<iati-activities version="2.03" generated-datetime="2026-10-25T20:58:32"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-25T00:13:54" hierarchy="1"><iati-identifier>44000-P177328</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Transmission Expansion and Energy Storage Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen Namibia's transmission network and enable integration of renewable energy generation.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed Project will address key priorities in Namibia's energy sector. The Project Development Objective (PDO) is to strengthen the transmission network, maintain grid stability, and facilitate uptake of renewable energy generation. The Project will finance the construction of a new transmission line and associated substations to strengthen NamPower's transmission network and to increase capacity to supply new load and to wheel additional renewable power through the NamPower network. The Project will also finance the development of the second utility scale Battery Energy Storage System (BESS) in the country that will facilitate the uptake of renewable energy generation while maintaining grid stability. The Project will also provide technical assistance (TA) for technical studies, transaction advisory, RE park infrastructure studies, and institutional capacity building. The proposed Project is structured around three components: (i) development of the Auas-Kokerboom Transmission Line (USD 100 million); and (ii) development of a utility scale BESS facility (USD 35 million); and (iii) technical assistance (USD 3.5 million) as set out in further detail in the PCN. Total project funding amounts USD 138.50 and the Project will combine a proposed IBRD loan and a proposed grant from the IBRD Fund for Innovative Global Public Goods (GPGs) Solutions (the “GPG Fund”), a proposed loan from the Green Climate Fund (“GCF”), and a proposed grant from the GCF. The GPG fund proceeds and the GCF loan will be used for developing the BESS facility to facilitate incorporation of large-scale renewable energy in Namibia's generation mix and to mitigate the high investment cost of pioneer BESS projects in the country. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="NA–P0050109"><narrative>NAMIBIA POWER CORPORATION (PROPRIETARY) LIMITED</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="NA-COA-0054576"><narrative>NAMIBIA POWER CORPORATION (PROPRIETARY) LIMITED</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-05-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-05-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nadia Taobane</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ntaobane@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
NamPower Center 15 Luther Street, PO Box 2864, Windhoek, Namibia, +264 (61) 205 4111, webinfo@nampower.com.na

</narrative></mailing-address></contact-info><recipient-country code="NA" percentage="100"><narrative xml:lang="en">NAMIBIA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3352136" />
                <name><narrative>Windhoek</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-22.55941 17.083229</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23631" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="100.000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="0" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="0" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="0" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="0" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2115570.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">70735181.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">41584115.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">23955134.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">100000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">100000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="NA-COA-54576"><narrative>NAMIBIA POWER CORPORATION (PROPRIETARY) LIMITED</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-09-30"/><value value-date="2026-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="NA-COA-54576"><narrative>NAMIBIA POWER CORPORATION (PROPRIETARY) LIMITED</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="NA-COA-54576"><narrative>NAMIBIA POWER CORPORATION (PROPRIETARY) LIMITED</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177328"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177328?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177328"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission line constructed under the project
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="461">
<comment><narrative>
The project has been declared effective on 25 April 2025, progress is expected to be seen in Q3 FY27 once the construction of the TL has commenced. Please note that the Feasibility Study and the ESIA have been completed.

Preparation of the transmission line activities is well advanced, prioritizing the sub-components with a long lead time for procurement/construction (highlighting that NamPower is finalizing the procurement of the (i) supply and delivery of the conductors, (ii) supply and delivery of Optical Fibre Ground Wire and (ii) supply and delivery of galvanized shield wire). The Project Implementing Unit is also preparing the bidding package for (i) supply and delivery of Reactors and (ii) Works package for the Transmission Line.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women with permanent positions in NamPower
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="24"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="30">
<comment><narrative>
The project has become effective on 25 April 2025.  

The client is finalizing the terms of reference for the Women's Leadership Training as part of their Leadership and Succession Planning Activities.
</narrative></comment>
</target>
<actual value="24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Support to preparation of RE projects
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0 consulting services or studies"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-12-01" />
<target value="3 consulting services or studies">
<comment><narrative>
The project has become effective on 25 April 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transmission capacity of the Namibian network between Auas and Kokerboom
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="500">
<comment><narrative>
The indicator presents the additional transmission capacity the Namibian network between Auas and Kokerboom can sustain (under the most onerous contingency conditions) following the completion of the backbone transmission line (expected in 2028).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NamPower gender safety, workplace equipment and work facilities audit in NamPower office
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="Yes">
<comment><narrative>
The project has become effective on 25 April 2025.  

The client is finalizing the terms of reference for the Respectful workplace policies and procedures.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Yearly consultation meeting with identified affected farm owners
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="Yes">
<comment><narrative>
Regular meetings with farmers on an individual basis are ongoing. Consultations including vulnerable groups, such as the Nama community are also ongoing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of VRE enabled in the NamPower transmission system (GWh/year)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="1000">
<comment><narrative>
The indicator presents the total volume of variable renewable energy enabled in the NamPower transmission system, as facilitated by the new A-K transmission line expected to be completed in 2028.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of VRE enabled in the NamPower transmission system (GWh/year)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="1000">
<comment><narrative>
The indicator presents the total volume of variable renewable energy enabled in the NamPower transmission system, as facilitated by the new A-K transmission line expected to be completed in 2028.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transmission capacity of the Namibian network between Auas and Kokerboom
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="500">
<comment><narrative>
The indicator presents the additional transmission capacity the Namibian network between Auas and Kokerboom can sustain (under the most onerous contingency conditions) following the completion of the backbone transmission line (expected in 2028).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transmission capacity of the Namibian network between Auas and Kokerboom
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="500">
<comment><narrative>
The indicator presents the additional transmission capacity the Namibian network between Auas and Kokerboom can sustain (under the most onerous contingency conditions) following the completion of the backbone transmission line (expected in 2028).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women in middle and senior management
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="30%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2028-12-01" />
<target value="35%">
<comment><narrative>
The project has become effective on 25 April 2025.  Discussions with clients on socioeconomic aspects and gender, including key priorities in terms of goods and services they would like to procure are ongoing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual public consultation events with citizens and disclosure of key take aways with stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-12-01" />
<target value="3">
<comment><narrative>
The project has become effective on 25 April 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Capacity Building Plan
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="No Annual Capacity Building Plan for NamPower"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="Annual Capacity Building Plan for 2025 - 2029">
<comment><narrative>
The project has become effective on 25 April 2025. 

The Annual Capacity Building Plan is currently under preparation and we expect progress on this item in Q3 FY26
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total volume of cleaner energy displaced to peak load (GWh/year)
</narrative></title>
<baseline year="2023" iso-date="2023-11-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-02" />
<period-end iso-date="2029-12-01" />
<target value="10">
<comment><narrative>
The project become effective on 25 April 2025.  Progress is expected to be seen in Q4 FY 27.  Please note that the Feasibility Study and the ESIA have been completed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of VRE enabled in the NamPower transmission system (GWh/year)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="1000">
<comment><narrative>
The indicator presents the total volume of variable renewable energy enabled in the NamPower transmission system, as facilitated by the new A-K transmission line expected to be completed in 2028.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased BESS capacity
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="45">
<comment><narrative>
The project has become effective on 25 April 2025.
 
The Project Implementing Unit will finalize the procuress to the Owners Engineer in Q3 FY 26 who will support NamPower with the procurement of the BESS. They are also finalizing the Bidding Documents for the design and Supply of Transformers, and are preparing to launch the bidding process for the EPC contractor.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women in middle and senior management
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="30%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2028-12-01" />
<target value="35%">
<comment><narrative>
The project has become effective on 25 April 2025.  

Discussions with the client on socioeconomic aspects and gender, including key priorities in terms of goods and services they would like to procure are ongoing.
</narrative></comment>
</target>
<actual value="30%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of VRE enabled in the NamPower transmission system (GWh/year)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="1000">
<comment><narrative>
The indicator presents the total volume of variable renewable energy enabled in the NamPower transmission system, as facilitated by the new A-K transmission line expected to be completed in 2028.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of VRE enabled in the NamPower transmission system (GWh/year)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="1000">
<comment><narrative>
The indicator presents the total volume of variable renewable energy enabled in the NamPower transmission system, as facilitated by the new A-K transmission line expected to be completed in 2028.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transmission capacity of the Namibian network between Auas and Kokerboom
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="500">
<comment><narrative>
The indicator presents the additional transmission capacity the Namibian network between Auas and Kokerboom can sustain (under the most onerous contingency conditions) following the completion of the backbone transmission line (expected in 2028).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transmission capacity of the Namibian network between Auas and Kokerboom
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="500">
<comment><narrative>
The indicator presents the additional transmission capacity the Namibian network between Auas and Kokerboom can sustain (under the most onerous contingency conditions) following the completion of the backbone transmission line (expected in 2028).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual public consultation events with citizens and disclosure of key take aways with stakeholders
</narrative></title>
<baseline year="2024" iso-date="2024-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-01" />
<period-end iso-date="2029-12-01" />
<target value="3">
<comment><narrative>
The project become effective on 25 April 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Support to preparation of RE projects
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0 consulting services or studies"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-12-01" />
<target value="3 consulting services or studies">
<comment><narrative>
The project become effective on 25 April 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total volume of cleaner energy displaced to peak load (GWh/year)
</narrative></title>
<baseline year="2023" iso-date="2023-11-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-02" />
<period-end iso-date="2029-12-01" />
<target value="10">
<comment><narrative>
The project become effective on 25 April 2025.  Progress is expected to be seen in Q4 FY 27.  Please note that the Feasibility Study and the ESIA have been completed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Capacity Building Plan
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="No Annual Capacity Building Plan for NamPower"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="Annual Capacity Building Plan for 2025 - 2029">
<comment><narrative>
The project has become effective on 25 April 2025. 

The Annual Capacity Building Plan is currently under preparation and we expect progress on this item in Q1 FY27
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NamPower gender safety, workplace equipment and work facilities audit in NamPower office
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="Yes">
<comment><narrative>
The project has become effective on 25 April 2025.  

The client is finalizing the terms of reference for the Respectful workplace policies and procedures.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Yearly consultation meeting with identified affected farm owners
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="Yes">
<comment><narrative>
Regular meetings with farmers on an individual basis are ongoing. Consultations including vulnerable groups, such as the Nama community are also ongoing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women with permanent positions in NamPower
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="24"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="30">
<comment><narrative>
The project become effective on 25 April 2025.  

The client has finalized the terms of reference for the Women's Leadership Training as part of their Leadership and Succession Planning Activities. The procurement process is expected to be launched from July 2026.
</narrative></comment>
</target>
<actual value="24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased BESS capacity
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="45">
<comment><narrative>
The project become effective on 25 April 2025.
 
The Project Implementing Unit signed the contract with the Owner's Engineer in February 2026 and the inception mission was held in April 2026. The initial selection for the EPC contractor for the BESS was launched in November 2025 and the bid closed February 2026. Regarding the procurement of the transformer for the BESS, the finalization of the design and bidding documents is ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission line constructed under the project
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2029-12-01" />
<target value="461">
<comment><narrative>
The project has been declared effective on 25 April 2025, progress is expected to be seen in Q3 FY27 once the construction of the TL has commenced. Please note that the Feasibility Study and the ESIA have been completed.

Preparation of the transmission line activities is well advanced, prioritizing the sub-components with a long lead time for procurement/construction (highlighting that NamPower is finalizing the procurement of the (i) supply and delivery of the conductors, (ii) supply and delivery of Optical Fibre Ground Wire and (ii) supply and delivery of galvanized shield wire). The Project Implementing Unit is also preparing the bidding package for (i) supply and delivery of Reactors and (ii) Works package for the Transmission Line.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>