legal framework introduced
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No proper legal framework in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="The Law on Social Assistance and Social Services enacted and implemented in all regions. All secondary legislation adopted andimplemented.">
<comment><narrative>
Target met. The legal framework enacted
</narrative></comment>
</target>
<actual value="The Law on Social Assistance and Social Services enacted and implemented in all regions. All secondary legislation adopted andimplemented.">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of beneficiaries with eligibility and benefit levels checked -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="40,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="120,000">

</target>
<actual value="80,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved capacity in SII for pension policy development with actuarial projections and impact of reform options undertaken by SII -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="no unit"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="Actuarial Unit in SII established, projections drafted">

</target>
<actual value="Unit in place and projections drafted.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase access of vulnerable groups to daily social care services
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="26.00"><comment><narrative>There were only 26 daily centers with a total of 1300 clients</narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="43.00">
<comment><narrative>
A total of 43 centers are in place, serving to 25,000 clients
</narrative></comment>
</target>
<actual value="43.00">
<comment><narrative>
Achieved. A total of 43 centers are in place, serving to 25,000 clients
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved transparency and public understanding of the pension system - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="44%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="75%">

</target>
<actual value="">
<comment><narrative>
A survey is on-going, expected to define the level of public understanding and transparency. When the digital archive will be inplace (by project end) all calculations of contributions and benefits will be transparent to beneficiaries.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved client services in pension administration -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="49%"><comment><narrative>Value defined based on the results of the first public opinion survey</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="70%">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="75%">
<comment><narrative>
The indicator is updated, based on the second survey, just completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved client services in pension administration -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="49%"><comment><narrative>Value defined based on the results of the first public opinion survey</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2012-09-30" />
<target value="70%">

</target>
<actual value="49%">
<comment><narrative>
The indicator will be updated, based on the second survey, which is actually starting.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved transparency and public understanding of the pension system - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="44%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="75%">

</target>
<actual value="">
<comment><narrative>
A survey is starting to take place, which will define the level of public understanding and transparency. When the digital archivewill be in place (by project end) all calculations of contributions and benefits will be transparent to beneficiaries.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive social service strategy is adopted by the Government and is being implemented
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No strategy in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Strategy adopted and implementation ocurred as spelled out in the action plan">
<comment><narrative>
Target met. The strategy is approved and implemented as per the action plan
</narrative></comment>
</target>
<actual value="Strategy adopted and implementation ocurred as spelled out in the action plan">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central registry of contributors and beneficiaries introduced and operating - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="Established">

</target>
<actual value="The SII archive building has been renovated. However, the IT and other required furniture and equipment are not in place yet.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals who know their pension rights - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="80%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="90%">

</target>
<actual value="95%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Prepare policy options for improving targeting of cash social assistance
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Options for improved targeting for the cash social assistance are identified and appraised">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved client services in pension administration -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="49%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="70%">

</target>
<actual value="75%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central registry of contributors and beneficiaries introduced and operating - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="Established">
<comment><narrative>
target mostly met - to be confirmed during ICR preparation
</narrative></comment>
</target>
<actual value="Central Archive established. Last furniture under delivery.">
<comment><narrative>
Central Archive expected to be fully operational within April (following the completion of furniture delivery by end of March)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with service user specific standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 8 residential care centers are assessed as meeting the relevant service user specific standards">
<comment><narrative>
Target met. 8 residential care centers are assessed as meeting the relevant service user specific standards.
</narrative></comment>
</target>
<actual value="8 residential care centers are assessed as meeting the relevant service user specific standards.">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with service user specific standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 8 residential care centers are assessed as meeting the relevant service user specific standards">
<comment><narrative>
Target met. 8 residential care centers are assessed as meeting the relevant service user specific standards.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduced number of documents required for applying for the pension benefit - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="8 on average"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2012-09-30" />
<target value="3">

</target>
<actual value="8">
<comment><narrative>
Although currently the number of documents is unchanged, the establishment of the archive database will reduce it to the targetnumber
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive social service strategy is adopted by the Government and is being implemented
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="No strategy in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="Strategy adopted and implementation ocurred as spelled out in the action plan">
<comment><narrative>
Target met. The strategy is approved and implemented as per the action plan
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals/companies who indicate they have improved access to information about their benefits and contributions - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="50%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="75%">

</target>
<actual value="75%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals/companies who indicate they have improved access to information about their benefits and contributions - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="50%"><comment><narrative>Defined based on the first public opinion survey results</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2012-09-30" />
<target value="75%">

</target>
<actual value="50%">
<comment><narrative>
The value will be defined as per the results of the second survey, just starting
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Periodic Household surveys to inform policy decisions
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value="Limited Household Survey in 1998"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2012-09-30" />
<target value="A system of surveys is in place (including a HBS) and the data are fully utilized by the Government">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of individuals who know their pension rights - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="80%"><comment><narrative>Defined based on the results of the first public opinion survey</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2012-09-30" />
<target value="90%">

</target>
<actual value="80%">
<comment><narrative>
The indicator will be updated following the second survey, which just started
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity of Social Insurance Institute to detect and reduce fraud in the system, via securing all the historical contribution and work history records
</narrative></title>
<baseline year="2008" iso-date="2008-03-31" value="All contribution records are on paper"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-31" />
<period-end iso-date="2012-09-30" />
<target value="100% of all contribution records transferred from paper to electronic form">

</target>
<actual value="The SII is in process of tranferring the data electronically, while waiting for the archive database to be functional. Currently,all rural data are transferred while 40% of data for the urban population">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with general standards
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="At least 14 residential care centers meet the general social care services standards">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of days for providing formal response to pension applications (positive or negative)less than 30 days on average - &quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-31" />
<target value="30 days">

</target>
<actual value="25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased number of beneficiaries with eligibility and benefit levels checked -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2009" iso-date="2009-09-30" value="40,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-30" />
<period-end iso-date="2013-03-30" />
<target value="120,000">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="120,000">
<comment><narrative>
Achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved client services in pension administration -&quot;added w/AF&quot;
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="49%"><comment><narrative>Value defined based on the results of the first public opinion survey</narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2013-03-31" />
<target value="70%">

</target>
<actual value="49%">
<comment><narrative>
The indicator will be updated, based on the second survey, which is on-going.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design and implementation of local social care plans
</narrative></title>
<baseline year="2001" iso-date="2001-06-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2001-06-01" />
<period-end iso-date="2009-09-30" />
<target value="8 regions have completed and are implementing the local social care plans">
<comment><narrative>
Target met. 8 regions have completed and are implementing the local social care plans
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Target met
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P110481</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to: (i) contribute to safeguarding the hydroelectric dams on the Drin and Mat river cascades in the territory of the Borrower; and (ii) improve the operational efficiency of said hydroelectric dams and enhance the stability of power supply in the regional market.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of Energy Community of South East Europe Adaptable Program Loan (APL) Program - Fifth APL for Albania Dam Safety Project are to: (i) contribute to safe guarding the major hydroelectric plants of Albania; and (ii) improve their operational efficiency and enhance the stability of power supply for the regional electricity market. The project's main impact will be to prevent a possible catastrophe resulting from a dam failure. Such a catastrophe can result in significant loss of life and damage to property of persons living in downstream areas. It will also cause a major and prolonged fall in hydropower production that will severely affect the entire population of Albania and will likely significantly increase electricity prices in the whole South East Europe (SEE) region. Poor and vulnerable people in the region will likely suffer disproportionately from any such electricity price increases. The project consists of two main components: (1) physical infrastructure investments; and (2) technical assistance. Physical infrastructure investments include: (i) the specification and implementation of water alarm systems in the Drin and Mat River basins, and specification of an Emergency Action Plan; (ii) rehabilitation of spillways on Fierza, Koman and Vau i Dejes dams on the Drin river; (iii) rehabilitation of electromechanical equipment in the Koman dam; and (iv) implementation of Load Frequency Control system in Vau i Dejes and Fierza Dams. The technical assistance component will finance: (i) hydrology studies and water management; (ii) implementation consultants; (iii) studies for new hydropower development; (iv) financial management systems capacity building; and (v) international panel of experts on safety of Dams.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0002164"><narrative>Albania Financial Supervisory Authority</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0002163"><narrative>Albanian Power Corporation (KESH)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-05-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Gazmend Daci</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183824" />
            <name><narrative>Ulez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.682781 19.89333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184080" />
            <name><narrative>Shkopet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.706108 19.825001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184781" />
            <name><narrative>Lumi i Matit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.64278 19.576389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007932401" />
            <name><narrative>Vau i Dejes Hydroelectric Power Station</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.013611 19.63583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007932403" />
            <name><narrative>Fierze Hydroelectric Power Station</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.251389 20.04306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007932453" />
            <name><narrative>Komani Hydroelectric Power Station</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.103249 19.82238</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="14010" percentage="26" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="37" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="37" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LH" percentage="100.000000" xml:lang="en"><narrative>FY17 - Renewable Energy Hydro</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="10" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="7" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="7" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="7" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="7" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="7" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="7" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="20" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="10" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="10" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="21" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="20" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="10" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="7" xml:lang="en"><narrative>Soil Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">41477.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">97039.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">70091.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">80507.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">89859.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">98344.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">178653.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">201068.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">215577.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">68051.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">225249.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">232838.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">239334.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">241310.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">236227.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">232415.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">237498.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">251583.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">268174.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">84022.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">281270.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">300614.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">320947.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">334538.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">354235.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">381557.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">400655.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">410080.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">431260.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">463842.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">242299.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">496141.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">521981.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">558763.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">598758.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">632646.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">668017.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">703317.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">743665.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">783059.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">403902.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">827643.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">851506.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">886347.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">916352.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">942933.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">976327.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">623875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">638804.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">648287.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">654428.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">538607.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">672439.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">682638.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">691796.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">704946.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">717098.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">728100.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">738993.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">750103.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">761453.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">970114.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">131700.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">424285.39</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">86976.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">143935.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">633526.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">186075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">83706.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">84963.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">556969.54</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">89320.97</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">80106.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">86751.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">163191.44</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">177457.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">191951.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">99676.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">102407.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2178648.01</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">941926.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">196817.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">201180.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">305635.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1024991.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1498199.48</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">206895.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1569022.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1824472.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">4193505.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">256559.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">801053.29</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1273010.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">225061.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">731404.35</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">780530.82</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">399816.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">775070.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">2127174.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">556965.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">512608.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">281614.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">307303.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1376666.68</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">701414.12</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">68797.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">154618.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1240454.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1227709.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">955329.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">7730.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">242945.29</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">300216.97</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">324478.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1014191.79</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2892215.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">141069.92</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1332140.36</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1641012.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2921488.15</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">35300000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">21600000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">14900000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-1613340</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">131700</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">424285</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">86976</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">143935</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">633527</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">186075</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">83706</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">84963</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">556970</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">89321</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">80106</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">86751</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">163191</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">177457</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">191951</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">48064</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">99676</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">102407</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">2178648</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">941926</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">196817</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">201180</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">305636</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">1024992</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1498199</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">206895</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1569023</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1824472</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">4193505</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">256560</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">801053</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">1273010</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">225062</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">731404</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">780531</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">399817</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">691428</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">83642</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">49430</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">2077744</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">556965</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">512608</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">281614</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">307303</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">1072025</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">304642</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">701414</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">68798</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">154619</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">1240454</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">975881</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">251829</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">464957</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">490372</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">7730</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">242945</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">300217</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">324479</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">103553</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">910639</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">2510276</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">381939</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">141070</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">176730</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1155410</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">353380</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">1287633</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">2319175</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">602313</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">123266</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">94424</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">140106</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">175800</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">949741</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">531636</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">979894</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">482892</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">34097</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">451896</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">686807</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">236974</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">257794</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">339892</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">238409</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">1683034</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">1389066</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">298108</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">101871</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">528160</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">1129817</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">473277</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">300658</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">885742</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">426780</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">306993</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">18009</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">1144067</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1060890</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">14498</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">269193</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">767651</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">465759</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">761819</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">289406</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">315553</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">489960</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">-1468</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-3636</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-6069</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-6582</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-8134</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-9753</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-48064</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-15190</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-291</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-23454</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-681</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-25757</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-731</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-34493</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-769</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-55233</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-845</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-68324</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-520</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-86242</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-682</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-90101</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-608</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-95310</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-898</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-96876</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-3227</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-103840</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-6495</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-109934</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-11080</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-110151</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-13101</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-34097</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-104522</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-16074</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-25948</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-83121</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-20531</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-22418</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-108610</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-24465</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-10813</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-76941</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-38619</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-26418</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-92923</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-31989</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-80044</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-650</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-31506</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-44868</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-30697</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-76897</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-12929</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-46653</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-81313</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-136719</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-191337</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-21484</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-188259</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-272207</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-76411</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-188840</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-294597</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-35708</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-161698</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-274605</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-50297</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-225882</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-115701</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-31400</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-87681</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-191597</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-24373</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-184004</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-76790</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-567362</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-1516667</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-610272</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-1508703</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-670779</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1487242</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-766304</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1482772</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-750815</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1531499</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-820864</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1550031</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-841459</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1531890</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-795373</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1482544</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-721538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1385003</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-723205</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1469730</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-755677</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1421263</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-754740</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1428261</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-751892</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1449462</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-734701</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1468558</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-777974</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-367156</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1479690</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-380891</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-807077</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1490540</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-381874</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-809161</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-2163"><narrative>Albanian Power Corporation (KESH)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110481"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P110481?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110481"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safeguarded dams and generation capacities
</narrative></title>
<baseline year="2008" iso-date="2008-05-19" value="Safeguard measures are not functional"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-19" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The PDO Indicator is FULLY ACHIEVED
• The main hydropower capacities in Albania are affected by safeguards measures (Drin and Mat Rivers Cascades).
• The dam geological, seismic and geodetic monitoring systems are functional (both Cascades). COMPLETED.
• The Rockfall danger protection works in all three Drin River Dams are COMPLETED
• Komani dam toe rehabilitation works are COMPLETED in July 2016.
• KESh and Albanian institution have adopted the recommendations of “Strengthening of the Institution set-up of Dam Safety andEmergency Preparedness” study. COMPLETED.
• Rehabilitation works in Komani HPP are completed and four generation units are in operation COMPLETED on March 2019.
• The rehabilitation works for four spillways are COMPLETERD. Two spillways structures in Fierza Dam (Tunnel-Nb3 1780m3/sec and Tunnel-Nb4 890m3/sec) and two in Komani Dam (Tunnel-Nb3 1900m3/sec and Tunnel-Nb4 1700 m3/sec) are handed-over to KESH in November 2021. The spillway structure in Zadeja Dam (Vau Deja HPP) is almost COMPLETED and will be fully in operation in January 2022.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safety of Dams Expert Panel
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Terms of reference drafted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-31" />
<target value="Panel in full operation.">

</target>
<actual value="The intermediate Indicator FULLY ACHIEVED
The Panel of Experts is fully operative; the individual contracts are valid untilDecember 2021. The Panel was expected to provide qualified views on the restored spillway capacity and the updated status ofseepages at Komani Dam. This is difficult to happen since the panel lost one of honored expert Mr. Paul Marinos.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Market Liberalization
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="0% in most countries"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The PDO Indicator is ACHIEVED
The shareholding arrangement between both the Albanian and the Kosovar transmission companies (OST-ALand KOSTT-KO) was concluded and signed on October 6, 2020.
The ALPEX has been registered on October 23, 2020. The selection of the service provider is ongoing. It is expected that ALPEX will commence its dry run operation in April 2022, and the first Day Ahead Market (DAM) auction is expected in June 2022, including the coupling with Kosovo. The Intraday Market will be operated on April 2023.
The deregulation process is continuing. After twelve customers connected in HV are qualified as eligible; the other 96 MV customersconnected in 35 kV were deregulated. The other group of customers potential to be deregulated are the customers connected in MV (20, 10, 6 kV); there are around 4000 customers. This will happen starting from January 2022. The total deregulated demand is estimatedto be 25% of total demand in Albania">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Remedial measures of medium priority and operational improvements completed
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="FS completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2020-12-31" />
<target value="Remedial measures and operational improvements completed">

</target>
<actual value="The intermediate Indicator FULLY ACHIEVED
(i). The Risk Analysis and preparation of Emergency Preparedness Plan (EPP) is COMPLETED;the Albanian responsible institutions are
adopting the recommendations provided in EPP.
(ii) The internal organization isCOMPLETED; the new dam safety department is established. The Internal Operational procedures are continuously improved. KESH isadopting the Strengthening of the Institution set-up of Dam Safety and Emergency Preparedness study recommendations.
(iii) TheRock-fall protection in Fierza HPP, Komani HPP and Vau Deja HPP are COMPLETED. The rockfall danger protection and rockfallstochastic modeling are completed in all Drin Cascade Dam (iv) The Drin River SCADA system (including the alarm system) is inimplementation phase; that is financed by KfW.
(v) Drin river operation optimization (WBG finances) - COMPLETED. The study(finalized in 2012) presents the results of the simulation of the Albanian system in order to optimize the utilization of hydroresources.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency preparedness plan
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2019-12-31" />
<target value="Continuation">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The Risk Analysis and preparation of Emergency Preparedness Plan (EPP) is COMPLETED.Albanian responsible authorities and institutions are adopting the recommendations provided in EPP">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthen the capacities of KESHs dam safety department and AlbCOLD
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2019-06-30" />
<target value="Completion">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The internal organization is COMPLETED; the new dam safety department is established.The internal operational improvements are ongoing. KESH is adopting the Strengthening of the Institution set-up of Dam Safety andEmergency Preparedness study recommendations.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
High priority remedial measures completed
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="FS completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The Intermediate Indicator is FULLY ACHIEVED
(i) The Electro- Mechanical Rehabilitation works in Komani HPP are completed. Four generation units are re-commissioned and in operation since March 2019.
(ii) The Dam's Instrumentation and Monitoring Systems are COMPLETED. The additional instruments and other facilities are provided by SECO and COMPLETED; the underwater inspection to verify the water leakages in Komani Dam, is COMPLETED.
(iii) The Komani Dam toe rehabilitation works, the consolidation of scour area and dredging to the tailrace channel are COMPLETED.
(iv) The Prefeasibility and Feasibility studies are both COMPLETED. The recommendations for new additional spillways in Fierza Dam and Komani Dam are provided.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Prepare a new structure and organization for KESH Generation
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2019-06-30" />
<target value="Completion">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The new dam safety department is established. The internal operational improvementsare ongoing. KESH is adopting the Strengthening of the Institution set-up of Dam Safety and Emergency Preparedness studyrecommendations">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Hydrology analysis and water management
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stag"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The Prefeasibility and Feasibility studies are both COMPLETED. The recommendations for new additional spillways in Fierza and Komani Dams, are provided.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the dams operation efficiency
</narrative></title>
<baseline year="2008" iso-date="2008-05-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-19" />
<period-end iso-date="2021-12-31" />
<target value="31.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievance received and addresses within agreed timeframe
</narrative></title>
<baseline year="2018" iso-date="2018-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-31" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency preparedness plan
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The Risk Analysis and preparation of Emergency Preparedness Plan (EPP) is COMPLETED. Albanian responsible authorities and institutions are adopting the recommendations provided in EPP">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial management capacity building
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The intermediate Indicator is PARTIALLY ACHIEVED.
The assignment was completed in September 2020 aimed strengthening the KESH's financial management capacity in maintaining financial management systems and reporting in full compliance with IFRS standards. While the overall quality of the KESH financial statement has improved as a result, as a result, certain audit qualifications remain unresolved as higher decision making (from the board and the shareholder) would be involved. The lack of the later puts the results of theactivity and the achievement of the PDO-level indicator in jeopardy. In this regard, the Bank team has advised KESH management to inform the supervisory board and shareholder accordingly and advise on the necessary steps to be taken to address the existing financial statements qualifications, aiming an unmodified opinion for the financial statements for the year 2020. The most significant qualifications that remain include (i) the adequacy of the methodology used for the impairment review, (ii) adequacy of the fixed assets revaluation update and (iii) disagreement on the measurement of certain borrowing items and financial instruments, and other presentation and classification departures. Finally, the practice of the selection and appointment of the other accounting experts and valuators, without consideration their technical competence is challenging the efforts to improve the financial reporting quality, as with the case of the last fixed assets revaluation update.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Hydrology analysis and water management
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stag"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2019-06-30" />
<target value="The system is completed and functional">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The Prefeasibility and Feasibility studies are both COMPLETED. The recommendationsfor new additional spillways in Fierza and Komani Dams, are provided.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievance received and addresses within agreed timeframe
</narrative></title>
<baseline year="2018" iso-date="2018-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-31" />
<period-end iso-date="2021-12-31" />
<target value="95.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The rehabilitated spillways are tested and functional for very high priority investments
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Feasibility Study (FS) completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-31" />
<target value="Rehabilitation tested and completed">

</target>
<actual value="The Intermediate Indicator is ACHIEVED
The rehabilitation works for four spillways are COMPLETERD. Two spillways structures inFierza Dam (Tunnel-Nb3 1780m3/sec and Tunnel-Nb4 890m3/sec) and two in Komani Dam (Tunnel-Nb3 1900m3/sec and Tunnel-Nb4 1700m3/sec) are handed-over to KESH in November 2021. The spillway structure in Zadeja Dam (Vau Deja HPP) is almost COMPLETED and willbe fully in operation in January 2022. The works for new Stoplog in Qyrsaq Dam will start in January 2022 and be completed inmid-2022. After that the works for rehabilitation of three Radial Gates at Qyrsaq Dam will start.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Prepare a new structure and organization for KESH Generation
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The new dam safety department is established. The internal operational improvements are ongoing. KESH is adopting the “Strengthening of the Institution set-up of Dam Safety and Emergency Preparedness” study recommendations">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safety of Dams Expert Panel
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Terms of reference drafted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The intermediate Indicator FULLY ACHIEVED
The Panel of Experts is fully operative; the individual contracts are valid until December 2021. The Panel was expected to provide qualified views on the restored spillway capacity and the updated status of seepages at Komani Dam. This is difficult to happen since the panel lost one of honored expert Mr. Paul Marinos.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Remedial measures of medium priority and operational improvements completed
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="FS completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The intermediate Indicator FULLY ACHIEVED
(i). The Risk Analysis and preparation of Emergency Preparedness Plan (EPP) is COMPLETED;the Albanian responsible institutions are
adopting the recommendations provided in EPP.
(ii) The internal organization is COMPLETED; the new dam safety department is established. The Internal Operational procedures are continuously improved. KESH is adopting the “Strengthening of the Institution set-up of Dam Safety and Emergency Preparedness” study recommendations.
(iii) The Rock-fall protection in Fierza HPP, Komani HPP and Vau Deja HPP are COMPLETED. The rockfall danger protection and rockfall stochastic modeling are completed in all Drin Cascade Dam (iv) The Drin River SCADA system (including the alarm system) is in implementation phase; that is financed by KfW.
(v) Drin river operation optimization (WBG finances) - COMPLETED. The study (finalized in 2012) presents the resultsof the simulation of the Albanian system in order to optimize the utilization of hydro resources.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Market Liberalization
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="0% in most countries"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-31" />
<target value="The Albanian Power Exchange to be Functional and Operational">

</target>
<actual value="The PDO Indicator is ACHIEVED
The shareholding arrangement between both the Albanian and the Kosovar transmission companies (OST-ALand KOSTT-KO) was concluded and signed on October 6, 2020.
The ALPEX has been registered on October 23, 2020. The selection of theservice provider is ongoing. It is expected that ALPEX will commence its dry run operation in April 2022, and the first Day AheadMarket (DAM) auction is expected in June 2022, including the coupling with Kosovo. The Intraday Market will be operated on April2023.
The deregulation process is continuing. After twelve customers connected in HV are qualified as eligible; the other 96 MVcustomers connected in 35 kV were deregulated. The other group of customers potential to be deregulated are the customers connectedin MV (20, 10, 6 kV); there are around 4000 customers. This will happen starting from January 2022. The total deregulated demand isestimated to be 25% of total demand in Albania">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The rehabilitated spillways are tested and functional for very high priority investments
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Feasibility Study (FS) completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The Intermediate Indicator is ACHIEVED
The rehabilitation works for four spillways are COMPLETERD. Two spillways structures in Fierza Dam (Tunnel-Nb3 1780m3/sec and Tunnel-Nb4 890m3/sec) and two in Komani Dam (Tunnel-Nb3 1900m3/sec and Tunnel-Nb4 1700 m3/sec) are handed-over to KESH in November 2021. The spillway structure in Zadeja Dam (Vau Deja HPP) is almost COMPLETED and will be fully inoperation in January 2022. The works for new Stoplog in Qyrsaq Dam will start in January 2022 and be completed in mid-2022. After that the works for rehabilitation of three Radial Gates at Qyrsaq Dam will start.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial management capacity building
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-31" />
<target value="KESHs annual financial statements are prepared in full compliance with IFRS">

</target>
<actual value="The intermediate Indicator is PARTIALLY ACHIEVED.
The assignment was completed in September 2020 aimed strengthening the KESHsfinancial management capacity in maintaining financial management systems and reporting in full compliance with IFRS standards.While the overall quality of the KESH financial statement has improved as a result, as a result, certain audit qualificationsremain unresolved as higher decision making (from the board and the shareholder) would be involved. The lack of the later puts theresults of the activity and the achievement of the PDO-level indicator in jeopardy. In this regard, the Bank team has advised KESHmanagement to inform the supervisory board and shareholder accordingly and advise on the necessary steps to be taken to address theexisting financial statements qualifications, aiming an unmodified opinion for the financial statements for the year 2020. The mostsignificant qualifications that remain include (i) the adequacy of the methodology used for the impairment review, (ii) adequacy ofthe fixed assets revaluation update and (iii) disagreement on the measurement of certain borrowing items and financial instruments,and other presentation and classification departures. Finally, the practice of the selection and appointment of the otheraccounting experts and valuators, without consideration their technical competence is challenging the efforts to improve thefinancial reporting quality, as with the case of the last fixed assets revaluation update.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safeguarded dams and generation capacities
</narrative></title>
<baseline year="2008" iso-date="2008-05-19" value="Safeguard measures are not functional"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-19" />
<period-end iso-date="2021-12-31" />
<target value="Safeguard remedies are implemented at Drin and Mat Rivers Cascades">

</target>
<actual value="The PDO Indicator is FULLY ACHIEVED
 The main hydropower capacities in Albania are affected by safeguards measures (Drin and MatRivers Cascades).
 The dam geological, seismic and geodetic monitoring systems are functional (both Cascades). COMPLETED.
 TheRockfall danger protection works in all three Drin River Dams are COMPLETED
 Komani dam toe rehabilitation works are COMPLETED inJuly 2016.
 KESh and Albanian institution have adopted the recommendations of Strengthening of the Institution set-up of DamSafety and Emergency Preparedness study. COMPLETED.
 Rehabilitation works in Komani HPP are completed and four generation unitsare in operation COMPLETED on March 2019.
 The rehabilitation works for four spillways are COMPLETERD. Two spillways structuresin Fierza Dam (Tunnel-Nb3 1780m3/sec and Tunnel-Nb4 890m3/sec) and two in Komani Dam (Tunnel-Nb3 1900m3/sec and Tunnel-Nb4 1700m3/sec) are handed-over to KESH in November 2021. The spillway structure in Zadeja Dam (Vau Deja HPP) is almost COMPLETED and willbe fully in operation in January 2022.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthen the capacities of KESHs dam safety department and AlbCOLD
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="Planning stage"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2021-12-10" />
<target value="">

</target>
<actual value="The intermediate Indicator is FULLY ACHIEVED.
The internal organization is COMPLETED; the new dam safety department is established.The internal operational improvements are ongoing. KESH is adopting the “Strengthening of the Institution set-up of Dam Safety and Emergency Preparedness” study recommendations.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the dams operation efficiency
</narrative></title>
<baseline year="2008" iso-date="2008-05-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-19" />
<period-end iso-date="2021-12-10" />
<target value="31.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
High priority remedial measures completed
</narrative></title>
<baseline year="2011" iso-date="2011-03-10" value="FS completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-10" />
<period-end iso-date="2020-12-31" />
<target value="Rehabilitation completed">

</target>
<actual value="The Intermediate Indicator is FULLY ACHIEVED
(i) The Electro- Mechanical Rehabilitation works in Komani HPP are completed. Fourgeneration units are re-commissioned and in operation since March 2019.
(ii) The Dam's Instrumentation and Monitoring Systems areCOMPLETED. The additional instruments and other facilities are provided by SECO and COMPLETED; the underwater inspection to verifythe water leakages in Komani Dam, is COMPLETED.
(iii) The Komani Dam toe rehabilitation works, the consolidation of scour area anddredging to the tailrace channel are COMPLETED.
(iv) The Prefeasibility and Feasibility studies are both COMPLETED. Therecommendations for new additional spillways in Fierza Dam and Komani Dam are provided.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P176163</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Clean and Resilient Environment for Blue Sea Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to reduce pollution from land-based sources into the aquatic environment in selected areas of the South-West Coastal Belt of Albania. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Clean and Resilient Environment for Blue Sea Project is to reduce pollution from land-based sources into the aquatic environment in selected areas of the South-West Coastal Belt of Albania. This project has three components. 1) The first component, Promote Integrated and Circular Approaches for Protection of Landscapes and Water Resources, has the following sub-components: (i) Institutional support for sustainable performance, enhanced monitoring and transition to circular economy; (ii) Environmental-Performance Based Investments for local pollution prevention; and (iii) Behavioral change support and dissemination for scaling up. 2) The second component, Reduce Water Pollution in the Vjosa River, has the following sub-components: (i) Expansion of sanitation infrastructure; (ii) Improved sanitation facilities and management; and (iii) Non-point source pollution prevention. 3) The third component, Project Management, Monitoring and Evaluation, has the following sub-components: (i) Management and coordination activities by Ministry of Tourism and Environment (MoTE); and (ii) Management and coordination activities by National Agency for Water, Sewage and Waste Infrastructure (AKUM).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0048509"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0048510"><narrative>Ministry of Tourism and Environment</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-12-01"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-12-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-03-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-03-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maja Murisic</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmurisic@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782070" />
            <name><narrative>Permet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.23361 20.35167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783148" />
            <name><narrative>Gjirokaster</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.07583 20.13889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783754" />
            <name><narrative>Republic of Albania</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41 20</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183719" />
            <name><narrative>Vlore</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.4686 19.48318</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003186217" />
            <name><narrative>Vjose</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.61285 19.56339</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944395" />
            <name><narrative>Bashkia Kelcyre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.36196 20.16476</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944396" />
            <name><narrative>Bashkia Libohove</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.10754 20.25753</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944397" />
            <name><narrative>Bashkia Memaliaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.41524 19.96911</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944399" />
            <name><narrative>Bashkia Tepelene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.26736 19.97003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944427" />
            <name><narrative>Bashkia Selenice</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.39503 19.65958</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14022" percentage="74" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="19" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="4" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="74.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="9" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="82" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="96" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="10" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="22" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="9" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="9" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="19" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="4" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="4" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="79" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="79" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="14" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="10" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="9" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="4" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="4" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="79" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="79" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="96" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">370833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">370833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">370833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">370833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">370833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">370833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">370833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">753333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">753333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1038333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1038333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1269166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1269166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1459166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1459166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2152857.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2152857.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2152857.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2152857.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2152857.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2152857.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2152857.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1483333.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-29"/>
<value currency="USD" value-date="2030-03-29">73963950.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-29"/>
<value currency="USD" value-date="2030-03-29">73963950.81</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-48510"><narrative>Ministry of Tourism and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-54081"><narrative>Agency for Water Supply and Sewerage and Waste Infrastructure</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">204199</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-48510"><narrative>Ministry of Tourism and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-54081"><narrative>Agency for Water Supply and Sewerage and Waste Infrastructure</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">4676000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-48510"><narrative>Ministry of Tourism and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-54081"><narrative>Agency for Water Supply and Sewerage and Waste Infrastructure</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1155850</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-48510"><narrative>Ministry of Tourism and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-54081"><narrative>Agency for Water Supply and Sewerage and Waste Infrastructure</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-204199</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-48510"><narrative>Ministry of Tourism and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-54081"><narrative>Agency for Water Supply and Sewerage and Waste Infrastructure</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-290514</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-48510"><narrative>Ministry of Tourism and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-54081"><narrative>Agency for Water Supply and Sewerage and Waste Infrastructure</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-185629</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-48510"><narrative>Ministry of Tourism and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-54081"><narrative>Agency for Water Supply and Sewerage and Waste Infrastructure</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176163"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176163?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176163"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities with a GIS-based information system operational
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the number of municipalities benefitting from the improved monitoring of the provision of sanitation services and environmental protection. It does so by assessing the number of municipalities having implemented and using the GIS-based information system designed under the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Infrastructure integrating climate change related risks in the design
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the share of infrastructure financed or supported by the project that have been designed taking climate change risks into account
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women-headed household's who receive Intra-Domiciliary Sanitation Investments
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population covered by municipal waste collection service
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="90.00">
<comment><narrative>
This indicator measures the number of people benefiting from municipal waste collection service out of the total number of people in the Vlora South – Gjirokaster waste zone. It focuses on municipal waste only.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-site/decentralized sanitation solutions implemented and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="2,800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New treatment plants for wastewater / sludge established and operational
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the extended coverage of wastewater / sludge treatment plants. These treatment plants, either centralized or semi-centralized, should be established and operational to be accounted for. However the final number is subject to the conclusions deriving from the Feasibility Studies.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities improving waste management service performance
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="6.00">
<comment><narrative>
This indicator measures the improvement of municipal solid waste management in municipalities benefitting from environmental investments for local pollution prevention/reduction. To be accounted for, a municipality must improve one of the following indicators compared to the baseline (established in year 1): (a) percentage of waste collected / increased service coverage of population, (b) percentage of waste recovered for recycling
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women-headed household's who receive Intra-Domiciliary Sanitation Investments
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities with a Performance Monitoring Information Systems (MIS) for municipal solid waste that is operational and reporting on key KPIs
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="4.00">
<comment><narrative>
This indicator measures the operationalization and effective adoption by targeted municipalities of the MIS set up by the project for monitoring municipal solid waste management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cost recovery rate for municipal solid waste management services of selected municipalities
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="64.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="80.00">
<comment><narrative>
This indicator measures the improved cost recovery of municipal solid waste operations. More specifically, the indicator measures the share of annual revenue from waste management (fee collection) against the operating costs of waste management faced by the municipality (i.e. collection, recycling, transfer, and/or disposal costs)
</narrative></comment>
</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to safely managed sanitation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="51,800.00">
<comment><narrative>
This indicator will measure the impact of the expansion of sanitation infrastructure supported by the project on the population.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Wastewater flows from urban agglomerations safely treated
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="80.00">
<comment><narrative>
This indicator stems from SDG target 6.3. It measures the volumes of wastewater which are collected from different activities, and the volumes of wastewater which are safely treated before discharge into the environment. Both indicators are measured in units of 1000 m3/day. The ratio of the volume treated to the volume collected is taken as the ‘proportion of wastewater collected that is safely treated’, where safely treated implies the compliance with local environmental standards as well as with EU Directive (91/271/EEC). The geographical scope covers urban areas only in the four prioritized municipalities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Nutrients pollution filtered and avoided
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="45.00">
<comment><narrative>
This indicator measures the amount of nitrogen and phosphorus pollution avoided by the project, against the baseline pollution load. Avoided pollution is generated by expanded and restored wetlands and specific agricultural practices pertaining to the use of fertilizer and manure management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cost recovery rate for municipal solid waste management services of selected municipalities
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="64.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="80.00">
<comment><narrative>
This indicator measures the improved cost recovery of municipal solid waste operations. More specifically, the indicator measures the share of annual revenue from waste management (fee collection) against the operating costs of waste management faced by the municipality (i.e. collection, recycling, transfer, and/or disposal costs)
</narrative></comment>
</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Wastewater flows from urban agglomerations safely treated
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="80.00">
<comment><narrative>
This indicator stems from SDG target 6.3. It measures the volumes of wastewater which are collected from different activities, and the volumes of wastewater which are safely treated before discharge into the environment. Both indicators are measured in units of 1000 m3/day. The ratio of the volume treated to the volume collected is taken as the ‘proportion of wastewater collected that is safely treated’, where safely treated implies the compliance with local environmental standards as well as with EU Directive (91/271/EEC). The geographical scope covers urban areas only in the four prioritized municipalities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New treatment plants for wastewater / sludge established and operational
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the extended coverage of wastewater / sludge treatment plants. These treatment plants, either centralized or semi-centralized, should be established and operational to be accounted for. However the final number is subject to the conclusions deriving from the Feasibility Studies.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="200.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal waste recycled
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="1,300.00">
<comment><narrative>
This indicator measures the weight of waste collected annually by municipalities that is then separated for recycling
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities with a GIS-based information system operational
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="6.00">
<comment><narrative>
This indicator measures the number of municipalities benefitting from the improved monitoring of the provision of sanitation services and environmental protection. It does so by assessing the number of municipalities having implemented and using the GIS-based information system designed under the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-site/decentralized sanitation solutions implemented and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="2,800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="200.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Nutrients pollution filtered and avoided
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="45.00">
<comment><narrative>
This indicator measures the amount of nitrogen and phosphorus pollution avoided by the project, against the baseline pollution load. Avoided pollution is generated by expanded and restored wetlands and specific agricultural practices pertaining to the use of fertilizer and manure management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population covered by municipal waste collection service
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="90.00">
<comment><narrative>
This indicator measures the number of people benefiting from municipal waste collection service out of the total number of people in the Vlora South – Gjirokaster waste zone. It focuses on municipal waste only.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population covered by municipal waste collection service
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="90.00">
<comment><narrative>
This indicator measures the number of people benefiting from municipal waste collection service out of the total number of people in the Vlora South – Gjirokaster waste zone. It focuses on municipal waste only.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Wastewater flows from urban agglomerations safely treated
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="80.00">
<comment><narrative>
This indicator stems from SDG target 6.3. It measures the volumes of wastewater which are collected from different activities, and the volumes of wastewater which are safely treated before discharge into the environment. Both indicators are measured in units of 1000 m3/day. The ratio of the volume treated to the volume collected is taken as the ‘proportion of wastewater collected that is safely treated’, where safely treated implies the compliance with local environmental standards as well as with EU Directive (91/271/EEC). The geographical scope covers urban areas only in the four prioritized municipalities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Wastewater flows from urban agglomerations safely treated
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="80.00">
<comment><narrative>
This indicator stems from SDG target 6.3. It measures the volumes of wastewater which are collected from different activities, and the volumes of wastewater which are safely treated before discharge into the environment. Both indicators are measured in units of 1000 m3/day. The ratio of the volume treated to the volume collected is taken as the ‘proportion of wastewater collected that is safely treated’, where safely treated implies the compliance with local environmental standards as well as with EU Directive (91/271/EEC). The geographical scope covers urban areas only in the four prioritized municipalities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Nutrients pollution filtered and avoided
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="45.00">
<comment><narrative>
This indicator measures the amount of nitrogen and phosphorus pollution avoided by the project, against the baseline pollution load. Avoided pollution is generated by expanded and restored wetlands and specific agricultural practices pertaining to the use of fertilizer and manure management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Nutrients pollution filtered and avoided
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="45.00">
<comment><narrative>
This indicator measures the amount of nitrogen and phosphorus pollution avoided by the project, against the baseline pollution load. Avoided pollution is generated by expanded and restored wetlands and specific agricultural practices pertaining to the use of fertilizer and manure management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of activities that are designed and implemented through engagement of stakeholders and public
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="85.00">
<comment><narrative>
This indicator measures the stakeholder engagement in the design and implementation of the project. Each activity that is designed and implemented using the engagement of stakeholders and the general public will count toward this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="51800.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of activities that are designed and implemented through engagement of stakeholders and public
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="85.00">
<comment><narrative>
This indicator measures the stakeholder engagement in the design and implementation of the project. Each activity that is designed and implemented using the engagement of stakeholders and the general public will count toward this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="51800.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population covered by municipal waste collection service
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="90.00">
<comment><narrative>
This indicator measures the number of people benefiting from municipal waste collection service out of the total number of people in the Vlora South – Gjirokaster waste zone. It focuses on municipal waste only.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Infrastructure integrating climate change related risks in the design
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the share of infrastructure financed or supported by the project that have been designed taking climate change risks into account
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions reduction due to the improved wastewater treatment
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="5,800.00">
<comment><narrative>
This indicator measures the amounts of GHG emission reduction due to the improved treatment of wastewater, compared to the business as usual. The project expects to reduce the GHG emissions. The target shows the expected reduction by project activities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions reduction due to the improved wastewater treatment
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="5,800.00">
<comment><narrative>
This indicator measures the amounts of GHG emission reduction due to the improved treatment of wastewater, compared to the business as usual. The project expects to reduce the GHG emissions. The target shows the expected reduction by project activities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal waste recycled
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="1,300.00">
<comment><narrative>
This indicator measures the weight of waste collected annually by municipalities that is then separated for recycling
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities with a Performance Monitoring Information Systems (MIS) for municipal solid waste that is operational and reporting on key KPIs
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="4.00">
<comment><narrative>
This indicator measures the operationalization and effective adoption by targeted municipalities of the MIS set up by the project for monitoring municipal solid waste management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities improving waste management service performance
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2030-01-31" />
<target value="6.00">
<comment><narrative>
This indicator measures the improvement of municipal solid waste management in municipalities benefitting from environmental investments for local pollution prevention/reduction. To be accounted for, a municipality must improve one of the following indicators compared to the baseline (established in year 1): (a) percentage of waste collected / increased service coverage of population, (b) percentage of waste recovered for recycling
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to safely managed sanitation services
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-04-30" />
<target value="51,800.00">
<comment><narrative>
This indicator will measure the impact of the expansion of sanitation infrastructure supported by the project on the population.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P163239</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Regional and Local Roads Connectivity</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives are to improve access to selected agricultural and tourism centers, and to strengthen their municipalities capacity to manage their road assets.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Regional and Local Roads Connectivity Project for Albania are to improve access to selected agricultural and tourism centers, and to strengthen their municipalities capacity to manage their road assets. The project comprises of three components. The first component, accessibility improvement will finance the rehabilitation of regional and local roads; consultancy services for designs, civil works supervision, and technical and road safety audits; and road safety initiatives. It consists of following sub-components: (i) climate resilient road rehabilitation works; and (ii) road safety initiatives. The second component, capacity building for municipalities will provide support to municipalities in two areas of their new responsibilities, which is the management and maintenance of road networks, and in maximizing the potential impacts from improved access on agricultural competitiveness and tourism potential. It consists of following sub-components: (i) building municipal capacity to manage and maintain road networks; and (ii) building new economies. The third component, implementation management support includes incremental operational cost of the Albania development fund (ADF), development, and maintenance of a geographic information system (GIS), and prioritization database for regional and local roads, midterm evaluation, and capacity-building initiatives for the ADF.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0032608"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0032609"><narrative>Albania Development Fund</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-02-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-04-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Yevhen Bulakh</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ybulakh@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781337" />
            <name><narrative>Tushemisht</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.90028 20.71917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783523" />
            <name><narrative>Komuna e Bucimasit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.88333 20.68333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183865" />
            <name><narrative>Topoje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.76306 19.43278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183884" />
            <name><narrative>Theth</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.39583 19.77444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183900" />
            <name><narrative>Qafa e Tethores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.4 19.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185366" />
            <name><narrative>Hoxhare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.75 19.47861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185446" />
            <name><narrative>Gryke</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.76972 19.42028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185674" />
            <name><narrative>Fier</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.71667 19.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185815" />
            <name><narrative>Dermenas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.74556 19.49389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003205139" />
            <name><narrative>Gjelaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.21778 19.58194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944404" />
            <name><narrative>Bashkia Pogradec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.92409 20.59645</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="85" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="94.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YT" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Tourism</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="6" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="80" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="7" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="80" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="100" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="23" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="24" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="23" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="23" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">430375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">859991.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">859991.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1244220.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1244220.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1206583.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1206583.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">464177.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">464177.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">464177.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">464177.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">464177.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">464177.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">430375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">859991.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">859991.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1244220.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1244220.87</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1206583.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1206583.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">464177.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">464177.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">464177.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">464177.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">464177.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">464177.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">594831.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">594831.35</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-594831</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">125000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">1136250</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">1365293</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">13796136</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">2648371</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">7052404</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">2806821</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">5061305</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">1557949</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2728011</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1376124</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">4797095</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">4319571</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1229671</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-594831</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-73915</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-73615</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-240466</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-288140</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-182744</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-213993</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-240804</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-377487</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-873983</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1282489</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1520405</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1801255</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1606739</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1491265</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1356751</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1065000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1065000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1051766</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1051766</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-32609"><narrative>Albania Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163239"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163239?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163239"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of community consultations in target locations that influence decision-making over the road rehabilitation design
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="50.00">
<comment><narrative>
(i) Theth culverts, were adopted to allow passage of the grazing livestock in the area. (II) Tushemisht, as result of consultation there will be better lighting and the design option with one side walking path and one bike lane through urban area was selected (III) The project has organized 5 consultations on technical designs and environmental impacts between the concept and the technical design preparation, including Fier - Seman road which is now dropped, and substituted with building a new bridge in the same section and another Poshnje road in the same Municipality.
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduced travel time on project roads
</narrative></title>
<baseline year="2018" iso-date="2018-01-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-24" />
<period-end iso-date="2024-06-30" />
<target value="35.00">
<comment><narrative>
This indicator measures the average percentage reduction in travel times along project roads. The reduced travel times will come from improved surface, improved junction design and safer interactions between motorized and non-motorized road users.
</narrative></comment>
</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Geo-spatial data tool enhanced to show road condition and access to agricultural and tourism centers
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="Yes">
<comment><narrative>
This indicator measures improvements to the existing geo-spatial data tool being used by ADF. this was achieved and is hosted in ADF as part of the RAMS platform. ADF can now demonstrate geospatial outputs showing road condition, access indicators to key tourism facilities, access indicators to areas of agricultural production and processing, and the presentation of key socio-economic data. These data encompass 10,000 km of all regional and local roads in Albania,
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity building trainings to municipalities on how to recruit and retain women in roads sector.
</narrative></title>
<baseline year="2017" iso-date="2017-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-03" />
<period-end iso-date="2024-06-29" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women employed in high skilled jobs in the workforce of the contractors and road departments of the municipalities participating in the project
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="15.00">
<comment><narrative>
The employment figures had not yet been collected systematically for all successful bidders. However, a successful bidder for the Pogradec road package reported 33% of women among its skilled workforce, and 60% - among non-skilled workers. This is a much higher figure than the project target (15%) and shows that training and amendment of bidding documents had an initial positive impact.
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Design stage technical audits including climate resilient aspects passed
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Policies and practices with respect to women's employment in roads construction and maintenance
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Design stage road safety audits passed
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project related grievances addressed within the required terms, disaggregated by gender
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="100.00">
<comment><narrative>
All grievances have been addressed.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Development of tourism development concept plan
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="2.00">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="55.00">
<comment><narrative>
Works are completed.
</narrative></comment>
</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Asset management system of selected municipalities enhanced through incorporation of prioritization database
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="Yes">
<comment><narrative>
TA completed this assignment. RAMS is functioning in all municipalities and is hosted at ADF
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Development of recommendations for linking agricultural producers to local demand
</narrative></title>
<baseline year="2021" iso-date="2021-06-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-16" />
<period-end iso-date="2024-06-29" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Standard service level agreement contract prepared and training provided
</narrative></title>
<baseline year="2018" iso-date="2018-01-23" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-23" />
<period-end iso-date="2024-06-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved municipalities road asset management capacity as demonstrated through the adoption of Municipal Rehabilitation and Maintenance Plan
</narrative></title>
<baseline year="2018" iso-date="2018-01-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-24" />
<period-end iso-date="2024-06-30" />
<target value="Yes">
<comment><narrative>
The TA consultant has completed the network survey and trained municipality staff for the future surveys in their respective networks The RAMS databank is completed . As of May 2024 surveys have been completed in all municipalities (not only of the project municipalities) covering about 10,000km of regional and local roads. RAMS system is now functional, and Municipalities have internalized the Maintenance Plan principles
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of agricultural and tourism centers connected by improved project roads
</narrative></title>
<baseline year="2018" iso-date="2018-01-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-24" />
<period-end iso-date="2024-06-30" />
<target value="9.00">
<comment><narrative>
This indicator measures the number of agriculture markets including consumer regional markets that are used daily by farmers, and tourism destinations distinguished by inherent or exhibited natural or cultural value and historical significance including national parks, archeological sites and historical places, beaches and recreational areas located within 40 min from the rehabilitated roads that are provided with improved access for visitors and local population. The number above refers to Shkoder, Pogradec Durres, Tepelene, Vlore, Lushnje, Rrogozhine  municipality roads.
</narrative></comment>
</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P178715</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Climate Resilience and Agriculture Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to increase competitiveness and climate resilience of priority agri-food value chains.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project is fully aligned with the upcoming CPF FY23-27 which attaches great importance to improving competitiveness, enhance resilience and support a more sustainable growth. The Albania Climate Resilience and Agriculture Development Project (CRAD) will contribute to Objective 3.2: “Depolluting the economy and better managing natural resources” for High Level Outcome 3 (HLO 3) “Enhanced resilience to climate change and natural risks and better management of natural resources”, as well as Objective 1.2: “Improved enabling environment for private sector growth” and Objective 1.3: “Improved quality and sustainability of public services” for HLO 1: ‘A more sustainable growth’. The proposed project is also highly consistent with the World Bank's overall development frameworks – Resilience, Inclusion, Sustainability, and Efficiency (RISE) and World Bank Group Climate Change Action Plan 2021–2025: Green, Resilient and Inclusive Development (GRID), in terms of addressing long-term development challenges and contributing to post pandemic build back better.   The proposed Climate Resilience and Agriculture Development Project will work through an integrated approach that combines the promotion of the agri-food sector's competitiveness with increased climate resilience and a more sustainable growth. The proposed project would include the following three components. Component 1 will focus on supporting resilient and climate smart agriculture, productivity improvements and improving market access through investments to shorten the value chain, strengthen resilience of food supply and develop a modern and reliable irrigation delivery services and drainage network for high-value agricultural production. The project would support (i) development of five Micro Food Hubs in the peri-urban areas of main cities in the regions of Tirana, Shkodra/Lezha, Vlora and Gjrokastra to provide better market access to local producers while supporting short supply chains and resiliency in urban food supply; (ii) development of two typical food product clusters in the regions of Berat and Dibra, to create the enabling environment for the valorization of two typical food products (olive oil and processed fruits and vegetables) through the aggregation of producers (consortium), and the improvement of quality and market access with the development of their technical and marketing capacity; (iii) development of a Climate Smart Agriculture IT Platform to collect all the relevant information such as soil type, hydrometeorological data, agriculture practices (i.e. use of fertilizers, pesticides, irrigation, etc.), and guide the farmers toward resilient agriculture practices; and (iv) modernizing selected irrigation and drainage schemes for high-value agricultural production through support of innovative interventions to advance resilience, productivity, and sustainability of the agriculture sector. Component 2 will focus on addressing weak compliance and control mechanisms related to food safety, veterinary and phytosanitary standards which currently impede competitiveness and create market access inequalities both in the local and export markets. The project would provide support to increase institutional capacity to implement the food safety, veterinary and phytosanitary requirements through (i) establishment and upgrading of Border Inspection Posts to increase the competent authority capacity to perform official controls (documentary, identity and physical controls) for live animals, products of animal and non-animal origin, plants and plant products as well as agricultural inputs; (ii) improvement of diagnostic support in the areas of food safety, veterinary and plant health analyses; and (iii) development of storage capacity for detained goods which do not comply with food safety, veterinary or plant health standards. Component 3 will focus on  establishing a sustainable and effective monitoring and evaluation (M&amp;E) system for agricultural and rural development policy in Albania. Support will be provided to build the monitoring capacity of the Ministry of Agriculture and Rural Development and municipalities to increase their ability to measure and analyze agricultural policy impacts to support evidence-based policymaking, as well as to ensure capacity for project implementation and monitoring. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0051976"><narrative>Republic of Albania                                                                                 </narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0051976"><narrative>Republic of Albania                                                                                 </narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0051976"><narrative>Republic of Albania                                                                                 </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0051975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-03-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-03-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Teklu Tesfaye</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ttesfaye1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363278" />
            <name><narrative>Mursi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.70472 20.07667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184862" />
            <name><narrative>Lushnje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.94194 19.705</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185672" />
            <name><narrative>Fier</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.72389 19.55611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185797" />
            <name><narrative>Divjake</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.99667 19.52944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31140" percentage="43" xml:lang="en"/><sector vocabulary="1" code="31195" percentage="32" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="12" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="42.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="59" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="59" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="37" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="14" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="47" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="14" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="27" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="37" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="69" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="47" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="14" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="47" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="69" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="47" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="59" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="59" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="14" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">583333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">583333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">64667086.48</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">64667086.48</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">70000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">173386</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2173800</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2985727</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-173386</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-100837</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-148537</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-134193</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-160434</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-173311</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-51975"><narrative>Ministry of Agriculture and Rural Development                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178715"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178715?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178715"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers participating in Micro Food Hub activities
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="500.00">
<comment><narrative>
This indicator measure the number of farmers involved in Micro Food Hub activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total energy consumption of irrigation and drainage schemes covered by renewable energy generated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="25.00">
<comment><narrative>
This indicator measures the percentage of total energy consumption of irrigation and drainage schemes covered by renewable energy generated by SPVs installed with the project support.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area served by Climate Smart Agriculture Platform
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="2,000.00">
<comment><narrative>
This indicator measures the pilot area covered by sensors and that will served by Climate Smart Agriculture Platform.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased storage capacity for detained products
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
The indicator “Increased storage capacity for detained products (metric tons)” has not yet been achieved, as investments to establish or upgrade storage facilities for detained products have not commenced to date. Delays in completing preparatory activities, including design and procurement, have postponed the implementation of works required to expand storage capacity. Consequently, no additional storage capacity has been added under the project so far. While preparatory activities are progressing, timely initiation of investments and strengthened implementation will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Laboratory staff trained and prepared to carry out assigned set of laboratory analyses
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="75.00">
<comment><narrative>
The indicator “Laboratory staff trained and prepared to carry out the assigned set of laboratory analyses (number)” has not yet been achieved, as planned training and capacity-building activities for laboratory personnel have not been fully implemented to date. Delays in equipment procurement, laboratory upgrading, and sequencing of technical assistance have postponed the delivery of hands-on training required to operationalize new analytical methods. Consequently, no additional laboratory staff have been certified as trained and fully prepared under the project so far. While preparatory activities are progressing, accelerated implementation and timely delivery of training and technical support will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers connected to the pressurized and on-demand public irrigation service in the project area
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
This indicator refers to the number of farmers shifting from their current practice of pumping water from different sources (including groundwater, drains, and stream) using small fuel pumps to irrigate their crops to publicly available irrigation service made possible by the project interventions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in on-farm irrigation cost
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="30.00">
<comment><narrative>
This indicator refers to the reduction in irrigation cost realized by beneficiary farmers due to the shift from costly own provisioning of irrigation water through pumping to the on-demand public irrigation service.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="12300.00">
<comment><narrative>
This indicator measures the total area of land provided with irrigation and drainage services under the project, including in (i) the area provided with new irrigation and drainage services, and (ii) the area provided with improved irrigation and drainage services, expressed in hectare (ha).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sales of agricultural produce from farmers through Micro Food Hubs and clusters
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="6,000.00">
<comment><narrative>
This indicator measures the amount of agricultural produce from farmers sold through Micro Food Hubs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of methods accredited at the NRL allowing for reliable analyses in the areas of food safety, veterinary and plant health as specified by relevant international standards and EU legislation
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="10.00">
<comment><narrative>
The indicator “Number of methods accredited at the National Reference Laboratory (NRL) allowing for reliable analyses in the areas of food safety, veterinary and plant health, as specified by relevant international standards and EU legislation” has not yet been achieved. Progress toward accreditation has been constrained by delays in initiating key activities, including laboratory upgrading, equipment procurement, and technical support for accreditation processes. As a result, no additional methods have been accredited to date. While preparatory steps are now underway, accelerated implementation and timely completion of the remaining activities will be necessary for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased storage capacity for detained products
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
This indicator measures the increased storage capacity (in metric tons) for detained goods which do not comply with food safety, veterinary or plant health standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sales of agricultural produce from farmers through Micro Food Hubs and clusters
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="6,000.00">
<comment><narrative>
The indicator “Sales of agricultural produce from farmers through Micro Food Hubs and clusters (metric tons)” has not yet been achieved, as the Micro Food Hubs have not been established to date. While preparatory activities are now advancing, implementation has experienced significant delays, which have postponed the operationalization of the MFHs and the generation of associated sales volumes. Nevertheless, provided that implementation is accelerated and remaining bottlenecks are addressed, the indicator is still considered achievable within the current project closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women selling agricultural produce through MFHs
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="150.00">
<comment><narrative>
This is a gender tag indicator, and measures the number of women selling agricultural produce though MFHs, with a target 30% of participants are female. The MFHs and typical food clusters will ensure meaningful participation of women and provide trainings (such as marketing and sales training) to increase their accessibility to markets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers participating in Micro Food Hub activities
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="500.00">
<comment><narrative>
This indicator measure the number of farmers involved in Micro Food Hub activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers connected to the pressurized and on-demand public irrigation service in the project area
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
The indicator “Farmers connected to the pressurized and on-demand public irrigation service in the project area (percentage)” has not yet been achieved, as rehabilitation and modernization works for the irrigation schemes have not commenced to date. Delays in preparatory activities have postponed the start of physical works and, consequently, the connection of farmers to the upgraded irrigation services. While preparatory steps are now progressing, accelerated implementation and timely initiation of works will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total energy consumption of irrigation and drainage schemes covered by renewable energy generated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="25.00">
<comment><narrative>
The indicator “Total energy consumption of irrigation and drainage schemes covered by renewable energy generated by the project (percentage)” has not yet been achieved, as investments in renewable energy systems for irrigation and drainage schemes have not commenced. Delays in completing preparatory and procurement activities have postponed the installation and operationalization of renewable energy infrastructure, resulting in no contribution to energy consumption coverage to date. While preparatory work is progressing, timely initiation of investments and strengthened implementation will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sales of agricultural produce from farmers through Micro Food Hubs and clusters
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="6,000.00">
<comment><narrative>
This indicator measures the amount of agricultural produce from farmers sold through Micro Food Hubs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sales of agricultural produce from farmers through Micro Food Hubs and clusters
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="6,000.00">
<comment><narrative>
The indicator “Sales of agricultural produce from farmers through Micro Food Hubs and clusters (metric tons)” has not yet been achieved, as the Micro Food Hubs have not been established to date. While preparatory activities are now advancing, implementation has experienced significant delays, which have postponed the operationalization of the MFHs and the generation of associated sales volumes. Nevertheless, provided that implementation is accelerated and remaining bottlenecks are addressed, the indicator is still considered achievable within the current project closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers connected to the pressurized and on-demand public irrigation service in the project area
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
This indicator refers to the number of farmers shifting from their current practice of pumping water from different sources (including groundwater, drains, and stream) using small fuel pumps to irrigate their crops to publicly available irrigation service made possible by the project interventions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers connected to the pressurized and on-demand public irrigation service in the project area
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
The indicator “Farmers connected to the pressurized and on-demand public irrigation service in the project area (percentage)” has not yet been achieved, as rehabilitation and modernization works for the irrigation schemes have not commenced to date. Delays in preparatory activities have postponed the start of physical works and, consequently, the connection of farmers to the upgraded irrigation services. While preparatory steps are now progressing, accelerated implementation and timely initiation of works will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of methods accredited at the NRL allowing for reliable analyses in the areas of food safety, veterinary and plant health as specified by relevant international standards and EU legislation
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="10.00">
<comment><narrative>
This indicator measure the number of methods accredited at the National Reference Laboratory supported by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of methods accredited at the NRL allowing for reliable analyses in the areas of food safety, veterinary and plant health as specified by relevant international standards and EU legislation
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="10.00">
<comment><narrative>
The indicator “Number of methods accredited at the National Reference Laboratory (NRL) allowing for reliable analyses in the areas of food safety, veterinary and plant health, as specified by relevant international standards and EU legislation” has not yet been achieved. Progress toward accreditation has been constrained by delays in initiating key activities, including laboratory upgrading, equipment procurement, and technical support for accreditation processes. As a result, no additional methods have been accredited to date. While preparatory steps are now underway, accelerated implementation and timely completion of the remaining activities will be necessary for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total energy consumption of irrigation and drainage schemes covered by renewable energy generated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="25.00">
<comment><narrative>
This indicator measures the percentage of total energy consumption of irrigation and drainage schemes covered by renewable energy generated by SPVs installed with the project support.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total energy consumption of irrigation and drainage schemes covered by renewable energy generated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="25.00">
<comment><narrative>
The indicator “Total energy consumption of irrigation and drainage schemes covered by renewable energy generated by the project (percentage)” has not yet been achieved, as investments in renewable energy systems for irrigation and drainage schemes have not commenced. Delays in completing preparatory and procurement activities have postponed the installation and operationalization of renewable energy infrastructure, resulting in no contribution to energy consumption coverage to date. While preparatory work is progressing, timely initiation of investments and strengthened implementation will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of methods accredited at the NRL allowing for reliable analyses in the areas of food safety, veterinary and plant health as specified by relevant international standards and EU legislation
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="10.00">
<comment><narrative>
This indicator measure the number of methods accredited at the National Reference Laboratory supported by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in on-farm irrigation cost
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-09-30" />
<target value="30.00">
<comment><narrative>
This indicator refers to the reduction in irrigation cost realized by beneficiary farmers due to the shift from costly own provisioning of irrigation water through pumping to the on-demand public irrigation service.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women selling agricultural produce through MFHs
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="150.00">
<comment><narrative>
This is a gender tag indicator, and measures the number of women selling agricultural produce though MFHs, with a target 30% of participants are female. The MFHs and typical food clusters will ensure meaningful participation of women and provide trainings (such as marketing and sales training) to increase their accessibility to markets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Business Intelligence platform established and connected with existing data  platforms and functions
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="Yes">
<comment><narrative>
The indicator “Business Intelligence platform established and connected with existing data platforms and functions (Yes/No)” has not yet been achieved, as the development and deployment of the Business Intelligence platform have not commenced to date. Delays in completing preparatory activities—including needs assessment, system design, and procurement—have postponed the establishment of the platform and its integration with existing data systems and functions. As a result, the platform has not yet been established or operational. While preparatory work is progressing, timely procurement and accelerated implementation will be required for the platform to be established and fully connected within the remaining project period.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Citizen Engagement – Direct Beneficiaries that feel project investments reflected their needs and provide feedback
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
Citizen engagement will include a feedback mechanism (e.g.: scorecards),  to generate recommendations on how to strengthen participation based on gender representation of direct beneficiaries and other stakeholders, and how to strengthen implementation throughout the project's lifetime.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded and/or resolved within 90 days
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
Grievances responded and/or resolved within 90 days (percentage of total received).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Laboratory staff trained and prepared to carry out assigned set of laboratory analyses
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="75.00">
<comment><narrative>
This indicator measures the total number of laboratory staff trained and prepared to carry out assigned set of laboratory analyses, for both AKU and ISUV.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new analysis performed in the regional laboratories supported by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="1,000.00">
<comment><narrative>
This indicator measures the number of new analysis performed in the regional laboratories supported by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers participating in cluster activities
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the number of farmers involved in cluster activities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers participating in cluster activities
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the number of farmers involved in cluster activities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Border Inspection Posts established or upgraded to perform official controls and meet international standards
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="6.00">
<comment><narrative>
The indicator “Border Inspection Posts established or upgraded to perform official controls and meet international standards (number)” has not yet been achieved, as planned rehabilitation and upgrading works for the border inspection posts have not commenced to date. Delays in completing preparatory activities, including design, procurement, and coordination with relevant authorities, have postponed the initiation of investments required to bring the facilities in line with international standards. As a result, no border inspection posts have been established or upgraded under the project so far. While preparatory work is progressing, timely initiation of works and strengthened implementation will be necessary for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new analysis performed in the regional laboratories supported by the project
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="1,000.00">
<comment><narrative>
The indicator “Number of new analyses performed in the regional laboratories supported by the project (number)” has not yet been achieved, as the activities required to operationalize the laboratories— including equipment procurement, facility upgrading, and staff training—have not been completed to date. Delays during the preparatory phase have postponed the introduction of new analytical capacities, resulting in no additional analyses being performed under the project so far. While preparatory actions are now progressing, accelerated implementation and timely completion of the remaining investments will be necessary for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded and/or resolved within 90 days
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
The indicator “Grievances responded and/or resolved within 90 days (percentage)” has not yet been achieved, as the project-level grievance redress mechanism (GRM) has not been fully operationalized to date. Delays in implementing core project activities and establishing formal grievance intake, tracking, and response processes have resulted in limited or no grievances being registered and processed under the project so far. Consequently, no data is available to assess resolution performance within the 90-day timeframe. While preparatory steps to strengthen the GRM are progressing, timely operationalization of grievance handling procedures and systematic monitoring will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Citizen Engagement – Direct Beneficiaries that feel project investments reflected their needs and provide feedback
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="80.00">
<comment><narrative>
The indicator “Citizen Engagement – Direct beneficiaries that feel project investments reflected their needs and provide feedback (percentage)” has not yet been achieved, as citizen engagement activities and beneficiary feedback mechanisms linked to project investments have not been fully operationalized to date. Delays in implementing core investments have limited direct interaction with beneficiaries and postponed the rollout of structured feedback and consultation processes. As a result, no measurable data on beneficiary perceptions has been collected so far. While preparatory work on engagement mechanisms is advancing, timely implementation of project activities and systematic collection of beneficiary feedback will be required for this indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area served by Climate Smart Agriculture Platform
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="2,000.00">
<comment><narrative>
This indicator measures the pilot area covered by sensors and that will served by Climate Smart Agriculture Platform.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Business Intelligence platform established and connected with existing data  platforms and functions
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="Yes">
<comment><narrative>
A Business Intelligence platform will be established for MARD and connected with existing data platforms with the project support.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Border Inspection Posts established or upgraded to perform official controls and meet international standards
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="6.00">
<comment><narrative>
This indicator records the number of Border Inspection Posts that will be supported by the project with facilities such as premises, equipment etc.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2028-09-30" />
<target value="12300.00">
<comment><narrative>
This indicator measures the total area of land provided with irrigation and drainage services under the project, including in (i) the area provided with new irrigation and drainage services, and (ii) the area provided with improved irrigation and drainage services, expressed in hectare (ha).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The indicator “People with enhanced resilience to climate risks (number of people)” has not yet been achieved, as key activities intended to strengthen climate resilience—particularly investments related to climate-resilient irrigation infrastructure, renewable energy, and improved agricultural services—have not progressed to the implementation stage. Delays in initiating these interventions have postponed the delivery of tangible benefits to project beneficiaries, and consequently no measurable improvements in climate resilience have been recorded to date. While preparatory work is advancing, accelerated implementation of the planned investments will be required for the indicator to be achieved within the remaining project period.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P155875</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Project for Integrated Urban and Tourism Development (PIUTD)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO of the proposed project is to improve urban infrastructure, enhance tourism assets, and strengthen institutional capacity to support tourism-related local economic development in selected areas in the south of Albania.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Integrated Urban and Tourism Development Project for Albania is to improve urban infrastructure, enhance tourism assets, and strengthen institutional capacity to support tourism-related local economic development in selected areas in the south of Albania. The project comprises of four components. The first component, urban upgrading and infrastructure improvement will finance the upgrading of infrastructure in selected municipalities by: (a) preparing of feasibility studies and designs (including urban design studies); (b) carrying out construction works to restore selected heritage buildings; (c) upgrading public spaces, the street network, and associated infrastructure; and (d) conducting construction supervision. The second component, touristic sites upgrading will finance investments aimed at improving selected touristic sites along the south of the Albania touristic corridor by inter alia: (a) restoring of selected heritage and cultural assets and creating rest stops or viewpoints; (b) repairing and improving site infrastructure such as pedestrian's pathways; (c) preparing the required feasibility studies, site management plans, engineering designs; and (d) conducting construction supervision. The third component, tourism market and product development will: (a) strengthening the capacity of municipalities to deliver municipal services through inter alia: (i) provision of asset management systems, geographic information systems, and solid waste collection equipment; and (ii) establishment of site management capacity to enhance the operation of rehabilitated assets. The fourth component, implementation support will provide support to carry out project implementation, including maintenance of the project monitoring and evaluation system, as well as training and financing of incremental operating costs.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0025391"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0025393"><narrative>Ministry of Infrastructure and Energy</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0025392"><narrative>Albanian Development Fund</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-06-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-11-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tuo Shi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tshi@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363245" />
            <name><narrative>Rrethi i Sarandes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.83333 20.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782610" />
            <name><narrative>Labova e Madhe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.20694 20.13611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783151" />
            <name><narrative>Rrethi i Gjirokastres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.03333 20.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595331" />
            <name><narrative>Ksamil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.76889 19.99972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183592" />
            <name><narrative>Ishulli i Zvernecit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.51056 19.40167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184575" />
            <name><narrative>Orikum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.32528 19.47139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011204014" />
            <name><narrative>Porto Palermo Beach</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.06244 19.79351</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011204027" />
            <name><narrative>Berat Castle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.70847 19.94575</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944398" />
            <name><narrative>Bashkia Permet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.23246 20.41091</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010944368" />
            <name><narrative>Bashkia Berat</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.69997 19.94983</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23630" percentage="89" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YT" percentage="44.0000000" xml:lang="en"><narrative>FY17 - Tourism</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="18" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="17" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="18" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="88" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">129717.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">82644.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">186801.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">214988.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">117434.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">253257.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">278178.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">315027.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">170045.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">357414.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">371756.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">188789.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">383400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">395470.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">204054.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">419468.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">409670.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">203557.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">426142.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">478824.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">531222.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">271646.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">568781.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">635450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">350882.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">742163.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">795839.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">424935.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">916823.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">993858.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">518726.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1091057.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1165820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1245766.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">651709.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1357662.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1428875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">739465.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1541836.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1638893.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">848805.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1734814.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1767474.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">915474.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1891724.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1926869.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1909829.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">952962.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1942631.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1964854.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">978664.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1935176.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1951435.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">980084.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1956547.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1940146.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">959565.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1904930.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1897972.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1889026.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">939330.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1873548.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1867655.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">930597.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1853952.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1844296.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">918740.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1830877.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">3493981.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1772325.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">612122.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">821610.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">728780.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">635265.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">3970925.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1742759.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2255650.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">776930.07</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">595077.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">3903530.38</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2535627.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2914502.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">71000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">34600000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">174461</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">1772325</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">612123</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">821611</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">728781</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">635265</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">3970925</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">1742759</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">2255650</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">776930</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">595077</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">3903530</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">2535628</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">2914503</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">2894829</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-93584</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">2349158</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">757264</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">5770511</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">79155</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">3014404</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">2670428</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">2183200</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">1450866</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">2033386</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">5251763</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">320147</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">3527393</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">2446327</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">2119057</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">454011</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">2570370</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">443466</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2182378</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">7273309</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1201490</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">435402</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1533365</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-354354</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1710446</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1527302</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">4392022</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">5000360</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-174461</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-119837</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-110388</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-103375</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-114269</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-130101</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-133395</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-154856</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-142240</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-159233</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-156757</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-173442</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-79155</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-553051</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-42088</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-918820</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-41350</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1218809</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-74816</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1443722</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-95223</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-85756</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1252755</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1273949</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-96616</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-106076</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1249217</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1597095</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2176210</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2191022</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-236052</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-25392"><narrative>Albanian Development Fund</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P155875"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P155875?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P155875"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities with functioning destination management partnerships in the project area
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="4.00">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 1) Urban roads rehabilitated in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="16">

</target>
<actual value="65.15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Number of touristic products developed with destination management partnership support
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="25.00">
<comment><narrative>
The consultancy for the touristic product development is ongoing.&amp;nbsp;&amp;nbsp;
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Capacity of local governments improved through technical and managerial trainings
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="20.00">

</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of touristic sites with improved accessibility
</narrative></title>
<baseline year="2016" iso-date="2016-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-15" />
<period-end iso-date="2026-06-15" />
<target value="11">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Component 3) Market Development Strategy for the South of Albania developed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Number of municipalities with improved management systems
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="4.00">
<comment><narrative>
The consultancy for the tourism information and statistics system is ongoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 1) Streets with improved street lighting in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="19">

</target>
<actual value="83.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 2) Number of Site Management Plans developed and endorsed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficient streetlighting units installed in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="66.00">
<comment><narrative>
Selected municipalities refer to the towns of Ksamil and Orikum only, which have been added under the AF loan. The current value is 0 because the civil works at Ksamil and Orikum are not started yet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that have engaged local citizens in an approved participatory process for the integrated urban upgrading
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="6.00">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or rehabilitated urban public spaces in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="100,000.00">

</target>
<actual value="231,874">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased number of visitors visiting selected touristic sites
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="10.00">

</target>
<actual value="228">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-06-15" />
<target value="3000">
<comment><narrative>
The only Intermediate Indicator that has not yet met its final target is the “New or Better Jobs”; the final actual value is currently being evaluated according to the WBG's new guidance on More and Better-Paid Jobs (MBJ) introduced in May 2026. Substantial economic impacts have been achieved in the project areas with completed investments, as reflected by the increase in tourists and tourism-related businesses and jobs. The previous actual values were based on data of new tourism-related businesses provided by the Project municipalities and survey data on the average number of employees per business for each of the Project municipalities. The final actual value is currently being evaluated according to the WBG's new guidance on More and Better-Paid Jobs (MBJ) introduced in May 2026.
</narrative></comment>
</target>
<actual value="2000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="92482">

</target>
<actual value="106825">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="92482">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="118856">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or rehabilitated urban public spaces in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="100,000.00">

</target>
<actual value="231,874">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or rehabilitated urban public spaces in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="100,000.00">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="253274">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased number of visitors satisfied by selected touristic sites
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5.00">

</target>
<actual value="9.38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased number of visitors satisfied by selected touristic sites
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5.00">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="9.38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities with functioning destination management partnerships in the project area
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="4.00">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities with functioning destination management partnerships in the project area
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="4.00">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of touristic sites with improved accessibility
</narrative></title>
<baseline year="2016" iso-date="2016-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-15" />
<period-end iso-date="2026-06-15" />
<target value="11">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of touristic sites with improved accessibility
</narrative></title>
<baseline year="2016" iso-date="2016-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-15" />
<period-end iso-date="2026-06-15" />
<target value="11">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 1) Urban roads rehabilitated in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="16">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="70.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 2) Number of Site Management Plans developed and endorsed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5.00">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Component 3) Market Development Strategy for the South of Albania developed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Component 4) Project website maintained with up-to date information on project activities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="Yes">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 1) Streets with improved street lighting in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="19">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="91.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 2) Integrated touristic sites designs developed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5.00">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Destination Management Business Plans Developed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="4.00">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed (%)
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="100.00">
<comment><narrative>
Final target has been achieved. 100 percent of the registed grievances have been addressed. The total number of grievances received and addressed is 43.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 1) New or rehabilitated pedestrian walkways in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="19">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="63.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Number of touristic products developed with destination management partnership support
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="25.00">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased number of visitors visiting selected touristic sites
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="10.00">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="341">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that have engaged local citizens in an approved participatory process for the integrated urban upgrading
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="6.00">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Number of municipalities with improved management systems
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="4.00">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Man-days of temporary employment generated under the Project through the civil works in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5,500.00">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="18000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Capacity of local governments improved through technical and managerial trainings
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="20.00">
<comment><narrative>
Final target has been achieved
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficient streetlighting units installed in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="66.00">
<comment><narrative>
Final target has been achieved and surpassed.
</narrative></comment>
</target>
<actual value="110">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="92482">

</target>
<actual value="106825">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 3) Destination Management Business Plans Developed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Man-days of temporary employment generated under the Project through the civil works in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5,500.00">
<comment><narrative>
Selected municipalities refer to the towns of Ksamil and Orikum only, which have been added under the AF loan. The current value is 0 because the civil works at Ksamil and Orikum are not started yet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 1) New or rehabilitated pedestrian walkways in selected municipalities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="19">

</target>
<actual value="60.86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Component 2) Integrated touristic sites designs developed
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased number of visitors satisfied by selected touristic sites
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="5.00">

</target>
<actual value="9.38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Component 4) Project website maintained with up-to date information on project activities
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed (%)
</narrative></title>
<baseline year="2016" iso-date="2016-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-31" />
<period-end iso-date="2026-06-15" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-06-15" />
<target value="3000">
<comment><narrative>
Substantial economic impacts have been achieved in the project areas with completed investments, as reflected by the increase in tourists and tourism-related businesses and jobs. The actual value is based on data of new tourism-related businesses provided by the Project municipalities and survey data on the average number of employees per business for each of the Project municipalities.
</narrative></comment>
</target>
<actual value="2000">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P160594</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Albania Gender Equality in Access to Economic Opportunities DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objectives are to support the Government of Albania's efforts to enhance the policy framework for gender equality in access to economic opportunities, with a focus on (i) improving women's access to assets; (ii) leveling the playing field to enhance labor market opportunities for women; and (iii) strengthening institutional arrangements for gender-informed policy making.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Gender Equality in Access to Economic Opportunities Development Policy Financing Project for Albania are to support the Government of Albania's efforts to enhance the policy framework for gender equality in access to economic opportunities, with a focus on (i) improving women's access to assets, (ii) leveling the playing field to enhance labor market opportunities for women; and (iii) strengthening institutional arrangements for gender-informed policy making. Expected results include : Actions supported under Pillar 1 are expected to increase the accuracy of immovable property registries for married couples, improve the quality of information on property titles, and provide affordable legal assistance to ensure that property titles recognize the rights of vulnerable women. Prior Action 4 is an important first step towards mainstreaming gender in procurement in Albania and is expected to increase compliance with legislation on gender equality and nondiscrimination in employment practices, including the equal work for equal pay provisions of the Labor Code, and to strengthen respect for gender-equality principles in the private sector.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0029953"><narrative>Government of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0029953"><narrative>Government of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0029953"><narrative>Government of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0029952"><narrative>Ministry of Finance and Economy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2017-03-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-11-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ana Maria Oviedo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aoviedo@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3183875" />
                <name><narrative>Tirana</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>41.3275 19.81889</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15170" percentage="31" xml:lang="en"/><sector vocabulary="1" code="15180" percentage="29" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="19" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="7" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="6" xml:lang="en"/><sector vocabulary="1" code="11240" percentage="4" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EC" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Early Childhood Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="63.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="100" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="38" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="13" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="13" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="38" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="38" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="13" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">41880.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">42430.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">50780.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">58700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">66410.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">75390.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">130730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">95960.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">101220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">107060.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">112950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">179510.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">124850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">129700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">137200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">147610.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">155620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">163300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">261180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">186830.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">196720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">203440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">207660.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">326320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">224350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">224280.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">228140.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">232830.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">234640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">351600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">238440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">240070.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">238060.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">236610.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">238420.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">352090.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">227070.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">225570.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">222420.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">215530.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">208950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">306030.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">197840.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">192040.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">185860.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">180830.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">265260.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">172660.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">168580.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">164700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">161000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">157390.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">214570.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">190720.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">41880.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">42430.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">50780.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">58700.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">66410.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">75390.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">130730.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">95960.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">101220.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">107060.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">112950.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">179510.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">124850.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">129700.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">137200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">147610.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">155620.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">163300.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">261180.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">186830.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">196720.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">203440.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">207660.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">326320.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">224350.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">224280.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">228140.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">232830.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">234640.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">351600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">238440.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">240070.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">238060.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">236610.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">238420.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">352090.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">227070.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">225570.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">222420.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">215530.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">208950.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">306030.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">197840.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">192040.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">185860.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">180830.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">265260.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">172660.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">168580.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">164700.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">161000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">157390.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">214570.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">190720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">10000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">25064</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">10171059</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-25064</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-50537</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-30485</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-28228</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-24715</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-40679</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-166254</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-236522</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-255977</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-238606</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-196270</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-171859</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-170559</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-29952"><narrative>Ministry of Finance and Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160594"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P160594?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160594"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of total records in the Albanian Digital Registry of Properties with a valid identification number and with the owners female gender verified
</narrative></title>
<baseline year="2019" iso-date="2019-11-04" value="16.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-04" />
<period-end iso-date="2020-12-31" />
<target value="20.00">
<comment><narrative>
&lt;p&amp;gt;No updated result is&amp;nbsp;available as of May 2022, as the process of digitalization of &lt;em&amp;gt;kartelas&lt;/em&amp;gt;??????? at the State Cadaster Office did not advance as planned. While the result was not achieved, there is substantial progress in this Pillar. At the time the DPF was prepared all three prior actions were expected to play a complementary role in increasing women&amp;rsquo;s claim on assets. Unfortunately, in 2019 only the cadaster action (PA 2) had a clear, measurable baseline on which to establish a results indicator. While the Cadaster Office has not made any appreciable progress in digitalizing property records and thus there is no new measureavailable, there has been notable progress on the implementation and institutionalization of PA 1 (Notary Law) and PA 3 (Legal Aid Law). Notaries are all trained on gender gaps and use the electronic system. The Legal Aid directorate is in place, as well as an M&amp;amp;E system for service delivery.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of women, including those categorized as vulnerable, that have been employed through the National Employment Services
</narrative></title>
<baseline year="2019" iso-date="2019-11-04" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-04" />
<period-end iso-date="2020-12-31" />
<target value="45.00">
<comment><narrative>
&lt;p&amp;gt;Because of a gradual implementation of the new National Employment Services (NAES)&amp;nbsp;and the deterioration of the labor market due to the pandemic, the share of registered women that were employed through NAES, which initially increased from 39%&amp;nbsp;in 2018 to 48%&amp;nbsp;in 2019, fell to 35%&amp;nbsp;in 2020 and 31%&amp;nbsp;in 2021. This was due to an increase in female registered jobseekers from 37 thousand in 2019 to 47 thousand in 2021 while the absolute number of placements declined from close to 15 thousand in 2019 to less than 12 thousand in 2021. In addition, the profile of ALMP beneficiaries shifted towards older workers in 2020 as the proportion of workers over 35 years old went from 29%&amp;nbsp;in 2019 to 43%&amp;nbsp;in 2020. Also of note, female beneficiaries of ALMPs fell by over 10%&amp;nbsp;in 2020 before rising again in 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of budget programs across all line ministries that comply with the review process established by the gender responsive budgeting guidelines
</narrative></title>
<baseline year="2019" iso-date="2019-11-04" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-04" />
<period-end iso-date="2020-12-31" />
<target value="54.00">
<comment><narrative>
&lt;p&amp;gt;While the target was not achieved in 2020, it was surpassed in 2021 and significantly surpassed in 2022. In March 2021 the Ministry of Finance provided a breakdown of the gender responsive budgeting (GRB) programs and KPIs for the 2021-2023 MTBP, showing that the number of GRB programs had reached its target of over half of the total budget programs, and a growing share of budget expenditure. &amp;nbsp;In the MTBP 2020-2022, 34 programs were identified as GRB; in the MTBP 2021-2023, 43 programs, and in the MTBP 2022-2024, 47 programs were identified as GRB.&amp;nbsp;On the municipal side, all municipalities have received training for GRB identification and reporting (with support from UNWomen).&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of bidders in public procurement tenders that submit a self-declaration related to nondiscrimination in the workplace
</narrative></title>
<baseline year="2019" iso-date="2019-11-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-04" />
<period-end iso-date="2020-12-31" />
<target value="85.00">
<comment><narrative>
&lt;p&amp;gt;The self-declaration form was very successfully introduced and so far, there has been a 100% compliance.&amp;nbsp;Moreover, every 3 months PPA has shared the list of winners with the Labor Inspectorate (around 1,000 economic operators on average), which inspects about 40% of all winners and reports the cases where violations were identified, and corrections requested. During 2020, there was one case where an economic operator was found in violation of the labor code and took no corrective action; in 2021 six administrativeproceedings were initiated resulting in two dismissals, and four firms blacklisted for three years due to violation of the self-declaration on nondiscrimination.&amp;nbsp;This prior action, mandating bidders to fill out the fields on nondiscrimination, was reinforcedwith its incorporation in a new Procurement law passed in 2020. In addition, the Labor Inspectorate has worked closely with the Public Procurement Authority (PPA) to confirm and enforce labor provisions.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of key performance indicators for gender responsive budgeting programs that directly address documented gender gaps in the country
</narrative></title>
<baseline year="2019" iso-date="2019-11-04" value="64.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-04" />
<period-end iso-date="2020-12-31" />
<target value="75.00">
<comment><narrative>
&lt;p&amp;gt;The total number of key performance indicators (KPIs)&amp;nbsp;substantially increased between 2019 and 2022 (from 39 to 91), while the number of KPIs effectively addressing gaps increased from 25 to 62. Thus, the share of KPIs addressing gender gaps fell from&amp;nbsp;80% (2020) to&amp;nbsp;75% (2021) and&amp;nbsp;68% (2022), but this is due to the substantial increase in total KPIs.&amp;nbsp;One important challenge that continues to exist is the lack of sex-disaggregated data at the local level which limits the ability of local government to design and report on KPIs by gender.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of municipalities with an average teacher-student ratio in preschool less than or equal to 1:18
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="56.00">
<comment><narrative>
&lt;p&amp;gt;???????The original baseline and target were incorrectly stated, as in 2019 already 79% of municipalities had an average ratio of 18:1. By 2021 all municipalities had ratios below 18:1 and the change in rule has generally made funding of preschool more certain.&amp;nbsp; A significant reduction took place&amp;nbsp;especially in Tirana and Ura Vajgurore.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P122233</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Social Assistance Modernization Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project would support the Albania's implementation of reforms to improve the equity and efficiency of its social assistance programs.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of Social Assistance Modernization Project for Albania it to support country's implementation of reforms to improve the equity and efficiency of its social assistance programs. The project has two components. (1) Strengthening the implementation and performance of social assistance programs. The objective of this component is to support the results of implementation of improvements in the main social assistance programs. The component will support improved implementation of both the Ndihma Ekonomike (NE) program and disability assistance benefits in the main areas identified in the broad. Roadmap for reforms: (a) program parameters (eligibility criteria and intake processes); (b) benefits administration (business processes, management of information, and payments mechanisms, and reporting and monitoring); and (c) oversight and controls. (2) Technical assistance to strengthen implementation capacity for social assistance programs. The objectives of this component are to strengthen capacity for implementing improvements in the delivery of social assistance benefits. This component will finance select technical assistance and investment activities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0004557"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0004557"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0004565"><narrative>Ministry of Finance, Economy and Labor</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0004565"><narrative>Ministry of Finance, Economy and Labor</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0004558"><narrative>Ministry of Health and Social Protection</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-04-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-04-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Vlad Alexandru Grigoras</narrative></person-name><telephone>+1-202-473-1000</telephone><email>vgrigoras@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



















<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344951" />
            <name><narrative>Qarku i Tiranes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.26667 19.783331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="97.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="100" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="100" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">589912.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">589912.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">589912.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">842105.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">842105.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">842105.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">842105.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">842105.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">842105.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">842105.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">842105.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">842105.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">842105.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">842105.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">842105.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">589912.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">589912.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">589912.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">842105.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">842105.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">842105.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">842105.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">842105.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">842105.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">842105.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">842105.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">842105.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">842105.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">842105.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">842105.27</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">958333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">958333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">958333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">958333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">958333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1041666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1041666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1041666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1041666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">11000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-869201</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-5854</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">123557</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">326788</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">85489</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1411377</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">6727045</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">115635</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">5815760</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">123014</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">4128510</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">251695</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">4548002</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">145545</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">6502030</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">256524</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">27500</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">118453</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">12811402</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">401778</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">300000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3397</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">31706</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2202500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">97468</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">114139</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">110124</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">100239</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">13171</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-2700</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-123557</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-447</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-1552</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-2083</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-27604</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-30561</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-41489</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-44011</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-43875</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-42765</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-48046</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-63718</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-59070</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-27500</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-13941</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-59524</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-17290</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-102182</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-19733</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-57400</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-37676</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-49592</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-34175</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-49762</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-33245</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-40720</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-33530</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-38077</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-59279</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-43945</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-228982</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-366296</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-358848</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-664746</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-403217</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-744066</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-401189</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-736389</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-378014</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-599102</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-341182</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-496806</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-325893</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-422063</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-982625</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-988605</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1054208</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1056954</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1047829</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-974253</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-884154</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-941429</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-944043</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-964862</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-982536</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-965261</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-274854</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1041229</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-274854</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1015094</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4558"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4559"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4560"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4561"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4562"><narrative>The Ministry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4563"><narrative>Minsitry of Health and Social Protection</narrative></receiver-org><receiver-org xml:lang="en" ref="AL-COA-4564"><narrative>Ministry of Health and Social Protection (MHSP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122233"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P122233?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122233"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of weekly visits by PWD
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="140.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The average time (days) needed to determine eligibility status of applicants
</narrative></title>
<baseline year="2015" iso-date="2015-12-15" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of SSS Regional Offices rehabilitated
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of social administrators trained in implementation of the Unified Scoring Formula
</narrative></title>
<baseline year="2012" iso-date="2012-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of new applications and recertification requests received in Tirana, Elbasan and Durres that have been processed using the automated DA MIS
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MHSP has access to real-time data on DA applicants and beneficiaries in pilot areas
</narrative></title>
<baseline year="2012" iso-date="2012-05-31" value="No MIS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-31" />
<period-end iso-date="2018-05-04" />
<target value="DA MIS developed and operational in Tirana, Elbasan and Durres regions">

</target>
<actual value="DA MIS developed and operational in all three regions">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of households receiving benefits for the NE program that have been screened for eligibility using the Unified Scoring Formula agreed with the World Bank
</narrative></title>
<baseline year="2012" iso-date="2012-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy and action plan developed to guide the NE exit
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="No strategy and no action plan in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Strategy and action plan developed, consulted, approved by COM, and disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of Safety Nets programs (number)
</narrative></title>
<baseline year="2012" iso-date="2012-01-02" value="604240.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-02" />
<period-end iso-date="2018-05-04" />
<target value="600000.00">

</target>
<actual value="315000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  NE benefits received by the poorest 10% households.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-05-04" />
<target value="40.00">

</target>
<actual value="43.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of DA benefits that are actually addressed
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of Social Model for DA eligibility assessment
</narrative></title>
<baseline year="2012" iso-date="2012-05-31" value="DA assessment based on medical model"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-31" />
<period-end iso-date="2018-05-04" />
<target value="Assessment criteria, business procedures and institutional arrangements for the DA program are revised based on the Social Model, and these revisions are consulted, approved and disseminated (DLI 6)">

</target>
<actual value="Assessment criteria, business procedures and institutional arrangements for the DAP are revised based on the Social Model, and these revisions are consulted, approved and disseminated.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of DA beneficiaries in the three pilot regions satisfied with the access, quality of facilities, quality of services, and responsiveness to needs
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of NE applicants case files that are complete and consistent with the USF application and intake processes
</narrative></title>
<baseline year="2012" iso-date="2012-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="92.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of new DA applications and recertification requests in Tirana, Elbasan and Durres that have been reassessed using revised criteria and processes based on the Social Model
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="71.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of suspected fraud and error cases in the DA program that are investigated by social inspectors in accordance with revised sanctions policy and legislation
</narrative></title>
<baseline year="2012" iso-date="2012-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="88.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of local government units that use the automated MIS to process DA applicants registration, beneficiary selection, program enrollment, and payment orders
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2018-05-04" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;The original target was set nationwide, while the revised target was set for&amp;nbsp;Tirana, Elbasan, and Durres regions only.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of disability assistance beneficiaries that report no functional disability
</narrative></title>
<baseline year="2012" iso-date="2012-05-31" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  households in the poorest 10% that are covered by the Ndihma Ekonomike (NE) Program.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="38.20">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P121186</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Water Resources and Irrigation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Revised Project Development Objective (PDO) is to: (i) establish the strategic framework to manage water resources at the national level and at the level of the Drin-Buna and Semani River basins; and (ii) improve irrigation service delivery in Selected Irrigation Systems.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Water Resources and Irrigation Project for Albania are  to (i) establish the strategic framework to manage water resources at the national level and in the Drin-Buna and Semani river basins and (ii) improve, in a sustainable manner, the performance of irrigation systems in the project area. The project has 4 components. Dam and Irrigation and Drainage (I&amp;D) systems rehabilitation component will rehabilitate and modernize I&amp;D systems and dam infrastructure. Institutional support for irrigation and drainage component will improve the performance of organizations that provide irrigation services. This includes institutional reforms and capacity strengthening of local governments, drainage boards and Water Users' Associations, and piloting public-private partnerships in I&amp;D service delivery through recruitment of third party operators to deliver irrigation services in three I&amp;D pilot schemes. The component will also finance preparation of a National I&amp;D strategy. Institutional support for integrated water resources management component will establish the strategic framework to manage water resources at the national level and at the level of the Drin-Buna and Semani River basins. Implementation support component will manage project resources in accordance with the project's objectives and procedures.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0004232"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0004232"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0004233"><narrative>Ministry of Agriculture and Rural Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-02-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-11-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Regassa Ensermu Namara</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rnamara@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865730" />
            <name><narrative>Qarku i Beratit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.633331 20.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865734" />
            <name><narrative>Qarku i Korces</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.616669 20.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865735" />
            <name><narrative>Qarku i Kukesit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.200001 20.366671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344948" />
            <name><narrative>Qarku i Fierit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.76667 19.616671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344950" />
            <name><narrative>Qarku i Shkodres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.183331 19.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344952" />
            <name><narrative>Qarku i Vlores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.166672 19.799999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31140" percentage="85" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="12" xml:lang="en"/><sector vocabulary="1" code="73010" percentage="2" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="42.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="2" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="0" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="55" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="55" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="43" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="2" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="2" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="98" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="2" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="98" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="0" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="2" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="55" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="0" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">660230.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">660230.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">660230.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">990345.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">990345.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">694006.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">694006.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">694006.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">694006.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">694006.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">820189.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">820189.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">820189.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">820189.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">820189.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">874677.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">874677.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">874677.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">874677.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">874677.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">449288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">449288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">449288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">449288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">449288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">449288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">449287.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">449287.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">449287.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">449287.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">449287.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">449287.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">660230.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">660230.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">660230.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">694006.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">694006.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">694006.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">694006.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">694006.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">694006.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">820189.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">820189.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">820189.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">449288.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">449288.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">449288.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">27200000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-89019</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-721901</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">640099</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">668166</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">342661</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">1274300</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">107799</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">187358</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">882550</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1450388</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">661612</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">1192173</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">927453</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">764920</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1269754</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">761625</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">819149</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">2020036</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">1217054</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1340152</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">775358</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">1535994</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">2367511</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">2362145</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">2196853</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">1351881</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">675675</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2388331</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1790993</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">66585</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">1161831</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1362872</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">1393199</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2214600</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">2258639</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">6239672</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-88514</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">2111924</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">4467119</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">4448834</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">943419</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">1361738</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">792381</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">848225</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">259205</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-100622</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-1727</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-6796</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-8684</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-11924</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-14384</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-23645</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-26565</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-24850</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-31736</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-45381</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-54972</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-66585</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-30032</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-61095</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-32282</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-70301</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-32567</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-42853</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-41381</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-51994</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-72019</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-39564</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-90211</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-21514</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-96754</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-18822</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-85678</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-25422</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-114783</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-193844</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-406258</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-497744</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-587488</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-582475</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-646907</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-560021</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-629735</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-464796</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-525271</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-376408</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-434854</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-321798</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-421798</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-1051563</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-1145876</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-1174185</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-1137023</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-1098022</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-987504</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1036570</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1058151</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1038989</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1065554</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1013005</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-704945</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1130926</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-719781</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1147669</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-730636</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-4233"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121186"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P121186?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121186"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of an agreed IWRM strategy
</narrative></title>
<baseline year="2012" iso-date="2012-11-27" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded to and resolved in relation to delivery of project benefits
</narrative></title>
<baseline year="2017" iso-date="2017-12-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-05" />
<period-end iso-date="2020-05-31" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;WRIP project staff reports that only in one case farmers used the government portal to submit a complaint about the I&amp;amp;D service. This case has been processed adequately. There is no evidence of any additional grievances received and resolved at municipality level.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water users provided with new/improved irrigation and drainage services
</narrative></title>
<baseline year="2017" iso-date="2017-12-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-05" />
<period-end iso-date="2020-05-31" />
<target value="35000.00">
<comment><narrative>
&lt;p&amp;gt;This indicator was moved from Intermediate Results Indicator to PDO Indicator.&amp;nbsp; This indicator achieved 137% against the target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47980.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2017" iso-date="2017-12-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-05" />
<period-end iso-date="2020-05-31" />
<target value="40000.00">

</target>
<actual value="40000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of area served withirrgation and drainage service, where sustainable cost-sharing and operation and maintainance arrangements are introduced
</narrative></title>
<baseline year="2015" iso-date="2015-03-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-05" />
<period-end iso-date="2020-05-31" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;Although the M&amp;amp;E report had 9 percent for the actual end of project percentage, the project financed Local Government Management and Information System (LGMIS) showed that 67 percent was the actual final percentage as of November 16, 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="67.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of dams rehabilitated in compliance with international dam safety standards.
</narrative></title>
<baseline year="2017" iso-date="2017-12-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-05" />
<period-end iso-date="2020-05-31" />
<target value="13.00">
<comment><narrative>
&lt;p&amp;gt;One of the dams (T&amp;rsquo;Plan) was eliminated on the basis of the optimization assessment and subsequent priority setting.&amp;nbsp;The costs were excessive given the small size of the dam which serves only a few hectares and farmers, and there is a high rate of emigration from the designated area.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of two agreed RBM plans for Drini-Buna and Semani basins
</narrative></title>
<baseline year="2012" iso-date="2012-11-27" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of a functional water resources database.
</narrative></title>
<baseline year="2012" iso-date="2012-11-27" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-27" />
<period-end iso-date="2020-05-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct Project beneficiaries
</narrative></title>
<baseline year="2017" iso-date="2017-12-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-05" />
<period-end iso-date="2020-05-31" />
<target value="80000.00">

</target>
<actual value="105942.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of an agreed Irrigation Strategy
</narrative></title>
<baseline year="2017" iso-date="2017-12-05" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-05" />
<period-end iso-date="2020-05-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-supported RBMPs and investments informed by citizien feedback through consultations.
</narrative></title>
<baseline year="2017" iso-date="2017-12-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-05" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;MARD reported that due process was taken at the time of scheme selection to involve stakeholder participation in the selection of 13 I&amp;amp;D schemes and as part of the environmental and social impact assessment, and the baseline surveys carried out for the involuntary resettlement policy framework.&amp;nbsp; In addition, the water management institutions and other relevant entities participated in or were consulted in the preparation of the NSIWRM and the two RBMPs.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P144688</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Health System Improvement Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to contribute to the modernization of selected public hospital services and to support the reconstruction of selected medical facilities damaged by the 2019 earthquake.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Health System Improvement Project for Albania is to contribute to improving the efficiency of care in selected hospitals in Albania, improving the management of information in the health system, and increasing financial access to health services. The project is also directly aligned with the Government?s health sector reform strategy and will support the implementation of the Government?s reform agenda. To improve access and efficiency of health care services in Albania, the Project will support: a) reforming the hospital sector by creating a sound legal framework and management structure for efficient service provision, strengthening performance management and planning, overcoming operational constraints in service delivery, supporting rationalization of the hospital network, and strengthening the referral system; b) improving monitoring and management of service quality and efficiency through the establishment of a health management information system and of a medical equipment management and maintenance system; and c) reforming the health financing and provider payment systems, improving capacity of the HIF for strategic purchasing, strengthening systems for efficient purchasing/distribution of pharmaceuticals and medical supplies, and assessing options to expand insurance coverage within the available fiscal space.<BR>]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0013507"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0013506"><narrative>Ministry of Health and Social Protection</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-03-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-02-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Lorena Kostallari</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lkostallari@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363243" />
            <name><narrative>Sarande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.87556 20.00528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363341" />
            <name><narrative>Kakavije</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.90778 20.35833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000363383" />
            <name><narrative>Delvine</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.95111 20.09778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781139" />
            <name><narrative>Zall-Rec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.87611 20.32</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781358" />
            <name><narrative>Tropoje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.40417 20.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781443" />
            <name><narrative>Tepelene</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.29583 20.01917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781573" />
            <name><narrative>Skrapar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.5 20.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781921" />
            <name><narrative>Perrenjas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.85667 20.0625</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000781988" />
            <name><narrative>Pogradec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.9025 20.6525</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782070" />
            <name><narrative>Permet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.23361 20.35167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782268" />
            <name><narrative>Rrethi i Mirdites</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.83333 20</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782393" />
            <name><narrative>Maliq</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.70583 20.69972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782519" />
            <name><narrative>Librazhd</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.17944 20.315</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782632" />
            <name><narrative>Kurbnesh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.77972 20.08361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782843" />
            <name><narrative>Kelcyre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.31306 20.18944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000782910" />
            <name><narrative>Kalimash</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.08139 20.30833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783059" />
            <name><narrative>Gramsh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.86972 20.18444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783214" />
            <name><narrative>Fushe-Arrez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.06222 20.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783247" />
            <name><narrative>Fierze</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.26056 20.01694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783356" />
            <name><narrative>Devoll</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.61667 20.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000831098" />
            <name><narrative>Rrethi i Hasit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.16667 20.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865730" />
            <name><narrative>Qarku i Beratit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.63333 20.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865732" />
            <name><narrative>Qarku i Elbasanit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.06667 20.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865733" />
            <name><narrative>Qarku i Gjirokastres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.21667 20.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865734" />
            <name><narrative>Qarku i Korces</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.61667 20.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000865735" />
            <name><narrative>Qarku i Kukesit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.2 20.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183708" />
            <name><narrative>Vore</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.39083 19.655</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183751" />
            <name><narrative>Vidhas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.07861 19.98889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003183824" />
            <name><narrative>Ulez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.68278 19.89333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184080" />
            <name><narrative>Shkopet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.70611 19.825</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184099" />
            <name><narrative>Shijak</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.34556 19.56722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184136" />
            <name><narrative>Shengjin</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.81361 19.59389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184193" />
            <name><narrative>Valbone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.45139 19.89167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184197" />
            <name><narrative>Selenice</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.53056 19.63583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184238" />
            <name><narrative>Rubik</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.77444 19.78611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184388" />
            <name><narrative>Puke</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.04444 19.89972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184497" />
            <name><narrative>Peqin</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.04611 19.75111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184518" />
            <name><narrative>Patos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.68333 19.61944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184774" />
            <name><narrative>Mavrove</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.40889 19.59111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184791" />
            <name><narrative>Marinez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.74056 19.67333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184806" />
            <name><narrative>Mamurras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.5775 19.69222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184817" />
            <name><narrative>Mallakaster</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.58333 19.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003184862" />
            <name><narrative>Lushnje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.94194 19.705</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185012" />
            <name><narrative>Lac</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.63556 19.71306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185060" />
            <name><narrative>Kucove</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.80028 19.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185082" />
            <name><narrative>Kruje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.50917 19.79278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185102" />
            <name><narrative>Krahes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.43861 19.84444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185133" />
            <name><narrative>Koplik</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.21361 19.43639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185143" />
            <name><narrative>Koman</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.09028 19.81222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185144" />
            <name><narrative>Kolonje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.82417 19.60389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185318" />
            <name><narrative>Kafarraj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.6375 19.51</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185404" />
            <name><narrative>Hani Hotit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.33667 19.43417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185637" />
            <name><narrative>Fushekuqe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.65028 19.62</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185638" />
            <name><narrative>Fushe-Kruje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.47833 19.71778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003185897" />
            <name><narrative>Cerrik</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.03167 19.97583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344947" />
            <name><narrative>Qarku i Durresit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.48333 19.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344948" />
            <name><narrative>Qarku i Fierit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.76667 19.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344949" />
            <name><narrative>Qarku i Lezhes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.8 19.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344950" />
            <name><narrative>Qarku i Shkodres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.18333 19.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344951" />
            <name><narrative>Qarku i Tiranes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.26667 19.78333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003344952" />
            <name><narrative>Qarku i Vlores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.16667 19.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12230" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="97.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">966666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1023333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1023333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1023333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1581975.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1219605.51</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1013055.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">768970.02</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">282922.92</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1413401.69</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">922102.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">663645.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">327708.14</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2013369.84</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">556682.15</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1482658.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1566127.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">264679.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2795120.02</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">533856.36</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">40000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">29500000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-937058</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">90518</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1581975</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">1219606</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">1013056</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">768970</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">282923</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">1413402</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">922102</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">663645</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">327708</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">2013370</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">556682</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">1482658</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1566128</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">264680</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2795120</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">533856</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1140278</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">367558</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">336140</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">2254400</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">63578</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">1121985</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">622432</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">958942</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">2225100</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1478404</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">568746</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1381371</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2622523</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">1160052</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">450073</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">785358</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">441162</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">2704649</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">603522</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">167846</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">2635997</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">331943</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1322588</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2342447</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">2612537</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">946202</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">5589473</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1598232</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">3436316</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">1633882</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">389451</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-90518</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-95482</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-48772</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-48360</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-52744</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-51811</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-54604</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-60148</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-60928</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-58680</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-74327</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-66382</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-65508</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-60255</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-63578</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-15865</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-95365</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-34573</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-360939</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-49292</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-523134</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-82496</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-609548</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-82589</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-634718</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-103086</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-496981</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-185783</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-503815</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-329451</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-460845</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-550047</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-674488</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-726734</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-760936</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-886790</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-965109</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1040934</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-813284</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1264052</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1619132</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1267315</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-13506"><narrative>Ministry of Health and Social Protection</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P144688"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P144688?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P144688"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of facilities renovated and/or equipped
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="11 regional hospitals received medical equipment. 3 main hospitals are under rehabilitation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-09-12" />
<target value="11 regional hospitals equipped; 4 regional and municipal hospitals renovated; 3 departments of QSUT renovated">
<comment><narrative>
Mostly achieved. 

By June 2025, 11 hospitals have been equipped; renovations completed at 4 hospitals (Laci Kukes, Kruja, and Lezha). In addition, renovation is completed in the two QSUT Department Hospitals (Cardio-Surgery and Pediatric). Regarding the Psychiatric Hospital, works in the Children Psychiatry building have been succesfully completed, while a relatively small  amount of works in the Emergency Psychiatry building may not be fully completed by the closing date. 

All medical equipment has been delivered,  installed, and tested, with the exception of a few additional pieces of  equipment procured under a contract amendment for Lezha hospital (expected to be delivered and installed by September 19, 2025).
</narrative></comment>
</target>
<actual value="11 regional hospitals equipped; 2 regional and municipal hospitals renovated; 0 departments of QSUT renovated.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of facilities rehabilitated or reconstructed that incorporate earthquake mitigation measures and improved climate adaptation strategies
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-06-17" />
<target value="6.00">
<comment><narrative>
Achieved. 

All renovated facilities include Environmental and Social Management Framework incorporating earthquake mitigation measures and improved climate adaptation strategies.
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Medical equipment management and maintenance strategy revised and plans adopted
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-12-17" />
<target value="Strategy updated and plans adopted by MoHSP">
<comment><narrative>
Achieved. 

The strategy has been updated and the action plan has beed prepared and adopted by the MoHSP using the budget funds.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of facilities rehabilitated or reconstructed that incorporate earthquake mitigation measures and improved climate adaptation strategies
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-06-17" />
<target value="6.00">
<comment><narrative>
Achieved. 

All renovated facilities include Environmental and Social Management Framework incorporating earthquake mitigation measures and improved climate adaptation strategies.
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional hospitals and hospitals reconstructed after the 2019 earthquake meeting the minimum requirements of the accreditation agency
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="7.00">
<comment><narrative>
Overachieved. 

11 regional hospitals, 22 municipal hospitals, and five university hospitals have been accredited.
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of regional hospitals with Regional Hospital Information System (HIS) established and functional
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-06-24" />
<target value="11">
<comment><narrative>
Achieved. 

The RHIS was established and functional in the first four hospitals since 2024. The rollout to the additional seven hospitals was completed in June 2025.
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of patients admitted in hospital with an implemented RHIS registered in the RHIS
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-09-14" />
<target value="40.00">
<comment><narrative>
Mostly achieved.

Numerator: Number of patients admitted in hospitals with an implemented RHIS registered in the RHIS.
Denominator: Number of patients admitted in hospitals with an implemented RHIS.

As noted above, RHIS is functional in all the 11 regional hospitals.  Given the time lag for data collection, data is currently available for the first four hospitals, as follows: Shkoder 34%, Durres 27%, Elbasan 51%, and Vlore 39%. Based on this, the average achievement for this indicator stands at 37.75% for these four hospitals. 

Since no data are available from the remaining seven hospitals that were added under AF the result will remain unchanged, and the status of the indicator will stay “mostly achieved.”
</narrative></comment>
</target>
<actual value="37.75%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of essential registries that are consolidated and available online
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-06-17" />
<target value="4.00">
<comment><narrative>
Achieved. 

According to the Cabinet of Ministers decision, this activity was carried out by the National Agency of Information Society.
</narrative></comment>
</target>
<actual value="327.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women using mobile mammography for breast cancer screening
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="3,150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-12-18" />
<target value="7,000.00">
<comment><narrative>
Achieved, using MoHSP own funds. 

Mammography screenings are offered at specialty polyclinics, public hospital services (Regional and Municipal Hospitals), and through mobile mammography units. From January 1 to December 9, 2024, a total of 19,300 women have undergone mammography screenings nationwide. Of these, 11,094 were screened during Breast Cancer Awareness Month.
</narrative></comment>
</target>
<actual value="19,300">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of service payment packages (10 in total) using new platform processed
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="10.00">
<comment><narrative>
Overachieved. 
This activity has been completed directly by MoHSP, without direct Project contribution.
</narrative></comment>
</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
HIF experts and selected health personnel receiving training (disaggregated by gender)
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="433 (287 Females; 146 Males)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-12-17" />
<target value="533 (347 Females; 186 Males)">
<comment><narrative>
Overachieved.
</narrative></comment>
</target>
<actual value="3,922 (2,958 Females; 964 Male)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Master Plan for eHealth/HMIS activities developed
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="Yes">
<comment><narrative>
Achieved. 

The MoHSP has developed the e-Health Action Plan 2023-2030.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
HIF experts and selected health personnel receiving training (disaggregated by gender)
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="433 (287 Females; 146 Males)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-12-17" />
<target value="533 (347 Females; 186 Males)">
<comment><narrative>
Overachieved.
</narrative></comment>
</target>
<actual value="3,922 (2,958 Females; 964 Male)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional hospitals and hospitals reconstructed after the 2019 earthquake meeting the minimum requirements of the accreditation agency
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="7.00">
<comment><narrative>
Overachieved. 

11 regional hospitals, 22 municipal hospitals, and five university hospitals have been accredited.
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of regional hospitals with Regional Hospital Information System (HIS) established and functional
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-06-24" />
<target value="11">
<comment><narrative>
Achieved. 

The RHIS was established and functional in the first four hospitals since 2024. The rollout to the additional seven hospitals was completed in July 2025.
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total number of hospitals in the selected regions that have launched the implementation of the HMP recommendations
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="5">
<comment><narrative>
Achieved. 

Implementation was launched with the issuance by the MoHSP of the Order No. 160 on March 7, 2022 and Protocol No. 1163.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total number of hospitals in the selected regions that have launched the implementation of the HMP recommendations
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="5">
<comment><narrative>
Achieved. 

Implementation was launched with the issuance by the MoHSP of the Order No. 160 on March 7, 2022 and Protocol No. 1163.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of regional hospitals with Regional Hospital Information System (HIS) established and functional
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-06-24" />
<target value="11">
<comment><narrative>
Achieved. 

The RHIS was established and functional in the first four hospitals since 2024. The rollout to the additional seven hospitals was completed in June 2025.
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional hospitals and hospitals reconstructed after the 2019 earthquake meeting the minimum requirements of the accreditation agency
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="7.00">
<comment><narrative>
Overachieved. 

11 regional hospitals, 22 municipal hospitals, and five university hospitals have been accredited.
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional hospitals and hospitals reconstructed after the 2019 earthquake meeting the minimum requirements of the accreditation agency
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="7.00">
<comment><narrative>
Overachieved. 

11 regional hospitals, 22 municipal hospitals, and five university hospitals have been accredited.
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of patients admitted in hospital with an implemented RHIS registered in the RHIS
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-09-14" />
<target value="40.00">
<comment><narrative>
Mostly achieved.

Numerator: Number of patients admitted in hospitals with an implemented RHIS registered in the RHIS.
Denominator: Number of patients admitted in hospitals with an implemented RHIS.

As noted above, RHIS is functional in all the 11 regional hospitals.  Given the time lag for data collection, data is currently available for the first four hospitals, as follows: Shkoder 34%, Durres 27%, Elbasan 51%, and Vlore 39%. Based on this, the average achievement for this indicator stands at 37.75% for these four hospitals. 

Since no data are available from the remaining seven hospitals that were added under AF the result will remain unchanged, and the status of the indicator will stay “mostly achieved.”
</narrative></comment>
</target>
<actual value="37.75%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of patients admitted in hospital with an implemented RHIS registered in the RHIS
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-09-14" />
<target value="40.00">
<comment><narrative>
Mostly achieved.

Numerator: Number of patients admitted in hospitals with an implemented RHIS registered in the RHIS.
Denominator: Number of patients admitted in hospitals with an implemented RHIS.

As noted above, RHIS is functional in all the 11 regional hospitals.  Given the time lag for data collection, data is currently available for the first four hospitals, as follows: Shkoder 34%, Durres 27%, Elbasan 51%, and Vlore 39%. Based on this, the average achievement for this indicator stands at 37.75% for these four hospitals.

Data regarding RHIS-registered patients for the remaining seven hospitals, as well as 2024 data for the first four hospitals, are expected to be available by December 2025 and will be reported in the Implementation Completion and Results Report.
</narrative></comment>
</target>
<actual value="37.75%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total number of hospitals in the selected regions that have launched the implementation of the HMP recommendations
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="5">
<comment><narrative>
Achieved. 

Implementation was launched with the issuance by the MoHSP of the Order No. 160 on March 7, 2022 and Protocol No. 1163.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of regional hospitals with Regional Hospital Information System (HIS) established and functional
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-06-24" />
<target value="11">
<comment><narrative>
Achieved. 

The RHIS was established and functional in the first four hospitals since 2024. The rollout to the additional seven hospitals was completed in July 2025.
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who report that participatory processes in regional hospitals are effective
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-06-17" />
<target value="50.00">
<comment><narrative>
Achieved. 

Out of 11 total regional hospitals, 9 have already established boards that include citizen representatives. They actively participate in all meetings and consultation processes, presenting the feedback from the communities they belong to.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women using mobile mammography for breast cancer screening
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="3,150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-12-18" />
<target value="7,000.00">
<comment><narrative>
Achieved, using MoHSP own funds. 

Mammography screenings are offered at specialty polyclinics, public hospital services (Regional and Municipal Hospitals), and through mobile mammography units. From January 1 to December 9, 2024, a total of 19,300 women have undergone mammography screenings nationwide. Of these, 11,094 were screened during Breast Cancer Awareness Month.
</narrative></comment>
</target>
<actual value="19,300">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Medical equipment management and maintenance strategy revised and plans adopted
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-12-17" />
<target value="Strategy updated and plans adopted by MoHSP">
<comment><narrative>
Achieved. 

The strategy has been updated and the action plan has beed prepared and adopted by the MoHSP using the budget funds.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people accessing the expanded health services provided at hospitals supported through the project
</narrative></title>
<baseline year="2015" iso-date="2015-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-08-15" />
<period-end iso-date="2025-09-15" />
<target value="900,000">
<comment><narrative>
Achieved. 

This WBG corporate results indicator (CRI) tracks people benefiting from inpatient and emergency outpatient services at all 11 regional hospitals and the QSUT (Annex 12) that benefited from improved services during the project. It corrects the baseline value of the CRI indicator that was incorrectly documented as the improved facilities had not yet been constructed or upgraded at the start of the project, and correct baseline should have been zero. The catchment area data, as provided, is presented in Annex 12. It is noted that, based on the updated catchment area figures, the resulting number of people benefiting slightly increases compared to what was reported in the final ISR: from 900 000 to 921,692. As such, the CRI achievement at project closing was 921,692 over a baseline of 0.
</narrative></comment>
</target>
<actual value="921,692">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of clinical protocols and guidelines updated and implemented for management of five main chronic diseases
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="5">
<comment><narrative>
Overachieved. 

150 clinical protocols (including protocols for the treatment of non-communicable diseases) have been developed in cooperation with the Agency for Quality Assurance and Accreditation of Health and Social Care Services and implemented.
</narrative></comment>
</target>
<actual value="150">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-05-02" value="19,304.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-02" />
<period-end iso-date="2025-06-17" />
<target value="100,000.00">
<comment><narrative>
Partially achieved. 

This is a World Bank corporate results indicator. It tracks the number of people or businesses who use new or enhanced digitally enabled services through support by the Project. This includes new digitally delivered services as well as enhancements to existing digitally delivered services (i.e., those delivered through digital technologies such as internet, cloud computing, AI, etc.).
The target value was expected to be fully achieved by Project closing date. However, reporting on the achieved value is connected with the data collection for RHIS. Since no additional data was collected through RHIS and reported to WB after September 2025, the result will remain unchanged, and the status of the indicator will stay “partially achieved”.
</narrative></comment>
</target>
<actual value="48,845.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of clinical protocols and guidelines updated and implemented for management of five main chronic diseases
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="5">
<comment><narrative>
Overachieved. 

150 clinical protocols (including protocols for the treatment of non-communicable diseases) have been developed in cooperation with the Agency for Quality Assurance and Accreditation of Health and Social Care Services and implemented.
</narrative></comment>
</target>
<actual value="150">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Roadmap for hospital payment reforms adopted by HIF
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="Roadmap developed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="Roadmap adopted by HIF">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="Yes. Roadmap developed and adopted by HIF.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-05-02" value="19,304.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-02" />
<period-end iso-date="2025-06-17" />
<target value="100,000.00">
<comment><narrative>
Mostly achieved. 

This is a World Bank corporate results indicator. It tracks the number of people or businesses who use new or enhanced digitally enabled services through support by the Project. This includes new digitally delivered services as well as enhancements to existing digitally delivered services (i.e., those delivered through digital technologies such as internet, cloud computing, AI, etc.).
The target value is expected to be fully achieved by Project closing date.  However, reporting on the achieved value is connected with the data collection for RHIS. Hence, the result will be reported in the Project ICR.
</narrative></comment>
</target>
<actual value="48,845.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="2024" iso-date="2024-05-02" value="900,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-02" />
<period-end iso-date="2025-06-17" />
<target value="900,000.00">
<comment><narrative>
Achieved.

This is a World Bank corporate results indicator. It tracks the number of people benefitting, directly and indirectly, from inpatient and emergency services at the 11 regional hospitals and the tertiary hospital (QSUT). These services include the full continuum of health prevention, promotion, curtive, rehabilitative and palliative care that is safe, effective, and patient-centered. 

Baseline: 300,000 individuals benefiting from inpatient services + 600,000 individuals benefiting from emergency services with no more than 1 day in the hospital (2023, MoHSP).

Given the Project coverage (all 11 regional hospitals and QSUT), all the existing user population is expected to have sustained access to quality inpatient and emergency services.
</narrative></comment>
</target>
<actual value="900,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of essential registries that are consolidated and available online
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-06-17" />
<target value="4.00">
<comment><narrative>
Achieved. 

According to the Cabinet of Ministers decision, this activity was carried out by the National Agency of Information Society.
</narrative></comment>
</target>
<actual value="327.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of patients admitted in hospital with an implemented RHIS registered in the RHIS
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2025-09-14" />
<target value="40.00">
<comment><narrative>
Mostly achieved.

Numerator: Number of patients admitted in hospitals with an implemented RHIS registered in the RHIS.
Denominator: Number of patients admitted in hospitals with an implemented RHIS.

As noted above, RHIS is functional in all the 11 regional hospitals.  Given the time lag for data collection, data is currently available for the first four hospitals, as follows: Shkoder 34%, Durres 27%, Elbasan 51%, and Vlore 39%. Based on this, the average achievement for this indicator stands at 37.75% for these four hospitals.

Data regarding RHIS-registered patients for the remaining seven hospitals, as well as 2024 data for the first four hospitals, are expected to be available by December 2025 and will be reported in the Implementation Completion and Results Report.
</narrative></comment>
</target>
<actual value="37.75%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total number of hospitals in the selected regions that have launched the implementation of the HMP recommendations
</narrative></title>
<baseline year="2020" iso-date="2020-06-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-24" />
<period-end iso-date="2024-06-24" />
<target value="5">
<comment><narrative>
Achieved. 

Implementation was launched with the issuance by the MoHSP of the Order No. 160 on March 7, 2022 and Protocol No. 1163.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who report that participatory processes in regional hospitals are effective
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-06-17" />
<target value="50.00">
<comment><narrative>
Achieved. 

Out of 11 total regional hospitals, 9 have already established boards that include citizen
representatives. They actively participate in all meetings and consultation processes, presenting the feedback from the communities they belong to.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="2024" iso-date="2024-05-02" value="900,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-02" />
<period-end iso-date="2025-06-17" />
<target value="900,000.00">
<comment><narrative>
Achieved.

This is a new indicator added to contribute to World Bank corporate results. It tracks the number of people benefitting, directly and indirectly, from inpatient and emergency services at the 11 regional hospitals and the tertiary hospital (QSUT). These services include the full continuum of health prevention, promotion, curtive, rehabilitative and palliative care that is safe, effective, and patient-centered. 

Baseline: 300,000 individuals benefiting from inpatient services + 600,000 individuals benefiting from emergency services with no more than 1 day in the hospital (2023, MoHSP).

Given project support to all 11 regional hospitals and QSUT, this support is expected to provide sustained access to quality services for the existing user population.
</narrative></comment>
</target>
<actual value="900,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Master Plan for eHealth/HMIS activities developed
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="Yes">
<comment><narrative>
Achieved. 

The MoHSP has developed the e-Health Action Plan 2023-2030.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Roadmap for hospital payment reforms adopted by HIF
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="Roadmap developed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="Roadmap adopted by HIF">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="Yes. Roadmap developed and adopted by HIF.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of service payment packages (10 in total) using new platform processed
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2024-06-17" />
<target value="10.00">
<comment><narrative>
Overachieved. 
This activity has been completed directly by MoHSP, without direct Project contribution.
</narrative></comment>
</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of facilities renovated and/or equipped
</narrative></title>
<baseline year="2020" iso-date="2020-06-17" value="11 regional hospitals received medical equipment. 3 main hospitals are under rehabilitation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-17" />
<period-end iso-date="2025-09-12" />
<target value="11 regional hospitals equipped; 4 regional and municipal hospitals renovated; 3 departments of QSUT renovated">
<comment><narrative>
Achieved. 

By September 2025, 11 hospitals had been equipped, and renovations had been completed at four hospitals (Laci, Kukes, Kruja, and Lezha). In addition, renovations were completed at two QSUT department hospitals (Cardio-Surgery and Pediatric). Renovation works at the Psychiatric Hospital (Emergency and Adult Psychiatric) were successfully completed by November 30, 2025.

All medical equipment was delivered, installed, and tested by the project closing date (September 30, 2025).
</narrative></comment>
</target>
<actual value="11 regional hospitals equipped; 4 regional and municipal hospitals renovated; 3 departments of QSUT renovated.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T20:06:16" hierarchy="1"><iati-identifier>44000-P180679</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Resilience and Green Development DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The program development objective is to: (i) strengthen resilience of the government sector and households; (ii) strengthen the energy market framework and scale up renewable energy and energy efficiency; and (iii) protect the environment and reduce the country's carbon footprint.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Second Resilience and Green Development DPL for Albania (DPL2), in the amount of US$120 million equivalent, is the second of two in a programmatic series. The program development objective (PDO) is to: (i) strengthen resilience of the government sector and households; (ii) strengthen the energy market framework and scale up renewable energy and energy efficiency; and (iii) protect the environment and reduce the country's carbon footprint. The operation includes MFD-e and PCE components. Activities under PAs #5, #6 and #8 are MFD-enabling (MFDe). Under PA#5, the project provides for a regulatory framework to support private RE generation by allowing prosumers to sell electricity that they produce to the grid. By strengthening the link between deregulation, transparency, and attempts to attract new private investors, reforms supported under PA#6 are also MFD-e. Under PA#8, DPL2 assists with  the creation of the market segment for private waste management of certain waste streams. Support under PA#5, linked to RI#5, is also PCE. RI#5 is a non-monetary PCE-related results indicator (RI) that captures the increase in privately installed capacity of renewable energy.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0056252"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0056252"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–P0056252"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL-COA-0056251"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-02-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Angella Faith Montfaucon</narrative></person-name><telephone>+1-202-473-1000</telephone><email>amontfaucon@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3183875" />
                <name><narrative>Tirana</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>41.3275 19.81889</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23111" percentage="30" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="20" xml:lang="en"/><sector vocabulary="1" code="15118" percentage="10" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="30.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWB" percentage="10.0000000" xml:lang="en"><narrative>Solid Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="30.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="10.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBZ" percentage="20.0000000" xml:lang="en"><narrative>Other - Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">120000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">120000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">120000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-56251"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">133970937</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-56251"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-331712</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-56251"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-861154</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="AL-COA-56251"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180679"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180679?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180679"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the 33 budget  programs within relevant line ministries that have climate performance budget indicators in the 2026-2028 MTBP
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2026-12-13" />
<target value="60">
<comment><narrative>
MTBP is still in draft form.
</narrative></comment>
</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of applicants for disability benefits assessed through the new system
</narrative></title>
<baseline year="2022" iso-date="2022-11-02" value="47"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-02" />
<period-end iso-date="2026-12-02" />
<target value="92">
<comment><narrative>
Assessment to be made as data becomes available
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social services delivered, reported with a separate budget line dedicated to the Social Fund by local governments
</narrative></title>
<baseline year="2024" iso-date="2024-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-13" />
<period-end iso-date="2026-12-04" />
<target value="10">
<comment><narrative>
Assessment to be made as data becomes available
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The installed capacity of energy produced by renewables excluding hydro (in MW)
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-09" />
<target value="250">

</target>
<actual value="444">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume traded through ALPEX, in GWh
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-14" />
<target value="1500">

</target>
<actual value="840.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy consumption in public sector buildings (budgetary clients)
</narrative></title>
<baseline year="2022" iso-date="2022-12-13" value="242"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-13" />
<period-end iso-date="2026-12-13" />
<target value="218">

</target>
<actual value="245.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of packaging placed on the Albanian market that is covered by  producer responsibility organization(s) that are licensed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-08" />
<period-end iso-date="2026-12-08" />
<target value="50">
<comment><narrative>
The law is yet to be approved by the parliament
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of verified Annual MRV reports submitted by the Government
</narrative></title>
<baseline year="2021" iso-date="2021-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-13" />
<period-end iso-date="2026-12-05" />
<target value="2">
<comment><narrative>
Draft has been submitted but not yet verified
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
F-gases licenses issued (as a share of total market participants)
</narrative></title>
<baseline year="2024" iso-date="2024-02-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-09" />
<period-end iso-date="2026-12-09" />
<target value="60">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of elderly female beneficiaries (65+) using formal elderly care services
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="942"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="1130">

</target>
<actual value="1297">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of the eight SOEs classified as PIEs and large entities that publish audited non-financial information as part of their annual report
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2026-12-07" />
<target value="4">
<comment><narrative>
The World Bank, under the Strengthening Quality of Auditing and Reporting Project in Albania (SQARP), is providing assistance four selected SOEs  for the preparation of their non-financial statements for the year ending  2024.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of applicants for disability benefits assessed through the new system
</narrative></title>
<baseline year="2022" iso-date="2022-11-02" value="47"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-02" />
<period-end iso-date="2026-12-02" />
<target value="92">
<comment><narrative>
Assessment to be made as data becomes available
</narrative></comment>
</target>
<actual value="47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of packaging placed on the Albanian market that is covered by  producer responsibility organization(s) that are licensed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-08" />
<period-end iso-date="2026-12-08" />
<target value="50">
<comment><narrative>
The law is yet to be approved by the parliament
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the 33 budget  programs within relevant line ministries that have climate performance budget indicators in the 2026-2028 MTBP
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2026-12-13" />
<target value="60">
<comment><narrative>
MTBP is still in draft form.
</narrative></comment>
</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of elderly female beneficiaries (65+) using formal elderly care services
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="942"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="1130">

</target>
<actual value="1297">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
F-gases licenses issued (as a share of total market participants)
</narrative></title>
<baseline year="2024" iso-date="2024-02-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-09" />
<period-end iso-date="2026-12-09" />
<target value="60">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social services delivered, reported with a separate budget line dedicated to the Social Fund by local governments
</narrative></title>
<baseline year="2024" iso-date="2024-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-13" />
<period-end iso-date="2026-12-04" />
<target value="10">
<comment><narrative>
Assessment to be made as data becomes available
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CIT and PIT revenues as percent of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="4.33"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-06" />
<target value="4.83">
<comment><narrative>
As of June 2025
</narrative></comment>
</target>
<actual value="5.85">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The installed capacity of energy produced by renewables excluding hydro (in MW)
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-09" />
<target value="250">

</target>
<actual value="444">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy consumption in public sector buildings (budgetary clients)
</narrative></title>
<baseline year="2022" iso-date="2022-12-13" value="242"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-13" />
<period-end iso-date="2026-12-13" />
<target value="218">

</target>
<actual value="245.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of verified Annual MRV reports submitted by the Government
</narrative></title>
<baseline year="2021" iso-date="2021-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-13" />
<period-end iso-date="2026-12-05" />
<target value="2">
<comment><narrative>
Draft has been submitted but not yet verified
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume traded through ALPEX, in GWh
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-14" />
<target value="1500">

</target>
<actual value="840.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of climate informed new public investment (PI) included in the MTBP as a percentage of total PI submitted.
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-08" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CIT and PIT revenues as percent of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="4.33"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-06" />
<target value="4.83">
<comment><narrative>
As of June 2025
</narrative></comment>
</target>
<actual value="5.85">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of the eight SOEs classified as PIEs and large entities that publish audited non-financial information as part of their annual report
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2026-12-07" />
<target value="4">
<comment><narrative>
The World Bank, under the Strengthening Quality of Auditing and Reporting Project in Albania (SQARP), is providing assistance four selected SOEs  for the preparation of their non-financial statements for the year ending  2024.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of climate informed new public investment (PI) included in the MTBP as a percentage of total PI submitted.
</narrative></title>
<baseline year="2022" iso-date="2022-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-14" />
<period-end iso-date="2026-12-08" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:36:46" hierarchy="1"><iati-identifier>44000-P151972</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Citizen-Centric Service Delivery Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[ The development objective of the project is to improve the efficiency of delivery and access to selected administrative services in Albania. ]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The development objective of the Citizen-Centric Service Delivery Project is to improve the efficiency of delivery and access to selected administrative services in Albania. The project has three components. Component one supports enhancements of the backend systems: business process reengineering of services, building new IT systems and automation of services. Component two supports enhancements to the citizen interface with service delivery: reforming front offices in existing agencies, improving citizen convenience with one stop shops, improving online delivery of services, implementing beneficiary feedback, and providing information on services. Component three builds capacity to deliver improvements in services: by improving strategic planning, performance management, capacity building of the Prime Minister's DU and the Ministry of Innovation and Public Administration (MIPA) and other implementing agencies, and a communications strategy and campaign. A detailed description of the components can be found in annex two.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–ORP0021234"><narrative>Republic of Albania</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–ORP0021234"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0021235"><narrative>Agency for Delivery of Integrated Services in Albania (ADISA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021235"><narrative>Agency for Delivery of Integrated Services in Albania (ADISA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-07-15">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2015-08-25">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2020-12-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2020-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Simon Carl O'Meally</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>someally@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>





<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183875" />
						<name><narrative>Tirana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.327499 19.81889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><sector vocabulary="1" code="15126" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="100.000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="83" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="6" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="18" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="18" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="18" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="18" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="18" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="6" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">32000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-1442867</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">82132</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">986118</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">4631295</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">337944</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">278540</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">304804</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1395095</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">353628</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">327820</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">308020</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">4248600</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">396346</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">351069</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">8380820</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">383523</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">2211000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">171036</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">313903</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">280211</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">539600</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">302183</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">4899474</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">708656</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1173</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-82132</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-54323</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-58128</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-63414</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-73546</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-76252</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-77559</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-104854</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-92707</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-99141</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-105713</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-81395</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-79901</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-66807</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-211229</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-582337</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-718373</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-674604</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-585873</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-487959</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-394448</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-1169928</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-1214076</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-1184374</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-1180532</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-1114635</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-1264284</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-1258549</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151972"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P151972?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151972"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of registered users accessing e-government services (as percentage of adult population)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="2.25"></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2020-07-31" />
<target value="3.60">

</target>
<actual value="13.70">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The amount of data prefilled in public services' online forms
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="58.40"></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2020-07-31" />
<target value="71.00">

</target>
<actual value="63.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Services offered with improved customer service front office interface
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="2020-07-30" />
<target value="130.00">

</target>
<actual value="140.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Access to the poor and vulnerable: Percentage of the Roma who stated that receiving services from institutions contacted was &quot;easy&quot;or &quot;very easy&quot;
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="52.00"></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2020-07-31" />
<target value="72.00">

</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional pre-requisites of Citizen Centric Service Delivery Program
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="No"></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="2020-07-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New services  with level 3  automation
</narrative></title>
<baseline year="2015" iso-date="2015-06-15" value="0.00"></baseline>
<period>
<period-start iso-date="2015-06-15" />
<period-end iso-date="2020-07-30" />
<target value="75.00">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Services with information available on multiple platforms
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="2020-07-30" />
<target value="130.00">

</target>
<actual value="132.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with key performance indicators reported and quarterly performance reports circulated
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="2020-07-31" />
<target value="8.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time  taken to obtain health insurance card
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="5.50"></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2020-07-30" />
<target value="4.10">

</target>
<actual value="0.01">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of institutions with proactive citizen feedback mechanisms implemented
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="1.00"></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="2020-07-31" />
<target value="8.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Access to services for the poor and vulnerable: Percentage of females who stated that receiving services from institutions contacted was &quot;easy&quot; or &quot;very easy&quot;
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="50.00"></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2020-07-31" />
<target value="71.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Priority services with business process reengineered
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="2020-07-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time taken to process old age pension application
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="53.00"></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2020-07-30" />
<target value="40.00">

</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time taken to obtain motor vehicle registration
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="5.30"></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2020-07-30" />
<target value="4.00">

</target>
<actual value="0.02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Access to services for the poor and vulnerable: Percentage of the poor who stated that receiving services from institutions contacted was &quot;easy&quot; or &quot;very easy&quot;
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="50.00"></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2020-07-31" />
<target value="70.00">

</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agencies with new or enhanced backend IT systems to improve service delivery
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="2020-07-31" />
<target value="8.00">

</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:36:47" hierarchy="1"><iati-identifier>44000-P146280</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>AL Financial Sector DPL</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The PDO is to strengthen the financial sector regulatory and supervisory regime and mitigate key vulnerabilities of the bank and non-bank financial sectors.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The development objective of the Financial Sector Modernization Development Policy Loan Project for Albania is to strengthen the financial sector regulatory and supervisory regime and mitigate key vulnerabilities of the bank and non-bank financial sectors. This development policy loan (DPL) aims to strengthen the financial sector regulatory and supervisory regime and mitigate key vulnerabilities of the bank and non-bank sectors. The present operation is designed to support the government's reform agenda to address key challenges across the financial sector. The operation is structured around three pillars: (i) strengthening regulation and supervision of the banking sector and financial safety net; (ii) expediting the resolution of non-performing loans (NPLs); and (iii) strengthening the regulation and supervision of non-bank financial institutions (NBFIs). This is a standalone operation in the amount of United States (U.S.) 100 million dollars. Domestic and external vulnerabilities are high and continue to pose risks to macroeconomic stability. In sum, the financial sector authorities have undertaken significant measures to minimize vulnerabilities in the financial sector, and are currently working on the implementation of several other key reforms to further mitigate risks.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0014937"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-28">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-05-15">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2015-06-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2015-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Michael Brent Edwards</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>medwards1@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>


<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3183875" />
							<name><narrative>Tirana</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>41.3275 19.81889</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="24020" percentage="50" xml:lang="en"/><sector vocabulary="1" code="24030" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000031" percentage="70" xml:lang="en"><narrative>Financial Stability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000031" percentage="70" xml:lang="en"><narrative>Financial Stability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000311" percentage="70" xml:lang="en"><narrative>Financial Sector oversight and policy/banking regulation &amp; restructuring</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000311" percentage="70" xml:lang="en"><narrative>Financial Sector oversight and policy/banking regulation &amp; restructuring</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-06-30 00:00:00.0000000-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">100000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-30 00:00:00.0000000-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">100000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">96279915</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-242121</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-469040</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-380606</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-335285</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-277243</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-234584</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-247580</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-235720</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-229430</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-220234</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-233526</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-153343</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-186823</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-158265</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-122813</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-106587</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-107804</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-699948</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1415863</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1584903</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1564433</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1227730</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1028777</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-876812</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2771884</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2620750</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2349435</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2502094</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2543365</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2537034</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2598121</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2438193</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2748199</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2767076</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146280"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P146280?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146280"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:36:47" hierarchy="1"><iati-identifier>44000-P155605</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Albania Competitiveness Development Policy Loan</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The development objectives of the DPLs series is to enhance Albania's competitiveness by improving its investment regime, making it easier to do business and facilitating trade.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[This program document describes the Competitiveness Development Policy Lending (DPL) to Albania . This operation supports the government's strategy to enhance Albania's competitiveness in order to achieve higher and more inclusive growth. The DPL has been developed jointly by the World Bank Group. The operation builds on an extensive technical assistance program of the advisory services team, that covers the key areas of this operation, including investment policy and promotion, trade facilitation, and the Doing Business (DB) indicator reform program. The World Bank Group will jointly monitor and support the implementation of the next phase of reforms. The DPL is complementary to the other two policy based interventions supporting Albania's reform agenda. The reforms under the three policy-based interventions addressing fiscal, financial and business climate issues, together compose a coherent package to address critical growth and distributional issues over the medium-term.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0025112"><narrative>Ministry of Finance</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025112"><narrative>Ministry of Finance</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025112"><narrative>Ministry of Finance</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025113"><narrative>Ministry of Economic Development, Tourism, Trade and Enterprise</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025113"><narrative>Ministry of Economic Development, Tourism, Trade and Enterprise</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025113"><narrative>Ministry of Economic Development, Tourism, Trade and Enterprise</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025114"><narrative>Ministry of Urban Development</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025114"><narrative>Ministry of Urban Development</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0025114"><narrative>Ministry of Urban Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-07-12">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2017-01-31">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2018-01-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2018-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Feyi Boroffice</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>fboroffice@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>










<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3183875" />
							<name><narrative>Tirana</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>41.3275 19.81889</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="25010" percentage="20" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="20" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="20" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="20" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="20" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="6.00000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="56" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="11" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000143" percentage="11" xml:lang="en"><narrative>Trade Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="11" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="22" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="44" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="11" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000142" percentage="11" xml:lang="en"><narrative>Trade Logistics</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="11" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="11" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="11" xml:lang="en"><narrative>Regional Integration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-01-31 00:00:00.0000000-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">70000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-31 00:00:00.0000000-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">70000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">70000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">184536</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">77531934</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-184536</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-394188</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-345260</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-331421</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-341615</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-266989</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-310428</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-282899</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-250448</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-229235</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-215426</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-774296</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1450947</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1608835</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1593509</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1265587</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1089555</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-942257</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2301742</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2063453</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2197529</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2233777</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2228216</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2281867</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2141407</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2413678</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2430257</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P155605"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P155605?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P155605"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:36:53" hierarchy="1"><iati-identifier>44000-P174101</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Albania Emergency COVID-19 Response Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The objectives of the Project are to prevent, detect, and respond to the threat posed by COVID-19 and strengthen national systems for public health preparedness in the Republic of Albania.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objectives of the Project will be achieved through activities that support continued containment of COVID-19 in the short term, alongside investments to strengthen Albania's capacity for preventing and responding to public health emergencies (including further waves of the COVID-19 pandemic) in the medium- and longer-term. Albania's current position on the epidemic curve means that investments based on both short- and longer-term concerns are essential, to not lose the gains made through Albania's effective immediate response whilst strengthening the health system beyond the current crisis. As such, Albania has requested assistance to provide widespread population testing (including newer serologic testing); strengthen surveillance and contact tracing; start planning appropriate adjustment of physical distancing requirements and other preventive measures (carefully differentiated by region, economic sector, age or health status); expand capacity for treatment of severe cases, should numbers increase, whilst maintaining essential medical care and minimizing risks for patients and health personnel; and, enhance communications with the public and other key stakeholders. Objectives, scope and components of this project are aligned with the COVID-19 Fast Track Facility]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–ORP0045718"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0045719"><narrative>Ministry of Health and Social Protection</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-06-12">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2020-07-30">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2022-12-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2022-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Lorena Kostallari</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>lkostallari@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183875" />
						<name><narrative>Tirana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.3275 19.81889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184081" />
						<name><narrative>Shkodër</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.06828 19.51258</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183719" />
						<name><narrative>Vlorë</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.4686 19.48318</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783754" />
						<name><narrative>Republic of Albania</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41 20</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184935" />
						<name><narrative>Lezhë</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.78361 19.64361</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185082" />
						<name><narrative>Krujë</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.50917 19.79278</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185211" />
						<name><narrative>Kavajë</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.18556 19.55694</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782756" />
						<name><narrative>Korçë</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.61861 20.78083</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185728" />
						<name><narrative>Durrës</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.32355 19.45469</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783263" />
						<name><narrative>Elbasan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.1125 20.08222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><sector vocabulary="1" code="12110" percentage="37" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="31" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="21" xml:lang="en"/><sector vocabulary="1" code="12281" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="100" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="18" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="9" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="100" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="49" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="18" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="49" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="18" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="9" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="49" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="9" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="100" xml:lang="en"><narrative>ICT</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope>
		<humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">20000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">150000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">70000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">160000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">100000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">100000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">200000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">100000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">100000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">200000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">90000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">100000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">200000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">100000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">110000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">240000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">130000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">150000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">340000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">140000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">150000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">330000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">180000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">190000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">420000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">400000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">430000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">750000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">320000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">580000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">560000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">560000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">560000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">850000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">280000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">850000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">290000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">570000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">290000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">290000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">540000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">20000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">150000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">70000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">160000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">100000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">100000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">200000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">100000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">100000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">200000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">90000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">100000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">200000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">100000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">110000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">240000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">130000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">150000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">340000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">140000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">150000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">330000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">180000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">190000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">420000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">400000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">430000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">750000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">320000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">580000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">560000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">560000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">560000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">850000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">280000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">850000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">290000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">570000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">290000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">290000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">540000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">16800000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-723219</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">45609</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2976445</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">8110323</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">5278501</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">672212</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-678744</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">828152</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-165236</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-486828</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-47163</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-45609</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3963</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-9958</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-31141</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-221175</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-338938</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-368495</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-334573</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-253540</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-193992</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-179877</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-898746</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-914878</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-954639</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-974730</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-989429</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174101"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174101?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174101"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of green zones, in a given month, in which the number of new cases on any day exceeds 12
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="6"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of designated laboratories with diagnostic equipment, test kits, and reagents, as per MoHSP guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="0.00"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ICU beds supplied for the Infectious Disease Hospital
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="18.00"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="58.00">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of medical staff in public health laboratories, trained to undertake field epidemiology
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="0.00"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-06-30" />
<target value="100.00">

</target>
<actual value="1200.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social media events/interactions (e.g. Facebook, Twitter) which have facilitated citizen feedback and government response
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="0.00"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="1000.00">

</target>
<actual value="2520.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of COVID-19 cases that are health care workers
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="3.50"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="2.00">

</target>
<actual value="1.90">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of medical ambulances provided to Tirana tertiary hospital, regional hospitals, and IPH
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="0.00"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="20.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgraded infrastructure of the Infectious Disease Clinic in Mother Teresa Hospital completed
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="No"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of volunteer healthcare staff covered with salaries for at least 3 months
</narrative></title>
<baseline year="2020" iso-date="2020-05-12" value="0.00"></baseline>
<period>
<period-start iso-date="2020-05-12" />
<period-end iso-date="2022-12-30" />
<target value="300.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:36:59" hierarchy="1"><iati-identifier>44000-P144029</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>The Power Recovery Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The project development objective is to improve reliability of power supply and financial viability of the power sector.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The Power Recovery Project of Albania has an objective to improve reliability of power supply and financial viability of the power sector. This proposed project consists of four components: i) short-term complementary power import support; ii) upgrading distribution infrastructure, iii) transmission meter/data center upgrade; and iv) supporting power sector reforms and project implementation. The first component will support KESh/WPS with up to US$ 30 million to purchase short term complementary power imports to meet KESh/WPS? power supply obligations. The second component will support GoA?s and Distribution Company?s plan to reduce distribution losses, improve cash collection and reliability of power supply. Component three will support OST to: i) providing power meters and upgrading a data center; and, ii)supplying and installing an IT system for the data center and providing technical assistance for developing procedures for the establishment of a market platform for independent power producers and some eligible customers, among others. Finally, component four will support priority power sector reforms to facilitate the recovery of the power sector and improve the performance of the distribution company through provision of management and technical advisory services. The Project draws extensively upon the lessons learned from similar World Bank engagements worldwide and in Albania. The following key lessons have been reflected in the project design; (i) the need for upfront political commitment, and will, in enforcing payment discipline and penalization, under the existing judicial framework, of electricity theft; (ii) complementing project design and monitoring around higher policy actions through the DPL series, focusing on structural changes in the sector; (ii) designing implementation and monitoring of social outreach programs targeting electricity consumers and key stakeholders; (iii) coordination with inter-ministerial task forces responsible for supporting the loss reduction program and ongoing IFIs/donor support programs; and (iv) strong analytical diagnosis underpinning the operation. Still, heavy upfront implementation preparation and supervision of this operation will be required, together with periodic interaction with donors and IFIs involved in the sector.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–ORP0012948"><narrative>Republic of Albania</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0012947"><narrative>Ministry of Infrastructure and Energy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-03-07">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-09-29">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2021-06-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2021-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Rome Chavapricha</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>rome@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003344951" />
						<name><narrative>Qarku i Tiranes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.26667 19.783331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="23630" percentage="96" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="98.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="3" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="3" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="15" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="3" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="5" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="15" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="3" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="15" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="15" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="3" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="3" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="5" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">4333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">4333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">4333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">4333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">4333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">4333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">4666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">4666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">4666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">6666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-19049407</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-22377123</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">317677</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">162983</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">66225</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">219420</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">5564733</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">217997</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">215583</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">2464175</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">524687</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1167344</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">2365940</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">870618</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1859483</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">2071173</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">855957</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">12452699</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">11075794</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">9688094</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">836284</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">3113289</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1394586</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">1539903</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">4605900</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1090692</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">4744912</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1018769</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">1881401</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">846259</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">1596958</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">172985</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">331533</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">167051</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">489347</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">554112</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">322137</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">1302396</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">310158</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1325131</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">477340</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">333138</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">815438</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">367999</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">1008468</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">904256</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">514185</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">1836404</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">121726</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1419775</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">286000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">120841</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-3812535</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">315020</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-27348</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-3471</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-317677</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-910</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-2453</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-26899</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-21792</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-27595</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-52849</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-149001</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-181898</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-197199</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-212381</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-173404</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-279270</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-133101</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-123615</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-99377</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-213829</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1111340</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1559821</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1633715</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1459710</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1135923</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-939523</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-892283</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-2808571</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2443007</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-2448531</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2558470</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2555295</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2545654</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2487450</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2633958</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2732492</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2739547</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P144029"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P144029?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P144029"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electricity losses per year in the project area
</narrative></title>
<baseline year="2014" iso-date="2014-07-03" value="45.00"></baseline>
<period>
<period-start iso-date="2014-07-03" />
<period-end iso-date="2019-11-29" />
<target value="20.00">

</target>
<actual value="22.65">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of medium voltage customers in deregulated market
</narrative></title>
<baseline year="2014" iso-date="2014-07-03" value="0.00"></baseline>
<period>
<period-start iso-date="2014-07-03" />
<period-end iso-date="2019-11-29" />
<target value="1000.00">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of OST meters installed
</narrative></title>
<baseline year="2014" iso-date="2014-07-03" value="0.00"></baseline>
<period>
<period-start iso-date="2014-07-03" />
<period-end iso-date="2019-11-29" />
<target value="2328.00">

</target>
<actual value="1704.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical assistance initiated to support power sector reform
</narrative></title>
<baseline year="2014" iso-date="2014-07-03" value="No"></baseline>
<period>
<period-start iso-date="2014-07-03" />
<period-end iso-date="2019-11-29" />
<target value="TA to update the Financial Recovery Plan provided">

</target>
<actual value="TA to update the Financial Recovery Plan provided.



.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity of medium-voltage network
</narrative></title>
<baseline year="2014" iso-date="2014-07-03" value="0.00"></baseline>
<period>
<period-start iso-date="2014-07-03" />
<period-end iso-date="2019-11-29" />
<target value="80.00">

</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:37:00" hierarchy="1"><iati-identifier>44000-P152064</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Albania Financial Sector DPL</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[Project Development ObjectiveThe program development objective is to strengthen the resiliency of the banking sector, and regulation and supervision of nonbanks.Board Schedule Comments]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The development objective of Financial Sector Development Policy Loan (DPL) Project for Albania is to strengthen the resiliency of the banking sector and the regulation and supervision of nonbank financial institutions. The DPL is structured around three pillars: (a) adopting policy measures to reduce nonperforming loans (NPLs) and enhance the financial safety net, (b) strengthening regulation, supervision, and resolution regime of banks and Savings and Credit Associations (SCAs), and (c) strengthening the regulation and supervision of investment funds. This operation  directly contributes to the Country Partnership Framework (CPF) 2015-2019 Focus Area  1 objective to improve financial stability. The first focus area includes three CPF objectives that aim to support Albania's efforts to improve fiscal sustainability, strengthen public investment management, and improve financial stability. The World Bank has been providing substantial support to Albania in recent years, through several development policy operations and the objective of this operation is to enhance Albania's competitiveness through improving the investment regime, facilitating trade, and making it easier to do business.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0021357"><narrative>Bank of Albania (BoA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021357"><narrative>Bank of Albania (BoA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021358"><narrative>Ministry of Finance (MoF)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021358"><narrative>Ministry of Finance (MoF)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021359"><narrative>Albania Financial Supervisory Agency (AFSA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021359"><narrative>Albania Financial Supervisory Agency (AFSA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021360"><narrative>Albania Deposit Insurance Agency (ADIA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021360"><narrative>Albania Deposit Insurance Agency (ADIA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021361"><narrative>Ministry of Justice (MoJ)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0021361"><narrative>Ministry of Justice (MoJ)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-09-23">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2017-03-13">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2018-03-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2018-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Isfandyar Zaman Khan</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>ikhan2@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>











<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3183875" />
							<name><narrative>Tirana</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>41.3275 19.81889</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="24030" percentage="60" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="40" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000321" percentage="40" xml:lang="en"><narrative>Credit Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000031" percentage="80" xml:lang="en"><narrative>Financial Stability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000311" percentage="80" xml:lang="en"><narrative>Financial Sector oversight and policy/banking regulation &amp; restructuring</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-03-31 00:00:00.0000000-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">100000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-31 00:00:00.0000000-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">100000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">250000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">99750000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-1319610</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-2018889</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-2121722</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-2213111</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1870556</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1221556</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-970361</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-940444</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-905000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1420889</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2760250</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3424444</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3760983</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3815442</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3378826</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3222378</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2901517</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2080000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2080000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2080000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P152064"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P152064?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P152064"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:37:06" hierarchy="1"><iati-identifier>44000-P130492</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>ENVIRONMENTAL SERVICES</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The Project Development Objective (PDO) is to support sustainable land management practices and increase communities monetary and non-monetary benefits in targeted Project areas which are mainly in erosion prone rural upland areas.This PDO is to be achieved through the support of alternative livelihoods and provision of environmental services and through sustainable utilization of wood andpasture products in the long term. The Project will particularly focus on enhancing the financial, economic, and institutional sustainability of land use and natural resources management, and will help build capacities of Albania farmers, community organizations and government institutions to efficiently use EU funding.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The development objective of the Environmental Services Project (ESP) for Albania is to support sustainable land management practices and increase communities' monetary and non-monetary benefits in targeted project areas which are mainly in erosion prone rural upland areas. The project comprises of four components. The first component, strengthening institutional capacity aims to build a stable institutional environment that facilitates sustainable upland use management to maximize the provision of the different environmental services. It includes following two sub-components: (i) strengthening forest and pasture management capacity; and (ii) empowering beneficiaries. The second component, planning and provision of instrument of pre-accession assistance for rural development (IPARD) like grants aims to increase income generation opportunities and support government efforts to alleviate poverty in rural areas and improve land use management through integrated planning and a competitive grant scheme. The component will finance following three sub-components: (i) preparation of communal micro-catchment plans (CMCPs) and upgrading of communal forest and pasture management plans (CFPMPs) into CMCPs; (ii) provision of IPARD like competitive grants; and (iii) strengthening the capacity of technical bodies and applicants. The third component, introducing payment for environmental services aims to assist the development of mechanisms that allow sustainable financing of natural resource management beyond the ESP horizon. It includes following three sub-components: (i) development of carbon projects; (ii) development of payment mechanisms for watershed services; and (iii) piloting of payments for watershed services (PWS). The fourth component, supporting project implementation will support the ministry of environment (MOE) to carry-out project implementation and overall coordination according to the agreed mainstreamed arrangement. It includes following two sub-components: (i) project management; and (ii) establishment and operation of a monitoring information system (MIS).]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–ORP0009109"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="AL–ORP0009109"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0009110"><narrative>Ministry of Environment</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="AL–ORP0009110"><narrative>Ministry of Environment</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-09-16">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-07-08">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2021-05-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2021-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Drita Dade</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>ddade@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>





<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782131" />
						<name><narrative>Orosh</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.833328 20.08333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363285" />
						<name><narrative>Mesopotam</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.910278 20.09222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782118" />
						<name><narrative>Komuna e Ostrenit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.433331 20.450001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781139" />
						<name><narrative>Zall-Rec</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.87611 20.32</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781132" />
						<name><narrative>Zapod</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.05056 20.5525</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781127" />
						<name><narrative>Zavaline</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.980831 20.28083</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781110" />
						<name><narrative>Zerqan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.50222 20.360559</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781093" />
						<name><narrative>Zhepe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.67778 20.28694</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781061" />
						<name><narrative>Bucimas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.891392 20.681391</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363409" />
						<name><narrative>Aliko</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.858608 20.07917</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363380" />
						<name><narrative>Dhiver</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.836109 20.16861</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363369" />
						<name><narrative>Dropull i Poshtem</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.98333 20.200001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363368" />
						<name><narrative>Dropull i Siperm</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.933331 20.25</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781962" />
						<name><narrative>Porocan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.94194 20.298611</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781951" />
						<name><narrative>Potom</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.488331 20.373329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781927" />
						<name><narrative>Proger</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.694172 20.940281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781924" />
						<name><narrative>Proptisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.986111 20.502501</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781864" />
						<name><narrative>Komuna e Qukesit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.066669 20.466669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782049" />
						<name><narrative>Petran</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.209438 20.418329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782037" />
						<name><narrative>Pirg</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.785 20.70611</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782035" />
						<name><narrative>Pishaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.881111 20.182779</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781986" />
						<name><narrative>Pojan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.72583 20.8375</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781982" />
						<name><narrative>Komuna e Pogonit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.066669 20.35</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781976" />
						<name><narrative>Komuna e Polisit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.133331 20.25</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363288" />
						<name><narrative>Markat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.73278 20.19528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363298" />
						<name><narrative>Livadhja</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.789169 20.121941</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363363" />
						<name><narrative>Finiq</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.906391 20.058331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782561" />
						<name><narrative>Komuna e Leniasit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.76667 20.383329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781144" />
						<name><narrative>Zall-Dardhe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.806671 20.336109</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781159" />
						<name><narrative>Komuna e Xibrit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.466671 20.049999</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782544" />
						<name><narrative>Leshnje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.536942 20.31333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782535" />
						<name><narrative>Leskovik</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.15139 20.597219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782523" />
						<name><narrative>Libohove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.031109 20.26306</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782522" />
						<name><narrative>Libonik</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.704441 20.708611</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782500" />
						<name><narrative>Liqenas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.786671 20.90222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782498" />
						<name><narrative>Lis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.627499 20.085279</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782464" />
						<name><narrative>Llugaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.341389 20.10861</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782451" />
						<name><narrative>Komuna e Lumasit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.833328 20</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782443" />
						<name><narrative>Lunik</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.289169 20.32361</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782441" />
						<name><narrative>Lunxheri</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.133331 20.16667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782423" />
						<name><narrative>Macukull</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.68861 20.110279</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782372" />
						<name><narrative>Maqellare</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.58889 20.483061</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782355" />
						<name><narrative>Martanesh</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.400002 20.200001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782321" />
						<name><narrative>Melan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.654171 20.465281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782270" />
						<name><narrative>Miras</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.509171 20.928329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782253" />
						<name><narrative>Mollaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.56028 20.74028</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782250" />
						<name><narrative>Mollas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.42556 20.67444</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782248" />
						<name><narrative>Mollas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.926941 20.003611</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782175" />
						<name><narrative>Komuna e Zagorit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.183331 20.25</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782169" />
						<name><narrative>Picar</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.166672 20.04833</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782163" />
						<name><narrative>Novosele</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.761391 20.69833</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782155" />
						<name><narrative>Odrie</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.133331 20.16667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782140" />
						<name><narrative>Orenje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.284721 20.211941</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781621" />
						<name><narrative>Shtiqen</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.040562 20.43417</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781601" />
						<name><narrative>Shupenze</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.529999 20.423611</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782576" />
						<name><narrative>Lekas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.602219 20.512501</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782582" />
						<name><narrative>Lazarat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.046669 20.147499</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782611" />
						<name><narrative>Labinot-Mal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.200829 20.15222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782612" />
						<name><narrative>Labinot-Fushe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.14056 20.146111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782622" />
						<name><narrative>Kushove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.788891 20.18889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782658" />
						<name><narrative>Kukur</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.867779 20.363609</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781599" />
						<name><narrative>Shushice</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.0975 20.148331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000363200" />
						<name><narrative>Xarre</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.728329 20.05444</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781798" />
						<name><narrative>Roshnik</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.73278 20.03944</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781795" />
						<name><narrative>Rajce</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.090279 20.576389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781778" />
						<name><narrative>Rukaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.683609 20.019171</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781740" />
						<name><narrative>Selishte</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.627499 20.279169</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781690" />
						<name><narrative>Shengjin</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.926109 20.18833</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781667" />
						<name><narrative>Shirgjan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.051941 20.053329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781664" />
						<name><narrative>Shishtavec</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.98 20.605829</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781176" />
						<name><narrative>Vreshtas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.79694 20.776939</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781182" />
						<name><narrative>Voskopoje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.63306 20.58889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781185" />
						<name><narrative>Voskop</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.611938 20.690281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781580" />
						<name><narrative>Skenderbegas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.776112 20.240561</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781212" />
						<name><narrative>Vithkuq</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.525002 20.5825</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781250" />
						<name><narrative>Vertop</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.628891 20.05389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781260" />
						<name><narrative>Vergo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.006672 20.00889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781272" />
						<name><narrative>Komuna e Vendreshes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.51667 20.116671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781280" />
						<name><narrative>Velcan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.95472 20.462219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781326" />
						<name><narrative>Ujmisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.908329 20.346939</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781335" />
						<name><narrative>Udenisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.963329 20.63917</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781343" />
						<name><narrative>Tunje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.834171 20.11194</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781358" />
						<name><narrative>Tropoje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.404171 20.16667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783212" />
						<name><narrative>Fushe-Bulqize</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.521938 20.282221</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783224" />
						<name><narrative>Komuna e Gryke Cajes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.883331 20.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783231" />
						<name><narrative>Frasher</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.368889 20.42444</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783247" />
						<name><narrative>Fierze</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.260559 20.016939</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783254" />
						<name><narrative>Fajze</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.166939 20.35083</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783259" />
						<name><narrative>Erseke</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.33778 20.67889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783300" />
						<name><narrative>Drenove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.583328 20.792219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783343" />
						<name><narrative>Dishnice</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.65139 20.81361</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783370" />
						<name><narrative>Derjan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.673611 20.058331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783384" />
						<name><narrative>Gjerbes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.629169 20.25111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783412" />
						<name><narrative>Clirim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.4175 20.55028</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783446" />
						<name><narrative>Cerava</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.851391 20.725</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783450" />
						<name><narrative>Cepan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.420559 20.260559</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783461" />
						<name><narrative>Carshove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.118061 20.540831</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783479" />
						<name><narrative>Buz</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.445 20.004721</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783489" />
						<name><narrative>Bushtrice</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.878609 20.42194</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781376" />
						<name><narrative>Tregan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.024719 20.078329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781382" />
						<name><narrative>Trebinje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.91333 20.553061</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781402" />
						<name><narrative>Topojan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.984718 20.522221</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781416" />
						<name><narrative>Komuna Tomin</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.68111 20.40222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781436" />
						<name><narrative>Terpan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.552219 20.024441</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781468" />
						<name><narrative>Surroj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.992222 20.34417</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781472" />
						<name><narrative>Sult</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.88472 20.09944</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781481" />
						<name><narrative>Suke</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.375278 20.15472</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781487" />
						<name><narrative>Suc</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.576939 20.05139</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783695" />
						<name><narrative>Ballaban</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.416672 20.134439</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783734" />
						<name><narrative>Arren</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.913059 20.28833</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783739" />
						<name><narrative>Arras</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.735828 20.324169</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000829569" />
						<name><narrative>Bytyc</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.310001 20.20278</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000831333" />
						<name><narrative>Komuna e Cepojes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.116669 20.033331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000831499" />
						<name><narrative>Komuna e Malzit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.083328 20.23333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000831500" />
						<name><narrative>Komuna e Qafa e Malit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.066669 20.1</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000831502" />
						<name><narrative>Komuna e Terthores</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.116669 20.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000831503" />
						<name><narrative>Komuna e Fanit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.933331 20.16667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781506" />
						<name><narrative>Stravaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.00528 20.423059</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781521" />
						<name><narrative>Stebleve</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.337219 20.469999</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000781563" />
						<name><narrative>Sllove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.801109 20.408331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000865202" />
						<name><narrative>Piskove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.279171 20.272499</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002525810" />
						<name><narrative>Lukove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.992222 19.913891</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002595331" />
						<name><narrative>Ksamil</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.76889 19.99972</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183625" />
						<name><narrative>Zharrez</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.709171 19.649719</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183646" />
						<name><narrative>Zejmen</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.707779 19.689171</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183653" />
						<name><narrative>Zall-Herr</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.389439 19.827499</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183658" />
						<name><narrative>Zall-Bastar</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.429722 19.930281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183684" />
						<name><narrative>Xhafzotaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.34444 19.547501</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183701" />
						<name><narrative>Komuna e Vranishtit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.200001 19.75</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783104" />
						<name><narrative>Gore</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.700001 20.58333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782771" />
						<name><narrative>Kolsh</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.07806 20.34194</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782791" />
						<name><narrative>Kodovjat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.805561 20.25111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782980" />
						<name><narrative>Hocisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.60833 20.914169</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783006" />
						<name><narrative>Komuna e Gurres</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.533329 20</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183865" />
						<name><narrative>Topoje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.763062 19.432779</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183907" />
						<name><narrative>Terbuf</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.040001 19.61417</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183930" />
						<name><narrative>Komuna e Kelmendit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.48333 19.633329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183936" />
						<name><narrative>Synej</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.18 19.5425</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183945" />
						<name><narrative>Sukth</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.380562 19.537781</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183959" />
						<name><narrative>Strum</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.75111 19.737499</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184013" />
						<name><narrative>Sinje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.64806 19.868059</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184019" />
						<name><narrative>Komuna e Lopesit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.366669 19.83333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184021" />
						<name><narrative>Sinaballaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.06889 19.69944</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184060" />
						<name><narrative>Shoshit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.237499 19.780001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184067" />
						<name><narrative>Komuna e Shllakut</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.099998 19.700001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184101" />
						<name><narrative>Sheze</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.02417 19.816111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783086" />
						<name><narrative>Gostime</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.145561 20.24</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783111" />
						<name><narrative>Golaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.247501 20.38028</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783136" />
						<name><narrative>Komuna e Gjorices</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.51667 20.433331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783156" />
						<name><narrative>Gjinar</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.022499 20.18889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783158" />
						<name><narrative>Gjinaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.118061 20.435829</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783163" />
						<name><narrative>Gjergjan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.04306 20.02972</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184211" />
						<name><narrative>Komuna e Farkes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.283329 19.866671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184230" />
						<name><narrative>Ruzhdie</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.67083 19.69833</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783170" />
						<name><narrative>Gjegjan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.937778 20.01111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783206" />
						<name><narrative>Komuna e Muhurit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.683331 20.26667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783211" />
						<name><narrative>Komuna e Fushe-Cidhnes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.75 20.35</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184316" />
						<name><narrative>Remas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.886391 19.511391</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184359" />
						<name><narrative>Qesarat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.390282 19.88583</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184362" />
						<name><narrative>Qerret</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.053059 19.837219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184374" />
						<name><narrative>Qelez</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.089722 19.895</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184384" />
						<name><narrative>Pult</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.25 19.66667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184398" />
						<name><narrative>Komuna e Kurveleshit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.216671 19.933331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184408" />
						<name><narrative>Preze</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.427219 19.672779</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184417" />
						<name><narrative>Poshnje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.780281 19.84417</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184420" />
						<name><narrative>Portez</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.699169 19.57444</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184472" />
						<name><narrative>Komuna e Pezes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.216671 19.716669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184474" />
						<name><narrative>Petrele</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.253059 19.85306</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184484" />
						<name><narrative>Perparim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.049999 19.79917</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184487" />
						<name><narrative>Perondi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.778889 19.923059</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783512" />
						<name><narrative>Bulagarec</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.658329 20.757219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783519" />
						<name><narrative>Bujan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.326389 20.076389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783560" />
						<name><narrative>Bradashesh</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.105 20.022499</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184568" />
						<name><narrative>Otllak</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.743889 19.93528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184584" />
						<name><narrative>Komuna e Ana e Malit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.01667 19.41667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184588" />
						<name><narrative>Novosele</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.625 19.46694</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184594" />
						<name><narrative>Nikel</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.444172 19.748329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184606" />
						<name><narrative>Ngracan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.64444 19.7925</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184611" />
						<name><narrative>Ndroq</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.263889 19.65583</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184725" />
						<name><narrative>Komuna e Postribes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.133331 19.633329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184742" />
						<name><narrative>Memaliaj-Fshat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.345829 19.97917</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184755" />
						<name><narrative>Mbrostar-Ure</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.753609 19.579439</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184801" />
						<name><narrative>Manze</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.428612 19.59306</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184808" />
						<name><narrative>Maminas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.379169 19.6075</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783590" />
						<name><narrative>Blinisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.861389 20</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783593" />
						<name><narrative>Blerim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.160561 20.19194</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184945" />
						<name><narrative>Levan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.676109 19.489719</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184969" />
						<name><narrative>Lekbibaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.29472 19.931669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184973" />
						<name><narrative>Lekaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.114441 19.60972</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185015" />
						<name><narrative>Kute</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.473331 19.76639</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185017" />
						<name><narrative>Kutalli</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.78389 19.786671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185031" />
						<name><narrative>Kurjan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.717499 19.74556</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185044" />
						<name><narrative>Kuman</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.726669 19.68667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185069" />
						<name><narrative>Kryevidh</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.100559 19.5275</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185078" />
						<name><narrative>Komuna e Krutjes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.866669 19.716669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185087" />
						<name><narrative>Krrabe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.215561 19.97139</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185102" />
						<name><narrative>Krahes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.43861 19.84444</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185107" />
						<name><narrative>Kozare</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.83083 19.90056</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185113" />
						<name><narrative>Kote</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.389439 19.602221</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185141" />
						<name><narrative>Komuna e Komesit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.583328 19.966669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185144" />
						<name><narrative>Kolonje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.824169 19.603889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185218" />
						<name><narrative>Katundi i Ri</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.403061 19.518061</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185223" />
						<name><narrative>Kastrat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.352501 19.48917</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185234" />
						<name><narrative>Kashar</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.34972 19.710279</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185246" />
						<name><narrative>Karine</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.063061 19.71611</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185291" />
						<name><narrative>Komuna e Kallmetit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.833328 19.66667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185315" />
						<name><narrative>Kajan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.914169 19.889441</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185320" />
						<name><narrative>Kacinar</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.89333 19.898609</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783606" />
						<name><narrative>Bilisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.627499 20.99</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185363" />
						<name><narrative>Hysgjokaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.971668 19.789721</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185382" />
						<name><narrative>Komuna e Helmasit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.200001 19.616671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185386" />
						<name><narrative>Hekal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.561939 19.73583</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185412" />
						<name><narrative>Hajmel</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.95306 19.637779</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185432" />
						<name><narrative>Komuna e Gurit i Zi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.049999 19.566669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185449" />
						<name><narrative>Gruemire</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.159168 19.51889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185465" />
						<name><narrative>Greshice</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.551941 19.77833</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185469" />
						<name><narrative>Grekan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.92944 19.9475</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185487" />
						<name><narrative>Gradishte</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.888062 19.585831</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185491" />
						<name><narrative>Gracen</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.151939 19.96361</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185495" />
						<name><narrative>Komuna e Grabjanit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.950001 19.58333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185527" />
						<name><narrative>Golem</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.967781 19.68528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185567" />
						<name><narrative>Gjocaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.025558 19.72389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185580" />
						<name><narrative>Gjepalaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.333061 19.57806</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783611" />
						<name><narrative>Bicaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.99472 20.4125</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185648" />
						<name><narrative>Fratar</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.5 19.816669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185653" />
						<name><narrative>Komuna e Frakulles</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.650002 19.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185664" />
						<name><narrative>Fier-Shegan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.867222 19.78528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783629" />
						<name><narrative>Dardhas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.845829 20.657221</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185843" />
						<name><narrative>Dajt</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.393608 19.915831</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185846" />
						<name><narrative>Dajc</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.991669 19.410561</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185847" />
						<name><narrative>Dajc</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.915562 19.604441</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185860" />
						<name><narrative>Cukalat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.730282 19.79056</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185925" />
						<name><narrative>Cakran</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.603329 19.62611</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185937" />
						<name><narrative>Bushat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.119438 19.899719</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185961" />
						<name><narrative>Bubullime</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.818062 19.640829</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185963" />
						<name><narrative>Bubq</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.474171 19.65167</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185989" />
						<name><narrative>Brataj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.26778 19.66917</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003186068" />
						<name><narrative>Berzhite</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.245281 19.90111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000783669" />
						<name><narrative>Barmash</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.277779 20.61833</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003186153" />
						<name><narrative>Ballagat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.995281 19.76528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003186155" />
						<name><narrative>Baldushk</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.21389 19.79694</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003186184" />
						<name><narrative>Armen</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.536388 19.596109</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003186196" />
						<name><narrative>Aranitas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.59444 19.806669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003186208" />
						<name><narrative>Allkaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.857498 19.75528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782807" />
						<name><narrative>Klos</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.94611 20.00972</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315384" />
						<name><narrative>Balldreni i Ri</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.819172 19.64028</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315389" />
						<name><narrative>Komuna e Qenderit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.216671 19.466669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315391" />
						<name><narrative>Komuna e Shkrelit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.299999 19.58333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315393" />
						<name><narrative>Komuna e Temalit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.150002 19.816669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315394" />
						<name><narrative>Komuna e Rrethines</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.099998 19.533331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315395" />
						<name><narrative>Komuna e Berdices</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42 19.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315397" />
						<name><narrative>Komuna e Vig-Mneles</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.950001 19.700001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315400" />
						<name><narrative>Komuna e Kthelles</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.716671 19.950001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315401" />
						<name><narrative>Komuna e Kolcit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.783329 19.683331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315444" />
						<name><narrative>Komuna e Koder Thumanes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.533329 19.66667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315445" />
						<name><narrative>Komuna e Cudhit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.508331 19.85</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315447" />
						<name><narrative>Komuna e Berxullit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.383331 19.700001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782814" />
						<name><narrative>Komuna e Trebishtes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.366669 20.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003343829" />
						<name><narrative>Dushk</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.726669 19.757219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003343997" />
						<name><narrative>Selite</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.547501 19.848061</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003344005" />
						<name><narrative>Vllahine</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.45694 19.64361</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782850" />
						<name><narrative>Komuna e Luznit</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.633331 20.366671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782856" />
						<name><narrative>Kastriot</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.729439 20.37722</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782906" />
						<name><narrative>Kalis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.83889 20.366671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782917" />
						<name><narrative>Komuna e Kalajes e Dodes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.821941 20.49778</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782953" />
						<name><narrative>Iballe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.1875 20.002501</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000782963" />
						<name><narrative>Hotolisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.15667 20.397221</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183780" />
						<name><narrative>Velabisht</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.701672 19.93222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183791" />
						<name><narrative>Vaqarr</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.299171 19.744169</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183820" />
						<name><narrative>Ungrej</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.875278 19.79472</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183824" />
						<name><narrative>Ulez</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.682781 19.89333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184129" />
						<name><narrative>Shenkoll</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.69083 19.65333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184143" />
						<name><narrative>Shengjergj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.183331 19.533331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184167" />
						<name><narrative>Shales</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.998611 19.947781</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184173" />
						<name><narrative>Komuna e Shales</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.333328 19.75</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184177" />
						<name><narrative>Sevaster</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.396389 19.729719</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184191" />
						<name><narrative>Selite</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.635281 19.754999</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184271" />
						<name><narrative>Rrashbull</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.322781 19.510281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184278" />
						<name><narrative>Komuna e Rrases</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.966671 19.83333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184283" />
						<name><narrative>Rrape</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.044441 19.97056</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184528" />
						<name><narrative>Paskuqan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.353889 19.806669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184538" />
						<name><narrative>Paper</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.05167 19.960831</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184562" />
						<name><narrative>Pajove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.054722 19.8375</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184887" />
						<name><narrative>Luftinje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.44278 19.954439</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003184930" />
						<name><narrative>Libofshe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.834438 19.552219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185351" />
						<name><narrative>Ishem</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.54528 19.6</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185637" />
						<name><narrative>Fushekuqe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.65028 19.620001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003185815" />
						<name><narrative>Dermenas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.74556 19.493891</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003186103" />
						<name><narrative>Baz</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.631939 19.929171</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003315380" />
						<name><narrative>Golem</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.245831 19.534719</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000834294" />
						<name><narrative>Funare</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.196388 20.059719</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000865079" />
						<name><narrative>Moglice</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.71806 20.438061</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000865098" />
						<name><narrative>Bogove</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.57111 20.15</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003183765" />
						<name><narrative>Velipoje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>41.87833 19.40556</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003343744" />
						<name><narrative>Fierze</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>40.920559 19.846939</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0007302898" />
						<name><narrative>Margegaj</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>42.371731 20.073009</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="43042" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="100.000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="4" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="4" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="4" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="44" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="44" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="44" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="44" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">125000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">208333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">208333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">83333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">83333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">83333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">83333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">83333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">461007.8700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">442220.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">196562.6000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">288317.1200</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1058507.5500</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">378445.9500</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">661262.3200</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">936850.8100</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">181974.9800</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">958228.5600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">557312.7800</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">567601.7700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">103642.0500</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">25740.8700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">408989.0800</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">668334.6500</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">68492.4700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">242044.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">715104.0500</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1671192.6800</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">83333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">83333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">83333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">83333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">83333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.0000</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">10000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-41007</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">20643</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">442220</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">196563</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">288317</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">334110</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">26666</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">233661</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">235985</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">181975</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">743920</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">557313</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">567602</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">50678</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">230720</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">68492</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">144998</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1569465</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">371230</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">84871</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">148483</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">149179</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">756104</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-31155</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">206924</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">102399</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">693613</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-35976</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-20643</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-115</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-2305</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-2474</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-3998</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-3921</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-3834</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-4404</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-9892</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-11161</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-7825</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-15511</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-12694</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-11461</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-10545</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-10683</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-68844</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-138139</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-153281</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-149861</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-116383</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-96408</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-81130</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-301136</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-313673</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-281200</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-299471</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-304411</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-303653</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-310964</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-291823</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-328927</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-331186</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130492"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P130492?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130492"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People in forest&amp;adjacent community with monetary/non-monetary benefit from forest
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2020-09-23" />
<target value="3000.00">
<comment><narrative>
&lt;p&amp;gt;Achieved (129%). Sub indicators &amp;ndash; Achieved (110% women benefiting), Achieved (700% ethnic minority/indigenous group benefiting) This indicator relates to PDO outcome (ii). The indicator was one of the Bank&amp;#39;s core sector indicators at the time of appraisal. In the project, this indicator measures only the number of individual beneficiaries that received monetary benefits from the project in the form of payments for labor under the IPARD like and LAG grants. On this basis the overall target has been exceeded (3,858). The disaggregated targets have also been exceeded with 71 persons of ethnic minorities (Roma, Greek or other minorities) and 1,098 were women.&amp;nbsp; Non-monetary benefits which were not measure systematically include improved environmental conditions reported by beneficiaries, e.g., reduced erosion, benefits of areas afforested, access to forest products for self-consumption (e.g., fromthinning activities, through increased production), some sales of forest products (e.g., under some LEADER LAG grants, increase production with project support), increased skills for SLM, participation in FPUAs including by women,&amp;nbsp;and the benefits of increased water for irrigation and livestock. Data source: ARDA database, and project MIS.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3858.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pasture area brought under management plans
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2019-09-30" />
<target value="90000.00">
<comment><narrative>
&lt;p&amp;gt;Partially achieved (33%).&amp;nbsp; This indicator relates to PDO outcome indicators (i) and (ii). At the time of appraisal based on the best available data, it was estimated that amount of pasture area in comparison to forest area was about 33%.&amp;nbsp; During implmentation, and based on new data collection under the NFI, it has been found that the area is more in the region of 15%. Across the six FPMPs approved, 29,781 ha of pasture are now under management plans. Data source: FPMPs, Project MIS.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="29781.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2019-09-30" />
<target value="180000.00">
<comment><narrative>
&lt;p&amp;gt;Partially achieved (90%). This indicator relates to PDO outcome indicators (i) and (ii). This was a Core Sector indicator at thetime of appraisal and related to commune and micro-catchment plans. With the reform, the focus turned to supporting plans at the municipal level. The project supported the preparation of management plans for six municipalities (Maliq, Malesi e Madhe, Has, Berat, Gramsh and Korce) following guidelines also developed with project support. Under the project 161, 285 ha of forest are now under management plans that MTE has approved. Additional areas that were planned to be included for management planning were dropped due to the delay in approval of the AF and difficulties in procurement. Data source: FPMPs, Project MIS.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="165285.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area where sustainable land mgt. practices were adopted as a result of proj
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2020-09-23" />
<target value="9000.00">
<comment><narrative>
&lt;p&amp;gt;Achieved (137%). This indicator relates to PDO outcome (i). The indicator was part of the Bank&amp;#39;s core sector indicator requirement at the time of appraisal. The indicator measures the number of hectares where practices to improve sustainable management of forest and pasture have been adopted by land users with project support, that contribute to improved SLM. Overall, the target achieved for forest and pasture areas by project closure was not less than the foreseen sum of forest pasture and agricultural lands as originally envisioned. As such the indicator captures area under SLM practices adopted under the IPARD like and eligible activities under the LEADER LAG grants. Eligible activities were identified in the Grant Operational Manual for IPARD like and LAG grants. These included: afforestation (with native or other acceptable tree species), encouraging natural regeneration, forest improvement (enrichment planting, thinning, coppicing, etc.), horticulture, pasture improvement (stone and/or toxic weed removal), pasture establishment, fencing, medicinal plant cultivation, check dams, rehabilitation of irrigation, trail construction, livestock watering points, fire prevention, natural erosion measures (green fences). The area covers land with direct environmental impacts (afforestation) and indirect impacts (managing livestock and human traffic in forest and pasture lands). Overall, the project area covered by where practices were adopted was 12,320 hectares. Data source: ARDA database, Project MIS and field verification reported by ARDA, PMT and NFA staff.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12320.80">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest and Pasture Areas Registered
</narrative></title>
<baseline year="2017" iso-date="2017-12-04" value="0.00"></baseline>
<period>
<period-start iso-date="2017-12-04" />
<period-end iso-date="2020-09-23" />
<target value="1100000.00">
<comment><narrative>
&lt;p&amp;gt;Partially achieved (98%). This indicator relates to PDO outcome indicator (i). &amp;nbsp; Given that there will be some unknowns in the registration process as boundaries are aligned and mistakes discovered, there is a very small difference between the target and achievement. The end target covers land formally registered in the ownership of the municipalities following transfer from the State. &amp;nbsp; The target has been partially achieved with 1,083, 871 ha registered and the registration products having completed qualitycontrol requirements). Registration has covered 60 of the 61 municipalities in the country. Data source: Project MIS&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1083871.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land management specialists and users trained
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2019-09-30" />
<target value="2000.00">
<comment><narrative>
&lt;p&amp;gt;Achieved (over 107% for land users and specialists trained) Achieved (102% for female land users trained), &amp;nbsp;Partially achieved (70% for FPUA members trained, 86% for women FPUA members trained), Achieved (102% for individual farmers trained), Achieved (105% for individual female trained), Partially achieved (34%, ministry staff trained). This group of indicators relates to PDO outcomeindicators (i) and (ii). The indicator measures the number of people trained and includes (i) staff of MTE, State Cadaster Agency, ARDA and municipalities; and (ii) members of forest and pasture users&amp;#39; associations. The PAD contained typos that were later corrected (2000 land users trained and not 20,000, similarly 800 female land users trained not 8,000) The number of FPUA members trained represents the persons trained, counted only once even though the same individuals participated in different sessions of trainingson different topics. The target for FPUA members to be trained was not achieved due to difficulties in estimation. Targets for women &amp;nbsp;trained in all categories were all exceeded, except for FPUA members which was nearly achieved (86%). Training topics covered SLM practices, property rights, NFI methods, forest management planning, LEADER LAG development strategies, use of data systems, e.g., AlFIS, Interim database, grant application processes, business planning. The number of ministry staff trained (241 persons) wasnot achieved because of institutional restructuring which reduced the number of staff at this level. Data source: Project MIS and training database.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2143.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries participating in project consultation activities during implementation
</narrative></title>
<baseline year="2019" iso-date="2019-05-13" value="0.00"></baseline>
<period>
<period-start iso-date="2019-05-13" />
<period-end iso-date="2020-09-23" />
<target value="350.00">
<comment><narrative>
&lt;p&amp;gt;Achieved (178%). &amp;nbsp; This indicator relates to PDO outcome indicators (i). This indicator was introduced at the first restructuring to capture aspects of citizen engagement. The indicator measures the number of people who participated during consultations on registration, forest inventory, FPMPs and LEADER LAG activities. Beneficiaries included employees from central government institutions as well as municipalities who were consulted, such as MTE, former IPRO/SCA, NEA, ARDA, former SIEF, municipalities, and members of communities where forest management planning took place. &amp;nbsp; Of the 624 beneficiaries participating, 126 were women exceeding the target of 100. Data Source: Project MIS, training reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="624.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:37:07" hierarchy="1"><iati-identifier>44000-P147226</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Albania - Public Finance DPL</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[This loan of US$120 million is the first in a series of two programmatic development policy loans (DPLs) which aims to improve fiscal sustainability by strengthening public financial management (PFM) to address arrears and through tax, pensions and energy sector reforms to support macro-fiscal stability. The series focuses on addressing weaknesses in public finance management that have resulted in the accumulation of general government arrears of 5.3 percent of GDP in 2013 and a surge in public debt from 54.7 percent in 2008 to 70.7 percent in 2013. Arrears and high public debt are now weighing heavily on Albania's growth prospects and threatening to reverse the significant progress that has until recently been made in reducing poverty. Clearance of arrears and prevention of future arrears will help boost private investment and reduce the high levels of non-performing loans (NPLs) that are currently stifling credit to the private sector. Strengthening budget preparation and execution will in turn increase transparency and credibility of public finances, limit the accumulation of new arrears and improve the efficiency and effectiveness of public spending. In parallel, raising revenues, reforming the pension system and reducing fiscal risks emanating from the energy sector are important for putting Albania's public debt on a sustainable long-term trajectory and safe-guarding macro-fiscal stability. Without reforms, Albania's pension system is fiscally and socially unsustainable while the energy sector, left unreformed, will pose a large threat to the budget and absorb increasing fiscal resources. The government recognizes that steps to strengthen PFM and reduce longer term fiscal pressures are critical for Albania to protect the fiscal space for growth-enabling investment and poverty-alleviating social services.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="AL–ORP0016011"><narrative>Minister of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-29">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-05-29">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2015-12-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2015-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Doerte Doemeland</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>ddoemeland@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>


<recipient-country code="AL" percentage="100"><narrative xml:lang="en">ALBANIA</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3183875" />
							<name><narrative>Tirana</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>41.3275 19.81889</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="10" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="45" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="10" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="25" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="20" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="45" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="20" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="10" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-12-30 00:00:00.0000000-12-01"/>
<period-end iso-date="2015-12-30"/>
<value currency="USD" value-date="2015-12-30">120000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-30 00:00:00.0000000-12-01"/>
<period-end iso-date="2015-12-30"/>
<value currency="USD" value-date="2015-12-30">120000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">120000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">115511270</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-290145</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-565393</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-456098</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-401788</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-332233</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-281113</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-296687</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-282474</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-274937</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-263916</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-279845</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-183758</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-223879</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-189657</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-147173</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-127860</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-129463</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-841567</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1704489</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1910589</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1888686</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1484554</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1246132</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1064057</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-3218840</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-3043337</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2728274</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2905548</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2953474</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2946122</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3017059</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2831343</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3191337</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3213258</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147226"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147226?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147226"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity></iati-activities>