<iati-activities version="2.03" generated-datetime="2026-10-25T20:57:31"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P132270</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>First Phase of the Central Asia Road Links Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Central Asia Road Links (CARs) program is the result of a collaborative effort initiated by respective governments in the Central Asia region which has been developed as a regional, multi-phase program considered as a regional transformational project under IDA 16 and IDA 17. The program has the overall objective to increase transport connectivity between neighboring countries in Central Asia along priority cross-border road links whilst supporting improvements in road operations and maintenance practices. The project development objective (PDO) of the First Phase of the Central Asia Road Links Program (CARs-1) is to increase transport connectivity between the Kyrgyz Republic and Tajikistan along priority cross-border road links in Batken Oblast whilst supporting improvements in road operations and maintenance practices. The road sections to be financed under CARs-1 prioritize connectivity between the Osh and BatkenOblast in the Kyrgyz Republic and Sugd Oblast in Tajikistan as they build lateral spurs from the Osh-Isfana axis to the Tajik border.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the First Phase of the Central Asia Road Links Project for Kyrgyz Republic is to increase transport connectivity between the Kyrgyz Republic and the Republic of Tajikistan along priority cross-border road links in Batken Oblast whilst supporting improvements in road operations and maintenance practices. The project has three components. The first component, rehabilitation of priority road links in Batken Oblast will finance the provision of works and consultants' services for the rehabilitation of about 56 kilometers of road sections in Batken Oblast along and within close vicinity of the road corridor (OBI) Osh-Batken-Isfana. The second component, improvement of road operations and maintenance practices will finance the provision of goods, and consultants' services for the improvement of road operations and maintenance practices. It will support exposure of OBI road department (UAD) management to international practices on maintenance techniques through the hiring of individual internationally recruited consultants. The third component, project management and implementation is expected to finance the provision of goods, consultants' services, and training, operating costs, including a financial management software and financial audit to support project coordination, implementation, and management.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0010467"><narrative>Ministry of Finance of the Kyrgyz Republic</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0010466"><narrative>Ministry of Transport and Roads</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-03-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-04-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-11-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-11-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Muhammad Zulfiqar Ahmed</narrative></person-name><telephone>+1-202-473-1000</telephone><email>zulfiqar@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001528735" />
            <name><narrative>Batken</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.062592 70.819389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21023" percentage="98" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="40" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="40" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="40" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="20" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="20" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="40" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">761084.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">761084.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">978537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">869811.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">869811.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">869811.04</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">652358.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">652358.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">652358.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">652358.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">652358.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">652358.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">761084.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">761084.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">761084.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">761084.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">761084.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">761084.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">761084.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">761084.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">761084.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">978537.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">869811.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">869811.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">869811.04</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">652358.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">652358.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">652358.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-11-15"/>
<value currency="USD" value-date="2019-11-15">10105307.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-11-15"/>
<value currency="USD" value-date="2019-11-15">10105307.12</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">36800000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">8200000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-4922205</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-803551</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">38961</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">27624</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">2940065</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1773207</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-338464</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">65513</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">109096</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">158871</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">49536</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">135180</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1033261</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1098172</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">189621</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">138398</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">141020</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">424388</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1793622</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">155132</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">138326</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1883098</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">5281380</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">354281</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">578672</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">143710</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">190095</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">100000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">695200</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">183780</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1206301</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">1450477</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">364930</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">217943</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">377810</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">97423</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">204327</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">98401</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">744032</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">626574</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">3833990</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">274088</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">262745</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">2518693</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2247491</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">197333</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">153772</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">36618</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-3703</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-5115</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-10092</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-25131</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-51572</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-55156</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-61897</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-82291</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-103353</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-108692</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-105276</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-103309</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-97975</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-98446</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-99044</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-97855</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-93338</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-101534</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-97787</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-97749</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-264054</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-258507</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-270110</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-271890</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-10466"><narrative>Ministry of Transport and Roads</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132270"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P132270?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132270"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market accessibility index of Batken Oblast
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="4.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;No survey has been done at the end of the project.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="77.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Road users satisfied with maintenance of the Pulgon-Batken road section
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;No survey has been done at the end of the project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road user costs by truck along the project road sections and in project area (US$/ veh-km)
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="0.52"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="56.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual budget allocation for routine (summer and winter) maintenance for road sections in sustainable condition along the corridor under OBI UAD
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="242489.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strengthen implementation capacity of the Project
</narrative></title>
<baseline year="2014" iso-date="2014-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This&amp;nbsp;indicator was not part of the agreed Results Framework, therefore for the purposes of the ICR this indicator is not assessed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Compliance by OBI UAD with service level criteria as specified in the Service Level Agreement
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="91.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Plan on transport control has been discussed at the regional level (CAREC) and approved by MOTC
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of freight through Kyzyl-Bel/Guliston and Kairagach/Madaniyat border crossing points
</narrative></title>
<baseline year="2013" iso-date="2013-11-01" value="500000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="166023.40">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P163592</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CASA1000 Community Support Project - Kyrgyz Republic</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To engage communities in the development of social and economic infrastructure in order to enhance services, livelihoods and inclusion in target oblasts near the CASA1000 Transmission Line.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of CASA1000 Community Support Project for Kyrgyz Republic is to engage communities in the development of social and economic infrastructure in order to enhance services, livelihoods and inclusion in target villages near the CASA1000 Transmission Line. This project has three components. 1) The first component, Support for Community-led Investments in Social and Economic Infrastructure, aims to contribute to the infrastructure aspects of the Project development objective (PDO). It has the following subcomponents: (i) Support for electricity improvements within target villages; (ii) Support for social infrastructure and services in target villages; and (iii) Support for livelihoods facilities in selected Aiyl Aimak (AAs). 2) The second component, Support for Community Mobilization, Youth Engagement and Communications, aims to support a range of community mobilization and capacity building activities to ensure that communities, particularly youth and marginalized groups, are actively engaged in selecting poverty-focused project interventions. It has the following subcomponents: (i) Support for community mobilization and youth engagement; and (ii) Communications. 3) The third component, Project management, and monitoring and evaluation aims to finance the incremental costs of Community development and investment agency (ARIS) for project management, including coordination and supervision of the implementation, managing the budget, project audits, a feedback system, and procurement. It has the following subcomponents : (i) Project management and coordination; and (iii) Monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0032944"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0032944"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0032945"><narrative>Community Development and Investment Agency</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2017-09-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-04-10"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Luiza A. Nora</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lnora@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001529778" />
            <name><narrative>Jalal-Abad oblast</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.5 72.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001463580" />
            <name><narrative>Batken</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.83333 71</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001346798" />
            <name><narrative>Osh Oblasty</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40 73</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11240" percentage="67" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EC" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Early Childhood Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="30" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="20" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="40" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="30" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="10" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="40" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="20" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="10" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="11" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="30" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="10" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">145833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">145833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">270833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">270833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">183333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">183333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">4166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">10500000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">10500000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-313838</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-113</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-350</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-11077</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">87119</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">88656</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">300000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">127455</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">141890</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">498724</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">833816</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">90247</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">303717</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">140726</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">451315</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">182177</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">213008</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">249213</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">225835</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">332102</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">287495</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">356330</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">449761</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">465870</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">238493</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">374571</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">500000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">470300</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">342518</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">355980</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">298803</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1426658</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">259066</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">10500</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">291018</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">385390</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">399111</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">20993</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">385764</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">807477</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">1161036</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">1300000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">398951</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1067250</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">381959</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">102454</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1060970</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">204624</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1994754</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">80700</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">681328</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1735254</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1800742</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">819838</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1357071</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1749802</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">120140</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-245949</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-10952</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-873</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-7712</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-15697</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-5933</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-16919</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-17594</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-16043</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-39424</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-18107</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-38621</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-16104</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-38445</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-72369</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-71892</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-73769</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-74405</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-74646</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-32945"><narrative>Community Development and Investment Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163592"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163592?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163592"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO1: Percentage of beneficiaries in target communities who report that project investments met their needs
</narrative></title>
<baseline year="2018" iso-date="2018-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-30" />
<period-end iso-date="2024-12-30" />
<target value="75.00">
<comment><narrative>
Results of endline survey
</narrative></comment>
</target>
<actual value="76%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO2. Percentage of subproject investments which were prioritized in women's groups.
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2024-12-31" />
<target value="50.00">

</target>
<actual value="52">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IO10. Percentage of project beneficiaries reporting that village investments in livelihoods facilities supported the reestablishment of livelihoods
</narrative></title>
<baseline year="2020" iso-date="2020-07-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-24" />
<period-end iso-date="2024-12-31" />
<target value="80% women / 80% men">
<comment><narrative>
results of endline survey
</narrative></comment>
</target>
<actual value="80% men/80% women">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IO9: Number of women able to earn additional income as a result of project investments
</narrative></title>
<baseline year="2020" iso-date="2020-07-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-24" />
<period-end iso-date="2024-12-31" />
<target value="2,000">
<comment><narrative>
326jobs through social investments, 1,713 jobs through livelihoods investments and 673 jobs under LSP
</narrative></comment>
</target>
<actual value="2676">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO6: Percentage of target communities selecting their highest priority subproject
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
all 323 SPs for social infrastructure
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO13. Percentage of agreed data and information uploaded in the MIS according to procedures
</narrative></title>
<baseline year="2020" iso-date="2020-07-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-24" />
<period-end iso-date="2024-12-31" />
<target value="80.00">

</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IO11. Percentage of project beneficiaries reporting that investments in social infrastructure supported post-COVID-19 needs
</narrative></title>
<baseline year="2020" iso-date="2020-07-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-24" />
<period-end iso-date="2024-12-31" />
<target value="80% women / 80% men">
<comment><narrative>
Results of endline survey
</narrative></comment>
</target>
<actual value="81%men/80%women">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO4: Percentage of target communities effectively completing the agreed community mobilization and social accountability process
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2024-12-30" />
<target value="80.00">
<comment><narrative>
Accountability has been conducted in parent project and 150 AAs under AF
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO3: Percentage of young (women and men) beneficiaries who report that their role/voice in local decision making has been enhanced as a result of project support
</narrative></title>
<baseline year="2018" iso-date="2018-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-27" />
<period-end iso-date="2024-12-30" />
<target value="75.00">
<comment><narrative>
Results of endline survey
</narrative></comment>
</target>
<actual value="84% women and 81%men">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO4: Percentage of target communities with improved access to social infrastructure and/or livelihoods facilities as a result of project support
</narrative></title>
<baseline year="2024" iso-date="2024-04-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-03" />
<period-end iso-date="2024-12-30" />
<target value="100.00">
<comment><narrative>
All subprojects are completed
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IO8. Percentage of relevant subprojects that support climate change adaptation or mitigation
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2024-12-31" />
<target value="80">

</target>
<actual value="82%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO2: Percentage of beneficiaries in target communities who report that their engagement in decision making over village investments was effective
</narrative></title>
<baseline year="2018" iso-date="2018-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-27" />
<period-end iso-date="2024-12-30" />
<target value="75.00">
<comment><narrative>
Results of endline survey
</narrative></comment>
</target>
<actual value="75%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO5: Percentage of target AOs expanding the Local Development Strategy with youth development and livelihood activities
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2023-06-30" />
<target value="80.00">
<comment><narrative>
41 LDS with priority initiatives for 77 villages were developed.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO15: Percentage of beneficiaries in target communities who report that the CSP is an effective solution to the local impacts of the CASA1000 transmission line
</narrative></title>
<baseline year="2018" iso-date="2018-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-30" />
<period-end iso-date="2023-06-30" />
<target value="70.00">
<comment><narrative>
results of endline survey
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IO14: Percentage of beneficiaries in target communities who report that youth engagement activities were effective in supporting the community.
</narrative></title>
<baseline year="2020" iso-date="2020-07-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-24" />
<period-end iso-date="2023-06-30" />
<target value="70% men/ 70% women">
<comment><narrative>
Results of endline survey
</narrative></comment>
</target>
<actual value="82% men/81% women">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO12. Percentage of target AAs in which the Livelihoods Support Program is implemented
</narrative></title>
<baseline year="2020" iso-date="2020-07-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-24" />
<period-end iso-date="2024-12-31" />
<target value="100.00">
<comment><narrative>
LSP completed
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO3. Percentage of target communities empowering young women and men to facilitate community mobilization
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2023-06-30" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO1: Percentage of villages with improved electricity supply for household and/or productive purposes as a result of project support
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2023-06-30" />
<target value="80.00">
<comment><narrative>
Results of endline survey
</narrative></comment>
</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IO7: Percentage of target communities demonstrating an understanding of CSP objectives and parameters
</narrative></title>
<baseline year="2018" iso-date="2018-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-31" />
<period-end iso-date="2023-06-30" />
<target value="80.00">
<comment><narrative>
Results of endline survey
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P145634</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Phase of the Central Asia Road Links Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Central Asia Road Links (CARs) program has the overall development objective to increase transport connectivity between neighboring countries in Central Asia along priority cross-border road links and to support improvements in road operations and asset management practices. The program is the result of a collaborative effort initiated by respective governments in the Central Asia region which has been developed as a regional, multi-phase program considered as a regional project under IDA16 and IDA 17 with substantialtransformational impact.  The project development objective (PDO) of the Second Phase of the Central Asia Road Links Program (CARs-2) is to increase transport connectivity between the Republic of Tajikistan and neighboring countries along priority cross-border road links in Sugd Oblast and to support improvements in road operations and asset management practices. The road sections to be financed under CARs-2 prioritize connectivity between Sugd Oblast in Tajikistan with Batken and Osh Oblasts in the Kyrgyz Republic and Ferghana Oblast in Uzbekistan.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) of the Second Phase of the Central Asia Road Links Program (CARs-2) is to increase transport connectivity between the Republic of Tajikistan and neighboring countries along priority cross-border road links in Sugd Oblast and to support improvements in road operations and asset management practices. The road sections to be financed under CARs-2 prioritize connectivity between Sugd Oblast in Tajikistan with Batken and Osh Oblasts in the Kyrgyz Republic and Ferghana Oblast in Uzbekistan. The road sections to be financed under CARs-2 prioritize connectivity between the Sugd Oblast in Tajikistan and the Osh and Batken Oblasts in the Kyrgyz Republic as they build lateral spurs from the Khujand- Osh axis to the Kyrgyz border. The project consists of three components. Component one is expected to finance the provision of works and consultants? services for the rehabilitation of approximately 70 kilometers of road sections in Sugd Oblast. Component two is proposed to finance the provision of goods, and consultants? services for the improvement of road operations and asset management practices. Component three is expected to finance the provision of goods, consultants? services, and training, operating costs, including a financial audit to support project coordination, implementation, and management.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0014376"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0014376"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0014376"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0014377"><narrative>Ministry of Transport</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-08-11"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-02-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jen JungEun Oh</narrative></person-name><telephone>+1-202-473-1000</telephone><email>joh2@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001221092" />
            <name><narrative>Viloyati Sughd</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40 69</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="40" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="20" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="40" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="40" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="40" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="20" xml:lang="en"><narrative>Regional Integration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">692810.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">866013.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">416666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">833333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">692810.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">692810.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">692810.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">692810.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">692810.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">692810.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">692810.46</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2883272.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2883272.65</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">6750000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">38250000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-1644454</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-3005</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">4570142</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">531975</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">477367</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">2000581</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">654316</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">422914</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">694221</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">107217</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">2346859</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1048367</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">548366</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1264396</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">2589314</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">526816</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">2590070</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2313848</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">155775</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">1758321</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1561644</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1592934</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1475367</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">1255236</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">2182028</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">288011</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">400363</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">530287</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">1224444</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1898894</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">203901</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">673164</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">826109</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1000916</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">402565</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-14964</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-16428</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-26787</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-49971</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-76174</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-89855</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-101392</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-118081</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-126378</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-128561</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-136767</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-122488</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-108928</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-124421</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-118012</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-117657</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-111241</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-104273</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-119029</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-104765</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-595712</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-556191</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-526832</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-520973</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-531539</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-525082</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-523883</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-520427</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-534017</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-538622</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-541690</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-14377"><narrative>Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P145634"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P145634?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P145634"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Approval by MoT and presentation at regional level (CAREC) of a Strategic Plan on weight and axle load control
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-12-31" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;74.4 km of roads were rehabilitated, translating into 41.33 percent of roads in good and fair condition in Sugd oblast. This exceeded the original target of 70 km by 6 percent.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="74.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="70.00">

</target>
<actual value="74.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-term Transport Sector Development Strategy is developed and endorsed
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;National Transport Sector Development Strategy until 2030 has been completed and approved by the Ministry of Transport in November 2020.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RAMS system is in operation for analysis and planning of road works
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Equipment for traffic count and road roughness measurement is used for populating data in RAMS
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthen implementation capacity of the Project
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="Yes">
<comment><narrative>
Within two (2) months of the Effective Date of the Project, the Recipient shall ensure that PIG will have staffed the PIG with the relevant civil servants and signed contracts with the specialized consultants.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road user costs by truck along the project road sections and in project area (US$/veh-km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.57"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="0.47">

</target>
<actual value="0.47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthen implementation capacity of the Project
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-12-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of freight through Guliston/Kyzyl-Bel and Madaniyat/Kairagach, Patar border crossing points
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="359,838.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2020-08-31" />
<target value="550,000.00">
<comment><narrative>
At the time of submitting the ISR, only the first half year of 2020 data have been aggregated. The second half traffic data will be aggregated after end of the year and added together for the full year number. Due to COVID-19 and related travel and trade restrctions, there has been a significant reduction in the traffic volume, which is considered temporary and expected to rebound once the pandemic is under control.
</narrative></comment>
</target>
<actual value="620,961.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="2,400,600.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="2,650,000.00">

</target>
<actual value="2,658,400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Approval by MoT and presentation at regional level (CAREC) of a Strategic Plan on weight and axle load control
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;In September 2019 first Deputy Minister of Transport of Tajikistan/PIG Director presented a Strategic Plan on weight and axle load control at the CAREC meeting in Tashkent, Uzbekistan.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market accessibility index of Sugd Oblast
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="4.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-12-31" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;The market accessibility index of Sugd Oblast improved to 5.5, which exceeded the original target of 5.0.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-term Transport Sector Development Strategy is developed and endorsed
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market accessibility index of Sugd Oblast
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="4.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="5.00">
<comment><narrative>
Passengers component &amp;ndash;This indicator measures the average market accessibility of Sugd Oblast, described as the sum of population of the selected major cities weighted by travel time to reach major markets. Major cities include Isfara, Kanibadam, and Khujand. Freight component &amp;ndash; a freight component such as average travel times for a typical freight truck between Kanibadam to/from the Guliston/Kyzyl-Bel, from Dehmoy to/from Madniyat/Kairagach and from Kanibadam to/from Patar border control points.

The number will be updated during preparation of ICR, with support from the Bank team to repeat the analysis during preparation.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of road users (beneficiaries) with the improvements along completed road sections
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="90.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Equipment for traffic count and road roughness measurement is used for populating data in RAMS
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Hardware, machinery, and equipment required for the operation of RAMS were procured and installed, including servers, roughness profiler, and 40 traffic counts on the main roads in different regions of the country.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of road users (beneficiaries) with the improvements along completed road sections
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-12-31" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;Most respondents (94%) of the project&amp;rsquo;s final beneficiary survey were satisfied with the civil works and the quality of roads.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of freight through Guliston/Kyzyl-Bel and Madaniyat/Kairagach, Patar border crossing points
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="359838.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2020-12-31" />
<target value="550000.00">
<comment><narrative>
&lt;p&amp;gt;The targets for the volume of freight through Guliston/Kyzyl-Bel and Madaniyat/Kairagach, Patar border crossing points have beenachieved ahead of the schedule, and even exceeded the initial target of 550,000 tons. However, due to COVID-19 and related trade and travel restrictions, the volume has dropped dramatically from 620,961 tons achieved in 2019 to 113,724 tons in Dec 2020.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="620961.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-term Transport Sector Development Strategy is developed and endorsed
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="2400600.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-12-31" />
<target value="2650000.00">
<comment><narrative>
&lt;p&amp;gt;The Project has directly benefited 2,658,400 inhabitants, including 1,329,400 women, which exceeds the original target by 0.4 percent.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2658400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Approval by MoT and presentation at regional level (CAREC) of a Strategic Plan on weight and axle load control
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="70.00">

</target>
<actual value="74.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RAMS system is in operation for analysis and planning of road works
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="Yes">
<comment><narrative>
With the hardware supplied and installed under the project, MOT has started carrying out some RAMS activities. While additional support is needed to scale the data collection to the larger network and bring about institutional and organizational changes to ensure continued use of RAMS, some functionalities are in place for analysis and planning.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="40.00">

</target>
<actual value="41.33">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of freight through Guliston/Kyzyl-Bel and Madaniyat/Kairagach, Patar border crossing points
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="359838.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2020-08-31" />
<target value="550000.00">

</target>
<actual value="620961.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road user costs by truck along the project road sections and in project area (US$/veh-km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.57"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-12-31" />
<target value="0.47">
<comment><narrative>
&lt;p&amp;gt;Road user costs by truck along the project road sections and in the project area decreased from 0.57US$/veh-km to 0.47US$/veh-km.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RAMS system is in operation for analysis and planning of road works
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Road Asset Management Database System developed was put in operation. Hardware, machinery, and equipment required for the operation of RAMS were procured and installed, including servers, roughness profiler, and 40 traffic counts on the main roads in differentregions of the country. With the hardware supplied and installed under the project, MOT has started carrying out some RAMS activities. While additional support is needed to scale the data collection to the larger network and bring about institutional and organizational changes to ensure continued use of RAMS, some functionalities are in place for analysis and planning.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road user costs by truck along the project road sections and in project area (US$/veh-km)
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.57"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="0.47">

</target>
<actual value="0.47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthen implementation capacity of the Project
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Equipment for traffic count and road roughness measurement is used for populating data in RAMS
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-06-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of road users (beneficiaries) with the improvements along completed road sections
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="90.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market accessibility index of Sugd Oblast
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="4.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2020-08-31" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2014" iso-date="2014-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-30" />
<period-end iso-date="2020-12-31" />
<target value="40.00">
<comment><narrative>
&lt;p&amp;gt;74.4 km of roads were rehabilitated, translating into 41.33 percent of goods in good and fair condition in Sugd oblast. This exceeded the original target by 3 percent.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="41.33">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P171524</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>RESILAND CA+ Program: Tajikistan Resilient Landscape Restoration Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to increase the area under sustainable landscape management in selected locations in Tajikistan, and promote Tajikistan's collaboration with Central Asia countries on transboundary landscape restoration.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed Tajikistan Resilient Landscapes Restoration Project is a part of the Regional RESILAND CA+ Program, whose objective is to increase the resilience of regional landscapes in Central Asia, with particular focus on cross-border landscapes and collaborative efforts. The Project will apply landscape management approaches that seek to provide frameworks for allocating and managing land to achieve environmental, economic and social objectives in areas of multiple and often competing land uses. The project will build on lessons from ELMARL, CAMP4ASB and other Bank and donor-funded projects on forestry, pasture, agriculture, irrigation, disaster risk mitigation, and rural economy in the country. The Project will be implemented over a five-year period by the Committee for Environmental protection under the Government of the Republic of Tajikistan (CEP). The project will work with village and community-based/resource user groups and organizations taking responsibility for the choice, design and management of smaller-scale landscape and livelihood investments. At the same time, the project will work across sectors, e.g., with the State Forest Agency, Ministry of Energy and Water Resources, Ministry of Agriculture, Ministry of Finance, as well as local administration and organizations (district, sub-district) to incorporate a landscape approach for investment planning. Project areas/districts have been selected based on a combination of criteria: poverty incidence, potential for integrated landscape restoration (incorporating pasture, agriculture, water, forestry, biodiversity), regional and transboundary corridors, and complementarity with government and donor-funded initiatives.The project is expected to contribute to resilience through project interventions that focus on: building technical capacities of land users and extension support, supporting institutions and access to information, undertaking of resource and climate risk assessments before selecting investments, implementing a range of sustainable land management and climate adaptation investments that also sequester carbon. Primary project beneficiaries are expected to be rural communities, private farmers and farmer groups, villages and village communities and resource user groups (e.g., for pasture) interested in adopting landscape restoration practices. These communities will benefit from technical and financial support to implement technologies and approaches that improve their livelihoods, increase their resilience, while also contributing to the restoration of ecosystem functions. government agencies are expected to benefit from technical support for integrated landscape planning in ways that attempt to reconcile different land uses at national and regional scales. Government institutions will also benefit from financing for restoration activities in forest, pasture and protected areas.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0042252"><narrative>Republic of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0042252"><narrative>Republic of Tajikistan</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0042251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-07-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-02-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Asferachew Abate Abebe</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aabate@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008216066" />
            <name><narrative>Nohiyai Panjakent</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.37452 67.79159</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008216045" />
            <name><narrative>Nohiyai Ayni</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.29536 68.78884</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007669228" />
            <name><narrative>Kuhistoni Mastchohskiy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.4 69.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008217321" />
            <name><narrative>Nohiyai Vanj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38.41838 71.7627</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008220897" />
            <name><narrative>Nohiyai Murghob</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38.38097 73.71607</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008220920" />
            <name><narrative>Nohiyai Rushon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38.14663 72.05467</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008220923" />
            <name><narrative>Nohiyai Shughnon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.70004 72.16748</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008221255" />
            <name><narrative>Nohiyai Qubodiyon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.49623 68.26299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008221272" />
            <name><narrative>Nohiyai Nosiri Khusrav</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.20954 67.91996</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001220576" />
            <name><narrative>Shahritus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.26206 68.13849</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31210" percentage="78" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="73" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="11" xml:lang="en"/><sector vocabulary="1" code="31163" percentage="9" xml:lang="en"/><sector vocabulary="1" code="31163" percentage="9" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="7" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="7" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="52.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="33" xml:lang="en"><narrative>Geospatial Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000831" percentage="56" xml:lang="en"><narrative>Forests Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="91" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="51" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="11" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="51" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="10" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="64" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="11" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="25" xml:lang="en"><narrative>Landscape Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">714285.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">11804723.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">11804723.56</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">45000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">45951</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">3000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">70979</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">700823</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1138882</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">1273634</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2427995</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1320030</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">180755</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">2978916</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">2111622</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">3015871</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1333866</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">56000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">2186851</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">2399168</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">2908259</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">957967</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">2767050</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2320657</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-42251"><narrative>The Committee for Environmental Protection under the Government of the Republic of Tajikistan</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171524"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P171524?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171524"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="685000.00">
<comment><narrative>
The FMPs are supported by NFI work, up until CY2027. The actual coverage in hectares is being calculated for final assessment of the end target.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of sub-grants disbursed to women-led or predominantly women groups
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="15.00">
<comment><narrative>
This indicator measures the proportion of grants disbursed in the project that are received and managed by women-led groups and predominantly women composed groups (more than 50% women members).  In the case of PUUs/FUGs/WUAs, women-led would require that the Chair of the group be a woman.  In the case of CIGs, the leader is to be a woman. This indicator measures the access that women have to financing from the project which is provided in the form of sub-grants.  The reporting will also capture the value of these sub-grats as a percentage of the total disbursed.
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="336,000.00">
<comment><narrative>
This indicator measures the number of people in the project areas that benefit from the range of SLM practices that the project is able to implement. Benefits include monetary (employment, income) and non-monetary (changes in aspects of well-being, and improved condition of agricultural and natural resources, etc). Assumption: There are 140,000 households in project districts. CEP estimates that 21,000 households would benefit from subcomponent 2.4 (each household is assumed to receive $350), and 35000, under subcomponent 2.1 and 2.2. So, in total, 56,000 would benefit from one of the project activities on forestry, pasture, protected area, and agriculture crop-based livelihood. Average size of household in Tajikistan is 6. With this, 336,000 people would benefit from the project.

Please, note for sub-indicator Target Date will be moved to 2027 in line with the parent indicator during the next restructuring process, when it takes place.
</narrative></comment>
</target>
<actual value="465,441">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="180000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the prject; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="101,106">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area brought under pasture management plans
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="83,000.00">
<comment><narrative>
The IRI is achieved. PMPs developed and in place for all 63 PUUs covering a total area of 87,000 ha.

This indicator measures  the area in hectares that has been brought under management plans for pasture supported by the project. The indicator will aggregate area for PMPs implemented by PUUs.
Note: Not all area under management plans is included under PDO indicator; only the area where intensive management activities have been carried out is considered.
</narrative></comment>
</target>
<actual value="87000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishing Land Degradation Neutrality Target for the country
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Please note the achievement of this indicator has not been directly supported by the project and already reported at country level to UNCCD: High Level Note on LDN (Tajikistan)

This includes determination of LDN targets for the country and getting it approved by the government for submission to UNCCD. The target &quot;Yes&quot; for this indicator means that the process for setting up LDN in a country, following the set methodology by UNCCD, is completed; a report containing LDN target and associated assessment is published in hard copy, distributed to key stakeholders, and publicly disclosed in the relevant website such as that of CEP; and the government has approved submitting the LDN target to UNCCD.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="336,000.00">
<comment><narrative>
This indicator measures the number of people in the project areas that benefit from the range of SLM practices that the project is able to implement. Benefits include monetary (employment, income) and non-monetary (changes in aspects of well-being, and improved condition of agricultural and natural resources, etc). Assumption: There are 140,000 households in project districts. CEP estimates that 21,000 households would benefit from subcomponent 2.4 (each household is assumed to receive $350), and 35000, under subcomponent 2.1 and 2.2. So, in total, 56,000 would benefit from one of the project activities on forestry, pasture, protected area, and agriculture crop-based livelihood. Average size of household in Tajikistan is 6. With this, 336,000 people would benefit from the project.

Please, note for sub-indicator Target Date will be moved to 2027 in line with the parent indicator during the next restructuring process, when it takes place.
</narrative></comment>
</target>
<actual value="465,874">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="336,000.00">
<comment><narrative>
This indicator measures the number of people in the project areas that benefit from the range of SLM practices that the project is able to implement. Benefits include monetary (employment, income) and non-monetary (changes in aspects of well-being, and improved condition of agricultural and natural resources, etc). Assumption: There are 140,000 households in project districts. CEP estimates that 21,000 households would benefit from subcomponent 2.4 (each household is assumed to receive $350), and 35000, under subcomponent 2.1 and 2.2. So, in total, 56,000 would benefit from one of the project activities on forestry, pasture, protected area, and agriculture crop-based livelihood. Average size of household in Tajikistan is 6. With this, 336,000 people would benefit from the project.

Please, note for sub-indicator Target Date will be moved to 2027 in line with the parent indicator during the next restructuring process, when it takes place.
</narrative></comment>
</target>
<actual value="465,441">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized (Number)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="5.00">
<comment><narrative>
CAREC launched activities in CY2024. At MTR, policies have been identified; drafts formulated and shared with CA countries for comments. The process for approving the MOU advanced compared to the status six months ago. For example, Uzbekistan approved all the MOU. We expect others to follow suit and finalize the approval by the end of December 2026.

The polices include: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized (Number)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="5.00">
<comment><narrative>
CAREC launched activities in CY2024. At MTR, policies have been identified; drafts formulated and shared with CA countries for comments. 

The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="180000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the prject; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="117,244">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="180000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the prject; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="101,106">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of feedback/ grievances resolved within the stipulated service standards for response times
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="90.00">
<comment><narrative>
This indicator measures the proportion of feedback/grievances that are addressed within the standards as given in the project GRM guidelines.
No complaints, inquiries are fully addressed.
As of MTR, the project registered 793 entries; 182 suggestions; 258 requests; 5 appeals. All inquiries are fully addressed.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized (Number)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="5.00">
<comment><narrative>
CAREC launched activities in CY2024. At MTR, policies have been identified; drafts formulated and shared with CA countries for comments. 

The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of sub-grants disbursed to women-led or predominantly women groups
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="15.00">
<comment><narrative>
This indicator measures the proportion of grants disbursed in the project that are received and managed by women-led groups and predominantly women composed groups (more than 50% women members).  In the case of PUUs/FUGs/WUAs, women-led would require that the Chair of the group be a woman.  In the case of CIGs, the leader is to be a woman. This indicator measures the access that women have to financing from the project which is provided in the form of sub-grants.  The reporting will also capture the value of these sub-grats as a percentage of the total disbursed.
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="240000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year. This will be assessed before the closure of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="240000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year. This will be assessed before the closure of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PUUs/FUGs/CIGs that have women members in decision making roles on  their councils /boards/committees.
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="50.00">
<comment><narrative>
This indicator measures the minimum percentage of PUUs, FUGs, and CIGs that have women in decision-making roles on the boards or councils of these groups/unions. At least one women needs to be on either the board or council to be included. The reporting will also capture the total number of women in decision-making roles, and the number of members of all groups receiving financing from the prject who are women (Target: At least 50 percent of project supported PUUs/FUGs/CIGs have at least one woman on their board/council)
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Protected area management plans prepared or updated
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="4.00">
<comment><narrative>
All PAMPs until 2029 approved in Q4 CY2024 and under implementation. SPNAs: Tajik National Park (TNP) and Zorkul Special Reserve in GBAO, Yagnob National Natural Park in Sughd, and State Natural Reserve Tigrovaya Balka in Khatlon), covering the total protected area of 2,792,000 ha.

Original assumptions: This indicator measures  the number of protected area management plans prepared or updated. The area that has been brought under management plans of protected areas by operations supported by the project is targeted to be 2000000 ha.

Note: Not all area under management plans is included under PDO indicator; only the area where intensive management activities have been carried out is considered.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area brought under pasture management plans
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="83,000.00">
<comment><narrative>
The IRI was revised. Previous report showed higher total area. The revised figure is based on the Pasture Management Plans (PMPs) developed and in place for all 63 Pasture User Unions ( PUUs) covering a total area of 48,218 ha.

This indicator measures  the area in hectares that has been brought under management plans for pasture supported by the project. The indicator will aggregate area for PMPs implemented by PUUs.
Note: Not all area under management plans is included under PDO indicator; only the area where intensive management activities have been carried out is considered.
</narrative></comment>
</target>
<actual value="48,218">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons trained in central and local government units on integrated landscape management and related subjects (segregate by central, local, women)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2025-09-30" />
<target value="550.00">
<comment><narrative>
Capacity building activities are ongoing.

Number of people who participate in training, short courses, workshops, and seminars (both in-person and virtual) on a range of topics related to building capacities on landscape restoration.
</narrative></comment>
</target>
<actual value="287.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest area brought under management plans
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="685000.00">
<comment><narrative>
The monitoring and evaluation team calculated and confirmed the areas brought under management plans.
</narrative></comment>
</target>
<actual value="108,132">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of strategies and action plans formulated (Landscape Restoration Strategy and Action Plan and Protected Area Strategy and Action Plan)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="2.00">
<comment><narrative>
Due to the government's ongoing consolidation of various national strategic documents, plans, and programs, the strategies and action plans initially outlined in the project design are now integrated into broader frameworks. Specifically, they are part of (i) the National Greening Program 2040, which includes landscape restoration activities, and (ii) the Environmental Code, which also encompasses provisions for protected areas.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of feedback/ grievances resolved within the stipulated service standards for response times
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="90.00">
<comment><narrative>
This indicator measures the proportion of feedback/grievances that are addressed within the standards as given in the project GRM guidelines.
No complaints, inquiries are fully addressed.
As of MTR, the project registered 793 entries; 182 suggestions; 258 requests; 5 appeals. All inquiries are fully addressed.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Forestry Inventory completed and publicly disclosed
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the status of the preparation of the NFI for the country, and whether the report has been published and shared. The target &quot;Yes&quot; for this indicator means that report (s) containing current status of forest resources in the county is published in hard copy, distributed to key stakeholders, and publicly disclosed in the relevant websites such as those of FA and CEP.
Consultant selected, NFI work commenced in Q3 and progress is on track and work will be completed before the project closing date.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishing Land Degradation Neutrality Target for the country
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Please note the achievement of this indicator has not been directly supported by the project and already reported at country level to UNCCD: High Level Note on LDN (Tajikistan)

This includes determination of LDN targets for the country and getting it approved by the government for submission to UNCCD. The target &quot;Yes&quot; for this indicator means that the process for setting up LDN in a country, following the set methodology by UNCCD, is completed; a report containing LDN target and associated assessment is published in hard copy, distributed to key stakeholders, and publicly disclosed in the relevant website such as that of CEP; and the government has approved submitting the LDN target to UNCCD.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average percentage of direct beneficiaries who are satisfied with activities (annually, disaggregated)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="90.00">
<comment><narrative>
This indicator shows the proportion of direct beneficiaries who express satisfaction with project activities.
To be assessed against Baseline Survey by Project Closure. As of MTR, based on preliminary data collection from various beneficiaries, the satisfactory rate is above 95%.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="336,000.00">
<comment><narrative>
This indicator measures the number of people in the project areas that benefit from the range of SLM practices that the project is able to implement. Benefits include monetary (employment, income) and non-monetary (changes in aspects of well-being, and improved condition of agricultural and natural resources, etc). Assumption: There are 140,000 households in project districts. CEP estimates that 21,000 households would benefit from subcomponent 2.4 (each household is assumed to receive $350), and 35000, under subcomponent 2.1 and 2.2. So, in total, 56,000 would benefit from one of the project activities on forestry, pasture, protected area, and agriculture crop-based livelihood. Average size of household in Tajikistan is 6. With this, 336,000 people would benefit from the project.

Please, note for sub-indicator Target Date will be moved to 2027 in line with the parent indicator during the next restructuring process, when it takes place.
</narrative></comment>
</target>
<actual value="465,874">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="336,000.00">
<comment><narrative>
This indicator measures the number of people in the project areas that benefit from the range of SLM practices that the project is able to implement. Benefits include monetary (employment, income) and non-monetary (changes in aspects of well-being, and improved condition of agricultural and natural resources, etc). Assumption: There are 140,000 households in project districts. CEP estimates that 21,000 households would benefit from subcomponent 2.4 (each household is assumed to receive $350), and 35000, under subcomponent 2.1 and 2.2. So, in total, 56,000 would benefit from one of the project activities on forestry, pasture, protected area, and agriculture crop-based livelihood. Average size of household in Tajikistan is 6. With this, 336,000 people would benefit from the project.

Please, note for sub-indicator Target Date will be moved to 2027 in line with the parent indicator during the next restructuring process, when it takes place.
</narrative></comment>
</target>
<actual value="465,441">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized (Number)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="5.00">
<comment><narrative>
CAREC launched activities in CY2024. At MTR, policies have been identified; drafts formulated and shared with CA countries for comments. The process for approving the MOU advanced compared to the status six months ago. For example, Uzbekistan approved all the MOU. We expect others to follow suit and finalize the approval by the end of December 2026.

The polices include: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons trained in central and local government units on integrated landscape management and related subjects (segregate by central, local, women)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2025-09-30" />
<target value="550.00">
<comment><narrative>
Capacity building activities are ongoing.

Number of people who participate in training, short courses, workshops, and seminars (both in-person and virtual) on a range of topics related to building capacities on landscape restoration.
</narrative></comment>
</target>
<actual value="277.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized (Number)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="5.00">
<comment><narrative>
CAREC launched activities in CY2024. At MTR, policies have been identified; drafts formulated and shared with CA countries for comments. 

The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="180000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the prject; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="117,244">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="180000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the prject; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="101,106">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PUUs/FUGs/CIGs that have women members in decision making roles on  their councils /boards/committees.
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="50.00">
<comment><narrative>
This indicator measures the minimum percentage of PUUs, FUGs, and CIGs that have women in decision-making roles on the boards or councils of these groups/unions. At least one women needs to be on either the board or council to be included. The reporting will also capture the total number of women in decision-making roles, and the number of members of all groups receiving financing from the prject who are women (Target: At least 50 percent of project supported PUUs/FUGs/CIGs have at least one woman on their board/council)
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of strategies and action plans formulated (Landscape Restoration Strategy and Action Plan and Protected Area Strategy and Action Plan)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="2.00">
<comment><narrative>
Due to the government's ongoing consolidation of various national strategic documents, plans, and programs, the strategies and action plans initially outlined in the project design are now integrated into broader frameworks. Specifically, they are part of (i) the National Greening Program 2040, which includes landscape restoration activities, and (ii) the Environmental Code, which also encompasses provisions for protected areas.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Forestry Inventory completed and publicly disclosed
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the status of the preparation of the NFI for the country, and whether the report has been published and shared. The target &quot;Yes&quot; for this indicator means that report (s) containing current status of forest resources in the county is published in hard copy, distributed to key stakeholders, and publicly disclosed in the relevant websites such as those of FA and CEP.
Consultant selected, NFI work commenced in Q3 and will be completed before the project closing date.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Protected area management plans prepared or updated
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="4.00">
<comment><narrative>
All PAMPs until 2029 approved in Q4 CY2024 and under implementation. SPNAs: Tajik National Park (TNP) and Zorkul Special Reserve in GBAO, Yagnob National Natural Park in Sughd, and State Natural Reserve Tigrovaya Balka in Khatlon), covering the total protected area of 2,792,000 ha.

Original assumptions: This indicator measures  the number of protected area management plans prepared or updated. The area that has been brought under management plans of protected areas by operations supported by the project is targeted to be 2000000 ha.

Note: Not all area under management plans is included under PDO indicator; only the area where intensive management activities have been carried out is considered.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average percentage of direct beneficiaries who are satisfied with activities (annually, disaggregated)
</narrative></title>
<baseline year="2022" iso-date="2022-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-30" />
<period-end iso-date="2027-09-30" />
<target value="90.00">
<comment><narrative>
This indicator shows the proportion of direct beneficiaries who express satisfaction with project activities.
To be assessed against Baseline Survey by Project Closure. As of MTR, based on preliminary data collection from various beneficiaries, the satisfactory rate is above 95%.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P120788</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Central Asia Hydrometeorology Modernization Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Central Asia Hydrometeorology Modernization Project (CAHMP) is to improve the accuracy and timeliness of hydromet services in Central Asia, with particular focus on Kyrgyz Republic and Republic of Tajikistan.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Central Asia Hydrometeorology Modernization Project (CAHMP) is to improve the accuracy and timeliness of hydromet services in Central Asia, with particular focus on Kyrgyz Republic and Republic of Tajikistan. There are three components to the project. The first component of the project is strengthening regional coordination and information sharing: This component will ensure that each of the National Hydrometeorological Services (NHMSs) in the region can share, use, exchange and archive common hydromet data and information, and that each agency has a comparable level of expertise in the production of information and delivery of hydromet services. The second component of the project is strengthening of hydromet services in Kyrgyz Republic. The component will help strengthen Kyrgyzhydromet to ensure that it has the infrastructure and capability to sustainably observe, forecast and deliver weather, water and climate services that meet the country's identified economic and societal needs. The third component of the project is strengthening of hydromet services in Republic of Tajikistan. The component will help strengthen Tajikhydromet to ensure that it has the infrastructure and capability to sustainably observe, forecast and deliver weather, water and climate services that meet the country's identified economic and societal needs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0004120"><narrative>Ministry of Finance of the Kyrgyz Republic</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0004120"><narrative>Ministry of Finance of the Kyrgyz Republic</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0004121"><narrative>Ministry of Finance of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0004121"><narrative>Ministry of Finance of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0004122"><narrative>Executive Committee of the International Fund for Saving the Aral Sea (EC-IFAS)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0004122"><narrative>Executive Committee of the International Fund for Saving the Aral Sea (EC-IFAS)</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0004119"><narrative>Tajikhydromet</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-02-03"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-05-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Daniel Werner Kull</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dkull@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>













<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001527747" />
            <name><narrative>Kyrgyz Republic</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.5 75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001522867" />
            <name><narrative>Republic of Kazakhstan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>48 68</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001512440" />
            <name><narrative>Republic of Uzbekistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.666672 63.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001220409" />
            <name><narrative>Republic of Tajikistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39 71</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="41081" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="100" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="25" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="25" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="100" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="25" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="25" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="75" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">83881.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">95065.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">100000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">600000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">24067.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">81476.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">357395.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">40300.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">69598.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">110335.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">175438.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">495672.59</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">113232.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">112101.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">560285.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">265038.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">31264.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">286466.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">676591.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">303559.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">242497.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">31262.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1027092.72</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">358695.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">330731.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">76797.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">348680.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">332500.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">2427657.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">906754.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">212770.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">52652.54</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">399005.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">510915.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">765812.39</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">229261.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">92900.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">873460.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">113350.07</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">427623.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">39576.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">78707.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">84900.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">477034.38</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1060186.01</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">300000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">85200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">127008.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">421544.92</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">8700000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">900000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">6000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">5100000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">3000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">2500000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">2500000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">3500000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-9197</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-9435</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-3188</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-157</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-207</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-77856</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-338</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">400000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">335000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">65000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">20520</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">3548</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">81476</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">110325</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">47071</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">40300</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">55095</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">14503</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">110335</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">21612</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">153827</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">134918</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">147788</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">12967</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">113233</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">35545</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">76556</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">137280</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">423006</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">25988</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">214990</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">24061</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">31264</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">286466</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">640035</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">36556</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">250103</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">53457</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">133436</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">109062</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">31262</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">19244</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">615946</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">178547</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">213356</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">158695</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">150904</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">179828</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">25029</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">51768</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">148680</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">132501</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">427592</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">2000066</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">706754</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">200000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">37486</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">42434</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">132851</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">52653</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">89900</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">309106</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">152925</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">357990</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">44419</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">203759</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">317634</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">229261</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">92900</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">384157</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">274648</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">14656</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">113350</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">119106</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">308518</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">200000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">39576</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">78708</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">84900</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">48382</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">228652</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1060186</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">300000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">85200</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">127008</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">230225</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">136808</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">54512</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">24375</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">51460</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">45928</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">6802</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">317669</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">93029</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">27129</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">68000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">129156</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">200000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">270000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">20251</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">20209</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">400000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">98508</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">37700</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">37700</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">136259</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">136259</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">65917</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">65917</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">292039</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">292039</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">177728</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">61809</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">158052</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">40247</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">40247</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">14459</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">14459</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">104257</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">19162</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">19162</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">180000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">234724</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">234724</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">219586</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">98312</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">219586</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">214928</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">332983</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">182316</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">356931</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">182316</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">150000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">26162</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">26162</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">259519</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">292179</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">291619</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">152799</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">252935</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">84000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">61652</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">61652</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">120333</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">308673</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">133092</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">74000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">198381</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">74600</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">299270</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">110000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">462972</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">301274</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">301874</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">328981</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">250704</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">139480</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">139480</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">117606</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">117606</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">819469</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1412</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-1555</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-1493</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-2157</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-3036</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-3873</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-5077</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-6524</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-10053</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-11251</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-13795</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-14714</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-16070</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-16675</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-17098</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-464</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-16922</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-809</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-17069</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1030</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-18177</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-2735</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-17610</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3909</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-16967</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-5097</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-16196</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-5927</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-15757</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-7229</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-16122</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-8984</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-15551</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-8950</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-14635</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-8840</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-15996</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-8360</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-15345</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-9437</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-15331</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-8413</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-46872</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-46228</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-43573</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-44134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-43968</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-43651</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-44171</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-36832</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-43243</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-37794</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-45184</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-38120</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-45481</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-38337</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-4123"><narrative>EC-IFAS Regional Center of Hydrology (RCH); Ministry of Emergency Situations of the Kyrgyz Republic; Tajikhydromet</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120788"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P120788?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120788"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased accuracy of river flow forecasts
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="60-70% for KgHM and TjHM; 80-85% for KzHM and UzHM"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="2016-01-21" />
<target value="85% for KgHM and 80% for TjHM">
<comment><narrative>
&lt;p&amp;gt;Target achieved for TjHM and exceeded by 6% for KgHM.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="KgHM: 90%
TjHM: 80%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp B: Kyrgyz Republic, IRI 1) Improved status of hydrometeorological observation networks
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="13% of meteostations gauging main meteo parameters 44% of stream gauges reporting operational data 77% stream gauges measuring discharges"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="2018-07-10" />
<target value="100% of meteostations gauging main meteo parameters 93% of stream gauges reporting operational data 87% stream gauges measuring discharges">
<comment><narrative>
&lt;p&amp;gt;Target substantially achieved.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100% of meteostations gauging main meteo parameters.

68% of stream gauges reporting operational data.

87% stream gauges measuringdischarges.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Component C Tajikistan, IRI 4): Historical data archiving
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded by 75%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1,395,547 pages">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp C: Tajikistan, IRI 1) Improved status of hydrometeorological observation networks
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="19% of meteostations gauging main meteo parameters 

16% of stream gauges reporting operational data 

49% stream gauges measuring discharges"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="2018-07-10" />
<target value="90% of meteostations gauging main meteo parameters 50% of stream gauges reporting operational data 71% stream gauges measuring discharges">
<comment><narrative>
&lt;p&amp;gt;Target substantially achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="90% of meteostations gauging main meteo parameters 

43% of stream gauges reporting operational data 

58% stream gauges measuring discharges">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp A: EC-IFAS, IRI 1): Improved access to national and regional numeric weather prediction products to all CA countries
</narrative></title>
<baseline year="2016" iso-date="2016-01-21" value="100x250 km transmitted every 12 hours"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-21" />
<period-end iso-date="2018-07-10" />
<target value="7x7 km every 6 hours for all of Central Asia 2x2 km every 6 hours for the mountainous region of Central Asia">
<comment><narrative>
&lt;p&amp;gt;Target substantially achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="COSMO-CA numerical weather prediction (NWP) model is producing 6.6x6.6 km forecasts km every 12 hours for all of Central Asia, and 2.2x2.2 km forecasts every 12 hours for the mountainous region of Central Asia. However it continues to face regular service disruptions. As part of its effort to resolve these disruptions, Uzhydromet has started implementing a government grant to correct these deficiencies, and the Project provided regional forecaster trainings in June and August 2022 to support Central Asian forecasters and ICT specialists on using COSMO-CA. Technical assistance is being provided by experts from Roshydromet.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp B: Kyrgyz Republic, IRI 2) Better transmission of data to global telecommunication system (GTS)
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="86.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp C: Tajikistan, IRI 3) Increased sustainability and strengthened performance of Tajikhydromet operations
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="Existing legal structure, operating procedures and staffing are inadequate to meet TjHM mission needs.

Investment and O&amp;M needs far exceed TjHM budgets."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="2018-03-21" />
<target value="New regulations developed. New standard operating procedures developed. New business plan developed. Budget significantly increased.">
<comment><narrative>
&lt;p&amp;gt;Target achieved.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="As part of the advisory services for the institutional strengthening and improvement of the Tajikhydromet system, new regulations were developed and approved, budget was increased, user survey was developed, a long term business plan was developed.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased user satisfaction with hydrometeorological services
</narrative></title>
<baseline year="2016" iso-date="2016-01-21" value="KgHM: 2.80 TjHM: 2.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-21" />
<period-end iso-date="2016-01-21" />
<target value="KgHM: 4.3 TjHM: 4.3">
<comment><narrative>
&lt;p&amp;gt;Target substantially achieved for KgH&amp;nbsp;and TjHM.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="KgHM: 3.7

TjHM: 3.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp B: Kyrgyz Republic, IRI 4) Increased institutional strength and sustainability of Kyrgyzhydromet
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="Existing legal structure, operating procedures and staffing are inadequate to meet KgHM mission#s needs.

Investment and O&amp;M needs far exceed KgHM budgets."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="2018-07-10" />
<target value="New regulations developed. New standard operating procedures developed. New business plan developed. Budget significantly increased.">
<comment><narrative>
&lt;p&amp;gt;Target achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="New technical instructions and standard technical operating procedures have been developed and implemented. The budget has increased and feasibility study and development plan until 2030 is in place.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Component B: Kyrgyz Republic, IRI 3) Historical data archiving
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded by 53%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1,224,200 pages have been scanned">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp A: EC-IFAS, IRI 3): Improved access to landslide, mudflow and snowmelt guidance for all CA countries
</narrative></title>
<baseline year="2018" iso-date="2018-03-02" value="CARFFGS provides only flash flood guidance products across the region"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target achieved.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="The Central Asia Flood Early Warning System (CAFEWS) is stablished and provides provides flash flood, landslide, riverine routing and snowmelt guidance products across the region.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased accuracy and timeliness of basic weather forecasts
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="60-65% for KgHM and TjHM; 75-80% for KzHM and UzHM"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="2016-01-21" />
<target value="85% for KgHM and 85% TjHM">
<comment><narrative>
&lt;p&amp;gt;Target exceeded by 9% for KgHM and substantially achieved by TjHM.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="KgHM: 93% 
TjHM: 84%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp A: EC-IFAS, IRI 2): Established platform for integration of five NHMSs in CA
</narrative></title>
<baseline year="2016" iso-date="2016-01-21" value="Lack of agreed regional approaches on knowledge exchange and emergency procedures"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-21" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target&amp;nbsp;achieved.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="A Distance Learning System (DLS)was established with branches in Kazakhstan, Kyrgyzstan, Tajikistan and Uzbekistan.A cascade methodof severe weather forecasting (SWFDP-CA) in Central Asia was developed and implemented.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(Comp C: Tajikistan, IRI 5) Increased reliability of climate data
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="Information on climate limited and of inadequate quality"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target substantially achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Ability to downscale local scales for at least 85% of the country">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
(Comp C: Tajikistan, IRI 2) Better transmission of data to global telecommunication system (GTS)
</narrative></title>
<baseline year="2011" iso-date="2011-08-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target substantially achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P181459</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>One Health for Pandemic Prevention, Food Systems Resilience, and Ecosystem Health in Central Asia</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen the capacity to prevent, detect, and respond to priority zoonotic diseases, antimicrobial resistance, and food safety issues in Central Asia through a regional One Health approach. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Program will support the coordinated implementation of the Central Asia One Health Framework for Action.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–00009479"><narrative>Regional Environmental Centre for Central Asia</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–00009479"><narrative>Regional Environmental Centre for Central Asia</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0056503"><narrative>Republic of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0056503"><narrative>Republic of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0056505"><narrative>Kyrgyz Republic</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0056505"><narrative>Kyrgyz Republic</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-00007304"><narrative>Kyrgyz Republic - Ministry of Water Resources, Agriculture and Processing Industry</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-05-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-05-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Pierre Gerber</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pgerber@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





















<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="0000000" />
                    <name>
                        <narrative>No Data Available</narrative>
                    </name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                    <pos>0.00 0.00</pos>
                </point>
                <exactness code="2"/>
                <location-class code="4" />
            </location><sector vocabulary="1" code="31163" percentage="50" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHF" percentage="6.00000000" xml:lang="en"><narrative>Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAL" percentage="47.0000000" xml:lang="en"><narrative>Livestock</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="47.0000000" xml:lang="en"><narrative>Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1500001.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1085832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1085844.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">58000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">58000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-7305"><narrative>Kyrgyz Republic - Ministry of Health; Kyrgyz Republic - Ministry of Natural Resources, Ecology and Technical Supervision (MNRETS); Kyrgyz Republic - Ministry of Water Resources, Agriculture and Processing Industry; Tajikistan - Committee for  Environmental Protection; Tajikistan - Committee for  Food Security; Tajikistan - Ministry of Agriculture; Tajikistan - Ministry of Health and Social Protection and Population</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-7305"><narrative>Kyrgyz Republic - Ministry of Health; Kyrgyz Republic - Ministry of Natural Resources, Ecology and Technical Supervision (MNRETS); Kyrgyz Republic - Ministry of Water Resources, Agriculture and Processing Industry; Tajikistan - Committee for  Environmental Protection; Tajikistan - Committee for  Food Security; Tajikistan - Ministry of Agriculture; Tajikistan - Ministry of Health and Social Protection and Population</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-7305"><narrative>Kyrgyz Republic - Ministry of Health; Kyrgyz Republic - Ministry of Natural Resources, Ecology and Technical Supervision (MNRETS); Kyrgyz Republic - Ministry of Water Resources, Agriculture and Processing Industry; Tajikistan - Committee for  Environmental Protection; Tajikistan - Committee for  Food Security; Tajikistan - Ministry of Agriculture; Tajikistan - Ministry of Health and Social Protection and Population</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181459"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181459?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181459"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have endorsed a multisectoral One Health workforce strategy
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have endorsed a multisectoral One Health workforce strategy
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities  related to this indicator are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries with at least 80% of stakeholders satisfied with the engagement processes (including public awareness programs/activities) implemented under the program
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities just initiated in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have a National One Health Action Plan developed and implemented
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
NOHAP will be established when the NOHCSs are established and secretariats are operational
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Countries joining the program with IDA/IBRD resources that have established cross-border cooperation on surveillance, laboratories, and/or emergency response
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="50">
<comment><narrative>
Activities  related to this indicator have not yet started in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries conducting awareness raising, risk communication/community engagement, and/or information campaigns targeting multisectoral stakeholders
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Awareness raising and communication campaigns are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries with at least one expert in management of protected areas trained in conducting surveillance of zoonotic diseases in wildlife on 25% of the protected areas
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries where the heads of technical departments in agriculture, environment, and health at the national/provincial/district level are trained in and adopting a cross-sectoral approach to zoonoses
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries that have designed and/or established a comprehensive wildlife monitoring system for zoonotic diseases
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Environment coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have a national One Health coordination structure established and operational in which women hold at least 35% of all technical and managerial positions
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
TJ: PIU initiated the creation of the NOHCS
KG: NOHCS established in KG, secretariat will be staffed when the project is effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have conducted at least one multisectoral simulation exercise and/or intra-/after-action review to assess system functionality for one zoonotic outbreak
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with a min. score of 3.0 for 60% of Performance of Veterinary Services relevant core competencies, and a 0.3-point improvement in the average score for the same competencies
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries with at least 80% of stakeholders satisfied with the engagement processes (including public awareness programs/activities) implemented under the program
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries with learning plans on One Health implementation developed and implemented
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities  related to this indicator have not yet started in TJ nor at CAREC. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of countries joining the program with IDA/IBRD resources where at least two field epidemiologists in the human and animal health sectors each have completed a one-year FETP
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="100">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of countries joining the program with IDA/IBRD resources where at least two field epidemiologists in the human and animal health sectors each have completed a one-year FETP
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="100">
<comment><narrative>
Activities  related to this indicator are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have strengthened diagnostic capacity at public health, veterinary, and environmental facilities to effectively detect priority zoonotic and food-borne diseases and AMR pathogens
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries that have designed and/or established a comprehensive wildlife monitoring system for zoonotic diseases
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Countries joining the program with IDA/IBRD resources that have established cross-border cooperation on surveillance, laboratories, and/or emergency response
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="50">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional One Health Coordination Structure established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="No Regional One Health Coordination Structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="Regional One Health Coordination Structure routinely plans and supports the development and implementation of regional surveillance systems">
<comment><narrative>
Ongoing staffing of the Regional One Health Coordination Secretariat. MoU for the Regional One Health Coordination Structure drafted and shared with five countries
</narrative></comment>
</target>
<actual value="Regional One Health Coordination Secretariat, Council and Technical Working Group established. Regulations adopted by Beneficiaries.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional One Health Coordination Structure established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="No Regional One Health Coordination Structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="Regional One Health Coordination Structure routinely plans and supports the development and implementation of regional surveillance systems">
<comment><narrative>
Ongoing staffing of the Regional One Health Coordination Secretariat. MoU for the Regional One Health Coordination Structure drafted and shared with five countries
</narrative></comment>
</target>
<actual value="No Regional One Health Coordination Structure">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries that have designed and/or established a comprehensive wildlife monitoring system for zoonotic diseases
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries that have designed and/or established a comprehensive wildlife monitoring system for zoonotic diseases
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Environment coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with a min. score of 3.0 for 60% of Performance of Veterinary Services relevant core competencies, and a 0.3-point improvement in the average score for the same competencies
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with a min. score of 3.0 for 60% of Performance of Veterinary Services relevant core competencies, and a 0.3-point improvement in the average score for the same competencies
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Agriculture and Vet coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with improved (&amp;gt; or = 0.25) average IHR States Parties Self-Assessment Annual Report (SPAR) core capacity scores on at least one of the prevent, detect, and response axes
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with improved (&amp;gt; or = 0.25) average IHR States Parties Self-Assessment Annual Report (SPAR) core capacity scores on at least one of the prevent, detect, and response axes
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Health coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with improved (&amp;gt; or = 0.25) average IHR States Parties Self-Assessment Annual Report (SPAR) core capacity scores on at least one of the prevent, detect, and response axes
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Health coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional One Health Coordination Structure established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="No Regional One Health Coordination Structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="Regional One Health Coordination Structure routinely plans and supports the development and implementation of regional surveillance systems">
<comment><narrative>
Ongoing staffing of the Regional One Health Coordination Secretariat. MoU for the Regional One Health Coordination Structure drafted and shared with five countries
</narrative></comment>
</target>
<actual value="Regional One Health Coordination Secretariat, Council and Technical Working Group established. Regulations adopted by Beneficiaries.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with improved (&amp;gt; or = 0.25) average IHR States Parties Self-Assessment Annual Report (SPAR) core capacity scores on at least one of the prevent, detect, and response axes
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with a min. score of 3.0 for 60% of Performance of Veterinary Services relevant core competencies, and a 0.3-point improvement in the average score for the same competencies
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Agriculture and Vet coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional One Health Coordination Structure established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="No Regional One Health Coordination Structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="Regional One Health Coordination Structure routinely plans and supports the development and implementation of regional surveillance systems">
<comment><narrative>
Ongoing staffing of the Regional One Health Coordination Secretariat. MoU for the Regional One Health Coordination Structure drafted and shared with five countries
</narrative></comment>
</target>
<actual value="No Regional One Health Coordination Structure">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries with at least one expert in management of protected areas trained in conducting surveillance of zoonotic diseases in wildlife on 25% of the protected areas
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities  related to this indicator are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Countries joining the program with IDA/IBRD resources that conduct routine passive surveillance of zoonotic diseases in wildlife and monitor for zoonotic pathogen hotspots
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="100">
<comment><narrative>
Activities  related to this indicator are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have strengthened diagnostic capacity at public health, veterinary, and environmental facilities to effectively detect priority zoonotic and food-borne diseases and AMR pathogens
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
Activities  related to this indicator are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries with learning plans on One Health implementation developed and implemented
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have a National One Health Action Plan developed and implemented
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
NOHAP will be established when the NOHCSs are established
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have conducted at least one multisectoral simulation exercise and/or intra-/after-action review to assess system functionality for one zoonotic outbreak
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Activities  related to this indicator are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries where the heads of technical departments in agriculture, environment, and health at the national/provincial/district level are trained in and adopting a cross-sectoral approach to zoonoses
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Training activities are under preparation in TJ. In the other countries, PIUs are not yet operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries conducting awareness raising, risk communication/community engagement, and/or information campaigns targeting multisectoral stakeholders
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
Awareness raising and communication campaigns will be carried out when the NOHCSs are established
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Countries joining the program with IDA/IBRD resources that conduct routine passive surveillance of zoonotic diseases in wildlife and monitor for zoonotic pathogen hotspots
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="100">
<comment><narrative>
Activities not yet initiated: PIU is being staffed in TJ and Project is not effective in KG
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Countries that have a national One Health coordination structure established and operational in which women hold at least 35% of all technical and managerial positions
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
KZ: established and operational - not meeting gender criteria
KG: established and operational - not meeting gender criteria
TJ: not yest established
TM: established but not operational
UZ: established but not operational
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional One Health Coordination Structure established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="No Regional One Health Coordination Structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="Regional One Health Coordination Structure routinely plans and supports the development and implementation of regional surveillance systems">
<comment><narrative>
Ongoing staffing of the Regional One Health Coordination Secretariat. MoU for the Regional One Health Coordination Structure drafted and shared with five countries
</narrative></comment>
</target>
<actual value="Regional One Health Coordination Secretariat, Council and Technical Working Group established. Regulations adopted by Beneficiaries.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional One Health Coordination Structure established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="No Regional One Health Coordination Structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="Regional One Health Coordination Structure routinely plans and supports the development and implementation of regional surveillance systems">
<comment><narrative>
Ongoing staffing of the Regional One Health Coordination Secretariat. MoU for the Regional One Health Coordination Structure drafted and shared with five countries
</narrative></comment>
</target>
<actual value="No Regional One Health Coordination Structure">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries that have designed and/or established a comprehensive wildlife monitoring system for zoonotic diseases
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries that have designed and/or established a comprehensive wildlife monitoring system for zoonotic diseases
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Environment coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with a min. score of 3.0 for 60% of Performance of Veterinary Services relevant core competencies, and a 0.3-point improvement in the average score for the same competencies
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with a min. score of 3.0 for 60% of Performance of Veterinary Services relevant core competencies, and a 0.3-point improvement in the average score for the same competencies
</narrative></title>
<baseline year="2025" iso-date="2025-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-14" />
<period-end iso-date="2032-10-14" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Agriculture and Vet coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with improved (&amp;gt; or = 0.25) average IHR States Parties Self-Assessment Annual Report (SPAR) core capacity scores on at least one of the prevent, detect, and response axes
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
PIU recently operational in Tajikistan only.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating countries with improved (&amp;gt; or = 0.25) average IHR States Parties Self-Assessment Annual Report (SPAR) core capacity scores on at least one of the prevent, detect, and response axes
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2032-10-15" />
<target value="5">
<comment><narrative>
PIU established in Tajikistan, Health coordinator under selection
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P151363</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Climate Adaptation and Mitigation Program for Aral Sea Basin CAMP4ASB</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[<p>To enhance regionally coordinated access to improved climate change knowledge services for key stakeholders (e.g., policy makers, communities, and civil society) in participating Central Asian countries, as well as to increased investments and capacity building that, combined, will address climate challenges common to these countries.</p>]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Climate Adaptation and Mitigation Program for the Aral Sea Basin Project for Central Asia is to enhance regionally coordinated access to improved climate change knowledge services for key stakeholders (e.g., policy makers, communities, and civil society) in participating Central Asian countries, as well as to increase investments and capacity building that, combined, will address climate challenges common to these countries. The project comprises of three components. The first component, regional climate knowledge services, will provide technical assistance, as well as minor civil works, goods (including software and equipment), and training, at both the regional and national levels, to develop a unified, integrated regional analytical platform for climate-resilient and low emission development, with improved data, information, knowledge, and decision-support tools. The second component, regional climate investment facility, will provide technical assistance and facilitation support to plan, implement, and manage climate investments. The second component consists of following two sub-components: (i) investment financing; and (ii)capacity building and community support. The third component, regional and national coordination consists of the following two sub-components:(i) regional coordination; and (ii)national coordination.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0020493"><narrative>Ministry of Finance of the Republic of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0020493"><narrative>Ministry of Finance of the Republic of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0020494"><narrative>Ministry of Finance of the Republic of Uzbekistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0020494"><narrative>Ministry of Finance of the Republic of Uzbekistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0020497"><narrative>Executive Committee for International Fund for Saving the Aral Sea</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0020497"><narrative>Executive Committee for International Fund for Saving the Aral Sea</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0020495"><narrative>Committee for Environmental Protection</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-09-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-11-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Asferachew Abate Abebe</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aabate@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>











<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001220409" />
            <name><narrative>Republic of Tajikistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39 71</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001512440" />
            <name><narrative>Republic of Uzbekistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.66667 63.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001484843" />
            <name><narrative>Xorazm Viloyati</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.5 60.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000453752" />
            <name><narrative>Karakalpakstan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.21636 58.82986</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31110" percentage="63" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="37" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="43.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="57.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="99" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="10" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="37" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="10" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="20" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="66" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="10" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="10" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="10" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="33" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">126666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">126666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">126666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">413333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">413333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">413333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">526666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">526666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">526666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">866666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">866666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">866666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">973333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">973333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">973333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">673333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">673333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">673333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">956666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">956666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">956666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">803333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">803333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">803333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">946666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">946666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">946666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">816666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">816666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">816666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">676666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">676666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">676666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">326666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">326666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">326666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">356666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">356666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">356666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">272277.29</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">60000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">663288.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1551645.08</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">648168.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">500013.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2252884.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1803335.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">435918.88</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">540230.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">699857.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">432203.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1358320.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">234020.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">546752.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">3524216.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1522716.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">678481.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">691376.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">387313.51</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">516219.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">633511.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">486734.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">995479.97</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">881228.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">120013.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">59786.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1220169.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">50012.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1464188.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">571330.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">425476.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">897383.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1018148.14</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">32000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">497707.79</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">593369.61</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">-40530.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">593873.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">572272.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">41270.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">446492.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">593653.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">593653.40</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">14000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">9000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-526240</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-84</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">272277</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">60000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">235566</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">427723</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">660000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1100000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">451645</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">308169</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">340000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">500013</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1474646</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">380078</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">398160</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1803336</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">435919</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">272434</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">267796</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">699858</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">432204</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">609396</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">748925</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">234020</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">73013</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">473739</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">389623</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">3134594</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1292977</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">229740</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">678481</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">105948</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">585429</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">328423</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">58891</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">516220</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">418703</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">214808</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">20000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">466735</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">525467</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">470013</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">360307</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">520921</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">120013</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">59787</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">583359</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">636810</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">50013</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">359220</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">630331</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">474638</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">571331</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">425476</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">847371</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">50013</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">608976</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">409172</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">32000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">497708</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">593370</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-40531</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">544874</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">49000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">572273</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">41218</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">446492</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">628422</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">1411992</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">547329</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">959654</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">1637</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">366750</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">10000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">395484</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">22000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">340213</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">183759</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1537</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-3797</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-9997</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-7284</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-59939</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-12567</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-67867</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-18049</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-128008</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-22137</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-124780</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-26486</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-129245</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-30642</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-132419</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-33999</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-138962</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-34250</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-133686</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-33958</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-127882</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-31439</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-117768</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-28001</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-118875</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-31936</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-115582</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-30309</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-114612</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-30219</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-108672</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-28592</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-107259</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-26839</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-119178</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-30583</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-109577</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-26973</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-235699</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-235290</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-140493</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-227589</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-133077</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-213660</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-131597</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-219655</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-134266</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-207858</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-132635</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-209888</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-132332</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-212678</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-131459</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-210028</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-134892</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-216434</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-136055</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-214041</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-136830</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-20495"><narrative>Committee for Environmental Protection; Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151363"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P151363?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151363"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved understanding of gender-specific implications of climate change among key stakeholders and implementation of key activities
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="10.00">
<comment><narrative>
Over-achieved (140%). At regional level, 14 key activities were organized to increase understanding of climate change impacts for women. This included outreach efforts (regional events, publications such as &quot;Women, food and climate change in Central Asia, CAREC 2020”) and training activities. At national level, under component 2, 27 training sessions focused on climate investments were dedicated to women, covering topics like &quot;The Role of Women in Small Business&quot; and &quot;Successful Cases on Projects Implemented by Women.&quot; With experienced women entrepreneurs as trainers, sharing their success stories.
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hectares in project area covered by effective agricultural, land, and water management practices suited to local agro-ecological conditions, which can address climate change
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2022-04-29" />
<target value="10,000.00">
<comment><narrative>
Over-achieved. Overall, the project covered 33 465 ha in Uzbekistan and 44 392 ha in Tajikistan.
The nature of the sub-projects financed by the project has changed from what was foreseen during preparation. The project has financed a lot of subprojects that resulted in adoption of new technologies for climate smart agriculture, which is transformed into number of ha covered by sustainable land and water management technologies.
Out of which, the project has covered 35,000 ha (15619 in Tajikistan and 19381 in Uzbekistan), applying effective agricultural, land, and water management measures to combat climate change (estimated as the land in or around forests).
</narrative></comment>
</target>
<actual value="77,857.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cooperative action resulting in the financing of investments that require collaboration across countries (e.g., transboundary investment or multi-country coordination of national policies)
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="2.00">
<comment><narrative>
Over-achieved (150%). Cooperative action resulting in the financing of investments that require collaboration across countries include the following:
• Energy infrastructure (TKM and UZ): The project supported the investment for the Ruslovoe water reservoir of the Tuyamuyun hydroelectric complex in its preparatory state by conducting hydrological modelling of the reservoir in order to aid decision-making to select viable technical solutions which takes into account the risks of sedimentation.
• Forecasting ICT (KG, KZ. TJ, TKM and UZ: The project supported the ppdate of the receiving station of MODIS data used by the MODSNOW software to assess runoff of mountain rivers in the Aral Sea basin and improve forecasting in the region.
• Forecasting ICT (KG, KZ and UZ): Purchase of a supercomputer installed and put into operation in Uzhydromet to use numerical methods of weather forecasts, including using the predictive model COSMO with an agreement on cooperation between the NMHS of CA.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of users of public climate data and analytical services provided by the platform
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="9,000.00">
<comment><narrative>
Over-achieved (286%). During the IDA phase, 7601 users were attracted, while during the GCF phase 16, 711 users were registered at the CACIP platform.
1. A substantial quantity of materials, including 767 diverse publications, printed materials, the online version of the NEXUS game, climate box, and various interactive instruments, have been uploaded onto the CACIP platform.
2. In addition, to enhance the geoportal platform of CACIP, 300 digital (vector) maps of natural resources, complemented by special instruments, have been incorporated.
</narrative></comment>
</target>
<actual value="25,711.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2022-04-29" />
<target value="80.00">
<comment><narrative>
Achieved (109%). The CAREC regional team has evaluated 116 sub-projects implemented since 2017 and documented the lessons learned from them. These micro-projects cover various climate-smart technologies and practices, such as drip irrigation, mulching, composting, and agroforestry, that aim to reduce the exposure and vulnerability of the agricultural sector to climate change impacts. During the survey, 87,5% of the beneficiaries have expressed their full satisfaction with the micro loan terms and conditions.
</narrative></comment>
</target>
<actual value="87.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of users reporting satisfaction with Climate Knowledge Services provided by Program
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="60.00">
<comment><narrative>
Over achieved (157%). For this indicator, the end value was included as the satisfaction rate related to Climate Knowledge Services provided by Program. The assessment/ feedback collected from participants of various events/trainings, provided through the Progress Reports stands at around 94% or higher.
</narrative></comment>
</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting climate-smart agricultural technologies
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2022-04-29" />
<target value="3,000.00">
<comment><narrative>
Over-achieved (143%). The indicator is calculated as follows, following the reports from the NCUs and RCU on sub-loans and grants:
IDA: 3816 sub-loans in Tajikistan and 42 sub-loans in Uzbekistan = 3,858
GCF: 444 sub-projects, covering 119 sub-projects in Tajikistan and 325 sub-projects in Uzbekistan.
Total: 4,302 sub-projects
</narrative></comment>
</target>
<actual value="4,302.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2022-04-29" />
<target value="50,000.00">
<comment><narrative>
It includes:
• IDA: the project made 3816 sub-loans covering 38,363 beneficiaries including 21,483 women (56%) in Tajikistan; and 42 sub-loans covering 648 beneficiaries including 285 women (44%) in Uzbekistan. Total: 39,011 beneficiaries
• GCF: the AF completed 325 sub-projects in Uzbekistan, covering 9 657 direct beneficiaries; and 119 subprojects in Tajikistan, covering 22 074 direct beneficiaries under the GCF phase. Total: 31,731 direct beneficiaries.
Additionally, the project supported creation of permanent and temporary jobs in Tajikistan (1,676 under the GCF phase) and Uzbekistan (5100 in total); 10,447 beneficiaries in Tajikistan and 9,052 beneficiaries in Uzbekistan were successfully trained in the area of climate change. 
Overall, during the GCF AF, the project indirect beneficiaries reached 62,024 people in Tajikistan and 102,842 people in Uzbekistan.
</narrative></comment>
</target>
<actual value="70,742.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of country-led plans and programs that draw on Program's climate knowledge services, including lessons from climate investments
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="3.00">
<comment><narrative>
Over-achieved (167%). Following country-led plans and programs draw on Project's climate knowledge services:
Uzbekistan:
•  Resolution of the Cabinet of Ministers of the Republic of Uzbekistan dated 11.29.2018. No. 970 “On measures to strengthen the material and technical base of the Center for Hydrometeorological Service of the Republic of Uzbekistan” for the period 2019-2022. 
• Uzbekistan subsidy rules for partial reimbursement of investment costs incurred by agroindustrial complex. Farmers in Uzbekistan to Receive Improved Subsidy Allocation — Uzbekistan News | DARYO.UZ
Tajikistan:
• National Action Plan on Adaptation to Climate Change and a National Adaptation Strategy 2019-2030.
• A government program on the National export strategy of Tajikistan (???????????????? ?????????? ??????????? (adlia.tj))
• A government instruction to enhance the export potential of honey production in Tajikistan
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of multi-country climate coordination networks supported under Program, enabling intra-governmental, sectoral, NGO, etc. cooperation
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="3.00">
<comment><narrative>
Over-achieved (300%). Since the beginning, the Project has organized 6 (six) Central Asia Regional Climate Change Conferences. Additionally, the following key multi-country events were led by the Projects: an online conference focusing on the outcomes of the &quot;Paris Agreement Art. 6 Cooperative approaches-Opportunities for Central Asia&quot; (August 2023); a hybrid conference on &quot;Strengthening regional dialogue on Post 28th Conference of the Parties to the UNFCCC&quot; in Dubai, UAE (December 2023); the 10th Meeting of Central Asian Foreign Ministries and Parliamentarians on Climate Change (December 2023); online coordination meetings with the UNFCCC Focal Points (October 2023). Overall, the CAMP4ASB regularly organized various events, including media training (over 120 journalists and media representatives), youth participation in the Leadership Program, creation of climate platforms involving Central Asia's Foreign Ministries and Parliamentarians, and Coalition of Climate NGOs in CA.
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feedback/Grievances responded and/or resolved within the stipulated service standards for response times
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="100.00">
<comment><narrative>
No grievances were reported; however, there were instances of miscommunication between current and potential beneficiaries and NCUs in both countries regarding conditions, terms, and coordination, which were raised by some beneficiaries. These concerns were successfully clarified or addressed by the National Coordination Units (NCUs), as reported. Both NCUs in Tajikistan and Uzbekistan and the RCU have fully functioning GRM systems (staff are in place, procedures well developed and advertised, awareness building has been carried out). The NCUs and RCU have received and responded to questions and comments from the community through these and other systems which are reported on in annual reports and checked during supervision missions.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional resources mobilized for knowledge, capacity, and investment for regional climate/green action through increased Program coordination among Central Asian countries and development community
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2024-05-31" />
<target value="40,000,000.00">
<comment><narrative>
Achieved (104%). The amount reflected here includes following projects and sources:
• Project to support the World Bank's CAMP4ASB, in Tajikistan and Uzbekistan: USD 19M (GCF)
• Smart Waters: USD 0.2M to conduct a regional research competition (2019) (USAID)
• Central Asian Women in Tech and Science Week 2029: USD 0.09M (US Embassy in UZ)
• 10th Central Asian Leadership Programme (2019): USD 0.09M  (UNEP, EU, OSCE, WB, SIWI, USAID, MFA FIN)
• Developing a Disaster Risk Transfer Facility in the CAREC Region: USD 1.8M (ADB).
• Strengthening the resilience of CA countries by enabling regional cooperation to assess high altitude glacio-nival systems: USD19 M (GEF-UNDP)
• Lately, the project has also leveraged additional resources by enhancing its program and project mobilization capacities, resulting in additional funds of $1,450,000. This includes contributions of $870k from GIZ, $460k from The Coca-Cola Foundation (TCCF), $120k from Global Water Challenge (GWC).
</narrative></comment>
</target>
<actual value="41,630,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries reached with financial services.
</narrative></title>
<baseline year="2016" iso-date="2016-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-28" />
<period-end iso-date="2022-04-29" />
<target value="3,000.00">
<comment><narrative>
Over-achieved (1,255%). The indicator is calculated as follows, following the reports from the NCUs and RCU:
• IDA: 5,946 were covered under IDA, 
• GCF: 31,731 [9 657 (UZ) &amp; 22 074 (TJ)] were covered under the GCF phase. 
Estimated as household (4ppl per HH): 9,419 HH
</narrative></comment>
</target>
<actual value="37,677.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P166820</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fourth Phase of the Central Asia Regional Links Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project development objectives of the Fourth Phase of the Central Asia Regional Links Program are to enhance the efficiency of cross-border trade for participants of the regional economy and to improve the resilience and safety of regional connectivity infrastructure in Sughd region and Gorno-Badakhshan Autonomous region.The project contributes to the Central Asia Regional Links Programs higher-level development objectives of increasing cross-border connectivity and enhancing integrated regional development to revitalize historically active economic exchanges in Central Asia and beyond along the Silk Route.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Fourth Phase of the Central Asia Regional Links (CARs) program, a series of projects (SOP) in multiple countries (borrowers), has the following components.Component 1: Improve regional connections in Sughd and GBAO regions (US$89 million equivalent from IDA; US$1 million from PACT Trust Fund). Activities to be financed under this component include: (i) rehabilitation of a 50.5 km long, Category I and III roads in Sughd in four sections (estimated at US$37.0 million); (ii) construction of Khorog bridge and tunnels/galleries and bridges around Barsem Village in GBAO to enhance the resilience of the road connectivity from climate hazards such as mudslides and avalanches (estimated US$46.7 million); (iii) provision of construction supervision services for road construction and rehabilitation works (estimated US$4.3 million); and (iv) preparation of feasibility studies for improvement of regional road connectivity for Sughd, Khatlon and GBAO regions as basis for potential lending operation (CARs-5), to be partially financed by PACT Trust Fund (estimated US$2.0 million).Component 2: Improve road asset preservation and road safety (US$20 million equivalent) comprises two sub-components.Sub-Component 2a Improve road asset preservation (US$8 million equivalent) will finance (i) supply and installation of weigh-in-motion (WIM) systems to preserve road assets, (ii) installation and commission of software packages for recording, storage and analysis of road network condition data, development of prioritized maintenance planning, optimized to allow for budget constraints, and annual maintenance plans, and (iii) training on the installed systems. Activities under this component have been carefully coordinated with other development partners.Sub-Component 2b Improve Road Safety (US$12.0 million equivalent) will finance three activities. (i) Support the Department of State Automobile Inspection to enforce use of 4-wheel vehicle safety belts, through a legal review and regulatory reforms, publicity campaign to warn of start of enforcement, and design of, and implement support for, an enforcement campaign. (ii) Retrofit or construct safety barriers along selected road sections in severe mountainous terrains as a demonstration pilot. (iii) Support the Department of State Automobile Inspection under the Ministry of Interior, the lead agency for road safety, to develop a Road Safety Strategy and to establish a Road Safety Observatory.Component 3: Facilitate cross-border movement of goods (US$20 million equivalent). Two groups of activities will be financed under this component. (i) Upgrading of the Customs information and communication technology (ICT) platform (estimated at US$17.5 million), including equipment and facilities (computers, networking equipment, data center, end-use terminals), customs automation software, development and testing of the provided system, and implementation support up to 2025. (ii) Strengthening of institutional capacity and human resources in Customs Service (estimated at US$2.5 million), comprising integration of the newly upgraded Customs ICT platform with the National Single Window and other related systems, technical assistance on customs modernization, implementation of time release studies, assessment of implementation of measures under the WTO Trade Facilitation Agreement, strengthening of the human resources unit within the Customs Service to ensure gender equality in employment and career promotion, and training of staff on code of ethics and gender-sensitivity to improve services to both female and male customers.Component 4: Support project implementation, coordination and management (US$2 million equivalent). This component will support project implementation, coordination and management including provision of goods, consultants services and training, operating costs and financial audit.Component 5: Contingent Emergency Response (US$0). This zero-dollar component is designed to provide swift response in the event of an eligible crisis or emergency, by enabling Tajikistan to request the World Bank to reallocate project funds to support emergency response, and reconstruction, where needed.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0036671"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0036671"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0036670"><narrative>Ministry of Transport</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-04-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-07-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Abdul Hameed Khalili</narrative></person-name><telephone>+1-202-473-1000</telephone><email>akhalili@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001220409" />
            <name><narrative>Republic of Tajikistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39 71</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001221092" />
            <name><narrative>Viloyati Sughd</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40 69</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001347488" />
            <name><narrative>Viloyati Khatlon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.83333 69</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001221692" />
            <name><narrative>Viloyati Mukhtori Kŭhistoni Badakhshon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38 73</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001221328" />
            <name><narrative>Khorugh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.48974 71.55304</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001220015" />
            <name><narrative>Barsem</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.5674 71.71865</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001221874" />
            <name><narrative>Dushanbe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38.53575 68.77905</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001346374" />
            <name><narrative>Roghun</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38.69331 69.73692</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001514871" />
            <name><narrative>Kurkat</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.13778 69.25891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001514875" />
            <name><narrative>Kŭchkak</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.24755 70.34237</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001514879" />
            <name><narrative>Khujand</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.28256 69.62216</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001514891" />
            <name><narrative>Konibodom</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.29414 70.43122</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001514900" />
            <name><narrative>Ghafurov</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.21571 69.72867</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008275266" />
            <name><narrative>Dehmoi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.21438 69.5186</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001218612" />
            <name><narrative>Murgab</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.49656 61.97142</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21011" percentage="52" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="25" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="15" xml:lang="en"/><sector vocabulary="1" code="21013" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="15.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="69" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="17" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="17" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="69" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="47" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="69" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="47" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="17" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="17" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="69" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="47" xml:lang="en"><narrative>Climate change</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">11000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">24228633.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">24228633.34</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">131000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">3850193</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">4957671</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">1068849</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">7493420</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">237600</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1159796</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">8744412</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">2559801</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">3054312</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1205003</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">2311797</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">4845573</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">237241</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">2170660</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">4079674</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">2601137</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1104277</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">14517946</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">3858536</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1552315</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">3017312</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1298634</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">790639</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">2424684</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">3218761</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1054923</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">13567488</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1438489</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">2266929</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">501767</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2581527</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-36672"><narrative>Customs Service; Ministry of Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166820"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P166820?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166820"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road crashes or fatalities along the main routes in Khorog
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="6.00">
<comment><narrative>
Annual Road crashes or fatalities along the main routes in Khorog, measuring the sustainable opportunity of transport and trade.

Data provided by the Department of State Automobile Inspection of the Ministry of Internal Affairs for the year 2022 indicates 12 crashes, for 2023 - 17 crashes, and actual number of 11 crashes is for the 10 months of 2024. Most probably the indicator would be achieved.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time spent for customs clearance
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="834.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="584.00">
<comment><narrative>
The custom automation and simplification process is still in progress. The firm for “Third Party Verification for Time Release Study and Trade facilitation Agreement” was hired, and the TRS was carried out. The actual value for this indicator is extracted from the TRS report. The target for this indicator is already achieved.
</narrative></comment>
</target>
<actual value="421">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road closures per year in Barsem caused by natural hazards
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="120.00">
<comment><narrative>
Annual number of hours of road closures in Barsem caused by natural hazards, measuring the resilience of transport and trade.

The baseline of this indicator was identified from the moment when this road was completely closed for a month due to the consequences of natural disasters
that occurred. During the winter 2023-2024, based on the data provided by the State Road Maintenance Administration (GUSAD) of the Shugnan district, there
were no roads closures in the village of Barsem due to natural and climatic conditions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market accessibility index of Sughd region
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="0.00">
<comment><narrative>
This is an accessibility indicator for average access of the population to markets in Sughd region. From the beginning of the project, the formula from CARs-2 was used: H=?WJ/TIJ, where H is the accessibility indicator, W- is the size indicator at target j, such as total population in major cities (Khujand, Isfara, and Konibodom), and T is the travel time between the origin and target j, i.e in this case travel time to the market in Khujand from the nearby major cities. The baseline indicator at 20.99 was calculated with no end target for this indicator. 
There are three major cities in Sughd: Khujand, Isfara, and Konibodom. The baseline data for the first half of 2023 will be the following: 
Population of the major cities (thousand people):
Khujand-198.7, Isfara-54.9, Konibodom-54.4
Total=308.0 (thousand persons)
Travel time (in min):
Khujand-10, Isfara-110, Konibodom-90 (min)
Then, the baseline H would be 20.99, which should be updated in last ISR.
The current value is 21.80.
</narrative></comment>
</target>
<actual value="21.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Kannibodam and Bekobod BCP
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="210.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="126.00">
<comment><narrative>
Travel time between Kannibodam and Bekobod BCP, measuring the improvement of regional connectivity along the trade corridor connecting with Kyrgyz Republic and Uzbekistan.

Currently construction work is in progress on the road sections No 2, 3, &amp; 4, which began on March 1, 2023, and expected to be completed on February 27, 2026. Currently, the average travel time between Kannibodam and Bekobod BCP is 162 minutes. 
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="140">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time spent for customs clearance
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="834.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="584.00">
<comment><narrative>
The custom automation and simplification process is still in progress. The firm for “Third Party Verification for Time Release Study and Trade facilitation Agreement” was hired, and the TRS was carried out. The actual value for this indicator is extracted from the TRS report. The target for this indicator is already achieved.
</narrative></comment>
</target>
<actual value="421">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average daily traffic volume passing through Khorog Bridge
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="1,233.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="1,480.00">
<comment><narrative>
Traffic volume passing through Khorog Bridge, measuring the improvement of regional connectivity as well as increased trade and travel in GBAO, resulting from reduced transport and trip delays. 

The bridge construction work is in progress. According to the data provided by the Department of Road Management of GBAO, the average daily traffic density
on the section near the Khorog Bridge for the end of November 2024 is 1382.00 vehicles per day. 
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="1,420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Kannibodam and Bekobod BCP
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="210.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="126.00">
<comment><narrative>
Travel time between Kannibodam and Bekobod BCP, measuring the improvement of regional connectivity along the trade corridor connecting with Kyrgyz Republic and Uzbekistan.

Currently construction work is in progress on the road sections No 2, 3, &amp; 4, which began on March 1, 2023, and expected to be completed on February 27, 2026. Currently, the average travel time between Kannibodam and Bekobod BCP is 162 minutes. 
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="140">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road crashes or fatalities along the main routes in Khorog
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="6.00">
<comment><narrative>
Annual Road crashes or fatalities along the main routes in Khorog, measuring the sustainable opportunity of transport and trade.

Data provided by the Department of State Automobile Inspection of the Ministry of Internal Affairs for the year 2022 indicates 12 crashes, for 2023 - 17 crashes, and actual number of 11 crashes is for the 10 months of 2024. Most probably the indicator would be achieved.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time spent for customs clearance
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="834.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="584.00">
<comment><narrative>
The custom automation and simplification process is still in progress. The firm for “Third Party Verification for Time Release Study and Trade facilitation Agreement” was hired, and the TRS was carried out. The actual value for this indicator is extracted from the TRS report. The target for this indicator is already achieved.
</narrative></comment>
</target>
<actual value="421">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road closures per year in Barsem caused by natural hazards
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="120.00">
<comment><narrative>
Annual number of hours of road closures in Barsem caused by natural hazards, measuring the resilience of transport and trade.

The baseline of this indicator was identified from the moment when this road was completely closed for a month due to the consequences of natural disasters
that occurred. During the winter 2023-2024, based on the data provided by the State Road Maintenance Administration (GUSAD) of the Shugnan district, there
were no roads closures in the village of Barsem due to natural and climatic conditions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market accessibility index of Sughd region
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="0.00">
<comment><narrative>
This is an accessibility indicator for average access of the population to markets in Sughd region. From the beginning of the project, the formula from CARs-2 was used: H=?WJ/TIJ, where H is the accessibility indicator, W- is the size indicator at target j, such as total population in major cities (Khujand, Isfara, and Konibodom), and T is the travel time between the origin and target j, i.e in this case travel time to the market in Khujand from the nearby major cities. The baseline indicator at 20.99 was calculated with no end target for this indicator. 
There are three major cities in Sughd: Khujand, Isfara, and Konibodom. The baseline data for the first half of 2023 will be the following: 
Population of the major cities (thousand people):
Khujand-198.7, Isfara-54.9, Konibodom-54.4
Total=308.0 (thousand persons)
Travel time (in min):
Khujand-10, Isfara-110, Konibodom-90 (min)
Then, the baseline H would be 20.99, which should be updated in last ISR.
The current value is 21.80.
</narrative></comment>
</target>
<actual value="21.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Kannibodam and Bekobod BCP
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="210.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="126.00">
<comment><narrative>
Travel time between Kannibodam and Bekobod BCP, measuring the improvement of regional connectivity along the trade corridor connecting with Kyrgyz Republic and Uzbekistan.

Currently construction work is in progress on the road sections No 2, 3, &amp; 4, which began on March 1, 2023, and expected to be completed on February 27, 2026. Currently, the average travel time between Kannibodam and Bekobod BCP is 162 minutes. 
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="140">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Detailed implementation plan for customs automation
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="Not prepared"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2024-12-31" />
<target value="Developed and adopted by the government (target by end of 2021)">
<comment><narrative>
This plan was prepared and submitted by UNCTAD. The plan was reviewed and approved by Customs Services management. The indicator is achieved.
</narrative></comment>
</target>
<actual value="Developed and adopted by the Government.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Communities in target areas with effective citizen engagement channels
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="60.00">
<comment><narrative>
The indicator will measure the project &amp; establishment of functioning channels for citizen engagement (that follow approved procedures) at the community (village or town) in the design/planning and monitoring of rehabilitation and construction of roads to ensure that local concerns and needs are addressed. Procedures will ensure, inclusion, and that the feedback loop is closed by MOT information and response. This indicator is being tied to the project GRM to ensure monitoring since the beginning of civil works contracts in Sughd and GBAO. 

According to the data from the sociologist, there are 35 communities in Sughd and GBAO who benefit from the Project. Currently, the effective citizen engagement is established in all 35 communities in the construction works catchment area: 31 in Sughd and 4 in GBAO. That is 100% of total.
The indicator has exceeded the target.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of procedures for lodgement of pre-arrival information and risk-based border clearance
</narrative></title>
<baseline year="2020" iso-date="2020-05-20" value="There is no established customs procedures for processing of pre-arrival information or risk-based border clearance."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-20" />
<period-end iso-date="2024-12-31" />
<target value="The established customs procedures for processing of pre-arrival information and risk-based border clearance are being implemented using the automated system.">
<comment><narrative>
To calculate this indicator, a chart with two parts indicating their completion status was developed. These parts are:
1. Amendment of legislation to ensure the receipt of pre-arrival information and undergoing customs control, considering risk factors, which consist of 21 activities:
? completed: 0,00% (0 activities)
? in progress: 100,00% (21 activities)
? not started 0,00% (0 activities)
2. Customs procedures for submitting pre-arrival information and undergoing border control, considering risk factors, which consist of 3 activities:
? completed:66,67% (2 activities)
? in progress: 33,33% (1 activities)
? not started: 0% (0 activities)
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="Customs procedures are established for processing of pre-arrival information and risk-based border clearance in pilot parallel run of ASYCUDA and UAIS.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient structure constructed in project areas in GBAO
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="3.80">
<comment><narrative>
The total number of km of all bridges, tunnels and galleries constructed for climate resilience in GBAO under the project. 

The road construction process is underway, As of November 30, 2024, the overall physical progress in GBAO is 58.1%. The works will be completed by spring
2026. 
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="3.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Youth
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-10-10" />
<target value="27,5000">
<comment><narrative>
This is a Corporate Results Indicator (CRI) newly added to the Project Results Framework. The baseline is 0, as the youth did not have improved access to sustainable transport infrastructure services. The MoT has now calculated the actual and the endline values, which is similar to the one obtained using WB geospatial tool.
</narrative></comment>
</target>
<actual value="27,6803">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road sections where barriers have been retrofitted
</narrative></title>
<baseline year="2020" iso-date="2020-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-06" />
<period-end iso-date="2026-10-31" />
<target value="40.00">
<comment><narrative>
At present, the design work has been completed by NARCO – Nabeel Abdul-Raheem Consultants (Kuwait), tender and social and environmental documents have been prepared and sent to the Bank for review. According to the project, it is proposed to install 60 km of road safety barriers.
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female customs officers at managerial level as share of total managers
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="10.00">
<comment><narrative>
According to the Human Resources Department of the Customs Service, by April 30, 2025, there are 11 female customs officers (4.98%) at managerial level as share of total managers.
</narrative></comment>
</target>
<actual value="4.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-10-08" />
<target value="110,0000">
<comment><narrative>
This is a Corporate Results Indicator (CRI) newly added to the Project Results Framework. The baseline is 0, as the people did not have improved access to sustainable transport infrastructure services. The MoT has now calculated the actual and the endline values which is similar to the one obtained using WB geospatial tool.
</narrative></comment>
</target>
<actual value="101,8707">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road crashes or fatalities along the main routes in Khorog
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="6.00">
<comment><narrative>
Annual Road crashes or fatalities along the main routes in Khorog, measuring the sustainable opportunity of transport and trade.

Data provided by the Department of State Automobile Inspection of the Ministry of Internal Affairs for the year 2022 indicates 12 crashes, for 2023 - 17 crashes, and actual number of 11 crashes is for the 10 months of 2024. Most probably the indicator would be achieved.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services – Female
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-10-10" />
<target value="51,0000">
<comment><narrative>
This is a Corporate Results Indicator (CRI) newly added to the Project Results Framework. The baseline is 0, as the female did not have improved access to sustainable transport infrastructure services. The MoT has now calculated the actual and the endline values, which is similar to the one obtained using WB geospatial tool.
</narrative></comment>
</target>
<actual value="504,194">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a National Road Safety Strategy
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
The contract for consultancy services for the development of the &quot;National Road Safety Strategy for 2024-2034&quot; between the Ministry of Transport and FRED Engineering S.r.I. was singed on July 31, 2024. The project started on August 9, 2024, and is expected to complete in 12 months. According to the initial report
of FRED Engineering S.r.I., the project will be implemented in four stages to achieve the set goal. Currently, work is underway within the second stage, i.e. assessment of the current situation. It is planned to prepare a draft of the NRSS and AP 2024-2034 by August 2025. Adoption is planned for 2026.
Most likely the indicator will be achieved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Safety belt compliance
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="60.00">
<comment><narrative>
According to the information provided by the Department of the State Automobile Inspection of the Ministry of Internal Affairs of Tajikistan, the level of seat belt use in the country on average among drivers is 33.8%. However, the results of the baseline survey conducted by EASST Expertise Ltd are as follows:
the level of seat belt use in the country on average among drivers is 24.5%, and among all car occupants is 13.4%. Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="50.50">
<comment><narrative>
Targets shall be update upon completion of rehabilitation. Construction work is in progress on the road sections No 1, 2, 3, &amp; 4, and the roads have been partially rehabilitated. The lower layer of asphalt pavement has been laid. At the same time, construction work is in progress to install curbstones, assemble precast reinforced concrete trays, install reinforced concrete pipes, construct embankments, excavate trenches, construct roadbeds, dismantle existing structures, relocate utility lines, construct the lower and upper layers of the foundation, and work is underway to install outdoor lighting supports. With 46.0% of works completed in Sughd, roads will be fully rehabilitated by spring 2026. 
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="38.79">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of five-year and annual road maintenance plan and budget
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="Yes">
<comment><narrative>
Data for the preparation of the five-year and annual plan for road maintenance and budgeting will be analyzed in the HDM-4 software package. In September
2024, 5 licenses of HDM-4 software were purchased under the project.
Currently, a survey of road user costs and a survey in road maintenance departments are being conducted, after which the HDM-4 software will be calibrated for Tajikistan in February 2025.
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of customs procedures for paper-free clearance operations, including electronic payment of duties, taxes and fees
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
To calculate this indicator, a chart with two parts indicating their completion status was developed. These parts are:
1. Changes in legislation for paper-free clearance, which consists of 20 activities:
? completed: 0% (0 activities)
? in progress: 100,00% (20 activities)
? not started: 0% (0 activities)
2. Customs procedures for paper-free clearance operations, including electronic payment of customs duties, which consist of 14 activities:
? completed: 78.57% (11 activities)
? in progress: 21.43% (3 activities)
? not started: 0% (0 activities)
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female customs inspectors as a share of total inspectors
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="10.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="20.00">
<comment><narrative>
According to the Human Resources Department of the Customs Service, by April 30, 2025, there are 128 female customs inspectors (14.27%) as a share of total inspectors
</narrative></comment>
</target>
<actual value="14.27">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Size of road network with baseline geometry, location, condition, traffic volume, and natural hazard exposure data are collected
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="7,000.00">
<comment><narrative>
Ministry of Transport will collect baseline data of Tajikistan's road network, covering geometry, location, condition and traffic volume, to utilize them in the Road Asset Management System. It will collect data from all international roads by end of 2022, all national roads by end of 2024, and additional roads by end of 2026.

The Corporate Solutions Company in cooperation with the RAMS Department of the State Unitary Enterprise &quot;Center for Digitalization of the Transport Sector&quot;
has started data collection. Currently, data was collected for 4,700 km (3,268 km of international and 1,432 km of national roads).
Most likely the indicator will be achieved.
</narrative></comment>
</target>
<actual value="5375">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of customs automation pilot
</narrative></title>
<baseline year="2020" iso-date="2020-05-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-07" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Activities on this indicator were completed, results of which can be found on official letter of the Customs Services under the Government of the Republic of Tajikistan which was shared with the Bank. The details are:
(a) Order for launch of pilot automation
(b) Action plan for automation pilot
(c) Official letter of the Deputy Head of Customs Services (with translation).
On July 26, 2023, the Official Ceremony of Pilot launch of the Information System for Customs Data &quot;ASYCUDA World&quot; in the customs authorities of the Republic of Tajikistan and the Database of regulatory legal acts in the field of customs took place. The indicator is achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road closures per year in Barsem caused by natural hazards
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="120.00">
<comment><narrative>
Annual number of hours of road closures in Barsem caused by natural hazards, measuring the resilience of transport and trade.

The baseline of this indicator was identified from the moment when this road was completely closed for a month due to the consequences of natural disasters
that occurred. During the winter 2023-2024, based on the data provided by the State Road Maintenance Administration (GUSAD) of the Shugnan district, there
were no roads closures in the village of Barsem due to natural and climatic conditions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road construction jobs created for the local community
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2023-12-31" />
<target value="350.00">
<comment><narrative>
Under civil works contracts, create opportunities for labor from local communities to be employed under the project.

During the reporting period, the total number of temporary jobs created for the local communities were 718, including 279 jobs in the construction of roads in
GBAO and 469 jobs in the Sughd region. 
The indicator has exceeded the target.
</narrative></comment>
</target>
<actual value="540">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-10-11" />
<target value="71,807">
<comment><narrative>
This is a Corporate Results Indicator (CRI) newly added to the Project Results Framework. The baseline is 0, as the people did not have access to climate resillient road infrastructure. The MoT has now calculated the actual and the endline values.
</narrative></comment>
</target>
<actual value="7,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market accessibility index of Sughd region
</narrative></title>
<baseline year="2020" iso-date="2020-06-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-04" />
<period-end iso-date="2026-10-31" />
<target value="0.00">
<comment><narrative>
This is an accessibility indicator for average access of the population to markets in Sughd region. From the beginning of the project, the formula from CARs-2 was used: H=?WJ/TIJ, where H is the accessibility indicator, W- is the size indicator at target j, such as total population in major cities (Khujand, Isfara, and Konibodom), and T is the travel time between the origin and target j, i.e in this case travel time to the market in Khujand from the nearby major cities. The baseline indicator at 20.99 was calculated with no end target for this indicator. 
There are three major cities in Sughd: Khujand, Isfara, and Konibodom. The baseline data for the first half of 2023 will be the following: 
Population of the major cities (thousand people):
Khujand-198.7, Isfara-54.9, Konibodom-54.4
Total=308.0 (thousand persons)
Travel time (in min):
Khujand-10, Isfara-110, Konibodom-90 (min)
Then, the baseline H would be 20.99, which should be updated in last ISR.
The current value is 21.80.
</narrative></comment>
</target>
<actual value="21.80">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P509488</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Regional Electricity Market Interconnectivity and Trade</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Central Asia Regional Electricity Market Interconnectivity and Trade Project for the Kyrgyz Republic, Tajikistan, and Uzbekistan has the development objectives to enhance regional electricity trade through a pilot regional electricity market, strengthen regional transmission capacity, and enable the integration of renewable energy in Central Asia. Component 1: Pilot regional electricity market. This component establishes, operationalizes, and pilots a short-term, transparent, and rules-based regional trading platform that complements existing bilateral contracts, using a day-ahead market to trade national surpluses and deficits and adopting a serviced market framework hosted by CDC Energia as the Regional Market Operator and central counterparty. Sub-components include design and delivery of market rules, participant eligibility and onboarding for transmission system operators and balance-responsible parties including, where permitted, independent power producers, configuration of the trading platform, staff training, and implementation followed by one to two years of live operation with options for extension; and development of an Automated Commercial Metered Data Management System to underpin settlement and reporting. Component 2: Reinforcement and digitalization of regional interconnections. This component finances no-regret investments that modernize and digitalize priority 500 kV and 220 kV assets to increase capacity, reliability, and redundancy, reduce losses, and enable higher variable renewable energy integration and cross-border power flows, while incorporating climate resilience and fiber optic communications. Sub-components include, in Tajikistan, construction of a new 500 kV Dushanbe–Regar transmission line with optical ground wire and the upgrade and expansion of the Regar and Dushanbe 500/220/35 kV substations to secure evacuation from Rogun hydropower plant and double transfer capacity to Uzbekistan; in Uzbekistan, construction of a second 220 kV Uzbekistan–Paulgan–Fergana–Sokin circuit and the Uzbekistan section of the 220 kV Yulduz–Kristall cross-border line with associated substation extensions, fiber optic links, and Supervisory Control and Data Acquisition/Energy Management System (SCADA/EMS) integration to strengthen the Fergana energy hub; and in the Kyrgyz Republic, construction of the Kyrgyz section of the 220 kV Kristall–Yulduz line and modernization and rehabilitation of the 220 kV Kristall and Torobaeva substations to enhance transfer capacity and stability with Uzbekistan, alongside implementation support and preparation of subsequent phase investments. Component 3: Strengthening the institutional framework and enabling environment. This component supports a phased regional governance setup for market development and coordinated planning, leveraging a ministerial-level Electricity Coordination Council under a Central Asia Energy Council, and uses CDC Energia to operate the pilot while options for a long-term market and system operator, a regional planning coordination body, and a regional regulatory body are developed. Sub-components include capacity building for national and regional institutions on technical, fiduciary, and environmental and social practices, knowledge sharing and monitoring and evaluation to inform subsequent market phases, design of trade-enabling financing and risk mitigation mechanisms, and support for coordinated cybersecurity practices and stakeholder engagement.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–00009785"><narrative>Republic of Uzbekistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–00009786"><narrative>Republic of Tajikistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–00009788"><narrative>Kyrgyz Republic</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-00009790"><narrative>Shabakahoi Intiqoli Barq JSC </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-01-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-01-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2032-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2032-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Kabir Malik</narrative></person-name><telephone>+1-202-473-1000</telephone><email>kmalik@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>








<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="0000000" />
                    <name>
                        <narrative>No Data Available</narrative>
                    </name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                    <pos>0.00 0.00</pos>
                </point>
                <exactness code="2"/>
                <location-class code="4" />
            </location><sector vocabulary="1" code="23631" percentage="100" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="100.000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">2933332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">2933344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">833344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">2500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">2933332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">2933344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">140000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">140000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-11893"><narrative>CDC Energia; National Electric Grid of Kyrgyzstan; National Electric Grid of Uzbekistan ; Shabakahoi Intiqoli Barq JSC </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-11893"><narrative>CDC Energia; National Electric Grid of Kyrgyzstan; National Electric Grid of Uzbekistan ; Shabakahoi Intiqoli Barq JSC </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">60000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-11893"><narrative>CDC Energia; National Electric Grid of Kyrgyzstan; National Electric Grid of Uzbekistan ; Shabakahoi Intiqoli Barq JSC </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P509488"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P509488?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P509488"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="1.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="3.0">
<comment><narrative>
Procurement of consultant for preparation of design and bidding document for the Dushanbe-Regar TL and upgrade of the substations is launched. Contract is expected to be signed by June 2026.
</narrative></comment>
</target>
<actual value="1.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Market Operator is Established and Functioning
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional market operator in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A regional market operator role and function developed and operational as part of the pilot regional electricity market in Central Asia.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="8,600">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="4.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants rating stakeholder consultations as effective, transparent, and inclusive (%)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles in implementing entities at Shabaqahoi Intiqoli Barq of Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles at Shabakahoi Intiqoli Barq of Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="17">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional institutional framework for collaboration in the energy sector defined
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional institutional framework for collaboration in the energy sector in place in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="An institutional framework for enhancing the regional cooperation in the energy sector in Central Asia is developed and agreed upon with participating countries.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles in implementing entities at National Electricity Grid of Kyrgyzstan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="1.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="3.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional electricity pilot fully operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional electricity market in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A pilot regional electricity market is established and piloted in Central Asia.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles at Shabakahoi Intiqoli Barq of Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional institutional framework for collaboration in the energy sector defined
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional institutional framework for collaboration in the energy sector in place in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="An institutional framework for enhancing the regional cooperation in the energy sector in Central Asia is developed and agreed upon with participating countries.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants rating stakeholder consultations as effective, transparent, and inclusive (%)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles at National Electricity Grid of Kyrgyzstan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants rating stakeholder consultations as effective, transparent, and inclusive (%)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional electricity pilot fully operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional electricity market in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A pilot regional electricity market is established and piloted in Central Asia.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Kyrgyz Republic
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="1.3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional institutional framework for collaboration in the energy sector defined
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional institutional framework for collaboration in the energy sector in place in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="An institutional framework for enhancing the regional cooperation in the energy sector in Central Asia is developed and agreed upon with participating countries.">
<comment><narrative>
Ministerial meeting is being convened on ad hoc basis.
</narrative></comment>
</target>
<actual value="ToR for the composition of Ministerial Steering Committee/Council (MSC) is developed and reviewed by participating countries.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Kyrgyz Republic
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="1.3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles in implementing entities at Shabaqahoi Intiqoli Barq of Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Market Operator is Established and Functioning
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional market operator in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A regional market operator role and function developed and operational as part of the pilot regional electricity market in Central Asia.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants rating stakeholder consultations as effective, transparent, and inclusive (%)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">
<comment><narrative>
Stakeholder consultation has not been launched yet and will be planned during the calendar year.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles at National Electricity Grid of Kyrgyzstan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="17">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional institutional framework for collaboration in the energy sector defined
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional institutional framework for collaboration in the energy sector in place in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="An institutional framework for enhancing the regional cooperation in the energy sector in Central Asia is developed and agreed upon with participating countries.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="1.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="3.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="8,600">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles in implementing entities at National Electricity Grid of Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles at National Electricity Grid of Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="17">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Market Operator is Established and Functioning
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional market operator in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A regional market operator role and function developed and operational as part of the pilot regional electricity market in Central Asia.">
<comment><narrative>
For the initial phase the CDC Energia will serve as the regional system and market operator for the pilot market.
</narrative></comment>
</target>
<actual value="ToR for development and operation of regional market is finalized and procurement process will be launched in April 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional electricity pilot fully operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional electricity market in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A pilot regional electricity market is established and piloted in Central Asia.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles in implementing entities at National Electricity Grid of Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Tajikistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="1.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="3.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="4.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Kyrgyz Republic
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="1.3">
<comment><narrative>
Procurement for preparation of design and bidding document of the Krystal-Yulduz transmission line and Torobaeva substation is launched and Contract signing is expected in August 2026.
</narrative></comment>
</target>
<actual value="1.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Kyrgyz Republic
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="1.3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy Capacity Enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="8,600">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity traded in Central Asia
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="8,600"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles at National Electricity Grid of Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Market Operator is Established and Functioning
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional market operator in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A regional market operator role and function developed and operational as part of the pilot regional electricity market in Central Asia.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of newly employed women in technical and managerial roles in implementing entities at National Electricity Grid of Kyrgyzstan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="17">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional electricity pilot fully operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No regional electricity market in Central Asia."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="A pilot regional electricity market is established and piloted in Central Asia.">
<comment><narrative>
The ToR for development and operation of pilot regional market is developed and reviewed by all participating countries. Countries also provided nomination for the tendering committee.
</narrative></comment>
</target>
<actual value="ToR for development of regional market is finalized and procurement process will be launched in April 2026">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="4.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2032-12-14" />
<target value="6.7">

</target>
<actual value="4.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased power transmission capacity - Uzbekistan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2.4">
<comment><narrative>
Procurement for modernization of the Krystal-Yulduz and Uzbekistan-Paulgan-Fergana-Sokin TLs is in advanced stage. The contract signing is expected By May, 2026.
</narrative></comment>
</target>
<actual value="1.8">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P177407</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>RESILAND CA+ Program: Kyrgyz Republic Resilient Landscape Restoration Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the project are: (i) to increase the area under sustainable landscape management in Selected Locations in the Kyrgyz Republic; and (ii) to promote Kyrgyz Republic's collaboration with other Central Asian countries on transboundary landscape restoration.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Resiland CA+ Program : Kyrgyz Republic Resilient Landscape Restoration Project for Kyrgyz Republic are: (i) to increase the area under sustainable landscape management in selected locations in the Kyrgyz Republic; and (ii) to promote Kyrgyz Republic's collaboration with other Central Asian countries on transboundary landscape restoration. The project comprises of three components. The first component, strengthening institutions and regional collaboration has a national and regional focus, financing activities that enhance government capacity for forecasting, monitoring, and preparedness for reducing and mitigating impacts of natural and climate-induced disasters, thereby enhancing resilience of landscapes and their restoration and activities that improve regional awareness, capacity, and cooperation on transboundary resilience of landscapes. It consists of following sub-components: (i) strengthening institutions and climate-induced hazard monitoring capacity; (ii) information and communication technology (ICT) for disaster risk management in degraded landscapes; and (iii) strengthening regional collaboration. The second component, enhancing resilient landscapes and livelihoods will finance upstream and downstream nature-based, grey, green, and hybrid solutions for reducing the impact of mudflows on communities, landscapes, and infrastructure in the targeted transboundary areas. It consists of following sub-components: (i) landscape restoration through climate-resilient green solutions; and (ii) landscape restoration through climate-resilient nature-based and grey solutions. The third component, project management and coordination will finance the incremental operating costs and other eligible expenses associated with project implementation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0050227"><narrative>Kyrgyz Republic</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0050226"><narrative>Ministry of Emergency Situations</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-02-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-02-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Aidai Bayalieva</narrative></person-name><telephone>+1-202-473-1000</telephone><email>abayalieva@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
101 Manas Ave, Bishkek, Kyrgyzstan, Kyrgyz Republic, +996 (312) 32-30-70, mchs.sa2021@gmail.com

</narrative></mailing-address></contact-info><recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="0000000" />
                    <name>
                        <narrative>No Data Available</narrative>
                    </name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                    <pos>0.00 0.00</pos>
                </point>
                <exactness code="2"/>
                <location-class code="4" />
            </location><sector vocabulary="1" code="31210" percentage="61" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="61" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="21" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="21" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="18" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="0" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="0" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="0" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="0" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="0" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="0" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="0" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="0" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2538000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">13120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">11823000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">22010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2909000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-29"/>
<value currency="USD" value-date="2029-06-29">35113068.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-29"/>
<value currency="USD" value-date="2029-06-29">35113068.45</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">45000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">250000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">350000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">310335</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">817240</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">581543</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1434180</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">4197808</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">701176</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">738807</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">505842</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-50226"><narrative>Ministry of Emergency Situations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177407"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177407?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177407"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project-supported services
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="75.00">
<comment><narrative>
Result as planned for Year 1. The target reflects the rate of satisfaction of beneficiaries provided with project-financed short, medium, or long-term livelihood opportunities and jobs and affected by DRM interventions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mudflow and land degradation monitoring systems upgraded with ICT and operationalized
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="Systems not upgraded"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="Land degradation and mudflow systems upgraded">
<comment><narrative>
Result as planned for Year 1. The systems will feature: (i) an ICT tool/model for a degraded landscapes disaster management system, (ii) user friendly guidelines for the use of the ICT tool/model in English, Russian, and Kyrgyz, and (iii) a minimum of five MoES offices where the ICT equipment and software will be updated. See full definition in PAD. 
The procurement of ICT equipment is on-going.
</narrative></comment>
</target>
<actual value="Systems not upgraded, but the procurement of IT equipment, training are on-going. The system upgrade is expected as planned in 2027.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Upstream) Community members benefitting from climate-resilient landscape restoration measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="9,765">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects rural communities within upstream intervention areas benefitting from tree planting and NBS measures put in place in terms of reduced landscape degradation and occurrence of mudflows and other disasters
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Upstream) Community members benefitting from climate-resilient landscape restoration measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="9,765">
<comment><narrative>
Preparatory works for tree planting are on-going, and for NBS are yet to be announced early 2026. Results expected in 2027. The target reflects rural communities within upstream intervention areas benefitting from tree planting and NBS measures put in place in terms of reduced landscape degradation and occurrence of mudflows and other disasters.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mudflow and land degradation monitoring systems upgraded with ICT and operationalized
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="Systems not upgraded"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="Land degradation and mudflow systems upgraded">
<comment><narrative>
Result as planned for Year 1. The systems will feature: (i) an ICT tool/model for a degraded landscapes disaster management system, (ii) user friendly guidelines for the use of the ICT tool/model in English, Russian, and Kyrgyz, and (iii) a minimum of five MoES offices where the ICT equipment and software will be updated. See full definition in PAD. 
The procurement of ICT equipment is on-going.
</narrative></comment>
</target>
<actual value="Systems not upgraded, but the procurement of IT equipment, training are on-going. The system upgrade is expected as planned in 2027.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Green jobs created
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="2,800">
<comment><narrative>
Result as planned for Year 1. The target reflects participants in the GWP (2,000) and livelihoods program (800). This indicator corresponds with the PROGREEN Pillar 1 Cross-cutting indicator: &quot;Women and youth with increased benefits from landscape-based value chains (Number)&quot;. Direct PROGREEN contribution: 266. The contribution is based on prorating the PROGREEN co-financing to the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved, and expected during 2026. CAREC organization was hired and leads coordination work between the countries and the governments of Central Asia regularly meet and work towards protocols/MoUs. The policies discussed actively: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central Asia Mountain Product business plan developed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="Product business plan not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="Product business plan finalized">
<comment><narrative>
Result as planned for Year 1. The result it to be agreed by the relevant Central Asian countries. The business plan will  include an outline of a training plan for mountain communities.
</narrative></comment>
</target>
<actual value="Product business plan not in place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Green jobs created
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="2,800">
<comment><narrative>
The livelihoods program (One village one product) has been launched and is in full speed of working with the target communities on mobilization, product identification and selection. Trainings are expected in 2026. GWP is to be announced after the extensive market assessment that will start early 2026. The target reflects participants in the Green Wager Program (2,000) and livelihoods program (800). This indicator corresponds with the PROGREEN Pillar 1 Cross-cutting indicator: &quot;Women and youth with increased benefits from landscape-based value chains (Number)&quot;. Direct PROGREEN contribution: 266. The contribution is based on prorating the PROGREEN co-financing to the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Embankment restored or repaired
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="16.00">
<comment><narrative>
Result as planned for Year 1. The target reflected functioning defective embankments repaired and dysfunctional embankments restored among the total of 30 km of embankments/riverbanks that need to be rehabilitated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Downstream) Community members benefitting from climate-resilient landscape restoration measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="43,632">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the number of people benefiting from structural mudflow mitigation measures.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved, and expected during 2026. CAREC organization was hired and leads coordination work between the countries and the governments of Central Asia regularly meet and work towards protocols/MoUs. The policies discussed actively: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central Asia Mountain Product business plan developed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="Product business plan not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="Product business plan finalized">
<comment><narrative>
Result as planned for Year 1. The result it to be agreed by the relevant Central Asian countries. The business plan will  include an outline of a training plan for mountain communities. 
The Mountain Secretariat is conducting wide discussions on the potential products and is in the process of preparing TORs for consultancy to work with the Central Asian sides on regional product identification and a road map of actions needed.
</narrative></comment>
</target>
<actual value="The Secretariat has started desk review activities, plans to select a consultancy in 2026, discuss with all regional stakeholders and present draft plan in 2027, as planned">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Downstream) Community members benefitting from climate-resilient landscape restoration measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="43,632">
<comment><narrative>
The target reflects the number of people benefiting from structural mudflow mitigation measures. The FS and DD works are on-going, civil works are yet to start in 2026-2027.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
No grievances have been filed to date. Addressed means resolved to the satisfaction of all parties and closed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
No grievances have been filed to date. Addressed means resolved to the satisfaction of all parties and closed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Upstream) Community members benefitting from climate-resilient landscape restoration measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="9,765">
<comment><narrative>
Preparatory works for tree planting are on-going, and for NBS are yet to be announced early 2026. Results expected in 2027. The target reflects rural communities within upstream intervention areas benefitting from tree planting and NBS measures put in place in terms of reduced landscape degradation and occurrence of mudflows and other disasters.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Instruments for regional climate induced disasters developed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="3">
<comment><narrative>
Result as planned for Year 1. The instruments are: (i) a regional roadmap for mudflow mitigation with an investment plan, (ii) regional NBS manual and guidelines for mudflows and other climate induced disasters, and (iii) a catalog of current and future climate-induced disasters of a transboundary nature in Central Asia. 
CAREC has mobilized the relevant expertise to work on document 1 and 3 and is working on establishing a working group consisting of relevant representatives to draft the documents. Document 2 will be launched after the NBS methodology is developed and pilots applied in project sites in the Kyrgyz Republic.
</narrative></comment>
</target>
<actual value="CAREC has involved an expert to support preparation of a regional catalogue of climate induced disasters">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project-supported services
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="75.00">
<comment><narrative>
Result as planned for Year 1. The target reflects the rate of satisfaction of beneficiaries provided with project-financed short, medium, or long-term livelihood opportunities and jobs and affected by DRM interventions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Embankment restored or repaired
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="16.00">
<comment><narrative>
Result as planned for Year 1. The target reflected functioning defective embankments repaired and dysfunctional embankments restored among the total of 30 km of embankments/riverbanks that need to be rehabilitated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Instruments for regional climate induced disasters developed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="3">
<comment><narrative>
Result as planned for Year 1. The instruments are: (i) a regional roadmap for mudflow mitigation with an investment plan, (ii) regional NBS manual and guidelines for mudflows and other climate induced disasters, and (iii) a catalog of current and future climate-induced disasters of a transboundary nature in Central Asia.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National glacier and snow cover monitoring system established and operationalized
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="System not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="System operationalized">
<comment><narrative>
Result as planned for Year 1. The target reflects a central database that integrates glacier and snow cover monitoring information from different agencies, interconnected with the USCMFE, and capable of preparing standard monitoring and modeling reports. The terms of refence are prepared for first stage of functional analysis and bid documents and will be announced early 2026.
</narrative></comment>
</target>
<actual value="System not in place, and functional analysis and feasibility study, as a preparatory activities, to start in 2026.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Upstream) Land area under climate-resilient vegetative and structural management measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="1,425">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects hectares of tree planting (Green Wager), hectares of terracing of degraded lands, and hectares of bioengineering structures (such as gabions, ripraps, and sediment control structures).
Preparatory works on green are on-going, NBS is to be launched in 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Downstream) Land area under climate-resilient structural management measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="8,133">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects hectares of residential, agricultural, and commercial areas protected by the structural measures such as embankment and other NBS measures including vegetative ripraps, groynes, and embankment buffer planting.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project-supported services
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="75.00">
<comment><narrative>
Result as planned for Year 1. The target reflects the rate of satisfaction of beneficiaries provided with project-financed short, medium, or long-term livelihood opportunities and jobs and affected by DRM interventions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Downstream) Land area under climate-resilient structural management measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="8,133">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects hectares of residential, agricultural, and commercial areas protected by the structural measures such as embankment and other NBS measures including vegetative ripraps, groynes, and embankment buffer planting.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Instruments for regional climate induced disasters developed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="3">
<comment><narrative>
Result as planned for Year 1. The instruments are: (i) a regional roadmap for mudflow mitigation with an investment plan, (ii) regional NBS manual and guidelines for mudflows and other climate induced disasters, and (iii) a catalog of current and future climate-induced disasters of a transboundary nature in Central Asia. 
CAREC has mobilized the relevant expertise to work on document 1 and 3 and is working on establishing a working group consisting of relevant representatives to draft the documents. Document 2 will be launched after the NBS methodology is developed and pilots applied in project sites in the Kyrgyz Republic.
</narrative></comment>
</target>
<actual value="CAREC has involved an expert to support preparation of a regional catalogue of climate induced disasters">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
Year 1 target yet to be achieved. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Upstream) Land area under climate-resilient vegetative and structural management measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="1,425">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects hectares of tree planting (Green Wager), hectares of terracing of degraded lands, and hectares of bioengineering structures (such as gabions, ripraps, and sediment control structures).
Preparatory works on green are on-going, NBS is to be launched in 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National glacier and snow cover monitoring system established and operationalized
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="System not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="System operationalized">
<comment><narrative>
Result as planned for Year 1. The target reflects a central database that integrates glacier and snow cover monitoring information from different agencies, interconnected with the USCMFE, and capable of preparing standard monitoring and modeling reports.
</narrative></comment>
</target>
<actual value="System not in place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National glacier and snow cover monitoring system established and operationalized
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="System not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="System operationalized">
<comment><narrative>
Result as planned for Year 1. The target reflects a central database that integrates glacier and snow cover monitoring information from different agencies, interconnected with the USCMFE, and capable of preparing standard monitoring and modeling reports. The terms of refence are prepared for first stage of functional analysis and bid documents and will be announced early 2026.
</narrative></comment>
</target>
<actual value="System not in place, and functional analysis and feasibility study, as a preparatory activities, to start in 2026.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
The targets yet to be achieved, and the first indicators are expected to appear in 2027. Currently, the preparatory works are on-going on green and grey solutions and investment activities are yet to start. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
No grievances have been filed to date. Addressed means resolved to the satisfaction of all parties and closed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Embankment restored or repaired
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="16.00">
<comment><narrative>
Result as planned for Year 1. The target reflected functioning defective embankments repaired and dysfunctional embankments restored among the total of 30 km of embankments/riverbanks that need to be rehabilitated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Green jobs created
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="2,800">
<comment><narrative>
The livelihoods program (One village one product) has been launched and is in full speed of working with the target communities on mobilization, product identification and selection. Trainings are expected in 2026. GWP is to be announced after the extensive market assessment that will start early 2026. The target reflects participants in the Green Wager Program (2,000) and livelihoods program (800). This indicator corresponds with the PROGREEN Pillar 1 Cross-cutting indicator: &quot;Women and youth with increased benefits from landscape-based value chains (Number)&quot;. Direct PROGREEN contribution: 266. The contribution is based on prorating the PROGREEN co-financing to the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
The targets yet to be achieved, and the first indicators are expected to appear in 2027. Currently, the preparatory works are on-going on green and grey solutions and investment activities are yet to start. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
The targets yet to be achieved, and the first indicators are expected to appear in 2027. Currently, the preparatory works are on-going on green and grey solutions and investment activities are yet to start. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
Year 1 target yet to be achieved. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved, and expected during 2026. CAREC organization was hired and leads coordination work between the countries and the governments of Central Asia regularly meet and work towards protocols/MoUs. The policies discussed actively: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved, and expected during 2026. CAREC organization was hired and leads coordination work between the countries and the governments of Central Asia regularly meet and work towards protocols/MoUs. The policies discussed actively: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved. The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved. The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
The targets yet to be achieved, and the first indicators are expected to appear in 2027. Currently, the preparatory works are on-going on green and grey solutions and investment activities are yet to start. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Downstream) Community members benefitting from climate-resilient landscape restoration measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="43,632">
<comment><narrative>
The target reflects the number of people benefiting from structural mudflow mitigation measures. The FS and DD works are on-going, civil works are yet to start in 2026-2027.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
The targets yet to be achieved, and the first indicators are expected to appear in 2027. Currently, the preparatory works are on-going on green and grey solutions and investment activities are yet to start. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
The targets yet to be achieved, and the first indicators are expected to appear in 2027. Currently, the preparatory works are on-going on green and grey solutions and investment activities are yet to start. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="9558">
<comment><narrative>
Year 1 target yet to be achieved. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved, and expected during 2026. CAREC organization was hired and leads coordination work between the countries and the governments of Central Asia regularly meet and work towards protocols/MoUs. The policies discussed actively: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved, and expected during 2026. CAREC organization was hired and leads coordination work between the countries and the governments of Central Asia regularly meet and work towards protocols/MoUs. The policies discussed actively: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="5.00">
<comment><narrative>
Year 1 target yet to be achieved. The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &quot;peace parks&quot;, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol. When results are aggregated at the RESILAND CA+ level, this result will not be double counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Upstream) Land area under climate-resilient vegetative and structural management measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="1,425">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects hectares of tree planting (Green Wager), hectares of terracing of degraded lands, and hectares of bioengineering structures (such as gabions, ripraps, and sediment control structures).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Downstream) Land area under climate-resilient structural management measures
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="8,133">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects hectares of residential, agricultural, and commercial areas protected by the structural measures such as embankment and other NBS measures including vegetative ripraps, groynes, and embankment buffer planting.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mudflow and land degradation monitoring systems upgraded with ICT and operationalized
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="Systems not upgraded"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="Land degradation and mudflow systems upgraded">
<comment><narrative>
Result as planned for Year 1. The systems will feature: (i) an ICT tool/model for a degraded landscapes disaster management system, (ii) user friendly guidelines for the use of the ICT tool/model in English, Russian, and Kyrgyz, and (iii) a minimum of five MoES offices where the ICT equipment and software will be updated. See full definition in PAD.
</narrative></comment>
</target>
<actual value="Systems not upgraded">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central Asia Mountain Product business plan developed
</narrative></title>
<baseline year="2024" iso-date="2024-06-01" value="Product business plan not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-01" />
<period-end iso-date="2029-06-01" />
<target value="Product business plan finalized">
<comment><narrative>
Result as planned for Year 1. The result it to be agreed by the relevant Central Asian countries. The business plan will  include an outline of a training plan for mountain communities. 
The Mountain Secretariat is conducting wide discussions on the potential products and is in the process of preparing TORs for consultancy to work with the Central Asian sides on regional product identification and a road map of actions needed.
</narrative></comment>
</target>
<actual value="The Secretariat has started desk review activities, plans to select a consultancy in 2026, discuss with all regional stakeholders and present draft plan in 2027, as planned">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2024" iso-date="2024-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-31" />
<period-end iso-date="2029-05-31" />
<target value="53,397">
<comment><narrative>
Year 1 target yet to be achieved. The target reflects the population that resides within the Kyrgyz Republic side of the project corridor, namely upstream and downstream community members benefiting from climate-resilient landscape restoration measures under sub-components 2.1 and 2.2.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T09:34:50" hierarchy="1"><iati-identifier>44000-P174135</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>RESILAND CA+ Program: Uzbekistan Resilient Landscapes Restoration Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are (i) to increase the area under sustainable landscape management in Selected Locations in Uzbekistan; and (ii) to promote Uzbekistan's collaboration with other Central Asian countries on transboundary landscape restoration.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Resilient Landscapes Restoration Project for Uzbekistan are: (i) to increase the area under sustainable landscape management in selected locations in Uzbekistan; and (ii) to promote Uzbekistan's collaboration with other Central Asian countries on transboundary landscape restoration. The project comprises of four components. The first component, strengthen institutions and policies, and support to regional collaboration will finance consulting services, goods, training and workshops, and operating costs. It consists of following sub-components: (i) strengthen institutions and policies; (ii) develop an information and communication technology (ICT) platform for forest landscape restoration and management; and (iii) strengthen regional collaboration. The second component, enhance resilient landscapes and livelihoods will finance works, consulting services, non-consulting services, goods, enterprise development matching grants, training and workshops, and operating costs. It consists of following sub-components: (i) enhance tree-based landscape restoration and management; and (ii) enhance resilient livelihoods and value chains. The third component, enhance protected areas and nature-based tourism will finance works, consulting services, non-consulting services, goods, training and workshops, and operating costs. It consists of following sub-components: (i) improve protected area management; and (ii) enhance nature-based tourism. The fourth component, project management and coordination will finance consulting services, non-consulting services, goods, equipment, training, incremental operating costs, and other eligible expenses associated with project implementation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0045766"><narrative>Republic of Uzbekistan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7C–P0045766"><narrative>Republic of Uzbekistan</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7C-COA-0045765"><narrative>Forestry Agency</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-09-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-09-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-09-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Asferachew Abate Abebe</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aabate@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="619" percentage="100" vocabulary="1"><narrative xml:lang="en">Central Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001215692" />
            <name><narrative>Zomin Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40 68.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001215838" />
            <name><narrative>Urgut Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.41667 67.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001217655" />
            <name><narrative>Bulung`ur Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.75 67.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001217778" />
            <name><narrative>Baxmal Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.75 67.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001346497" />
            <name><narrative>Uzun Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38.16667 68.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001512717" />
            <name><narrative>Sirdaryo Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.83333 68.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001513021" />
            <name><narrative>Pop Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.86654 71.11478</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001514024" />
            <name><narrative>Forish Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.66667 67.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001514068" />
            <name><narrative>Jizzax Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>40.08333 67.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001216113" />
            <name><narrative>Sho`rchi Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38 67.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001216186" />
            <name><narrative>Shahrisabz Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39 67.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001216243" />
            <name><narrative>Sariosiyo Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>38.66667 67.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001216686" />
            <name><narrative>Qumqo`rg`on</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>37.81528 67.57889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001216786" />
            <name><narrative>Kitob Tumani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>39.16074 67.03055</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31210" percentage="54" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="30" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="67.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YT" percentage="28.0000000" xml:lang="en"><narrative>FY17 - Tourism</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="6" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="64" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="64" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="64" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="72" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000831" percentage="72" xml:lang="en"><narrative>Forests Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="64" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="65" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="100" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="70" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="7" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="72" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="70" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="55" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="80" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="64" xml:lang="en"><narrative>Biodiversity</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1758333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1758333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3933333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3437500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1762500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">712500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">107142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">107142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">107142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">107142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">107142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">107142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">107142.84</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-15"/>
<value currency="USD" value-date="2028-09-15">103186526.04</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-15"/>
<value currency="USD" value-date="2028-09-15">103186526.04</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">142000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">967000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">2200000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">15585969</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1319600</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2740905</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-4930</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-12861</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-121995</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-280782</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="7C-COA-45765"><narrative>Forestry Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174135"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174135?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174135"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="8500.00">
<comment><narrative>
No results can be reported yet, the project has just started the implementation and preparing for the activities on the ground.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nature-based tourism infrastructure established or upgraded in Protected Areas and State Forest Fund Land
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="20.00">
<comment><narrative>
No results can be reported yet. The NBT basic infrastructure will include visitor centers in Zaamin PA and in Central leskhoz of Samarkand PA, as well as any of the following: observation points, roads, trails, parking areas, guest accommodation facilities, camping and picnic areas, zipline facilities, safe water facilities, food service areas, restrooms, waste disposal facilities, or other infrastructure that supports NBT in PAs and SFF land around the PAs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
During the reporting period, significant progress has been made in identifying and engaging beneficiaries of landscape management practices within the framework of the project “Restoration of Sustainable Forest Landscapes in Uzbekistan” across Jizzakh, Namangan, Kashkadarya, Samarkand, Syrdarya, and Surkhandarya regions.
A total of 316 mahalla citizens assemblies across 130 districts and cities were assessed to identify vulnerable population groups. As a result, 5,293 low-income households were identified as potential direct beneficiaries of project interventions. Overall, the project is progressing toward its target of 25,000 direct beneficiaries, with further expansion expected as implementation of planned activities accelerates.
</narrative></comment>
</target>
<actual value="5893">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A National ICT Platform for Forest Landscape Restoration and Management developed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No ICT platform in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="ICT Platform in place and operational">
<comment><narrative>
The work started. No results can be reported yet. The ICT Platform would be a state-of-the-art two-way forest management information system that monitors afforestation, reforestation, natural regeneration forests, and forest land use changes, and features a disaster response information platform, forest big data with mobile application, and a decision support tool that produces tailor-made recommendations on a set of forest-related subjects for decision making, planning, and monitoring.
</narrative></comment>
</target>
<actual value="No ICT platform in place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="8500.00">
<comment><narrative>
No result is available yet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or existing natural resource-based enterprises that receive financing
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="250.00">
<comment><narrative>
No results can be reported yet as the project had not yet been declared effective. Enterprises could be of three types as laid out in Law N 69-II, enacted on 25 May 2000 and amended on 2 May 2012: individual entrepreneurs, microfirms, and small enterprises.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional online database established and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="A thematic portal on energy, water, climate, agriculture, and health (CACIP)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="A regional online database on sustainable landscape restoration and management attached to CACIP">
<comment><narrative>
CAREC houses a Central Asia online database that stores, hosts, and publishes data and publications on sustainable landscape management and restoration with links to similar landscape restoration platforms outside the region. Following the hiring of CAREC by Uzbekistan RESILAND, the  Online database has been updated with data collected from Uzbekistan on landscape management.
</narrative></comment>
</target>
<actual value="A thematic portal on energy, water, climate, agriculture, and health (CACIP)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A technology-based National Forest Inventory developed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No NFI in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="First cycle NFI in place">
<comment><narrative>
No results can be reported yet. The NFI (first cycle) will be presented within an NFMS - a data platform that is capable of producing reports that inform forest and relevant policies and forest landscape planning, allows the periodical updating of data, and the production of periodical relevant reports. The NFI will cover the entire country and present data collected through field and remote sensing surveys.
</narrative></comment>
</target>
<actual value="No NFI in place">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
Result yet to be reported as soon as data is collected from the filed on the number of beneficiaries.  The target reflects the population that resides within the Uzbekistan side of the 6 Project corridors, including 25,000 direct beneficiaries (lands users under sub-component 2.1 and 2.2). Indirect beneficiaries are expected to benefit from landscape management practices through environmental services and NBT activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under improved agroforestry systems, plantation, reforestation, and/or grazing management
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="253,464.00">
<comment><narrative>
No results can be reported yet as the project had not yet been declared effective. The target reflects 77,700 hectares of tree-based production oriented interventions and ecosystem service-oriented interventions and 175,764 hectares of farmer-based natural regeneration.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feedback/grievances resolved within the stipulated service standards for response time
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
Training sessions on grievance resolution mechanisms were held in Syrdarya (29.09.2025), Kashkadarya (30.11.2025), Surkhandarya (02.12.2025), Jizzakh (17.12.2025), Samarkand (19.12.2025), Namangan (29.12.2025) regions together with forestry workers, residents and women living near forest areas. In forestry enterprises, hunting farms, and national natural parks within the project area, 44 complaint boxes and 44 complaint mechanism banners were installed.
Complaint boxes were checked in 6 zones of the project. To date, it has been established that work is underway to construct terraces and restore pastures, and no complaints have been received.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
CAREC drafted six polices and now are being reviewed by the six countries. The policies include : (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project-supported services
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
No results can be reported yet as the project had not yet been declared effective. Rate of satisfaction of beneficiaries provided with project-financed short, medium, or long-term livelihood opportunities and jobs, job-oriented training, and/or micro-finance. Livelihoods are defined as activities that generate income, monetary or in kind. Beneficiaries are community members, farmers and farmer group members, SME members, and other target groups that benefit from the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land-users adopting landscape restoration practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="25,000.00">
<comment><narrative>
No results can be reported yet as the project had not yet been declared effective. Individuals and their household members engaging in project-funded landscape restoration practices supported under sub-component 2.1, and community members/groups&amp;#39; members/SME members engaging in project-financed new or improved livelihoods in sustainable livelihoods under sub-component 2.2. This indicator corresponds with the PROGREEN indicator for pillar 1 &amp;quot;Land-users adopting new practices in targeted landscapes&amp;quot;. Direct PROGREEN contribution: 1,250 people, 375 of whom women.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="8500.00">
<comment><narrative>
No results can be reported yet, the project has just started the implementation and preparing for the activities on the ground.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project-supported services
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
The livelihood activities have not yet started.Rate of satisfaction of beneficiaries provided with project-financed short, medium, or long-term livelihood opportunities and jobs, job-oriented training, and/or micro-finance. Livelihoods are defined as activities that generate income, monetary or in kind. Beneficiaries are community members, farmers and farmer group members, SME members, and other target groups that benefit from the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting effective engagement processes through the regional online database
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
Currently, 35 beneficiaries are reporting effective engagement processes through the regional online database, as a proportion of the total target user base, while the system is still in the initial stage of implementation and full user coverage has not yet been achieved.
</narrative></comment>
</target>
<actual value="35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project-supported services
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
The livelihood activities have not yet started.Rate of satisfaction of beneficiaries provided with project-financed short, medium, or long-term livelihood opportunities and jobs, job-oriented training, and/or micro-finance. Livelihoods are defined as activities that generate income, monetary or in kind. Beneficiaries are community members, farmers and farmer group members, SME members, and other target groups that benefit from the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nature-based tourism infrastructure established or upgraded in Protected Areas and State Forest Fund Land
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="20.00">
<comment><narrative>
No results can be reported yet. The NBT basic infrastructure will include visitor centers in Zaamin PA and in Central leskhoz of Samarkand PA, as well as any of the following: observation points, roads, trails, parking areas, guest accommodation facilities, camping and picnic areas, zipline facilities, safe water facilities, food service areas, restrooms, waste disposal facilities, or other infrastructure that supports NBT in PAs and SFF land around the PAs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Protected area under improved management
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="26,536.00">
<comment><narrative>
Work has not yet started. No results can be reported yet. The target reflects the area of Zaamin PA (24,110 ha) and 10 percent of the area of the Central leskhoz of Samarkand PA (2,426 ha). This indicator corresponds with the PROGREEN indicator for Pillar 1: Land area under reforestation (direct contribution: 1,326 ha)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="373893.00">
<comment><narrative>
No results can be reported yet as the project had not yet been declared effective. Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon. They are reported i metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="373893.00">
<comment><narrative>
No results can be reported yet as the land restoration activities are at the early stage. Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon. They are reported i metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting effective engagement processes through the regional online database
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
No results can be reported yet. Beneficiaries are users of the regional online database supported under sub-component 1.3 and managed and hosted by CAREC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feedback/grievances resolved within the stipulated service standards for response time
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
No results can be reported yet. This indicator measures that proportion of feedback/grievances that are addressed within set standards as stipulated in the Project GRM guidelines.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nature-based tourism infrastructure established or upgraded in Protected Areas and State Forest Fund Land
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="20.00">
<comment><narrative>
Work has not yet started. No results can be reported yet. The NBT basic infrastructure will include visitor centers in Zaamin PA and in Central leskhoz of Samarkand PA, as well as any of the following: observation points, roads, trails, parking areas, guest accommodation facilities, camping and picnic areas, zipline facilities, safe water facilities, food service areas, restrooms, waste disposal facilities, or other infrastructure that supports NBT in PAs and SFF land around the PAs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in Protected Areas Management Effectiveness Tracking Tool (METT) score
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="10.00">
<comment><narrative>
No results can be reported yet. METT tracks and monitors progress towards worldwide protected area management effectiveness. The methodology is a rapid assessment based on a scorecard questionnaire. The scorecard includes all six elements of management identified in the IUCN World Commission on Protected Area (context, planning, inputs, process, outputs, and outcomes). Baseline to be established.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land-users adopting landscape restoration practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="25,000.00">
<comment><narrative>
No change since the last mission. The livelihood activities have been delayed. The PIU is in the process of hiring a consultancy firm to speed up the implementation of this component.  The activities include Individuals and their household members engaging in project-funded landscape restoration practices supported under sub-component 2.1, and community members/groups, members/SME members engaging in project-financed new or improved livelihoods in sustainable livelihoods under sub-component 2.2. This indicator corresponds with the PROGREEN indicator for pillar 1Land-users adopting new practices in targeted landscape. Direct PROGREEN contribution: 1,250 people, 375 of whom women.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or existing natural resource-based enterprises that receive financing
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="250.00">
<comment><narrative>
The work on nature based tourism has not yet started and no nature based enterprises so far.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
Result yet to be reported after data on the area covered with land restoration activities are collected. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="8500.00">
<comment><narrative>
No result is available yet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or existing natural resource-based enterprises that receive financing
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="250.00">
<comment><narrative>
The status has not changed since the last Implementation Support Mission. The work on Nature Based Tourism (NBT) has not yet started and no nature based enterprises so far.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under improved agroforestry systems, plantation, reforestation, and/or grazing management
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="253,464.00">
<comment><narrative>
No results can be reported yet as the land restoration activities began recently, Data should be collected on the areas of land that have been restored.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
Result yet to be reported as the implementation just started. The target reflects the population that resides within the Uzbekistan side of the 6 Project corridors, including 25,000 direct beneficiaries (lands users under sub-component 2.1 and 2.2). Indirect beneficiaries are expected to benefit from landscape management practices through environmental services and NBT activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
Result yet to be reported as the project is not yet effective.&amp;nbsp;The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productiv system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional online database established and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="A thematic portal on energy, water, climate, agriculture, and health (CACIP)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="A regional online database on sustainable landscape restoration and management attached to CACIP">
<comment><narrative>
CAREC is contracted to start with updating the Regional Online database. No update is available at this stage. CAREC houses a Central Asia online database that stores, hosts, and publishes data and publications on sustainable landscape management and restoration with links to similar landscape restoration platforms outside the region. When results are aggregated at the RESILAND CA+ level, this result will not be double-counted.
</narrative></comment>
</target>
<actual value="A thematic portal on energy, water, climate, agriculture, and health (CACIP)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting effective engagement processes through the regional online database
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
No results can be reported yet as the work started recently. Beneficiaries are users of the regional online database supported under sub-component 1.3 and managed and hosted by CAREC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
During the reporting period, implementation of sustainable landscape management practices has been initiated across 37 forestry enterprises in Jizzakh, Namangan, Kashkadarya, Samarkand, Syrdarya, and Surkhandarya regions. For 2025 and the first half of 2026, a total of 81,436 hectares was planned, including:
74,596 ha under forestry enterprises;
5,970 ha under protected natural areas;
870 ha under forest hunting farms.
Implementation progress in 2025/26 shows that:
Pasture restoration was carried out on 11,440 hectares (81% of the annual plan of 14,120 ha);
Terrace works were implemented on 945 hectare.(19% of the planned 5,120 ha).
In addition, contracts worth USD 21.95 million were signed with 24 forestry enterprises for pasture restoration and terrace construction.
Furthermore, 37 forestry enterprises signed contracts totaling USD 9.775 million for activities including farmer-managed natural regeneration and afforestations.
</narrative></comment>
</target>
<actual value="12 385">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="373893.00">
<comment><narrative>
No results can be reported yet as the land restoration activities are at the early stage. Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon. They are reported i metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Protected area under improved management
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="26,536.00">
<comment><narrative>
No results can be reported yet. The target reflects the area of Zaamin PA (24,110 ha) and 10 percent of the area of the Central leskhoz of Samarkand PA (2,426 ha). This indicator corresponds with the PROGREEN indicator for Pillar 1: Land area under reforestation (direct contribution: 1,326 ha)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A technology-based National Forest Inventory developed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No NFI in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="First cycle NFI in place">
<comment><narrative>
The TOR for conducting national forest inventory has been prepared and the work will be given to FAO. The PIU had multiple discussion with the FAO on assessment of the landscape (remote sensing, mapping, software and equipment), and preliminary negotiations have been held on the implementation of the National Forest Inventory by FAO;
Software for the implementation of the national modern forest monitoring system has not been developed, but a contract has been formalized with the Republican Aerogeodetic Center.
</narrative></comment>
</target>
<actual value="No NFI in place, preparation to start with the national forest inventory is advancing.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
During the reporting period, significant progress has been made in identifying and engaging beneficiaries of landscape management practices within the framework of the project “Restoration of Sustainable Forest Landscapes in Uzbekistan” across Jizzakh, Namangan, Kashkadarya, Samarkand, Syrdarya, and Surkhandarya regions.
A total of 316 mahalla citizens assemblies across 130 districts and cities were assessed to identify vulnerable population groups. As a result, 5,293 low-income households were identified as potential direct beneficiaries of project interventions. Overall, the project is progressing toward its target of 25,000 direct beneficiaries, with further expansion expected as implementation of planned activities accelerates.
</narrative></comment>
</target>
<actual value="5893">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
Result yet to be reported as soon as data is collected from the filed on the number of beneficiaries.  The target reflects the population that resides within the Uzbekistan side of the 6 Project corridors, including 25,000 direct beneficiaries (lands users under sub-component 2.1 and 2.2). Indirect beneficiaries are expected to benefit from landscape management practices through environmental services and NBT activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
Result yet to be reported as the implementation just started. The target reflects the population that resides within the Uzbekistan side of the 6 Project corridors, including 25,000 direct beneficiaries (lands users under sub-component 2.1 and 2.2). Indirect beneficiaries are expected to benefit from landscape management practices through environmental services and NBT activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
All the countries should sign the MOU. The review process advanced and Uzbekistan has already signed all the MOUs. The policies include : (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
CAREC drafted six polices and now are being reviewed by the six countries. The policies include : (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
Result yet to be reported as the project just recently declared effectiveness and other RESILAND regional activities have not commenced.
The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection. When results are aggregated at the RESILAND CA+ level, this result will not be double-counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
During the reporting period, implementation of sustainable landscape management practices has been initiated across 37 forestry enterprises in Jizzakh, Namangan, Kashkadarya, Samarkand, Syrdarya, and Surkhandarya regions. For 2025 and the first half of 2026, a total of 81,436 hectares was planned, including:
74,596 ha under forestry enterprises;
5,970 ha under protected natural areas;
870 ha under forest hunting farms.
Implementation progress in 2025/26 shows that:
Pasture restoration was carried out on 11,440 hectares (81% of the annual plan of 14,120 ha);
Terrace works were implemented on 945 hectare.(19% of the planned 5,120 ha).
In addition, contracts worth USD 21.95 million were signed with 24 forestry enterprises for pasture restoration and terrace construction.
Furthermore, 37 forestry enterprises signed contracts totaling USD 9.775 million for activities including farmer-managed natural regeneration and afforestations.
</narrative></comment>
</target>
<actual value="12 385">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
Result yet to be reported after data on the area covered with land restoration activities are collected. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
Result yet to be reported as the project is not yet effective.&amp;nbsp;The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productiv system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Protected area under improved management
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="26,536.00">
<comment><narrative>
No results can be reported yet. The target reflects the area of Zaamin PA (24,110 ha) and 10 percent of the area of the Central leskhoz of Samarkand PA (2,426 ha). This indicator corresponds with the PROGREEN indicator for Pillar 1: Land area under reforestation (direct contribution: 1,326 ha)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A technology-based National Forest Inventory developed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No NFI in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="First cycle NFI in place">
<comment><narrative>
This activity has not yet started. The NFI (first cycle) will be presented within an NFMS - a data platform that is capable of producing reports that inform forest and relevant policies and forest landscape planning, allows the periodical updating of data, and the production of periodical relevant reports. The NFI will cover the entire country and present data collected through field and remote sensing surveys.
</narrative></comment>
</target>
<actual value="No NFI in place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in Protected Areas Management Effectiveness Tracking Tool (METT) score
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="10.00">
<comment><narrative>
No results can be reported yet. METT tracks and monitors progress towards worldwide protected area management effectiveness. The methodology is a rapid assessment based on a scorecard questionnaire. The scorecard includes all six elements of management identified in the IUCN World Commission on Protected Area (context, planning, inputs, process, outputs, and outcomes). Baseline to be established.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under improved agroforestry systems, plantation, reforestation, and/or grazing management
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="253,464.00">
<comment><narrative>
No results can be reported yet as the land restoration activities began recently, Data should be collected on the areas of land that have been restored.  The target reflects 77,700 hectares of tree-based production oriented interventions and ecosystem service-oriented interventions and 175,764 hectares of farmer-based natural regeneration.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enabling environment for Land Degradation Neutrality and Nationally Determined Contribution targets improved
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="Yes">
<comment><narrative>
No results can be reported yet. The improved enabling environment will include: (i) revised LDN targets, (ii) a draft unified policy for forest landscape management, (iii) a draft comprehensive Forest Code, (iv) a draft national master plan for FLR and management, and (v) official incorporation of educational curricula on forest landscape restoration into the TSAU. Approaches for collaborative management with communities and user groups to user groups will be explored. This indicator corresponds with the PROGREEN indicator for Countries with policy and institutional framework improved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A National ICT Platform for Forest Landscape Restoration and Management developed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No ICT platform in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="ICT Platform in place and operational">
<comment><narrative>
No results can be reported yet. The ICT Platform would be a state-of-the-art two-way forest management information system that monitors afforestation, reforestation, natural regeneration forests, and forest land use changes, and features a disaster response information platform, forest big data with mobile application, and a decision support tool that produces tailor-made recommendations on a set of forest-related subjects for decision making, planning, and monitoring. The TOR is being finalized and tendering process to be finalized in Q1 CY2025.
</narrative></comment>
</target>
<actual value="No ICT platform in place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A National ICT Platform for Forest Landscape Restoration and Management developed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No ICT platform in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="ICT Platform in place and operational">
<comment><narrative>
The work in analyzing satellite imagery has been completed. The system for establishing the ICT system is being established at the Forest Agency.  The ICT Platform would be a state-of-the-art two-way forest management information system that monitors afforestation, reforestation, natural regeneration forests, and forest land use changes, and features a disaster response information platform, forest big data with mobile application, and a decision support tool that produces tailor-made recommendations on a set of forest-related subjects for decision making, planning, and monitoring.
</narrative></comment>
</target>
<actual value="No ICT platform in place yet. Work has advanced.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="8500.00">
<comment><narrative>
No result is available yet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in Protected Areas Management Effectiveness Tracking Tool (METT) score
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="10.00">
<comment><narrative>
Work has not yet started. No results can be reported yet. METT tracks and monitors progress towards worldwide protected area management effectiveness. The methodology is a rapid assessment based on a scorecard questionnaire. The scorecard includes all six elements of management identified in the IUCN World Commission on Protected Area (context, planning, inputs, process, outputs, and outcomes). Baseline to be established.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="8500.00">
<comment><narrative>
No result is available yet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enabling environment for Land Degradation Neutrality and Nationally Determined Contribution targets improved
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="Yes">
<comment><narrative>
The enabling environment for Land Degradation Neutrality (LDN) and Nationally Determined Contribution (NDC) targets has been significantly strengthened through policy development and institutional improvements. A key milestone is the development of the draft Forest Code of the Republic of Uzbekistan (for the first time), which is currently under coordination with relevant ministries and agencies and is expected to be adopted within the year. This represents a major step toward establishing a comprehensive legal framework for sustainable forest landscape management. In addition, a Memorandum of Understanding (MoU) has been signed between the Central Asian University for the Study of the Environment and Climate Change and the project implementation unit, aimed at strengthening institutional capacity and policy support. Overall, the progress for achieving this indicator is significant.
</narrative></comment>
</target>
<actual value="In progress">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feedback/grievances resolved within the stipulated service standards for response time
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
No results can be reported yet. This indicator measures that proportion of feedback/grievances that are addressed within set standards as stipulated in the Project GRM guidelines.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
All the countries should sign the MOU. The review process advanced and Uzbekistan has already signed all the MOUs. The policies include : (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land-users adopting landscape restoration practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="25,000.00">
<comment><narrative>
The livelihood activities have been delayed. The PIU is in the process of hiring a consultancy firm to speed up the implementation of this component.  The activities include Individuals and their household members engaging in project-funded landscape restoration practices supported under sub-component 2.1, and community members/groups, members/SME members engaging in project-financed new or improved livelihoods in sustainable livelihoods under sub-component 2.2. This indicator corresponds with the PROGREEN indicator for pillar 1Land-users adopting new practices in targeted landscape. Direct PROGREEN contribution: 1,250 people, 375 of whom women.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional online database established and operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="A thematic portal on energy, water, climate, agriculture, and health (CACIP)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="A regional online database on sustainable landscape restoration and management attached to CACIP">
<comment><narrative>
No results can be reported yet. CAREC houses a Central Asia online database that stores, hosts, and publishes data and publications on sustainable landscape management and restoration with links to similar landscape restoration platforms outside the region. When results are aggregated at the RESILAND CA+ level, this result will not be double-counted.
</narrative></comment>
</target>
<actual value="A thematic portal on energy, water, climate, agriculture, and health (CACIP)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enabling environment for Land Degradation Neutrality and Nationally Determined Contribution targets improved
</narrative></title>
<baseline year="2022" iso-date="2022-05-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-17" />
<period-end iso-date="2028-09-15" />
<target value="Yes">
<comment><narrative>
No results can be reported yet. The improved enabling environment will include: (i) revised LDN targets, (ii) a draft unified policy for forest landscape management, (iii) a draft comprehensive Forest Code, (iv) a draft national master plan for FLR and management, and (v) official incorporation of educational curricula on forest landscape restoration into the TSAU. Approaches for collaborative management with communities and user groups to user groups will be explored. This indicator corresponds with the PROGREEN indicator for Countries with policy and institutional framework improved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
During the reporting period, significant progress has been made in identifying and engaging beneficiaries of landscape management practices within the framework of the project “Restoration of Sustainable Forest Landscapes in Uzbekistan” across Jizzakh, Namangan, Kashkadarya, Samarkand, Syrdarya, and Surkhandarya regions.
A total of 316 mahalla citizens assemblies across 130 districts and cities were assessed to identify vulnerable population groups. As a result, 5,293 low-income households were identified as potential direct beneficiaries of project interventions. Overall, the project is progressing toward its target of 25,000 direct beneficiaries, with further expansion expected as implementation of planned activities accelerates.
</narrative></comment>
</target>
<actual value="5893">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
Result yet to be reported as soon as data is collected from the filed on the number of beneficiaries.  The target reflects the population that resides within the Uzbekistan side of the 6 Project corridors, including 25,000 direct beneficiaries (lands users under sub-component 2.1 and 2.2). Indirect beneficiaries are expected to benefit from landscape management practices through environmental services and NBT activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="500,000.00">
<comment><narrative>
Result yet to be reported as the implementation just started. The target reflects the population that resides within the Uzbekistan side of the 6 Project corridors, including 25,000 direct beneficiaries (lands users under sub-component 2.1 and 2.2). Indirect beneficiaries are expected to benefit from landscape management practices through environmental services and NBT activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
All the countries should sign the MOU. The review process advanced and Uzbekistan has already signed all the MOUs. The policies include : (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
CAREC drafted six polices and now are being reviewed by the six countries. The policies include : (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
Result yet to be reported as the project just recently declared effectiveness and other RESILAND regional activities have not commenced.
The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection. When results are aggregated at the RESILAND CA+ level, this result will not be double-counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
During the reporting period, implementation of sustainable landscape management practices has been initiated across 37 forestry enterprises in Jizzakh, Namangan, Kashkadarya, Samarkand, Syrdarya, and Surkhandarya regions. For 2025 and the first half of 2026, a total of 81,436 hectares was planned, including:
74,596 ha under forestry enterprises;
5,970 ha under protected natural areas;
870 ha under forest hunting farms.
Implementation progress in 2025/26 shows that:
Pasture restoration was carried out on 11,440 hectares (81% of the annual plan of 14,120 ha);
Terrace works were implemented on 945 hectare.(19% of the planned 5,120 ha).
In addition, contracts worth USD 21.95 million were signed with 24 forestry enterprises for pasture restoration and terrace construction.
Furthermore, 37 forestry enterprises signed contracts totaling USD 9.775 million for activities including farmer-managed natural regeneration and afforestations.
</narrative></comment>
</target>
<actual value="12 385">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
Result yet to be reported after data on the area covered with land restoration activities are collected. The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="280000.00">
<comment><narrative>
Result yet to be reported as the project is not yet effective.&amp;nbsp;The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productiv system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transboundary sustainable landscape management policies harmonized
</narrative></title>
<baseline year="2022" iso-date="2022-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-16" />
<period-end iso-date="2028-09-14" />
<target value="5.00">
<comment><narrative>
Result yet to be reported as the project just recently declared effectiveness and other RESILAND regional activities have not commenced.
The policies could be: (i) MoU for restoration of transboundary landscape corridors in Central Asia, (ii) regional methodology for ecosystem classification and inventory, (iii) MoU for the designation of transboundary &amp; peace parks, (iv) protocol for tourism across transboundary protected areas, and (v) nature-based solutions protocol for transboundary road protection. When results are aggregated at the RESILAND CA+ level, this result will not be double-counted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>