<iati-activities version="2.03" generated-datetime="2026-09-30T10:56:12"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-27T02:05:44" hierarchy="1"><iati-identifier>44000-P511407</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Syria Electricity Emergency Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) is to enable improved electricity supply and enhance the capacity of electricity sector institutions in Syria.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[SEEP comprises two investment components (Components 1 and 2), one TA component (Component 3), and one project implementation support component (Component 4).Component 1: Rehabilitation of Damaged High-Voltage Transmission Lines. The activities under Component 1 will focus on rehabilitating high voltage transmission lines including two critical 400 kV high-voltage interconnector transmission lines in Syria that were damaged during the conflict, restoring Syria's regional connectivity to Jordan and Turkiye. The restored transmission lines are essential for enabling electricity imports into Syria and improving the stability of PETDE's electricity network. Rehabilitating both lines is considered a no-regret investment that will benefit electricity consumers across Syria for several reasons, including facilitating electricity imports into Syria, connecting Syria's electricity system back to the regional interconnection network, and contributing to improving the grid stability and reducing the frequency of the blackouts through connecting the Syrian network to stronger networks with adequate frequency control.Component 2: Rehabilitation of Damaged High-Voltage Substations. This component focuses on rehabilitating damaged high-voltage transformer substations and providing necessary spare parts and maintenance equipment. Rehabilitating the damaged substations will benefit electricity consumers across Syria for several reasons. First, restoring the damaged substations near demand centers in the most impacted areas will enable the PETDE to optimize the power flow across its network, reduce high loading levels on existing substations that currently serve the impacted areas, reduce the technical losses and improve operational flexibility of the entire power system. As such, the quality of service for the consumers across PETDE network is expected to improve.Component 3: Technical Assistance for Electricity Sector Development and Institutional Capacity Building. This component will provide TA to (a) inform the Government's key electricity sector strategies, policy and regulatory reforms, and investment plans for medium to long term sustainability and (b) support the electricity sector institutional capacity to implement these strategies and reforms.Component 4: Project Implementation Support. This component will support the PETDE in implementing the Project using international best practices. It will finance the necessary operational expenses to implement the project. Additionally, it will finance the hiring of a qualified consulting firm, through an international competitive tender process, to act as PETDE's Owner Engineer (OE). The OE will assist PETDE's Project Management Team (PMT) by providing essential project management, engineering, site supervision, environmental, social, health and safety, and financial management services during both the construction phase and the subsequent project closure periods.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SY–00010028"><narrative> Syrian Arab Republic</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SY-COA-00010029"><narrative>The Public Establishment for Transmission and Distribution of Electricity (PETDE)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-06-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mohamed Zakaria Kamh</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mkamh@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SY" percentage="100"><narrative xml:lang="en">SYRIAN ARAB REPUBLIC</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="170654" />
                <name><narrative>Damascus</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>33.5102 36.291279</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23631" percentage="92" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="92" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="92" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="92" xml:lang="en"/><sector vocabulary="1" code="23220" percentage="3" xml:lang="en"/><sector vocabulary="1" code="23220" percentage="3" xml:lang="en"/><sector vocabulary="1" code="23220" percentage="3" xml:lang="en"/><sector vocabulary="1" code="23220" percentage="3" xml:lang="en"/><sector vocabulary="1" code="23240" percentage="3" xml:lang="en"/><sector vocabulary="1" code="23240" percentage="3" xml:lang="en"/><sector vocabulary="1" code="23240" percentage="3" xml:lang="en"/><sector vocabulary="1" code="23240" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="6.00000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLU" percentage="2.00000000" xml:lang="en"><narrative>Energy Generation - Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLW" percentage="2.00000000" xml:lang="en"><narrative>Energy Generation - Wind</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="90.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1703332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1703344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4379999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4380011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">4258332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">4258344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1460011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1459999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1460002.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">136465856.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">136465856.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">146000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SY-COA-10029"><narrative>The Public Establishment for Transmission and Distribution of Electricity (PETDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">9534144</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SY-COA-10029"><narrative>The Public Establishment for Transmission and Distribution of Electricity (PETDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511407"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P511407?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511407"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PETDE staff trained under capacity building programs on citizen engagement and community liaison matters in collaboration with development partners
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="20">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
High voltage substations rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="7">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No. of employees receiving certificate of technical qualification upon completion of training course (Number of people)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="400">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of studies informing electricity sector policy reforms completed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Owner's Engineer (OE) is mobilized
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity sector policies/strategies/investment plans informed by technical assistance and capacity building
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Substation transformer capacity rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1000000">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Regional interconnection capacity enabled through transmission lines rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="600">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
High voltage transmission lines rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="28">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Regional interconnection capacity enabled through transmission lines rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="600">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Substation transformer capacity rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1000000">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity sector policies/strategies/investment plans informed by technical assistance and capacity building
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4">
<comment><narrative>
Project not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-27T02:05:44" hierarchy="1"><iati-identifier>44000-P512516</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Syria Public Financial Management Capacity Strengthening Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) is to establish public financial management reform coordination capacity, strengthen budget controls and improve transparency in the use of public funds.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed Syria Public Financial Management Capacity Strengthening Project aims to provide the foundational Public Financial Management (PFM) systems and skills to enable the Transitional Government of Syria (TGoS) to manage domestic revenues and external funds in a transparent and accountable manner. The project will be designed based on the ‘Basics First’ approach in PFM reforms focus on building foundational systems and capacities before attempting advanced reforms. This is particularly relevant in Syria's context with limited technical and managerial capacity. It is important to acknowledge that while a lot needs to be done, considering the current capacity challenges, a programmatic approach over the medium-term will provide a better chance of transitioning from fragility by building a solid foundation to scale up later. The proposed project will follow an incremental approach by focusing on the ‘basics first’ to build foundational systems and capacities and prepare the ground for more advanced reforms. The PDO covers the three main thrusts of the project scope: (i) coordination capacity through the PFMRCU, (ii) budget controls through improved compliance from just-in-time support and PFM-procurement professionalization, and (iii) transparency through publication of accurate and timely fiscal information. The essential PFM PFM functions that will be targeted by the project are budget preparation and execution, procurement, and financial reporting including simplification and digitalization of the related business processes. Also the upskilling through professionalization of the PFM and procurement functions will be institutionalized to ensure sustainability. Instead of efficiency of spending in terms of budget outcomes, the project focuses on efficiency in terms of timeliness, comprehensiveness, and accuracy of the PFM functions. Improved payroll, procurement, and budgeting will contribute to better health, education, or infrastructure services. By mid-term of this project, a PEFA assessment is proposed to be conducted to develop a medium to long-term PFM reform strategy and action plan for future outcome-oriented reforms with gender and climate considerations.The project components/sub-components are: Component 1: Public Financial Management Reform OversightSub-component 1.1 Public Financial Management Reform Coordinating Unit (PFMRCU)Sub-component 1.2 Syria External Assistance Fiduciary Section (SEAS)Component 2: Capacity development for essential public financial management and procurement functions.Sub-component 2.1 PFM ProfessionalizationSub-component 2.2 Improving Public Procurement Management and Professionalization Sub-component 2.3 Flexible just-in-time (JIT) technical assistanceComponent 3: Syria Integrated Financial Management Information System (SIFMIS) ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SY–00010654"><narrative>Syrian Arab Republic, represented by the Ministry of Finance </narrative></participating-org><participating-org role="2" xml:lang="en" ref="SY–00010654"><narrative>Syrian Arab Republic, represented by the Ministry of Finance </narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SY-COA-00010653"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Winston Percy Onipede Cole</narrative></person-name><telephone>+1-202-473-1000</telephone><email>wcole@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SY" percentage="100"><narrative xml:lang="en">SYRIAN ARAB REPUBLIC</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="170654" />
                <name><narrative>Damascus</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>33.5102 36.291279</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="70" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="70" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="30" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="30" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="100.000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">250003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">541665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">541677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">625011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">500009.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">20000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">20000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">20000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SY-COA-10653"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P512516"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P512516?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P512516"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria External Assistance Fiduciary Section (SEAS) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2028-12-14" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Staff from ministries and public entities of administrative nature biometrically registered in the SIFMIS human resource/payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Staff from ministries and public entities of administrative nature biometrically registered in the SIFMIS human resource/payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Greenhouse gas (GHG) emissions reduction from SIFMIS
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Staff from ministries and public entities of administrative nature biometrically registered in the SIFMIS human resource/payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria External Assistance Fiduciary Section (SEAS) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2028-12-14" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff who have obtained certificates through the PFM-Procurement Professionalization Program of which at least 50 percent are female. (Number - gender disaggregated)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement Manual and Standard Procurement Documents issued.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Financial Management Reform Coordination Unit (PFMRCU) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria External Assistance Fiduciary Section (SEAS) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2028-12-14" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Financial Management Reform Coordination Unit (PFMRCU) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement Manual and Standard Procurement Documents issued.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria External Assistance Fiduciary Section (SEAS) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2028-12-14" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Greenhouse gas (GHG) emissions reduction from SIFMIS
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement Manual and Standard Procurement Documents issued.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria Budget Transparency Portal including a Citizen's Budget Helpdesk is operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff who have obtained certificates through the PFM-Procurement Professionalization Program. (Number - gender disaggregated)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2028-12-14" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of staff from ministries and public entities of an administrative nature paid through the SIFMIS payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement opportunities and contract awards published on the Single Procurement Portal (SPP).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria Budget Transparency Portal including a Citizen's Budget Helpdesk is operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Staff from ministries and public entities of administrative nature biometrically registered in the SIFMIS human resource/payroll module.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Greenhouse gas (GHG) emissions reduction from SIFMIS
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Greenhouse gas (GHG) emissions reduction from SIFMIS
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement Manual and Standard Procurement Documents issued.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget processed through SIFMIS. (Percentage).
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Financial Management Reform Coordination Unit (PFMRCU) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff who have obtained certificates through the PFM-Procurement Professionalization Program of which at least 50 percent are female. (Number - gender disaggregated)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM reform strategy and action plan based on a citizen-centric approach.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage value of executed budget paid through the Treasury Single Account (TSA)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff who have obtained certificates through the PFM-Procurement Professionalization Program. (Number - gender disaggregated)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2028-12-14" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria Budget Transparency Portal including a Citizen's Budget Helpdesk is operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Syria Budget Transparency Portal including a Citizen's Budget Helpdesk is operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Financial Management Reform Coordination Unit (PFMRCU) operational.
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-27T02:05:44" hierarchy="1"><iati-identifier>44000-P515199</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Syria Emergency Water Security and Resilient Services Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to restore bulk water and wastewater infrastructure in priority areas and enhance resilience to climate risks in Syria]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed operation responds to the request from the Government of Syria to support emergency investments in addressing the multifaceted crisis facing the water sector following years of conflict, chronic underinvestment and the impacts of climate change. The proposed project is intended to support the immediate rehabilitation of critical water infrastructure and provide the foundations to inform medium- to long-term resilient recovery efforts. This first project focuses on emergency investments in restoring water services, rehabilitation of wastewater treatment plants, enhancing the resilience of water resources and supporting strategic studies aimed at providing the medium term foundations for enhancing resilience. The proposed IDA grant will finance: (i) water supply investments in select locations; (ii) the rehabilitation of the Adra Treatment Plant in Damascus; (iii) no regret equipment and supplies to sustain operations; (iv) a national dam safety assessment; (v) climate and Water Data and Information Systems and; (vi) technical assistance to support preparation of strategic studies and investments, including transboundary waters, water governance and sector reforms, along with project implementation and capacity building. ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SY–00012743"><narrative>Syrian Arab Republic, represented by the Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SY-COA-00012742"><narrative>Ministry of Energy, Water Resources Directorate</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-04-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-04-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sally Zgheib</narrative></person-name><telephone>+1-202-473-1000</telephone><email>szgheib@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SY" percentage="100"><narrative xml:lang="en">SYRIAN ARAB REPUBLIC</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="170654" />
                <name><narrative>Damascus</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>33.5102 36.291279</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="14022" percentage="47" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="27" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="21" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWW" percentage="8.00000000" xml:lang="en"><narrative>Water Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWC" percentage="40.0000000" xml:lang="en"><narrative>Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWA" percentage="47.0000000" xml:lang="en"><narrative>Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWF" percentage="5.00000000" xml:lang="en"><narrative>Public Administration - Water, Sanitation, and Solid Waste Management </narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">5416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">3333344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">150000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">150000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SY-COA-12742"><narrative>Ministry of Energy, Water Resources Directorate</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P515199"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P515199?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P515199"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-14" />
<target value="190,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-14" />
<target value="190,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
KPIs and regulatory system for monitoring quality of water and wastewater services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted analytics for water infrastructure and climate data
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategies and studies developed for sector governance
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted analytics for water infrastructure and climate data
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from increased institutional capacity for cross-border, climate-resilient planning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="500,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitation of water treatment plants
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of citizens reporting satisfaction with water services
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional water supplied from rehabilitated bulk systems
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2026-08-14" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitation of wastewater treatment plants
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from increased institutional capacity for cross-border, climate-resilient planning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="500,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategies and studies developed for sector governance
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who receive training, certification and job intermediation support under the paid 12-month internship program
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategies and studies developed for sector governance
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic sanitation
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="220,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
KPIs and regulatory system for monitoring quality of water and wastewater services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitation of water treatment plants
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitation of wastewater treatment plants
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitation of water treatment plants
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional water supplied from rehabilitated bulk systems
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2026-08-14" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-14" />
<target value="190,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
KPIs and regulatory system for monitoring quality of water and wastewater services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
KPIs and regulatory system for monitoring quality of water and wastewater services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
KPIs and regulatory system for monitoring quality of water and wastewater services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
KPIs and regulatory system for monitoring quality of water and wastewater services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic sanitation
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="220,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic sanitation
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="220,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic sanitation
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="220,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries completing project-supported technical or managerial training
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries completing project-supported technical or managerial training
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic sanitation
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="220,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Targeted analytics for water infrastructure and climate data
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who receive training, certification and job intermediation support under the paid 12-month internship program
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitation of wastewater treatment plants
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic sanitation
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="220,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of citizens reporting satisfaction with water services
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries completing project-supported technical or managerial training
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of citizens reporting satisfaction with water services
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-08-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from increased institutional capacity for cross-border, climate-resilient planning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="500,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from increased institutional capacity for cross-border, climate-resilient planning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-15" />
<target value="500,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-14" />
<target value="190,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-14" />
<target value="190,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-08-14" />
<target value="190,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional water supplied from rehabilitated bulk systems
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2026-08-14" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-27T02:05:44" hierarchy="1"><iati-identifier>44000-P513704</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Syria Health System Recovery and Strengthening Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve access to quality health services and strengthen the capacity of the public health system in Syria.  ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[After over a decade of conflict, Syria's health system is severely fragmented, underfunded, and heavily reliant on humanitarian aid. More than half of health facilities are partially or non-functional; the health workforce has dramatically shrunk due to displacement and migration. The health systems for disease preparedness, prevention, and response are ill-prepared for tackling epidemic-prone diseases, as shown by the 2023 cholera outbreak and ongoing cross-border disease risks. Populations face catastrophic out-of-pocket expenditures and limited access to basic primary health care (PHC) services. Syria has also suffered from heatwaves and droughts, significantly affecting food production and prices. There are risks related to the escalation of internal and regional conflict amidst a new fragile institution emerging from civil war.  The project comprises of 3 components: Component 1 focuses on restoring and strengthening primary health care (PHC) services across Syria, with an emphasis on maternal, neonatal, and child health (MNCH), noncommunicable diseases, and emergency referrals. It includes rehabilitating and upgrading PHC facilities, providing essential medicines and equipment, and improving supply chains and referral systems. Capacity-building efforts will train health workers on updated clinical protocols, infection prevention and control (IPC), and logistics management. Investments will cover 150PHCs, ensuring service readiness and equitable access to essential health services.  Out of these 20 PHC will be upgraded to support Comprehensive Emergency Obstetric and Newborn Care.Component 2 aims to enhance Syria's public health emergency preparedness and response capacity. It will upgrade laboratory systems for disease diagnostics and antimicrobial resistance (AMR) monitoring, strengthen integrated disease surveillance and early warning systems, and ensure compliance with International Health Regulations (IHR). The component also includes workforce development through field epidemiology training and the establishment of rapid response teams. These measures will improve outbreak detection, reporting, and response, building resilience against epidemics and health shocks. This component also focuses on institutional capacity building to improve governance, planning, and operational efficiency within the health system. It will strengthen nursing education and workforce management through upgraded training infrastructure, digital learning platforms, and competency-based curricula. Additionally, it will integrate health information, human resources, and supply chain systems into a unified digital platform to enhance data management and resource allocation.  Nurse workforce development and training center rehabilitation will also be financed. Component 3 will support project management, monitoring and evaluation, fiduciary oversight, and stakeholder engagement to ensure effective implementation and compliance with safeguards.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SY–00012791"><narrative>Syrian Arab Republic</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SY-COA-00012792"><narrative>Ministry of Health</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-04-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-04-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Yassine Kalboussi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ykalboussi@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SY" percentage="100"><narrative xml:lang="en">SYRIAN ARAB REPUBLIC</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="170654" />
                <name><narrative>Damascus</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>33.5102 36.291279</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="12191" percentage="100" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHQ" percentage="47.0000000" xml:lang="en"><narrative>Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHF" percentage="3.00000000" xml:lang="en"><narrative>Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="50.0000000" xml:lang="en"><narrative>Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3333335.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3333335.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2083344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2083344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">75000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">75000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">75000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SY-COA-12792"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P513704"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P513704?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P513704"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PHCs provided with essential medicines and non medical supplies for provision of essential health services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Neonatal visits in PHC
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="50000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women attending ANC who received at least 1 nutrition intervention
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="360000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="450,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities meeting quality standards for essential services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="90%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of front line workers completing the FETP
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-07-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of warehouses with a functional LMIS
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="18">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
number of female trainees employed within 6-12 months post training
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="882">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with restored access to essential health services through supported primary health care facilities
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2029-06-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of facilities using upgraded and functional DHIS2
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PHCs that have been rehabilitated and meet climate resilient standards
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of warehouses with a functional LMIS
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="18">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of facilities using upgraded and functional DHIS2
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CEMONC Facilities upgraded
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health workers trained on DHIS2 data entry and use
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PHCs provided with essential medicines and non medical supplies for provision of essential health services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities meeting quality standards for essential services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="90%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Neonatal visits in PHC
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="50000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="450,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of nurses trained
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="2,100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PHEOC established and operational
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of warehouses with a functional LMIS
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="18">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Neonatal visits in PHC
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="50000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PHEOC established and operational
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health workers trained on DHIS2 data entry and use
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PHCs provided with essential medicines and non medical supplies for provision of essential health services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Citizen Engagement in Health Projects
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="60%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of nurses trained
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="2,100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of nurses trained
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="2,100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health workers trained on DHIS2 data entry and use
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of warehouses rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="18">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human Resource Information System (HRIS) established
</narrative></title>
<baseline year="2026" iso-date="2026-01-14" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-14" />
<period-end iso-date="2029-07-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CHWs trained and actively deployed to delivery maternal, child health, and nutrition services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CEMONC Facilities upgraded
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Citizen Engagement in Health Projects
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="60%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IYCF counseling provided to mothers
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="100000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="225,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
number of female trainees employed within 6-12 months post training
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="882">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of front line workers completing the FETP
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-07-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public health laboratories upgraded and operational for outbreak-prone disease and AMR testing
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women attending ANC who received at least 1 nutrition intervention
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="360000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of facilities using upgraded and functional DHIS2
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IYCF counseling provided to mothers
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="100000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="225,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with restored access to essential health services through supported primary health care facilities
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2029-06-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with restored access to essential health services through supported primary health care facilities
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2029-06-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with restored access to essential health services through supported primary health care facilities
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2029-06-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Citizen Engagement in Health Projects
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="60%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities meeting quality standards for essential services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="90%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities meeting quality standards for essential services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="90%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities meeting quality standards for essential services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="90%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public health laboratories upgraded and operational for outbreak-prone disease and AMR testing
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public health laboratories upgraded and operational for outbreak-prone disease and AMR testing
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human Resource Information System (HRIS) established
</narrative></title>
<baseline year="2026" iso-date="2026-01-14" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-14" />
<period-end iso-date="2029-07-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IYCF counseling provided to mothers
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="100000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="225,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CHWs trained and actively deployed to delivery maternal, child health, and nutrition services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public health laboratories upgraded and operational for outbreak-prone disease and AMR testing
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public health laboratories upgraded and operational for outbreak-prone disease and AMR testing
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CHWs trained and actively deployed to delivery maternal, child health, and nutrition services
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="2000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human Resource Information System (HRIS) established
</narrative></title>
<baseline year="2026" iso-date="2026-01-14" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-14" />
<period-end iso-date="2029-07-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
number of female trainees employed within 6-12 months post training
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="882">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of warehouses rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="18">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PHEOC established and operational
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CEMONC Facilities upgraded
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public health laboratories upgraded and operational for outbreak-prone disease and AMR testing
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of front line workers completing the FETP
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-07-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="450,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of warehouses rehabilitated
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="18">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PHCs that have been rehabilitated and meet climate resilient and energy efficiency standards
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women attending ANC who received at least 1 nutrition intervention
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="360000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with restored access to essential health services through supported primary health care facilities
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2029-06-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with restored access to essential health services through supported primary health care facilities
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2029-06-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities meeting quality standards for essential services
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-06-15" />
<target value="90%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PHCs that have been rehabilitated and meet climate resilient standards
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2029-06-15" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>