<?xml version="1.0" encoding="utf-8"?>  
		   <iati-activities version="2.03" generated-datetime="2026-10-15T16:48:13">
		   <iati-activity last-updated-datetime="2026-10-15T16:48:13"
		   xml:lang="EN" default-currency="USD" hierarchy="01">
		   <iati-identifier>XI-IATI-WBTF-TF071309</iati-identifier>
		   <reporting-org ref="XI-IATI-WBTF" type="40">  
		   		   <narrative>World Bank Trust Funds</narrative>
		   </reporting-org>
		   <title>
		   <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility	   </narrative>
		   </title>
		   <description type="1">
		   <narrative>&quot;The Pacific Regional Infrastructure Facility is a multi-donor  partnership established to provide flexible, transparent long-term  support and increased infrastructure investment in Pacific Island  Countries. This TFP represents interim funding arrangements for funds  administered by the World Bank.  In parallel, AusAID is also  establishing a separate Infrastructure Facility administered by ADB.   These Facilities will be administered separately but with common  mechanisms to ensure effective coordination.
 
 During this interim phase, a longer-term PRIF funding and delivery  mechanism will be developed, with the interim process providing the  development partners an opportunity to strengthen coordination and  harmonization, as well as undertake core analytic work to define a  long-term strategic direction.
 
 PRIF has five overall strategic objectives:
 1. Strengthen infrastructure services through the provision of  long-term, performance-linked support.
 2. Support country and region-led mechanisms, including infrastructure  planning and management and enhanced country/regional ownership.
 3. Support public expenditure management, by assisting with improved  budgetary management and planning/funding of infrastructure services.
 4. Build technical and institutional capacity to manage infrastructure,  with a focus on approaches suitable for small island states.
 5. Improve partnership and harmonization, by providing a common  platform for collaboration in infrastructure in the Pacific.&quot; </narrative>
		   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="XI-IATI-WBTF" type="40" role="4" >
       <narrative>World Bank Trust Funds </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2009-06-12"></activity-date><activity-date type="2"  iso-date= "2009-06-12"></activity-date><activity-date type="3"  iso-date= "2020-12-31"></activity-date><activity-date type="4"  iso-date= "2024-11-08"></activity-date> <contact-info type="3">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative>Office of the Regional Vice President</narrative>
       </department>
       <person-name>
       <narrative>Mr Pierre Graftieaux</narrative>
       </person-name>
       <job-title>
       <narrative>Resident Representative</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>pgraftieaux@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="889">   <narrative>Oceania regional</narrative>
       </recipient-region> <sector code="11330" 
	    vocabulary="1" percentage="0.56">
       <narrative>+![cdata[Vocational training]]+</narrative>
       </sector> <sector code="14021" 
	    vocabulary="1" percentage="1.91">
       <narrative>+![cdata[Water supply - large systems]]+</narrative>
       </sector> <sector code="14031" 
	    vocabulary="1" percentage="1.26">
       <narrative>+![cdata[Basic drinking water supply]]+</narrative>
       </sector> <sector code="15110" 
	    vocabulary="1" percentage="0.02">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="16010" 
	    vocabulary="1" percentage="0.80">
       <narrative>+![cdata[Social Protection]]+</narrative>
       </sector> <sector code="16011" 
	    vocabulary="1" percentage="0.21">
       <narrative>+![cdata[Social protection and welfare services policy, planning and administration]]+</narrative>
       </sector> <sector code="16020" 
	    vocabulary="1" percentage="1.37">
       <narrative>+![cdata[Employment policy and administrative management]]+</narrative>
       </sector> <sector code="21010" 
	    vocabulary="1" percentage="0.68">
       <narrative>+![cdata[Transport policy and administrative management]]+</narrative>
       </sector> <sector code="21012" 
	    vocabulary="1" percentage="11.29">
       <narrative>+![cdata[Public transport services]]+</narrative>
       </sector> <sector code="21020" 
	    vocabulary="1" percentage="15.85">
       <narrative>+![cdata[Road transport]]+</narrative>
       </sector> <sector code="21023" 
	    vocabulary="1" percentage="7.76">
       <narrative>+![cdata[National road construction]]+</narrative>
       </sector> <sector code="21040" 
	    vocabulary="1" percentage="0.09">
       <narrative>+![cdata[Water transport]]+</narrative>
       </sector> <sector code="21050" 
	    vocabulary="1" percentage="8.41">
       <narrative>+![cdata[Air transport]]+</narrative>
       </sector> <sector code="21081" 
	    vocabulary="1" percentage="0.01">
       <narrative>+![cdata[Education and training in transport and storage]]+</narrative>
       </sector> <sector code="22010" 
	    vocabulary="1" percentage="2.51">
       <narrative>+![cdata[Communications policy and administrative management]]+</narrative>
       </sector> <sector code="22013" 
	    vocabulary="1" percentage="3.75">
       <narrative>+![cdata[Information services]]+</narrative>
       </sector> <sector code="22020" 
	    vocabulary="1" percentage="5.78">
       <narrative>+![cdata[Telecommunications]]+</narrative>
       </sector> <sector code="22040" 
	    vocabulary="1" percentage="11.28">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector> <sector code="23010" 
	    vocabulary="1" percentage="10.88">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector> <sector code="23110" 
	    vocabulary="1" percentage="1.68">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector> <sector code="23210" 
	    vocabulary="1" percentage="0.68">
       <narrative>+![cdata[Energy generation, renewable sources - multiple technologies]]+</narrative>
       </sector> <sector code="23220" 
	    vocabulary="1" percentage="1.66">
       <narrative>+![cdata[Hydro-electric power plants]]+</narrative>
       </sector> <sector code="23230" 
	    vocabulary="1" percentage="1.04">
       <narrative>+![cdata[Solar energy for centralised grids]]+</narrative>
       </sector> <sector code="23240" 
	    vocabulary="1" percentage="0.91">
       <narrative>+![cdata[Wind energy]]+</narrative>
       </sector> <sector code="23260" 
	    vocabulary="1" percentage="0.91">
       <narrative>+![cdata[Geothermal energy]]+</narrative>
       </sector> <sector code="23270" 
	    vocabulary="1" percentage="0.87">
       <narrative>+![cdata[Biofuel-fired power plants]]+</narrative>
       </sector> <sector code="23330" 
	    vocabulary="1" percentage="0.11">
       <narrative>+![cdata[Oil-fired electric power plants]]+</narrative>
       </sector> <sector code="23630" 
	    vocabulary="1" percentage="1.62">
       <narrative>+![cdata[Electric power transmission and distribution (centralised grids)]]+</narrative>
       </sector> <sector code="31120" 
	    vocabulary="1" percentage="2.45">
       <narrative>+![cdata[Agricultural development]]+</narrative>
       </sector> <sector code="41010" 
	    vocabulary="1" percentage="0.19">
       <narrative>+![cdata[Environmental policy and administrative management]]+</narrative>
       </sector> <sector code="43042" 
	    vocabulary="1" percentage="0.14">
       <narrative>+![cdata[Rural development]]+</narrative>
       </sector> <sector code="73010" 
	    vocabulary="1" percentage="0.14">
       <narrative>+![cdata[Reconstruction relief and rehabilitation]]+</narrative>
       </sector> <sector code="74020" 
	    vocabulary="1" percentage="3.18">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="B03"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2009-06-12"></period-start> 
       <period-end iso-date="2020-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">106519901.30 </value>
       </budget><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11755291.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="NZ-1">
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">93366432.01  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="AU-5">
       <narrative>Australia - Ministry for Foreign Affairs and Trade</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">12396733.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="NZ-1">
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">96438399.51  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="AU-5">
       <narrative>Australia - Ministry for Foreign Affairs and Trade</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2024-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-2315206.24  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for August , 2024</narrative> 
       </description> 
	    <provider-org provider-activity-id="AU-5">
       <narrative>Australia - Ministry for Foreign Affairs and Trade</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2024-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-25.00  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for August , 2024</narrative> 
       </description> 
	    <provider-org provider-activity-id="NZ-1">
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118645">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118646">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10300000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1075000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P132686">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">113063.69  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P120907">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1329023.69  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118670">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1344057.46  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">15207843.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">157541.54  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P108873">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1580655.16  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1670833.11  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116848">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">170000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">172937.78  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118895">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">176055.31  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114987">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1789212.19  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P120594">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">182681.16  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P151806">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1960678.21  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103873">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">207446.15  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P129824">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2232536.92  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">228473.55  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P132119">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">24240.75  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103873">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">24354.93  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128938">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">249599.85  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">251911.48  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">252479.10  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117720">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2685038.03  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">283705.28  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P161319">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2913.30  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P161319">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">296980.75  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">299100.25  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P143408">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">299430.89  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P168545">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">300000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P154149">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">319690.88  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3288632.86  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114987">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">337353.06  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122489">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">355000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3756108.06  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3825644.39  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075523">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4030459.20  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P152779">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4100000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P126324">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">425044.83  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">460297.21  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P113184">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4700000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">475718.38  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128013">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">477033.70  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">490247.61  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122888">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">490390.78  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">50000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P171517">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5155917.85  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118895">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">531765.32  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122938">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5377885.14  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5437797.06  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128938">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5682561.45  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P113148">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">60132.50  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P120908">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">616914.04  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117025">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">630173.42  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">75893.49  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P143408">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">767334.14  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">86522.76  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P148238">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">90181.77  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P152779">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">924711.29  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P113184">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">950000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P132119">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">950000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145057">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">957553.78  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">99970.45  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114317">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-316184.59  </value>
		   <description>
       <narrative>Outgoing Commitment ( Grant Allocated Amount Cancellation/Adjustments ) -  for November , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145057">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-284.60  </value>
		   <description>
       <narrative>Outgoing Commitment ( Grant Allocated Amount Cancellation/Adjustments ) -  for December , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-13309.68  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for January , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P171517">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-214988.55  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for January , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-47887.66  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for January , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116848">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-12622.37  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-467493.54  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2024-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-395988.86  </value>
		   <description>
       <narrative>Outgoing Commitment ( Grant Allocated Amount Cancellation/Adjustments ) -  for May , 2024</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-P075523"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P096931"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P103873"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P112615"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P113148"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P113184"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P114987"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P118895"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P120594"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P121878"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P122151"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P126324"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P128938"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P128939"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P128940"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P131250"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P132119"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P132686"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P143408"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P145057"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P145311"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P145545"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P150908"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P152779"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P154149"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P160658"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P161319"  type="4"></related-activity>
   </iati-activity>	<iati-activity last-updated-datetime="2026-10-15T16:48:15"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P096931</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Tonga Transport Sector Consolidation Project</narrative>
       </title>
       <description type="1">
       <narrative>The objective of the Project is to assist the Recipient to develop its transport sector to have: (i) stronger policy, planning and regulatory institutions and framework; (ii) improved safety and security facilities and compliance with international safety and security standards; and (iii) greater domestic capacity for road rehabilitation and maintenance.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF055181" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Pacific Facility III </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF071699" type="40" role="4" >
       <narrative>Global Road Safety Phase 2 Multi Donor Trust Fund </narrative>
       </participating-org><participating-org ref="TF658011" type="60" role="1" >
       <narrative>FIA Foundation </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2008-03-17"></activity-date><activity-date type="2"  iso-date= "2008-03-17"></activity-date><activity-date type="3"  iso-date= "2018-12-30"></activity-date><activity-date type="4"  iso-date= "2018-11-21"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Julie Babinard</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Operations Officer</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jbabinard@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="TO">     <narrative>TONGA</narrative>
       </recipient-country> <sector code="21012"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Public transport services]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2008-03-17"></period-start> 
       <period-end iso-date="2018-12-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">10846706.06 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10300000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">107000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF055181">
       <narrative>Multi Donor Trust Fund for Pacific Facility III</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">14661.23  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071699">
       <narrative>Global Road Safety Phase 2 Multi Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">425044.83  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10300000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">523224.58  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P096931">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071699" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF055181" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Indicator 8 - Number of kilometers of roads under regular maintenance
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="488.00">


																	</target>

																	<actual value="462.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="10.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="42.00">


																	</target>

																	<actual value="70.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Percent of grievances related to project benefits resolved.
</narrative></title> 
<baseline year="2015" iso-date="2015-08-12" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-08-12" />  <period-end iso-date="2018-11-12" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator 6 - Safe Maritime systems
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="Sea navigation aids missing or in disrepair and fe"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="Achieved (surpassed, at 100% vs target of 80%)">


																	</target>

																	<actual value="80% of maritime infrastructure under TSCP AF has s">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator 7 - Consultant/contractors capacity
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="Road maintenance done by international contractors"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="Achieved (surpassed, at 77km vs target of 75km)">


																	</target>

																	<actual value="75 km of roads designed, supervised and maintained">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved road safety management systems
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="Achieved">


																	</target>

																	<actual value="Two road safety campaigns completed and improvemen">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator 5 - ICAO certification for Fua'amotu
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="(i) Fua'amotu airport ICAO compliance: Security 48"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="Achieved">


																	</target>

																	<actual value="Certification continues to be effective, ACM updat">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator 4 - Road maintenance fund created and operational
</narrative></title> 
<baseline year="2008" iso-date="2008-07-28" value="No funds to finance emergency, routine and periodi"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-07-28" />  <period-end iso-date="2017-10-27" />
<target value="Achieved (surpassed, at over 40% vs target of 20%)">


																	</target>

																	<actual value="20% of overall road maintenance activities finance">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator 3 - Change management process and creation of appropriate transport policy and planning units
</narrative></title> 
<baseline year="2008" iso-date="2008-07-28" value="No institutional core functions for sectoral polic"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-07-28" />  <period-end iso-date="2018-11-12" />
<target value="Achieved (surpassed, at 70% vs target of 50%)">


																	</target>

																	<actual value="At least 50% of staff positions filled according t">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator 2 - Transport policy framework developed and sub-sector policies defined.
</narrative></title> 
<baseline year="2008" iso-date="2008-07-28" value="No transport policy framework and sub-sector polic"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-07-28" />  <period-end iso-date="2018-11-12" />
<target value="Achieved">


																	</target>

																	<actual value="Transport policy framework developed and subsector">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Maritime aids to navigation installed in outer islands.
</narrative></title> 
<baseline year="2008" iso-date="2008-07-28" value="Sea navigation aids missing or in disrepair and fe"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-07-28" />  <period-end iso-date="2018-11-12" />
<target value="Achieved (surpassed)">


																	</target>

																	<actual value="Following aids installed: 17 units of navigational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Appropriately skilled staff recruited by MoI and equipped to fulfill their respective mandate.
</narrative></title> 
<baseline year="2010" iso-date="2010-11-04" value="MOI insufficiently staffed to fulfill its obligati"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-11-04" />  <period-end iso-date="2018-11-12" />
<target value="Partially achieved">


																	</target>

																	<actual value="Senior positions at MoI filled with qualitied staf">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator 1 - MOT integrated Ministry focusing on policy and planning
</narrative></title> 
<baseline year="2008" iso-date="2008-07-28" value="No unified transport sector policy planning and re"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-07-28" />  <period-end iso-date="2018-11-12" />
<target value="Achieved">


																	</target>

																	<actual value="One transport ministry responsible for transport p">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Roads rehabilitated, Rural
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="40.00">


																	</target>

																	<actual value="35.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="5.00">


																	</target>

																	<actual value="5.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Size of the total classified network
</narrative></title> 
<baseline year="2008" iso-date="2008-04-30" value="640.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-04-30" />  <period-end iso-date="2018-11-12" />
<target value="640.00">


																	</target>

																	<actual value="640.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:20"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P103873</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Utility Regulatory Authority</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-08-22"></activity-date><activity-date type="2"  iso-date= "2010-08-22"></activity-date><activity-date type="3"  iso-date= "2018-10-31"></activity-date><activity-date type="4"  iso-date= "2018-11-08"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Kamleshwar Prasad Khelawan</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="VU">     <narrative>VANUATU</narrative>
       </recipient-country> <sector code="14021"  vocabulary="1" percentage="33.00">
       <narrative>+![cdata[Water supply - large systems]]+</narrative>
       </sector> <sector code="22040"  vocabulary="1" percentage="33.00">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector> <sector code="23210"  vocabulary="1" percentage="34.00">
       <narrative>+![cdata[Energy generation, renewable sources - multiple technologies]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-08-22"></period-start> 
       <period-end iso-date="2018-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">1984918.96 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1960678.21  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P103873">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">24240.75  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P103873">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1960678.21  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103873">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">27983.55  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103873">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:23"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P112615</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Kiribati Adaptation Program - Phase III Project (KAP III)</narrative>
       </title>
       <description type="1">
       <narrative>To improve the resilience of Kiribati to the impacts of climate change on freshwater supply and coastal infrastructure.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="CH-4" type="10" role="1" >
       <narrative>Swiss Agency for Development and Cooperation (SDC) </narrative>
       </participating-org><participating-org ref="DE-1" type="10" role="1" >
       <narrative>Federal Ministry for Economic Cooperation and Development (BMZ) </narrative>
       </participating-org><participating-org ref="ES-DIR3-E04585801" type="10" role="1" >
       <narrative>Spain - Ministry of Foreign Affairs and Cooperation </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF021330" type="40" role="4" >
       <narrative>Special Fund for Policy and Human Resources Development </narrative>
       </participating-org><participating-org ref="TF053539" type="40" role="4" >
       <narrative>Least Developed Countries (LDC) - IBRD as Implementing Agency Projects Trust Fund </narrative>
       </participating-org><participating-org ref="TF070611" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Mainstreaming Disaster Reduction Initiative of the Global Facility for Disaster Reduction and  Recovery </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF072517" type="40" role="4" >
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP) </narrative>
       </participating-org><participating-org ref="TF504003" type="10" role="1" >
       <narrative>Sweden - Ministry for Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF507002" type="10" role="1" >
       <narrative>France - Ministry of Foreign Affair and International Development </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF518001" type="10" role="1" >
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation </narrative>
       </participating-org><participating-org ref="TF530006" type="10" role="1" >
       <narrative>Austria - Ministry for Agriculture, Forestry, Environment and Water Management </narrative>
       </participating-org><participating-org ref="TF532011" type="10" role="1" >
       <narrative>India - Ministry of Home Affairs </narrative>
       </participating-org><participating-org ref="TF535001" type="10" role="1" >
       <narrative>Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF535006" type="10" role="1" >
       <narrative>Development Cooperation and Humanitarian Affairs </narrative>
       </participating-org><participating-org ref="TF576004" type="10" role="1" >
       <narrative>National Emergency Management Agency (NEMA) </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="US-GOV-1" type="10" role="1" >
       <narrative>United States Agency for International Development (USAID) </narrative>
       </participating-org><participating-org ref="XM-DAC-21-1" type="10" role="1" >
       <narrative>Irish Aid, Department of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2011-07-01"></activity-date><activity-date type="2"  iso-date= "2011-07-01"></activity-date><activity-date type="3"  iso-date= "2019-10-31"></activity-date><activity-date type="4"  iso-date= "2019-12-27"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Artessa Saldivar-Sali</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Infrastructure Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>asaldivarsali@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="KI">     <narrative>KIRIBATI</narrative>
       </recipient-country> <sector code="14021"  vocabulary="1" percentage="21.00">
       <narrative>+![cdata[Water supply - large systems]]+</narrative>
       </sector> <sector code="14031"  vocabulary="1" percentage="22.00">
       <narrative>+![cdata[Basic drinking water supply]]+</narrative>
       </sector> <sector code="16010"  vocabulary="1" percentage="14.00">
       <narrative>+![cdata[Social Protection]]+</narrative>
       </sector> <sector code="31120"  vocabulary="1" percentage="43.00">
       <narrative>+![cdata[Agricultural development]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2011-07-01"></period-start> 
       <period-end iso-date="2019-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">12228694.29 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">167722.18  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070611">
       <narrative>Multi Donor Trust Fund for Mainstreaming Disaster Reduction Initiative of the Global Facility for Disaster Reduction and  Recovery</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">179999.61  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1803573.57  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">249599.85  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2995682.76  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF053539">
       <narrative>Least Developed Countries (LDC) - IBRD as Implementing Agency Projects Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">484460.95  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5377885.14  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">69774.73  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">899995.50  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070611">
       <narrative>Multi Donor Trust Fund for Mainstreaming Disaster Reduction Initiative of the Global Facility for Disaster Reduction and  Recovery</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11561597.92  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">828123.92  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P112615">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF072517" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF053539" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF021330" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF070611" type="1"></related-activity><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
People provided with access to improved water sources
</narrative></title> 
<baseline year="2017" iso-date="2017-07-31" value="5000.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-07-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="12780.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
People provided with access to improved water sources - Female (RMS requirement)
</narrative></title> 
<baseline year="2017" iso-date="2017-07-31" value="2500.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-07-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="5820.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
People provided with access to improved water sources - rural
</narrative></title> 
<baseline year="2017" iso-date="2017-07-31" value="3600.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-07-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="8435.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
People provided with access to improved water sources - urban
</narrative></title> 
<baseline year="2017" iso-date="2017-07-31" value="1400.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-07-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="2995.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of water utilities that the project is supporting
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="1.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Baseline health statistics (eg. reported diarrhea cases) disseminated to communities through WASH training (number of communities in each six month interval)
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="6.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Reduction in non-revenue water through provisionof consumer water meters
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="438.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
The frequency of water supply of households has increased to more than four hours per day (number of households)
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="438.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of groundwater abstraction systems installed and operating in North Tarawa.
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="3.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Community-led resilience sub-projects completed
</narrative></title> 
<baseline year="2017" iso-date="2017-07-31" value="35.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-07-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="80.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Population, for which Locally Managed Adaptation Plans are developed, finalized and being implemented.
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="31.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Volume of potable water saved through reduced leakage (kiloliters per day)
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="&lt;5"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" />  <period-end iso-date="2016-08-31" />
<target value="">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Volume of potable water provided from new rainwater harvesting systems (kiloliters per day)
</narrative></title> 
<baseline year="2016" iso-date="2016-01-11" value="1"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2016-01-11" />  <period-end iso-date="2016-08-31" />
<target value="">


																	</target>

																	<actual value="6.5">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Functional plans (under the Disaster Management Plan) relevant to public health and potable water are established and operational (number)
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="Nil"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="3 Sector Plans Operating">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Government coastal asset management condition assessment are maintained (percentage of shoreline)
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="Nil"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
National Key Performance Indicators on Climate Change Adaptation and Disaster Risk Management are developed, applied and reported.
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="Nil"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="KPIs are fully reported publicly">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Coastline asset condition assessment is completed and documented for all major non-government assets along the South Tarawa coastline (percentage of shoreline)
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="Nil"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Volume of potable water provided from new groundwater sources (kiloliters per day)
</narrative></title> 
<baseline year="2016" iso-date="2016-01-11" value="6"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2016-01-11" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="21">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
The Office of the President's building extension to house government services for disaster risk management and climate change adaptation is built and used
</narrative></title> 
<baseline year="2017" iso-date="2017-07-31" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-07-31" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Length of coastline protected
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="0.50"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" />  <period-end iso-date="2018-02-28" />
<target value="1.20">


																	</target>

																	<actual value="1.37">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Rehabilitation of distribution network to eliminate leakage (meters)
</narrative></title> 
<baseline year="2011" iso-date="2011-08-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-08-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="4602.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:34"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P113148</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SB Telecommunications and ICT Development Project</narrative>
       </title>
       <description type="1">
       <narrative>The Project aims to facilitate increased access to a wide variety of reliable and affordable telecommunications services for the majority of the Solomon Islands population through efficient and well-regulated competition.  The Project will support the development of a new regulatory institution#the Telecommunications Commission#designed to promote good governance in the sector. Further, through support for enabling infrastructure, the Project will pave the way for more widespread application of information communication technologies (ICT) supporting economic and social development, including greater opportunities for women.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-09-07"></activity-date><activity-date type="2"  iso-date= "2010-09-07"></activity-date><activity-date type="3"  iso-date= "2015-09-30"></activity-date><activity-date type="4"  iso-date= "2016-06-13"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Natasha Beschorner</narrative>
       </person-name>
       <job-title>
       <narrative>&quot;Senior Digital Development Specialist
GG&quot;</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="SB">     <narrative>SOLOMON ISLANDS</narrative>
       </recipient-country> <sector code="22010"  vocabulary="1" percentage="17.00">
       <narrative>+![cdata[Communications policy and administrative management]]+</narrative>
       </sector> <sector code="22020"  vocabulary="1" percentage="83.00">
       <narrative>+![cdata[Telecommunications]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-09-07"></period-start> 
       <period-end iso-date="2015-09-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">5682561.45 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5682561.45  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P113148">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5682561.45  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P113148">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6521.18  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P113148">
       <narrative>SOLOMON ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Internet service (128 kbps), business monthly rate
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="169.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="118.30">


																	</target>

																	<actual value="189.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Price of 3 minute international call (Australia)
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="3.60"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="2.61">

																	<comment><narrative>

																		Ranges from $2.61 to $2.64.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Mobile 3 minute local call
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="1.20"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.13">

																	<comment><narrative>

																		The cost of a one minute local mobile call is US$0.13-US$0.27 per minute (STL-Bemobile=US$0.20, Bemobile-STL=US$0.22,STL-fixed=US$0.27, Bemobile-fixed=US$0.24, STL-STL=US$0.13 and Bemobile-Bemobile=US$0.18).
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Mobile and fixed-line telephone subscribers per 100 people
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="8.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="40.00">


																	</target>

																	<actual value="61.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Mobile subscribers per 100 people
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="8.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="40.00">


																	</target>

																	<actual value="60.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact)
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="1.00"><comment>
					<narrative>Baseline value in PAD.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="5.00">


																	</target>

																	<actual value="3.00">

																	<comment><narrative>

																		ICT sector fully competitive; stable market environment; functioning independent regulator.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Increase in teledensity
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="8.00"><comment>
					<narrative>Limited access to telephony.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="40.00">


																	</target>

																	<actual value="60.00">

																	<comment><narrative>

																		Increasing network rollout to remoter islands.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Increase in network coverage
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="8.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="40.00">


																	</target>

																	<actual value="84.00">

																	<comment><narrative>

																		Both operators upgrading networks and services and are selectively upgrading from 2G to 3G services.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Develop dispute and mediation procedures
</narrative></title> 
<baseline year="2011" iso-date="2011-03-04" value="None"><comment>
					<narrative>Expected in YR2</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-03-04" />  <period-end iso-date="2011-03-15" />
<target value="Dispute resolution and mediation procedure in plac">


																	</target>

																	<actual value="Under preparation.">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Develop interconnection regime
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="None"><comment>
					<narrative>Expected in YR2</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Interconnection regime in place and functioning">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Develop numbering plan
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="None"><comment>
					<narrative>Expected in YR2</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Numbering plan in place">


																	</target>

																	<actual value="Review in 2013.">

																	<comment><narrative>

																		Review in 2013.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Spectrum management plan
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="None"><comment>
					<narrative>Expected in YR2</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Spectrum management plan in place">


																	</target>

																	<actual value="Updated plan scheduled for 2013.">

																	<comment><narrative>

																		Spectrum monitoring equipment procured and installed.Spectrum management consultations planned.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Telecommunications Commissioner and staff appointed and retained
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="None."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Commissioner and staff in place">

																	<comment><narrative> 

																	Continuing need to manage staff retention risk.
	</narrative></comment> 

																	</target>

																	<actual value="Commissioner  and staff in place">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved ICT policy environment in the country.
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="Basic Telecoms Policy in place, as adopted by Cabi"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="ICT policy capacity in Government.">


																	</target>

																	<actual value="ICT policy inputs documents prepared for consultat">

																	<comment><narrative>

																		Improved ICT policy environment defined in terms of available policy documentation, and capacity to update and implement. ICTPolicy specialist deliverables specified in TOR. Will work with MOCAIT, MOFT and Consultative Group.  MOCAIT ICT Director andDeputy Director to be recruited.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Create conducive environment for competition through establishment of a regulatory authority
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="1"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="5">

																	<comment><narrative> 

																	Need to introduce second-generation regulation, in era of convergence.
	</narrative></comment> 

																	</target>

																	<actual value="Independent Regulator fully operational.">

																	<comment><narrative>

																		Independent Regulator established and staffed. Basic regulatory framework in place. New licensing regime
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Decrease in tariffs of key communications services
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="February 2010 tariffs for local mobile calls; cal"><comment>
					<narrative>See sub indicators.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Reduced tariffs for statedservices">


																	</target>

																	<actual value="">

																	<comment><narrative>

																		Tariffs for several services have been reduced, notably for mobile broadband.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Legal and regulatory framework more effective at delivering sector performance
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="Law enacted; no regulations"><comment>
					<narrative>Telecoms Law enacted August 2009. Regulatory framework to be developed.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Regsenforced &amp; updated">


																	</target>

																	<actual value="Key sector regulations in place and enforced by TC">

																	<comment><narrative>

																		End target defined in terms of regulations in line with international best practice in place and implemented as needed. Progressindevelopment of regulatory framework for new licensing, general authorizations, interconnection, spectrum, numbering.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
New ICT policy framework formulated and adopted
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="Basic ICT policy"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="ICT policy framework and capacity in place">


																	</target>

																	<actual value="Updated ICT policy pending. Capacity still limited">

																	<comment><narrative>

																		ICT policy framework development in place.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Increase in the level of competition in the ICT sector
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="Incumbent monopoly"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="At least two telecommunications operators">


																	</target>

																	<actual value="Market remains competitive and stable.">

																	<comment><narrative>

																		5 active market participants: STL, Bemobile, Satsol, Pointcruz and Smile. Six other class licenses awarded. Class licensing regime.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Develop strategy for universal access
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="None"><comment>
					<narrative>Expected by YR5</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Universal Access Strategy prepared">


																	</target>

																	<actual value="None but basic strategy to be prepared with suppor">

																	<comment><narrative>

																		Commercial rollout still ongoing, so will be launched in late 2013.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Develop regulatory instruments
</narrative></title> 
<baseline year="2010" iso-date="2010-03-04" value="Law enacted; no regulation"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-03-04" />  <period-end iso-date="2015-03-04" />
<target value="Regulations enforced and updated">


																	</target>

																	<actual value="Spectrum regulation planned, after consultation.">

																	<comment><narrative>

																		Settlement Agreement provides basic regulatory framework for transition from monopoly to competition.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:36"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P113184</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Pacific Regional Connectivity Program</narrative>
       </title>
       <description type="1">
       <narrative>The objective of the Pacific Regional Connectivity Program is to reduce the cost and increase the availability of international bandwidth for participating countries, and thereby facilitate the development of a wide range of ICT applications to support social andeconomic development in the Pacific region.   Phase 1. Tonga-Fiji Connectivity Project:  The objective of the proposed Project isto improve the enabling environment for telecommunications and ICT in Tonga, including greater competition and increased access to infrastructure and services by reducing the costs of international connectivity and strengthening the telecommunications regulatory framework.  Access to the capacity on this new infrastructure will be available on an open-access basis. Expected sector-specific outcomes are:  (a) increased international connectivity; (b) improved enabling environment; and (c) increased access to ICT services.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF055181" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Pacific Facility III </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2009-10-01"></activity-date><activity-date type="2"  iso-date= "2009-10-01"></activity-date><activity-date type="3"  iso-date= "2019-01-23"></activity-date><activity-date type="4"  iso-date= "2018-12-17"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Natasha Beschorner</narrative>
       </person-name>
       <job-title>
       <narrative>&quot;Senior Digital Development Specialist
GG&quot;</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="TO">     <narrative>TONGA</narrative>
       </recipient-country> <sector code="22013"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Information services]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2009-10-01"></period-start> 
       <period-end iso-date="2019-01-23"> </period-end>
       <value currency="USD" value-date="2026-03-31">1443069.70 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">460297.21  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P113184">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">58061.20  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF055181">
       <narrative>Multi Donor Trust Fund for Pacific Facility III</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P113184">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">924711.29  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P113184">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">460297.21  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P113184">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1118425.24  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P113184">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF055181" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 2:  Price of Wholesale International Capacity Link (US$/Mbps/Month) for 1 STM-1 (155 Mbps) capacity
</narrative></title> 
<baseline year="2016" iso-date="2016-05-05" value="495.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2016-05-05" />  <period-end iso-date="2018-07-23" />
<target value="155.00">


																	</target>

																	<actual value="150.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 2:  Average per minute cost of international call (in US$)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="0.35"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2017-11-01" />
<target value="0.13">


																	</target>

																	<actual value="0.15">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 2:  Retail price of Internet Services (US$/GB/Month)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="75.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2017-11-01" />
<target value="3.00">


																	</target>

																	<actual value="5.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
International Internet Bandwidth (Mbps)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="37.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="4400.00">


																	</target>

																	<actual value="850.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Increased Capacity of MEIDECC to deliver on its mandates
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="5.00">


																	</target>

																	<actual value="5.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 1:  Direct project beneficiaries (number of people)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="1000.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="101000.00">


																	</target>

																	<actual value="55000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Increased Level of Competition in the ICT sector (number of service providers)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="2.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="6.00">


																	</target>

																	<actual value="6.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Access to Internet Services (per 100 people)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="50.00">


																	</target>

																	<actual value="40.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 2:  Volume of International Traffic (Mbps)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="30.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="1300.00">


																	</target>

																	<actual value="750.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Access to telephone services, mobile phone (per 100 people)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="59.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="101.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 2:  TCL restructuring completed
</narrative></title> 
<baseline year="2016" iso-date="2016-07-11" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2016-07-11" />  <period-end iso-date="2018-07-23" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 2: Implementation of open access and wholesale price regulation
</narrative></title> 
<baseline year="2016" iso-date="2016-07-11" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2016-07-11" />  <period-end iso-date="2018-07-23" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 1:  Length of fiber optic network built (km)
</narrative></title> 
<baseline year="2011" iso-date="2011-07-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-07-29" />  <period-end iso-date="2018-07-23" />
<target value="1217.00">


																	</target>

																	<actual value="1217.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:40"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P118895</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>VU  Telecommunications &amp; ICT Technical Assistance Project</narrative>
       </title>
       <description type="1">
       <narrative> The PDO is to facilitate the transfer of legal, regulatory, and technical expertise to support the establishment of fully-functional oversight institutions for telecommunications and ICT in Vanuatu.   </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2009-08-15"></activity-date><activity-date type="2"  iso-date= "2009-08-15"></activity-date><activity-date type="3"  iso-date= "2018-03-31"></activity-date><activity-date type="4"  iso-date= "2018-04-23"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Natasha Beschorner</narrative>
       </person-name>
       <job-title>
       <narrative>&quot;Senior Digital Development Specialist
GG&quot;</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="VU">     <narrative>VANUATU</narrative>
       </recipient-country> <sector code="22040"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2009-08-15"></period-start> 
       <period-end iso-date="2018-03-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">5328855.63 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">172937.78  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P118895">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5155917.85  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P118895">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5155917.85  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118895">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">172937.78  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118895">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="60.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="80.00">


																	</target>

																	<actual value="90.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Female beneficiaries
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="30.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="50.00">


																	</target>

																	<actual value="50.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthened capability, and self-sustainability, of the ICT regulatory institution - Regulator self-sustaining and locally managed
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Permanent regulatory authority (TRR) established, "><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="Ni-Vanuatu Regulator appointed and TRR achieves fu">


																	</target>

																	<actual value="Regulator position nationalized effective 2nd Dece">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthened capability, and self-sustainability of the ICT regulatory institution - Strengthened legal competencies
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Initial regulatory instruments in place, but capac"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="TRR Legal Unit in place and active.">


																	</target>

																	<actual value="Regulator instruments in place and TRR Legal Unit ">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthened capability, and self-stainability of the ICT regulatory institution - Improved economic analysis capability
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="No economic monitoring regime in place."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="Economic analysis and reporting conducted by TRR s">


																	</target>

																	<actual value="1.	TRR Market information and database completed2">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthened capability, and self-sustainability of the ICT regulatory institution - Completed Systems- Spectrum Management
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Spectrum plan &amp; pricing designed; management and a"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="Radio emissions audit and testing standards delive">


																	</target>

																	<actual value="1.	Spectrum Audit Framework developed and trialed ">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved ICT legal and regulatory framework - Improved legislation and regulation
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Telecommunications and Radiocommunications Act (20"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="Regulatory instruments for cyber security, e-comme">


																	</target>

																	<actual value="Numerous regulatory instruments developed and roll">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved ICT, including e-Government, policymaking, capability  - Enablers of improved ICT policymaking capability delivered
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Govt CIO appointed and recruiting staff.No moder"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="OGCIO staff develop and deliver local policy, appl">


																	</target>

																	<actual value="Full time CIO and staff in place; underpinned by n">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved ICT legal and regulatory framework
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Original:Telecoms Act (1989-as amended). Draft Te"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="TRR processes for regulatory instruments (for new ">


																	</target>

																	<actual value="Regulatory Instruments now available for enforceme">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthen capability and self-sustainability of the ICT regulatory institution
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Original:Interim Regulator established, 2008. Ful"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="Regulatory role transferred to national staff and ">


																	</target>

																	<actual value="First ni-Vanuatu Regulator appointed December 2015">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved ICT, including e-Government, and policymaking capability
</narrative></title> 
<baseline year="2012" iso-date="2012-03-05" value="Original:Telecoms Policy Statement (2007) focused"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-03-05" />  <period-end iso-date="2017-06-30" />
<target value="Whole of ICT policy review conducted including bro">


																	</target>

																	<actual value="A National ICT Policy was approved by the Council ">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:44"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P120594</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Samoa Post Tsunami Reconstruction</narrative>
       </title>
       <description type="1">
       <narrative>The projects development objective is to assist the Government of Samoa (GOS) in its efforts to support the relocation and rehabilitation of communities living in the island of Upolu affected by the tsunami of September 29, 2009, through the provision of improvedinfrastructure access to relocation sites; enhanced transport infrastructure, and assistance to local communities to address futurenatural disasters.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF055181" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Pacific Facility III </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-01-03"></activity-date><activity-date type="2"  iso-date= "2010-01-03"></activity-date><activity-date type="3"  iso-date= "2016-02-29"></activity-date><activity-date type="4"  iso-date= "2016-02-15"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr James A. Reichert</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="WS">     <narrative>SAMOA</narrative>
       </recipient-country> <sector code="21023"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[National road construction]]+</narrative>
       </sector> <sector code="74020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-01-03"></period-start> 
       <period-end iso-date="2016-02-29"> </period-end>
       <value currency="USD" value-date="2026-03-31">1818910.09 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1789212.19  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P120594">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">29697.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF055181">
       <narrative>Multi Donor Trust Fund for Pacific Facility III</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P120594">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1789212.19  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P120594">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">161819.57  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P120594">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="44000-P120594" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF055181" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Improved pedestrian access to relocation areas.
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Restored seawalls and road access to communities affected by the September 29, 2009 tsunami.
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Feasible access pathways constructed
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="95.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Feasible pedestrian links identified and designed
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Samusu - Lalomanu link road constructed (around 5 km)
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Before and after study of relocated communities
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-11-02" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="50.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Quarterly progress reports against work plan and budget
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-11-02" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Feasible route identified and road designed
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Salani Bailey Bridge Repaired
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
% of relocated houses with improved transport access to social/educational/commercial opportunities
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="86.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Access restored for emergency response and clean-up activities
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
100% compliance with EMP
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-11-02" />  <period-end iso-date="2015-08-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="10.60">


																	</target>

																	<actual value="10.60">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
9 km of existing seawalls repaired.
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="9.00">


																	</target>

																	<actual value="9.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
10 km of Lepa - Lalomanu link road upgraded and sealed.
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="10.00">


																	</target>

																	<actual value="10.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
20 km of existing access roads upgraded and sealed.
</narrative></title> 
<baseline year="2010" iso-date="2010-10-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-10-15" />  <period-end iso-date="2015-08-31" />
<target value="20.00">


																	</target>

																	<actual value="20.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:47"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P121878</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Kiribati Grid  Connected Solar PV Project</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF022993" type="40" role="4" >
       <narrative>Global Environment Facility (GEF) - Deferred Fee Income Account </narrative>
       </participating-org><participating-org ref="TF050551" type="40" role="4" >
       <narrative>Global Environment Facility (GEF) - IBRD as Implementing Agency Projects Trust Fund </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2011-07-25"></activity-date><activity-date type="2"  iso-date= "2011-07-25"></activity-date><activity-date type="3"  iso-date= "2019-10-31"></activity-date><activity-date type="4"  iso-date= "2019-11-12"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Kamleshwar Prasad Khelawan</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="KI">     <narrative>KIRIBATI</narrative>
       </recipient-country> <sector code="23110"  vocabulary="1" percentage="9.00">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector> <sector code="23230"  vocabulary="1" percentage="23.00">
       <narrative>+![cdata[Solar energy for centralised grids]]+</narrative>
       </sector> <sector code="23240"  vocabulary="1" percentage="23.00">
       <narrative>+![cdata[Wind energy]]+</narrative>
       </sector> <sector code="23260"  vocabulary="1" percentage="23.00">
       <narrative>+![cdata[Geothermal energy]]+</narrative>
       </sector> <sector code="23270"  vocabulary="1" percentage="22.00">
       <narrative>+![cdata[Biofuel-fired power plants]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2011-07-25"></period-start> 
       <period-end iso-date="2019-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">4125682.21 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2685038.03  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">490390.78  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">54968.13  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF022993">
       <narrative>Global Environment Facility (GEF) - Deferred Fee Income Account</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">895285.27  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF050551">
       <narrative>Global Environment Facility (GEF) - IBRD as Implementing Agency Projects Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3580323.30  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">571936.16  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P121878">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF050551" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF022993" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Savings $/yr (Component 1)
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="0.00"><comment>
					<narrative>Not available</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="290000.00">

																	<comment><narrative> 

																	Solar radiation and capacity factor realized.
	</narrative></comment> 

																	</target>

																	<actual value="0.00">

																	<comment><narrative>

																		Project implementation yet to start - no indicators to report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Energy from renewables
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="0.00"><comment>
					<narrative>Not available</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="7.00">


																	</target>

																	<actual value="0.00">

																	<comment><narrative>

																		Project implementation yet to start - no indicators to report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Maintenance program developed and implemented (Component 2)
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="Yes">

																	<comment><narrative> 

																	Installations serviceable. Maintenance program adequate. At least two programmed maintenance undertaken per annum.
	</narrative></comment> 

																	</target>

																	<actual value="No">

																	<comment><narrative>

																		Project implementation yet to start - no indicators to report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Training plan to &quot;build&quot; local capacity for maintenance and expansion (Component 2)
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="No"><comment>
					<narrative>Limited capacity</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="Yes">

																	<comment><narrative> 

																	At least 30 PUB, KESC, and KIT staff trained. At least 10 per annum.
	</narrative></comment> 

																	</target>

																	<actual value="No">

																	<comment><narrative>

																		Project implementation yet to start - no indicators to report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Medium term renewable energy plan and PUB capacity to increase renewable generation
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="No"><comment>
					<narrative>Limited. Lack of ongoing local capacity and commitment to diversification.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="Yes">

																	<comment><narrative> 

																	Feasibility study on amount of renewable energy on grid and 30 (over 3 years) trained staff to integrate RE into grid.
	</narrative></comment> 

																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Feasibility study on grid connected renewable energy finalized. Other donors working on investment options.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Solar energy kWh per year (Component 1)
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="0.00"><comment>
					<narrative>Not available</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="850.00">

																	<comment><narrative> 

																	Solar radiation and capacity factor realized.
	</narrative></comment> 

																	</target>

																	<actual value="0.00">

																	<comment><narrative>

																		Project implementation yet to start - no indicators to report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Reduction in diesel use l/yr (Component 1)
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="0.00"><comment>
					<narrative>Not available</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="230000.00">

																	<comment><narrative> 

																	Solar radiation and capacity factor realized.
	</narrative></comment> 

																	</target>

																	<actual value="0.00">

																	<comment><narrative>

																		Project implementation yet to start - no indicators to report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Tons per annum CO2 reductions (Component 1)
</narrative></title> 
<baseline year="2012" iso-date="2012-04-15" value="0.00"><comment>
					<narrative>Not available</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-04-15" />  <period-end iso-date="2016-12-31" />
<target value="765.00">

																	<comment><narrative> 

																	Solar radiation and capacity factor realized.
	</narrative></comment> 

																	</target>

																	<actual value="0.00">

																	<comment><narrative>

																		Project implementation yet to start - no indicators to report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:49"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P122151</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Kiribati Road Rehabilitation Project</narrative>
       </title>
       <description type="1">
       <narrative>The project will improve the condition of South Tarawa's main road network and help strengthen road financing and maintenance capacity.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF055181" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Pacific Facility III </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF072517" type="40" role="4" >
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-04-14"></activity-date><activity-date type="2"  iso-date= "2010-04-14"></activity-date><activity-date type="3"  iso-date= "2018-12-31"></activity-date><activity-date type="4"  iso-date= "2018-12-05"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Pierre Graftieaux</narrative>
       </person-name>
       <job-title>
       <narrative>Resident Representative</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>pgraftieaux@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="KI">     <narrative>KIRIBATI</narrative>
       </recipient-country> <sector code="21020"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Road transport]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-04-14"></period-start> 
       <period-end iso-date="2018-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">19152649.42 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">136789.08  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF055181">
       <narrative>Multi Donor Trust Fund for Pacific Facility III</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">15207843.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">319690.88  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3648968.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-160641.54  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for April , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18703918.19  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-7748.73  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for March , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">406835.52  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P122151">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF055181" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF072517" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:51"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P126324</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>KI  Telecommunications and ICT Development Project</narrative>
       </title>
       <description type="1">
       <narrative>The proposed Project development objective is: to strengthen the legal, regulatory and institutional environment, enabling transition to a market-driven telecommunications sector and facilitating improved connectivity for the Outer Islands.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2011-09-12"></activity-date><activity-date type="2"  iso-date= "2011-09-12"></activity-date><activity-date type="3"  iso-date= "2020-02-29"></activity-date><activity-date type="4"  iso-date= "2020-08-27"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Natasha Beschorner</narrative>
       </person-name>
       <job-title>
       <narrative>&quot;Senior Digital Development Specialist
GG&quot;</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="KI">     <narrative>KIRIBATI</narrative>
       </recipient-country> <sector code="22013"  vocabulary="1" percentage="52.00">
       <narrative>+![cdata[Information services]]+</narrative>
       </sector> <sector code="22020"  vocabulary="1" percentage="24.00">
       <narrative>+![cdata[Telecommunications]]+</narrative>
       </sector> <sector code="22040"  vocabulary="1" percentage="24.00">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2011-09-12"></period-start> 
       <period-end iso-date="2020-02-29"> </period-end>
       <value currency="USD" value-date="2026-03-31">4100000.00 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4100000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P126324">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4100000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P126324">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">234569.71  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P126324">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Decrease in tarrifs of mobile services and internet access - Price of 3 minute local mobile call.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="0.70"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.55">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Cost of 3 minute call to Australia
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="7.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="5.20">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Price of monthly internet serices (256 kbps)
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="55.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="41.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 2:  Award of other telecommunications licenses.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="1.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component 2:  Number of direct beneficiaries (including % female).
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="40000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Increase penetration of mobile telephones and Internet, including number of direct beneficiaries (% of population, of which 53% female)
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="12.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="40.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Increase penetration of mobile telephones and Internet in Outer Islands
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="5.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="30.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component 3:  Mobile penetration in Outer Islands (% population)
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="40.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component 3:  Internet penetration in Outer Islands (% population).
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="0.50"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="20.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component 2:  Internet broadband (minimum 256Kbps) subscribers (% of population).
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="20.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved ICT policymaking capacity
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="Basic ICT policy in place. Limited ICT policy capa"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="MCTTD completes review of all the current ICT Sect">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Legal and regulatory framework more effective at delivering sector performance
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="Telecommunications Act 2004 and associated instrum"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Sector laws and rules updated as appropriate in li">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 1:  TSKL restructured.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="No strategy in place for transforming TSKL"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="TSKL transformation strategy fully implemented">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 2:  Reformed Spectrum Management.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="Existing spectrum plan designed for sole operator"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="New spectrum management plan operational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 2:  Updated telecom numbering plan adopted.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="Five digit numbering plan in use."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="New six or seven digit number plan operational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 2:  Interconnection regime adopted.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="No interconnection regime"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Interconnection regime operational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 2:  Dispute and mediation procedures in place.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="No dispute and mediation procedures in place"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Dispute and mediation procedures operational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 2:  Licensing regime in place.
</narrative></title> 
<baseline year="2012" iso-date="2012-06-12" value="Multi-operator licensing regime not developed."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-12" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="New licensing regime operational, allowing new ope">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:54"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P128938</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Pacific Aviation Investment - Kiribati</narrative>
       </title>
       <description type="1">
       <narrative>The project development objective is to improve operational safety and oversight of international air transport and associated infrastructure.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF055181" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Pacific Facility III </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-10-13"></activity-date><activity-date type="2"  iso-date= "2010-10-13"></activity-date><activity-date type="3"  iso-date= "2019-12-30"></activity-date><activity-date type="4"  iso-date= "2020-06-10"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Pierre Graftieaux</narrative>
       </person-name>
       <job-title>
       <narrative>Resident Representative</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>pgraftieaux@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="KI">     <narrative>KIRIBATI</narrative>
       </recipient-country> <sector code="21050"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Air transport]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-10-13"></period-start> 
       <period-end iso-date="2019-12-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">5528208.64 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">24354.93  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128938">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5437797.06  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128938">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">66056.65  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF055181">
       <narrative>Multi Donor Trust Fund for Pacific Facility III</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128938">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5437797.06  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128938">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">266036.41  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128938">
       <narrative>KIRIBATI</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF055181" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Bonriki and Cassidy terminals upgraded
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Navigation and safety aids fully operational
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
2. State requirement for safety and security reaches global ICAO average
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="95.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="32.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Achievement of Fire Safety Standards at Bonriki and Cassidy airports
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="Category 3"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Category 6">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Successful implementation of agreed training plan
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No training plan"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Training plan implemented">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
3. Modernization of air traffic management
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="no PASNet or ADS-B"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="PasNet and ADS-B operational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Adoption of an Air Transport Master Plan
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Award of contract for airport management and operations support
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Separation of civil aviation regulatory functions from operations
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
4. Implementation of a regional safety and security levy for international passengers
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
1. ICAO certification of safety and security at project airports
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Length of coastal protection constructed
</narrative></title> 
<baseline year="2015" iso-date="2015-11-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-11-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="180.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:56"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P128939</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Pacific Aviation Investment - Tonga</narrative>
       </title>
       <description type="1">
       <narrative>The project development objective is to improve operational safety and oversight of international air transport infrastructure.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF055181" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Pacific Facility III </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2011-07-01"></activity-date><activity-date type="2"  iso-date= "2011-07-01"></activity-date><activity-date type="3"  iso-date= "2020-06-30"></activity-date><activity-date type="4"  iso-date= "2020-06-03"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Pierre Graftieaux</narrative>
       </person-name>
       <job-title>
       <narrative>Resident Representative</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>pgraftieaux@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="TO">     <narrative>TONGA</narrative>
       </recipient-country> <sector code="21050"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Air transport]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2011-07-01"></period-start> 
       <period-end iso-date="2020-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">1863496.71 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1580655.16  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">251911.48  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">30930.07  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF055181">
       <narrative>Multi Donor Trust Fund for Pacific Facility III</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1580655.16  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">594627.00  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-11.85  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of July , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16367.84  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-4282.74  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of October , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">244.36  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128939">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF055181" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Indicator Two: State requirements for safety and security reaches global ICAO average
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="90.70"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="49.00">


																	</target>

																	<actual value="62.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component A: Intermediate Result indicator One: Navigation and safety aids fully operational
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component A: Intermediate Result indicator Two: Rehabilitation of Fua'amotu and Vava'u runways
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Citizen Engagement
</narrative></title> 
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-12-18" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator One: Regulatory certification of safety and security at project airports
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="Fua’amotu Airport (TBU) currently certified, Vava’"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="Certification of both airports in accordance with ">


																	</target>

																	<actual value="Achieved. TBU and VAV are both compliant.">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator Three: Modernization of air traffic management
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="Very Small Aperture Terminal (VSAT) (previously PA"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="Very Small Aperture Terminal (previously PASNet) a">


																	</target>

																	<actual value="VSAT installation complete.">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator Four: Implementation of a regional safety and security levy for departing international passengers
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No Levy"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="AU$5 collected from each departing international p">


																	</target>

																	<actual value="Achieved, levy is being collected.">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component B: Intermediate Result indicator One: Preparation of necessary legislation for establishment of Tonga Airports Authority
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No legislation"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="Legislation prepared.">


																	</target>

																	<actual value="Revised Bill is with Cabinet.">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Construction and Operation of Air Traffic Control Tower (TBU)
</narrative></title> 
<baseline year="2015" iso-date="2015-11-09" value="Existing tower needs to be replaced with new tower"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-11-09" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Construction of Tower is now complete. Equipment i">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component B: Intermediate Result indicator Two: Successful implementation of agreed training plan
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No training plan"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="Training plan completed">


																	</target>

																	<actual value="Training completed. No additional training planned">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component A: Intermediate Result indicator Three: Energy efficient runway lighting fully operational and compliant at TBU
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="Lighting not upgraded."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2018-12-31" />
<target value="Lighting fully operational">


																	</target>

																	<actual value="Installation Complete">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:48:58"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P128940</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Pacific Aviation Investment - Tuvalu</narrative>
       </title>
       <description type="1">
       <narrative>The project development objective is to improve the safety and security of air transport and associated infrastructure.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF055181" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Pacific Facility III </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-10-13"></activity-date><activity-date type="2"  iso-date= "2010-10-13"></activity-date><activity-date type="3"  iso-date= "2020-12-30"></activity-date><activity-date type="4"  iso-date= "2020-12-02"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Satoshi Ogita</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Transport Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>sogita@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="TV">     <narrative>TUVALU</narrative>
       </recipient-country> <sector code="21050"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Air transport]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-10-13"></period-start> 
       <period-end iso-date="2020-12-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">235961.42 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">170000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">66246.02  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF055181">
       <narrative>Multi Donor Trust Fund for Pacific Facility III</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-284.60  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for December , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">170000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-284.60  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">271844.24  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128940">
       <narrative>TUVALU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF055181" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component A: Intermediate Result indicator One: Navigation and safety aids fully operational
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2023-06-15" />
<target value="100.00">


																	</target>

																	<actual value="10.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component A: Intermediate Result indicator Two: Rehabilitation of Funafuti runway
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2023-06-15" />
<target value="100.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title> 
<baseline year="2018" iso-date="2018-04-19" value="100.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-04-19" />  <period-end iso-date="2022-12-15" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component A: Intermediate Result indicator Four: Funafuti terminal and control tower upgrade
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2017-12-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Grievances responded and/or resolved within the stipulated service standards for response times
</narrative></title> 
<baseline year="2018" iso-date="2018-04-19" value="75.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-04-19" />  <period-end iso-date="2022-12-15" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Component A - Intermediate Indicator Seven: Implementation of repair and resiliency works for FUN runway
</narrative></title> 
<baseline year="2017" iso-date="2017-06-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-19" />  <period-end iso-date="2023-06-15" />
<target value="100.00">


																	</target>

																	<actual value="10.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title> 
<baseline year="2013" iso-date="2013-05-23" value="50.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-23" />  <period-end iso-date="2015-06-30" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Indicator Two: Resolution of safety concerns at participating airports reaches global ICAO average
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="95.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2023-06-15" />
<target value="40.00">


																	</target>

																	<actual value="95.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component B: Intermediate Result indicator One: Successful implementation of agreed training plan
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No training plan"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Training for the runway contractor not yet complet">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component A: Intermediate Result indicator Three: Achievement of Fire Standards
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="N/A"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2017-09-30" />
<target value="Category 5">


																	</target>

																	<actual value="Category 5">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator Four: Implementation of a regional safety levy for international passengers
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No levy"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2014-06-30" />
<target value="AU$5 collected from each departing international p">


																	</target>

																	<actual value="Levy being collected. Funds now being received by ">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator Three: Modernization of air traffic management
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="No VSAT or ADS-B"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2023-06-15" />
<target value="VSAT and ADS-B operational">


																	</target>

																	<actual value="ADS-B operational. VSAT equipment not functional.">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Indicator One: Certification of safety and security at project airports
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="FUN currently not certified"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" />  <period-end iso-date="2023-06-15" />
<target value="Certification of airports in accordance with agree">


																	</target>

																	<actual value="FUN currently not certified.">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component C: Intermediate Results Indicator Six - Successful implementation of the GBV and VAC Prevention Action Plan by the runwaycivil works contractor
</narrative></title> 
<baseline year="2017" iso-date="2017-06-19" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-19" />  <period-end iso-date="2022-12-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component C: Intermediate Results Indicator 7 - Successful implementation of GBV and VAC counselling program
</narrative></title> 
<baseline year="2017" iso-date="2017-08-14" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-08-14" />  <period-end iso-date="2020-12-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Project-supported organization(s) publishing periodic reports on GRM and how issues were resolved
</narrative></title> 
<baseline year="2018" iso-date="2018-04-19" value="Yes"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-04-19" />  <period-end iso-date="2022-12-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component A: Intermediate Results Indicator Six: Construction of storage facility under the terminal for water runoff to prevent flooding during heavy rainfall exacerbated by climate change
</narrative></title> 
<baseline year="2011" iso-date="2011-12-15" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-15" />  <period-end iso-date="2022-12-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Component A - Intermediate Result indicator Five: Number of kilometers of paved roads improved
</narrative></title> 
<baseline year="2013" iso-date="2013-05-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-23" />  <period-end iso-date="2013-05-23" />
<target value="15.40">


																	</target>

																	<actual value="15.40">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Size of the total classified network
</narrative></title> 
<baseline year="2013" iso-date="2013-05-23" value="15.40"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-23" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="15.40">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title> 
<baseline year="2013" iso-date="2013-05-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-23" />  <period-end iso-date="2015-06-30" />
<target value="7.40">


																	</target>

																	<actual value="7.40">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Roads rehabilitated, Rural
</narrative></title> 
<baseline year="2013" iso-date="2013-05-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-23" />  <period-end iso-date="2015-06-30" />
<target value="8.00">


																	</target>

																	<actual value="8.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:01"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P131250</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Institutional and Regulatory Framework Strengthening Project</narrative>
       </title>
       <description type="1">
       <narrative>The project development objective is to support the strengthening of the institutional and regulatory framework of the Tonga EnergyRoadmap (TERM) and facilitate the implementation of future renewable energy projects.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF071646" type="40" role="4" >
       <narrative>Asia Sustainable and Alternative Energy Program (ASTAE-MDTF) </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2011-08-22"></activity-date><activity-date type="2"  iso-date= "2011-08-22"></activity-date><activity-date type="3"  iso-date= "2017-06-30"></activity-date><activity-date type="4"  iso-date= "2017-06-06"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr James L. Neumann</narrative>
       </person-name>
       <job-title>
       <narrative>Practice Manager</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jneumann@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="TO">     <narrative>TONGA</narrative>
       </recipient-country> <sector code="23010"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2011-08-22"></period-start> 
       <period-end iso-date="2017-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">3407657.79 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2232536.92  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">296980.75  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">398551.07  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071646">
       <narrative>Asia Sustainable and Alternative Energy Program (ASTAE-MDTF)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">479589.05  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071646">
       <narrative>Asia Sustainable and Alternative Energy Program (ASTAE-MDTF)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2631087.99  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">793741.67  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P131250">
       <narrative>TONGA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071646" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Improvements in network reliability indexes
</narrative></title> 
<baseline year="2012" iso-date="2012-11-12" value="155.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-11-12" />  <period-end iso-date="2016-12-31" />
<target value="86.50">


																	</target>

																	<actual value="88.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Petroleum risk management framework completed
</narrative></title> 
<baseline year="2012" iso-date="2012-11-07" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-11-07" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Ability of TPL to model and predict the effects of new generation on the power systems
</narrative></title> 
<baseline year="2012" iso-date="2012-11-07" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-11-07" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Environmental and Social Management Framework completed
</narrative></title> 
<baseline year="2012" iso-date="2012-11-07" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-11-07" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Adequate staffing of TERM-IU
</narrative></title> 
<baseline year="2012" iso-date="2012-06-30" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-30" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Control and protection equipment installation to enable the network for intermittent renewable energy generation
</narrative></title> 
<baseline year="2012" iso-date="2012-11-07" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-11-07" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Development Plan for the grid completed
</narrative></title> 
<baseline year="2012" iso-date="2012-06-25" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-25" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Summary report of processes and documents required for investments in generation systems
</narrative></title> 
<baseline year="2012" iso-date="2012-06-25" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-25" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
A well-developed power system planning document for the years 2012-2017
</narrative></title> 
<baseline year="2012" iso-date="2012-06-25" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-25" />  <period-end iso-date="2016-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Kilometers constructed of new feeder lines
</narrative></title> 
<baseline year="2012" iso-date="2012-06-25" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-06-25" />  <period-end iso-date="2016-12-31" />
<target value="7.50">


																	</target>

																	<actual value="2.06">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:03"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P132119</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>MH  ICT Technical Assistance Project</narrative>
       </title>
       <description type="1">
       <narrative>The development objective of the Project is to strengthen the legal, regulatory and institutional environment to provide a foundation for improved access and affordability of telecommunications services.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2012-08-14"></activity-date><activity-date type="2"  iso-date= "2012-08-14"></activity-date><activity-date type="3"  iso-date= "2020-01-15"></activity-date><activity-date type="4"  iso-date= "2020-02-18"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr James L. Neumann</narrative>
       </person-name>
       <job-title>
       <narrative>Practice Manager</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jneumann@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="MH">     <narrative>MARSHALL ISLANDS</narrative>
       </recipient-country> <sector code="22040"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2012-08-14"></period-start> 
       <period-end iso-date="2020-01-15"> </period-end>
       <value currency="USD" value-date="2026-03-31">1178473.55 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">228473.55  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P132119">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">950000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P132119">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">950000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P132119">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">228473.55  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P132119">
       <narrative>MARSHALL ISLANDS</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strategic analysis of market structure and potential for private sector engagement developed and report delivered.
</narrative></title> 
<baseline year="2016" iso-date="2016-08-30" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2016-08-30" />  <period-end iso-date="2019-07-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Component 1:  ICT sector analysis and MINTA readiness assessment report prepared.
</narrative></title> 
<baseline year="2013" iso-date="2013-07-23" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-07-23" />  <period-end iso-date="2019-07-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Options are developed to strengthen and reposition MINTA
</narrative></title> 
<baseline year="2013" iso-date="2013-07-23" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-07-23" />  <period-end iso-date="2019-07-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Options are developed to strengthen and reposition MINTA, and report delivered.
</narrative></title> 
<baseline year="2013" iso-date="2013-07-23" value="Yes"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-07-23" />  <period-end iso-date="2019-07-15" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:05"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P132686</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>FSM and PW Telecoms &amp; ICT TA Project</narrative>
       </title>
       <description type="1">
       <narrative>The development objective of the Project is to strengthen the legal, regulatory and institutional environment to provide a foundation for improved access and affordability of telecommunications services, and increased private sector investment in the telecommunications sector.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2013-09-09"></activity-date><activity-date type="2"  iso-date= "2013-09-09"></activity-date><activity-date type="3"  iso-date= "2018-02-28"></activity-date><activity-date type="4"  iso-date= "2018-02-01"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr James L. Neumann</narrative>
       </person-name>
       <job-title>
       <narrative>Practice Manager</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jneumann@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="889">   <narrative>Oceania regional</narrative>
       </recipient-region> <sector code="22040"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2013-09-09"></period-start> 
       <period-end iso-date="2018-02-28"> </period-end>
       <value currency="USD" value-date="2026-03-31">1075000.00 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1075000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P132686">
       <narrative>Oceania, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1075000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P132686">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
FSM:  New communications legislation enacted to support a modern regulatory environment for ICT
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2017-08-30" />
<target value="Yes">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
FSM:  Options for improved fiber optic connectivity examined for Chuuk, Kosare, and Yap and report delivered
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2017-08-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
FSM:  FSMTC operational restructuring options prepared and report delivered.
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2017-08-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
FSM: Recommendations to ensure nondiscriminatory open access to fiber optic cable systems and other essential facilities is delivered.
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2017-08-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
FSM: Restructuring plan for the financial and ownership structure of FSMTC is developed.
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2017-08-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Palau:  Management, governance and investment structure in new fibre optic cable system is prepared
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2016-08-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Palau:  New Communications Law drafted to support a modern regulatory environment for ICT
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2016-08-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Palau:  New policies are developed to promote the development of ICT sector
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2016-08-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Palau:  Institutional capacity building, including consideration of subregional sharing of regulatory functions and/or establishment of a Palau multi-sector regulator
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2016-08-31" />
<target value="Yes">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Palau:   Investment structure for improved connectivity examined and cabinet selects preferred option
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2017-08-30" />
<target value="Yes">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Palau:  (a) Operating policies and procedures for Office of the Regulator are adopted
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2016-08-31" />
<target value="Yes">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Palau:  (b)Interconnection regime adopted
</narrative></title> 
<baseline year="2013" iso-date="2013-09-13" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-13" />  <period-end iso-date="2016-08-31" />
<target value="Yes">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:07"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P143408</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Samoa Aviation Investment Project</narrative>
       </title>
       <description type="1">
       <narrative>The project development objective is to improve operational safety and oversight of international air transport and associated infrastructure.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2013-07-01"></activity-date><activity-date type="2"  iso-date= "2013-07-01"></activity-date><activity-date type="3"  iso-date= "2020-04-30"></activity-date><activity-date type="4"  iso-date= "2020-03-03"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Noroarisoa Rabefaniraka</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Transport Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>nrabefaniraka@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="WS">     <narrative>SAMOA</narrative>
       </recipient-country> <sector code="21012"  vocabulary="1" percentage="8.00">
       <narrative>+![cdata[Public transport services]]+</narrative>
       </sector> <sector code="21050"  vocabulary="1" percentage="92.00">
       <narrative>+![cdata[Air transport]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2013-07-01"></period-start> 
       <period-end iso-date="2020-04-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">374993.74 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">299100.25  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P143408">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">75893.49  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P143408">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">299100.25  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P143408">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">391591.09  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P143408">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2024-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-7.69  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of July , 2024</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P143408">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="44000-P143408" type="4"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Women participants in management training and career fast-track support program
</narrative></title> 
<baseline year="2019" iso-date="2019-06-26" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2019-06-26" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="22.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Registered grievances and complaints responded to within 14 days
</narrative></title> 
<baseline year="2019" iso-date="2019-06-26" value="70.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2019-06-26" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Rehabilitation of APW pavement
</narrative></title> 
<baseline year="2014" iso-date="2014-07-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-07-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Navigation and safety aids fully operational
</narrative></title> 
<baseline year="2014" iso-date="2014-07-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-07-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
State requirements for safety measured by Universal Safety Oversight Audit Programme (USOAP) reaches global ICAO average
</narrative></title> 
<baseline year="2010" iso-date="2010-12-31" value="56.43"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-12-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="47.80">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Achievement of Fire Standards at APW
</narrative></title> 
<baseline year="2014" iso-date="2014-07-01" value="Category 8"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-07-01" />  <period-end iso-date="2015-06-30" />
<target value="">


																	</target>

																	<actual value="Category 10">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Successful implementation of agreed training plan
</narrative></title> 
<baseline year="2014" iso-date="2014-07-01" value="No training plan"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-07-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Training plan completed">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Regulatory certification of safety and security at project airports
</narrative></title> 
<baseline year="2014" iso-date="2014-01-01" value="APW certified"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Re-validation of certification of APW in accordanc">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Implementation of a regional safety and security levy for departing international passengers
</narrative></title> 
<baseline year="2014" iso-date="2014-07-01" value="No levy"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-07-01" /> <period-end iso-date="1900-01-01"/>
<target value="AU$5 collected">


																	</target>

																	<actual value="AU$5 collected from each departing international p">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Modernization of air traffic management
</narrative></title> 
<baseline year="2014" iso-date="2014-07-01" value="No VSAT or ADS-B"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-07-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="VSAT &amp; ADS-B operational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
SAA publishes periodic reports on GRM including resolution rates
</narrative></title> 
<baseline year="2015" iso-date="2015-12-31" value="Yes"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-12-31" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:10"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P145311</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Energy Sector Development Project</narrative>
       </title>
       <description type="1">
       <narrative>The Project Development Objective is to provide technical assistance to the Department of Energy, Mines and Mineral Resources (DEMMR) and the Utilities Regulatory Authority (URA) of Vanuatu in the development and execution of their work programs.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071278" type="40" role="4" >
       <narrative>SCF - IBRD IA </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF071550" type="40" role="4" >
       <narrative>SCF IBRD IA SUPPORT FOR SREP FUNDING PLAN PREPARATION </narrative>
       </participating-org><participating-org ref="TF071728" type="40" role="4" >
       <narrative>Support for Small Island Developing States (SIDS) DOCK Support Program Multi Donor Trust Fund </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-08-22"></activity-date><activity-date type="2"  iso-date= "2010-08-22"></activity-date><activity-date type="3"  iso-date= "2018-10-31"></activity-date><activity-date type="4"  iso-date= "2018-11-08"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Kamleshwar Prasad Khelawan</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="VU">     <narrative>VANUATU</narrative>
       </recipient-country> <sector code="23010"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-08-22"></period-start> 
       <period-end iso-date="2018-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">3034423.46 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1344057.46  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">157196.83  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071550">
       <narrative>SCF IBRD IA SUPPORT FOR SREP FUNDING PLAN PREPARATION</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">230413.43  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071278">
       <narrative>SCF - IBRD IA</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">477033.70  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">825722.04  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071728">
       <narrative>Support for Small Island Developing States (SIDS) DOCK Support Program Multi Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2400192.93  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">635323.58  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2024-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1093.05  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of July , 2024</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145311">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071550" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071728" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071278" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved energy sector planning, policymaking and monitoring and evaluation capability
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="Small Energy Unit with limited staff and capacity "><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="100% of priority energy, policy, legislative, and ">


																	</target>

																	<actual value="The Department of Energy has finalized the review ">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved energy sector plans, policy, legal and regulatory framework
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="Electricity Act, Petroleum Supply Act, Geothermal "><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="Priority policy, legislation and regulatory instru">


																	</target>

																	<actual value="The Department of Energy has finalized the review ">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthened capability, and self-sustainability, of the energy and water sector (utilities) regulatory institution
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="Regulator established 2008."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="External advisory assignments largely completed an">


																	</target>

																	<actual value="The Government (Parliament) considered and approve">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Electricity and water tariff reviews and reporting.
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="No electricity or water tariff reviews."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="Second round of electricity tariff reviews complet">


																	</target>

																	<actual value="The URA is undertaking the regulatory reviews in a">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Enablers of improved energy sector planning and policymaking capability delivered
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="4 DoE full-time staff or capacity in Government."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="DoE staff mentored in policy methods based on inte">


																	</target>

																	<actual value="The DoE has 10 full-time staff and three consultan">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved, plans, legislation, regulations, and compliance frameworks
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="URA Act (2007); Electricity Supply Act, Petroleum "><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="Drafting of new laws/regulations implementing new ">


																	</target>

																	<actual value="The Department of Energy has finalized the review ">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved economic analysis capability
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="No economic monitoring regime in place"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="Fully-developed economic analysis regime in place ">


																	</target>

																	<actual value="The URA recruited an economist into a local positi">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Regulator largely self-sustaining and preferably locally managed
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="No regulator in place."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="GoV budget and revenues cover 30% of URA’s costs. ">


																	</target>

																	<actual value="The Government has approved a plan for financial s">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthened financial analysis capability
</narrative></title> 
<baseline year="2013" iso-date="2013-05-01" value="No regulator instruments in place"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-05-01" />  <period-end iso-date="2017-06-30" />
<target value="Fully-developed financial analysis regime in place">


																	</target>

																	<actual value="A Financial analysis regime is in place and is bei">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:12"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P145545</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Enhanced Road Access Project</narrative>
       </title>
       <description type="1">
       <narrative>To restore key road sector assets damaged by extreme weather events and enhance the climate resilience of critical roads and bridges in Samoa.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF072517" type="40" role="4" >
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2014-01-15"></activity-date><activity-date type="2"  iso-date= "2014-01-15"></activity-date><activity-date type="3"  iso-date= "2022-02-28"></activity-date><activity-date type="4"  iso-date= "2022-04-05"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Sean David Michaels</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Transport Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>smichaels@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="WS">     <narrative>SAMOA</narrative>
       </recipient-country> <sector code="21012"  vocabulary="1" percentage="2.00">
       <narrative>+![cdata[Public transport services]]+</narrative>
       </sector> <sector code="21023"  vocabulary="1" percentage="48.00">
       <narrative>+![cdata[National road construction]]+</narrative>
       </sector> <sector code="74020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2014-01-15"></period-start> 
       <period-end iso-date="2022-02-28"> </period-end>
       <value currency="USD" value-date="2026-03-31">10050846.96 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">355000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3756108.06  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5879008.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">80000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-12622.37  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-5636.88  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for September , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2022-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1009.85  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for April , 2022</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072517">
       <narrative>Australia-Pacific Islands Partnership Trust Fund (APIP)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4756108.06  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4058396.77  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">814974.35  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for February , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">344888.68  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7918.80  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of August , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16395.15  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-7798.00  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">13091.41  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">12171.20  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6485.08  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1604.80  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of January , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16467.48  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of March , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of April , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7963.82  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of August , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1664.98  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">243.18  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">271.20  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145545">
       <narrative>SAMOA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF072517" type="1"></related-activity><related-activity ref="44000-P145545" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Targeted locations where traffic flows will have reduced disruptions
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="3.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="7.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Water crossings replaced or rehabilitated
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="5.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of gender responsive design features
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="5.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="7.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Instances when project designs are informed by access audits
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="4.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="8.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Improved connectivity through rehabilitation or replacement of water crossings to improved standards
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="5.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="100.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Roads rehablitated
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="2.30"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="4.12">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Roads constructed
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="1.60">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Improved connectivity through rehabilitation or construction of roads to improved standards
</narrative></title> 
<baseline year="2018" iso-date="2018-05-31" value="2.30"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2018-05-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="5.72">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:14"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P150908</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Rural Electrification Project</narrative>
       </title>
       <description type="1">
       <narrative>The project development objective (PDO) is to scale up access to electricity services for rural households, aid posts and communityhalls located in dispersed off-grid areas.   </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2014-12-04"></activity-date><activity-date type="2"  iso-date= "2014-12-04"></activity-date><activity-date type="3"  iso-date= "2020-12-31"></activity-date><activity-date type="4"  iso-date= "2024-05-09"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Mitsunori Motohashi</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>mmotohashi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="VU">     <narrative>VANUATU</narrative>
       </recipient-country> <sector code="23010"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2014-12-04"></period-start> 
       <period-end iso-date="2020-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">4794071.38 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4700000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">957553.78  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-467493.54  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2024-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-395988.86  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for May , 2024</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4648357.56  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2023-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-50584.32  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for March , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2024-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-293762.10  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for April , 2024</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">312097.20  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">50259.01  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of August , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">20309.76  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">14052.80  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">29967.64  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">71412.43  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P150908">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
People provided with access to electricity by household connections
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="100768.00">


																	</target>

																	<actual value="100450.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Community electricity connections constructed under the project
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="642.00">


																	</target>

																	<actual value="2230.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of private vendors in Vanuatu registered under the Project’s vendor registration program
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="4.00">


																	</target>

																	<actual value="10.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of households provided access to electricity under the Project by household systems
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="20565.00">


																	</target>

																	<actual value="20500.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of female-headed households provided access to electricity under the Project by household systems
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="3101.00">


																	</target>

																	<actual value="2665.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of kilowatts installed through the installation of household systems
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="553.00">


																	</target>

																	<actual value="363.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Community elec. connections constructed–Offgrid/minigrid–Only renewable sources
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="642.00">


																	</target>

																	<actual value="22030.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Communication campaigns; number of rural village awareness programs undertaken by province, island and village
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="185.00">


																	</target>

																	<actual value="200.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Consultations with women’s groups, including on project design and reviews
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="5.00">


																	</target>

																	<actual value="8.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of kilowatts installed through community facility connections
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="17.30">


																	</target>

																	<actual value="67.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Institutions providing microfinance products to households in rural areas for the purchase of solar systems under the Project
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="2.00">


																	</target>

																	<actual value="4.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of registered products available in the product catalogue
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="19.00">


																	</target>

																	<actual value="25.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Ppl provided wth elec. by hhold conn.–Offgrid/minigrid–Only renewable sources
</narrative></title> 
<baseline year="2014" iso-date="2014-10-22" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-10-22" />  <period-end iso-date="2020-06-30" />
<target value="100768.00">


																	</target>

																	<actual value="100450.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:16"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P154149</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Vanuatu Aviation Investment Project</narrative>
       </title>
       <description type="1">
       <narrative>The project development objective is to improve operational safety and oversight of international air transport and associated infrastructure in Vanuatu.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF053980" type="40" role="4" >
       <narrative>Public-Private Infrastructure Advisory Facility Multi Donor Trust Fund II </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF502001" type="10" role="1" >
       <narrative>Federal Republic of Germany </narrative>
       </participating-org><participating-org ref="TF506007" type="10" role="1" >
       <narrative>Millennium Challenge Corporation Department Of Policy And International Relations </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF516003" type="10" role="1" >
       <narrative>State Secretariat for Economic Affairs, SECO </narrative>
       </participating-org><participating-org ref="TF518001" type="10" role="1" >
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation </narrative>
       </participating-org><participating-org ref="TF530001" type="10" role="1" >
       <narrative>Austria - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="US-GOV-1" type="10" role="1" >
       <narrative>United States Agency for International Development (USAID) </narrative>
       </participating-org><participating-org ref="XM-DAC-903" type="40" role="1" >
       <narrative>International Finance Corporation (IFC) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2014-07-01"></activity-date><activity-date type="2"  iso-date= "2014-07-01"></activity-date><activity-date type="3"  iso-date= "2020-06-30"></activity-date><activity-date type="4"  iso-date= "2020-07-14"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Dung Anh Hoang</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Transport Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>dhoang1@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="VU">     <narrative>VANUATU</narrative>
       </recipient-country> <sector code="21012"  vocabulary="1" percentage="3.00">
       <narrative>+![cdata[Public transport services]]+</narrative>
       </sector> <sector code="21050"  vocabulary="1" percentage="47.00">
       <narrative>+![cdata[Air transport]]+</narrative>
       </sector> <sector code="21081"  vocabulary="1" percentage="3.00">
       <narrative>+![cdata[Education and training in transport and storage]]+</narrative>
       </sector> <sector code="73010"  vocabulary="1" percentage="47.00">
       <narrative>+![cdata[Reconstruction relief and rehabilitation]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2014-07-01"></period-start> 
       <period-end iso-date="2020-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">399193.01 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">300000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P154149">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">99193.01  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF053980">
       <narrative>Public-Private Infrastructure Advisory Facility Multi Donor Trust Fund II</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P154149">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">300000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P154149">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">291477.48  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P154149">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="44000-P154149" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF053980" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
State requirements for safety measured by Universal Safety Oversight Audit Programme (USOAP) reaches global ICAO average
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="47.51"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="47.51">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Navigation and safety aids in line with implementation schedule
</narrative></title> 
<baseline year="2011" iso-date="2011-12-13" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-13" /> <period-end iso-date="1900-01-01"/>
<target value="50.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Grievance registered related to delivery of project benefits by gender that are actually addressed
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Airport Master Plan in line with implementation schedule
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="50.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Aviation Sector Strategy in line with implementation schedule
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Repairs to Bauerfieled, Whitegrass and Pekoa Airport pavements in line with implementation schedule
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Grievances responded and/or resolved within the stipulated services standards for response times
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="100">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Fire Standards at VLI Achieved
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="Category 6"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" />  <period-end iso-date="2018-06-30" />
<target value="Category 8">


																	</target>

																	<actual value="Category 8">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Successful implementation of agreed training plan
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="No Training Plan"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Training Plan developed but not implemented">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Emergency Repairs to Bauerfieled and Whitegrass completed
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="No spot rehabilitations at Bauerfield/ Damages fro"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Three sets of emergency repairs at Bauerfield are ">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Regional safety and security levy for departing international passengers implemented
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="No levy"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="AU$5 collected">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Modernization of air traffic management achieved
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="No VSAT or ADS-B"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="ADS-B partially operational/VSAT under installatio">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Regulatory certification of safety and security at Bauerfield (VLI) maintained
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="VLI certified"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Re-validation of certification of VLI in accordanc">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Project-supported organization(s) publishing periodic reports on GRM and how issues were resolved
</narrative></title> 
<baseline year="2015" iso-date="2015-03-05" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-03-05" /> <period-end iso-date="1900-01-01"/>
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T16:49:19"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P160658</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Rural Electrification Project Stage II</narrative>
       </title>
       <description type="1">
       <narrative>The Project Development Objective is to support increased penetration of renewable energy and increased access to electricity services in the dispersed off-grid areas of Vanuatu.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="NZ-1" type="10" role="1" >
       <narrative>New Zealand - Ministry of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="TF071278" type="40" role="4" >
       <narrative>SCF - IBRD IA </narrative>
       </participating-org><participating-org ref="TF071290" type="40" role="4" >
       <narrative>Strategic Climate Fund - IBRD IA PROJECT FEES </narrative>
       </participating-org><participating-org ref="TF071309" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility </narrative>
       </participating-org><participating-org ref="TF072819" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility - Parallel Trust Fund of TF071309 </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2010-08-22"></activity-date><activity-date type="2"  iso-date= "2010-08-22"></activity-date><activity-date type="3"  iso-date= "2023-04-30"></activity-date><activity-date type="4"  iso-date= "2023-05-15"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Mitsunori Motohashi</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>mmotohashi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="VU">     <narrative>VANUATU</narrative>
       </recipient-country> <sector code="23230"  vocabulary="1" percentage="33.00">
       <narrative>+![cdata[Solar energy for centralised grids]]+</narrative>
       </sector> <sector code="23630"  vocabulary="1" percentage="33.00">
       <narrative>+![cdata[Electric power transmission and distribution (centralised grids)]]+</narrative>
       </sector> <sector code="43042"  vocabulary="1" percentage="34.00">
       <narrative>+![cdata[Rural development]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2010-08-22"></period-start> 
       <period-end iso-date="2023-04-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">2052508.84 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">130000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071290">
       <narrative>Strategic Climate Fund - IBRD IA PROJECT FEES</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3450000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072819">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility - Parallel Trust Fund of TF071309</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">630173.42  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6770000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071278">
       <narrative>SCF - IBRD IA</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-214988.55  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for January , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071309">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2023-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-21226.36  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for May , 2023</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071290">
       <narrative>Strategic Climate Fund - IBRD IA PROJECT FEES</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2023-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-2486695.72  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for May , 2023</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072819">
       <narrative>Multi Donor Trust Fund for the Pacific Region Infrastructure Facility - Parallel Trust Fund of TF071309</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2023-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-6204753.95  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for August , 2023</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071278">
       <narrative>SCF - IBRD IA</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">944875.71  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">163715.03  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for January , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">145646.43  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for May , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">35026.44  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for July , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">128845.48  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for September , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2022-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">180087.68  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for February , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2023-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-54212.66  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for May , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2023-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-15433.78  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for July , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">334929.02  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">21386.46  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of August , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">50369.44  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">22065.67  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">43316.91  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">43046.68  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">13793.76  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of January , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">27208.10  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of February , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">57745.76  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of March , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">42551.76  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of April , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10769.03  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of May , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1404.92  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of May , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">26000.00  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of June , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">28742.67  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">14313.94  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">30134.02  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18125.81  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">14850.28  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of January , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">12311.64  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of February , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3281.51  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of March , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18051.02  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of April , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10874.90  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of May , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18959.68  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of June , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">22788.20  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8877.07  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6493.42  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2390.55  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2306.01  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of March , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2610.60  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of April , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">26984.66  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of May , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2024-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-20.15  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of July , 2024</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P160658">
       <narrative>VANUATU</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071309" type="1"></related-activity><related-activity ref="44000-P160658" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF072819" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071290" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071278" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
People provided with a new electricty service
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="5612.00">


																	</target>

																	<actual value="3625.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Households received a Solar Home Systems or micro grids
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="1054.00">


																	</target>

																	<actual value="370.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Public Institutions received a Solar Home System or micro grid
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="5.00">


																	</target>

																	<actual value="104.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of mini grids constructed under the project
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of People connected to electricity through a mini grid constructed under the project
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Participants in consultation activities during project implementation (number)
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="700.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Participants in consultation activities during project implementation - female
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="343.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Direct project beneficiaries of which female
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="6.00">


																	</target>

																	<actual value="50.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Total households of which are female headed households received a Solar Home System, micro grid or electricity through a mini-grid
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="2.00">


																	</target>

																	<actual value="11.80">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Grievances registered related to delivery of project benefits addressed (%)
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation capacity of energy constructed - renewable energy facilities
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="0.55">


																	</target>

																	<actual value="0.29">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Annual electricity output from renewable energy as a result of renewable energy constructed under the project
</narrative></title> 
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2017-06-30" /> <period-end iso-date="1900-01-01"/>
<target value="0.34">


																	</target>

																	<actual value="0.32">


																	</actual>

																	</period>
</indicator>
</result></iati-activity></iati-activities>