<iati-activities version="2.03" generated-datetime="2026-09-30T10:56:00"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-27T00:41:31" hierarchy="1"><iati-identifier>44000-P121210</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>APL on Strengthening Regional Cooperation For Wildlife Protection in Asia</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project aims to assist the participating governments to build or enhance shared capacity, institutions, knowledge andincentivesto collaborate in tackling illegal wildlife trade and other select regional conservation threats to habitats in borderareas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Strengthening Regional Cooperation for Wildlife Protection Project is to assist the participating governments to build or enhance shared capacity, institutions, knowledge and incentives to collaborate in tackling illegal wildlife trade and other selected regional conservation threats to habitats in border areas. There are three components to the project. The first component of the project is capacity building for addressing the illegal trans-boundary wildlife trade. This component aims to bring about regional harmonization and collaboration in combating wildlife crime through strengthened legislative and regulatory frameworks, well-equipped specialized agencies and systems, as well as relevant training and awareness programs for staff across the range of agencies that contribute to the enforcement of wildlife laws and regulations. The second component of the project is promoting wildlife conservation in Asia. The third component of the project is coordination and communication. This component would provide services, Technical Assistance (TA) and incremental costs for project staff as well as operating costs for the management and coordination of the project.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0004243"><narrative>Economic Relations Division, Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0004243"><narrative>Economic Relations Division, Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0004244"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0004244"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="8S-COA-0004239"><narrative>Bangladesh Forest Department</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-06-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-04-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nathalie Weier Johnson</narrative></person-name><telephone>+1-202-473-1000</telephone><email>njohnson@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>













<recipient-region code="679" percentage="100" vocabulary="1"><narrative xml:lang="en">South Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001282988" />
            <name><narrative>Federal Democratic Republic of Nepal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>28 84</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001210997" />
            <name><narrative>Bangladesh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>24 90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="41010" percentage="50" xml:lang="en"/><sector vocabulary="1" code="41030" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="76.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="85" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="15" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="85" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="85" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">643085.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">643085.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">643085.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">643085.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">643085.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">643085.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">964628.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">964628.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">964628.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">964628.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">964628.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">964628.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">687585.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">687585.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">687585.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">687585.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">687585.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">687585.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">656071.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">656071.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">656071.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">656071.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">656071.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">656071.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">629052.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">629052.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">629052.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">629052.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">629052.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">629052.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">943578.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">943578.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">943578.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">943578.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">943578.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">943578.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">541252.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">541252.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">541252.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">541252.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">541252.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">541252.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">811878.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">811878.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">811878.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">811878.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">811878.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">811878.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">99023.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">99023.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">99023.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">99023.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">99023.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">99023.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">94484.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">94484.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">94484.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">94484.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">94484.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">94484.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">7311593.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">7311593.49</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">36000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">3000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-19312</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-959</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-4095378</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">166691</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">2135448</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">65601</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">608763</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">772210</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">173593</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">38142</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">125015</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">164969</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">443484</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">93797</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">559368</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">1030</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">709333</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">178576</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">158921</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">230263</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1125626</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">360961</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1021223</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">81735</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1293536</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">431860</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1669078</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">214340</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">882146</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">992782</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">821072</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">742515</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1926686</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">585343</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">956660</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">756420</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">420766</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1038846</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">753637</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">991071</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">302114</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">462595</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">438666</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1704212</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">760357</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">1295653</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">505652</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">403296</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">721161</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">766200</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1073469</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">335</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-18968</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-417845</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-10395</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-11822</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-12435</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-17222</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-26072</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-36060</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-52577</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-69560</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-81786</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-98594</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-106147</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-108966</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-106408</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-104168</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-102757</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-102856</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-103140</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-111120</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-106598</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-103419</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-95560</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-96082</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-96454</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-94396</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-86679</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-97739</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-95710</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-92289</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-284262</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-278569</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-260029</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-266412</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-265643</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-264970</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-268956</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-261445</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-273357</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-274581</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-4239"><narrative>Bangladesh Forest Department</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4240"><narrative>Department of Forests</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4241"><narrative>Department of National Parks and Wildlife Conservation</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-4242"><narrative>Ministry of Environment and Forests</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121210"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P121210?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121210"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas brought under enhanced biodiversity protection (ha)
</narrative></title>
<baseline year="2012" iso-date="2012-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-07" />
<period-end iso-date="2016-12-31" />
<target value="325400.00">

</target>
<actual value="372000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nepal Comp 2: Ind 2: Number of models developed for more effective wildlife management.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="2.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nepal Comp 2. Indicator 5: An ecotourism plan for Banke National Park developed.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="Yes">

</target>
<actual value="The plan is developed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3: Wildlife crime control institutions established  in the three participating countries.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nepal Comp 1: Indicator 2: Wildlife crime control mechanisms institutionalized and operationalized with capacity for forensic, legal support, and wildlife crime data access and collection.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="WCCB fully operational.">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bangladesh Component 1: Indicator 4: Number of training modules developed and delivered by the Wildlife Center
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="10">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bangladesh Component 2: Indicator 1: Number of flagship species for which breeding habitats have been identified in targeted areas.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bangladesh Component 3: Indicator 1: Effective project coordination among participating countries at each regional thematic meeting.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="3">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 1: A regional mechanism is developed and operational for addressing illegal wildlife trade and other conservation threats
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="SAWEN statute drafted, adopted and one annual meeting held after statute approval.">

</target>
<actual value="Target Achieved
Three annual meetings have been held.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bangladesh Component 1: Indicator I: New draft  Wildlife Conservation Act giving more powers to the Wildlife Circle approved by Parliament
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2013-12-31" />
<target value="Yr 2 - 100%. The target has been achieved.">

</target>
<actual value="Completed. Approved by Parliament on July10, 2012.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bangladesh Component 1: Indicator 5: Number of BFD staff trained in wildlife crime and/or conservation.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="1000.00">

</target>
<actual value="1672.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas brought under enhanced biodiversity protection (ha)
</narrative></title>
<baseline year="2012" iso-date="2012-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-07" />
<period-end iso-date="2016-12-31" />
<target value="25000.00">

</target>
<actual value="4738000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional 1: Number of agreed research programs for regional wildlife management developed among participating countries.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="3">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nepal Comp 2: Ind 3: A ranging model developed based on research information for elephant conservation to reduce conflict with humans.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="Yr 2 - 5 testing of models.">

</target>
<actual value="The Window 2 sub-projects include: (i) community based human-elephant conflict management in Jhapa District; (ii) improvingmanagement of Bardia National Park through habitat and human wildlife conflict management. Models are being developed based on theexperiences of these sub-projects, final product will be available prior to the end of the project.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Number of agreed knowledge products developed and shared among SAWEN countries on wildlife crime and/or wildlife conservation.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="15.00">

</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4: Number of implemented pilot initiatives that address trans-boundary wildlife issues.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="3.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bangldsh Comp 2: Indicator 2: Number of species conservation pilot plans developed for more effective wildlife management.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="6.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5: Number of activities contributing to tiger conservation.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="5.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nepal Comp 3 Ind 1: Effective project coordination among participating countries at each regional thematic meeting.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="3">

</target>
<actual value="3 meetings were conducted with all countries coordinating and participating">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional 2: Number of thematic meetings on wildlife crime and trans-boundary conservation issues among participating and other relevant countries
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="3">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nepal Comp 2: Indicator 1: Number of pilot projects designed and implemented to improve protection and conservation of key flagshipspecies.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="9.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bangladesh Component 1: Indicator 3: Establishment and Operationalizing of Wildlife Crime Control Unit (WCCU) with at least forensic section, legal support arm and wildlife crime bank
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="No wildlife crime control agency at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="WCCU fully operational.
Operation of forensic and legal units started.
Wild-life crime bank fully operational.">

</target>
<actual value="WCCU fully operational Operation of forensic and legal units started">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nepal Comp 1: Indicator 3: Legislation for effective compliance of CITES established.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="Legislation completed.">

</target>
<actual value="Legislation to address shortcomings in Nepals ability to fulfill obligations under CITIES has been drafted but has not yet receivedparliamentary approval.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bangladesh Component 2: Indicator 3: Number of national parks with an ecotourism plan.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="10">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bangladesh Component 1: Indicator 2: Number of staff added to the Wildlife Circle and who have been trained on enforcement and wildlife crime control.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="Inadequate capacity to respond to wildlife crimes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="105">

</target>
<actual value="107">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nepal Comp 1: Indicator 1: Implementation challenges of key policy and legislation identified.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="Nepal currently has -National Parks and Wildlife conservation Act, Forest Act and Forest rules"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="Updated policies and regulations fully operational.">

</target>
<actual value="Completed. These policies were reviewed. The key constraint identified was weak implementation rather than policy shortcomings.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Nepal Comp 1: Indicator 4: Number of staff trained in state of the art tools on wildlife conservation.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="180.00">

</target>
<actual value="320.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bangladesh Component 3: Indicator 2: Development and implementation of project communication plan
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2013-12-31" />
<target value="20 communication outputs produced.
Plan developed.">

</target>
<actual value="20 communication outputs produced
Communication plan executed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nepal Comp 2: Ind. 4: A replication strategy developed with action plan for mitigating human elephant conflict.
</narrative></title>
<baseline year="2011" iso-date="2011-03-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-07" />
<period-end iso-date="2016-12-31" />
<target value="Strategy and master plan developed.">

</target>
<actual value="A strategy and action plan are developed">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-27T00:41:31" hierarchy="1"><iati-identifier>44000-P171054</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Climate Adaptation and Resilience for South Asia</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To contribute to an enabling environment for climate-resilient policies and investments in select sectors and countries in South Asia.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Climate Adaptation and Resilience for South Asia (CARE) Project is to contribute to an enabling environment for climate-resilient policies and investments in select sectors and countries in South Asia. The Project has three components. 1. Evidence-based Climate Smart Decision Making component will develop platforms to enhance access to data for resilient planning and investments, including hazard and climate variability data, climate impact knowledge and other sector-specific data. 1.1. Expanding South Asia Region (SAR) Regional Resilience Data and Analytics Services (RDAS) subcomponent will support the development of a public domain data and analytics platform, namely the Regional Resilience Data and Analytics Service (RDAS) Platform to make climate-informed policy, planning and investment decisions for climate resilient development. 1.2. Strengthening national-level sectoral decision support systems (DSS) for the Participating countries subcomponent will provide support to enable the Participating Countries in developing or enhancing their respective interactive decision support system (DSS) platforms. 1.3. Trainings for Climate-Informed Decision-Making subcomponent will support policymakers and other users (i) within the South Asia region, in utilizing the data and RDAS platform for climate-informed planning and decision-making through the provision of trainings at the regional level; (ii) within the Participating Countries in utilizing the data and DSS platforms for climate-informed planning and decision-making in various sectors through the provision of trainings at the national and sub-national levels. 2. Enhancing Policies, Standards and Capacities for Climate Resilient Development component has the following subcomponents: 2.1. Advisory services for policy and investment interventions subcomponent will support the Participating Countries, to develop and/or strengthen evidence-based resilient policies, strategies and action/investment plans within the Participating Countries for mainstreaming climate resilience. 2.2. Promoting Climate Resilient Design and Standards for South Asia Region subcomponent will facilitate (i) the development of regional climate-resilient guidelines; and (ii) strengthen national and/or sectoral standards. 2.3. Implementation Support to Climate-Risk Management Solutions for Participating Countries subcomponent will support capacity building and technical support across the Participating Countries. 2.4. Innovation for Climate Adaptation and Resilience subcomponent will support innovative and disruptive technology solutions for resilience. 3. Project Management and Specialized Support component t will provide assistance for (i) the establishment and operation of the Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES) Project Implementation Unit (PIU); (ii) Project implementation and supervision of Component 1 of the Project, (iii) monitoring and evaluation; (iv) Training; (v) carrying out of relevant studies for climate impacts and related interventions, inclusive and gendered practices in climate resilient planning and investments; and (vi) financing of Incremental Operating Costs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0041546"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0041547"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="8S-COA-0041548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-05-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-05-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-08-05"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-08-05"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Naho Shibuya</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nshibuya@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="679" percentage="100" vocabulary="1"><narrative xml:lang="en">South Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001149361" />
            <name><narrative>Islamic Republic of Afghanistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>33 66</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001168579" />
            <name><narrative>Islamic Republic of Pakistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>30 70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001210997" />
            <name><narrative>Bangladesh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>24 90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001282988" />
            <name><narrative>Federal Democratic Republic of Nepal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>28 84</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001605651" />
            <name><narrative>Kingdom of Thailand</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 101</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001282028" />
            <name><narrative>Republic of Maldives</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.2 73</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001269750" />
            <name><narrative>Republic of India</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>22 79</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="66" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="17" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="75" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="75" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="75" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="75" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="75" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="100" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="39" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="39" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="39" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="75" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="75" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="39" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="39" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-05"/>
<value currency="USD" value-date="2025-08-05">8429840.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-05"/>
<value currency="USD" value-date="2025-08-05">8429840.26</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">12000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">24000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-3689999</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2150000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1700000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">226054</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">499374</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">2273000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">500626</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">882944</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1454822</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">326699</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">363359</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">1617081</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">438789</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-213054</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">956690</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">437107</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">904261</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">880000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">110000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">870348</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">512137</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">690253</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">550218</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">519423</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">669288</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">347241</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">824005</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-376721</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">762189</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">970904</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">423329</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">810385</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">1385423</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">609161</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">519702</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">310406</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">754909</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">697049</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">922120</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">983264</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">908743</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">397094</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">589366</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">120000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">16165</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">45220</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-19215</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-41548"><narrative>The Regional Integrated Multi-Hazard Early Warning System for Africa and Asia (RIMES)</narrative></receiver-org><receiver-org xml:lang="en" ref="8S-COA-41549"><narrative>Asian Disaster Preparedness Center (ADPC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171054"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P171054?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171054"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Innovative resilient solutions crowd sourced through Climate Innovation Challenge and TechEmerge Resilience Challenge
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="31.00">
<comment><narrative>
A total of 39 innovative solutions were crowdsource, including 16 under the Regional IDA grant, 16 under the UK FCDO PARCC window, and 7 through IFC's TechEmerge Resilience Challenge. The diversity of innovations from flood-forecasting tools and mobile agriculture apps to smart groundwater mapping and slope-stabilization technologies, demonstrates the project's success in leveraging private-sector and academic innovation for climate resilience. This performance underscores the regional platform's role as a catalyst for innovation, cross-country learning, and public-private collaboration on climate adaptation technologies
</narrative></comment>
</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with decision support systems and tools developed under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-13" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
This represents the result of a final survey undertaken in Bangladesh, Nepal, and Pakistan as follows: 
- 85.7% for Bangladesh (Flood Forecasting and Warning Center) 
- 77.6% for Nepal (Ministry of Agriculture and Livestock Development, Department of Livestock Services, Department of Roads, the National Disaster Risk Reduction and Management Authority) 
- 81.1% for Pakistan (Punjab Agriculture Department, Balochistan Agriculture Department, and the Ministry of Planning, Development, and Special Initiatives)
</narrative></comment>
</target>
<actual value="81.71">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees in select sectors satisfied based on the relevance, coherence, effectiveness, impact, and sustainability of training
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-07-29" />
<target value="70.00">
<comment><narrative>
A survey is being conducted at the end of every training event. The average satisfaction rate will be determined at the end of the project.
</narrative></comment>
</target>
<actual value="86.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-informed decision-making tools and systems developed/enhanced in focus countries
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-14" />
<target value="40.00">
<comment><narrative>
Six new decision support systems (DSSs) and two enhanced existing ones have been completed as follows: Enhanced DSSs: Bangladesh: FFWC DSS (FFWC/BWDB) Nepal: NAMIS/ADVISE (MoALD) New DSSs: Bangladesh: NLAS (DLS) Nepal: NAVIGATE (DoR), READY (NDRRMA) Pakistan: 2 ADVISE (PAD &amp; BACD), CLIM-PLANNeD (MoPDSI) Eight mobile applications have been completed as follows: Bangladesh: BAMIS (DAE), NLAS (DLS) Nepal: NAVIGATE (DoR), READY (NDRRMA) Pakistan: ADVISE (PAD &amp; BACD), CLIM-PLANNeD (MoPDSI)
</narrative></comment>
</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sectoral investments supported to include climate risks and resilient design in select sectors
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-15" />
<target value="5.00">
<comment><narrative>
RIMES supported the Bangladesh Weather and Climate Services Regional Project (BWCSRP; P150220) by developing an audio broadcasting system for disseminating the agromet advisories generated under BWCSRP.

ADPC has been preparing reports outlining recommendations to support the following investment projects:
• Climate Smart Agriculture and Water Management Project (CSAWMP; P161534) implemented by the Department of Agricultural Extension (DAE) in Bangladesh;        
• Western Economic Corridor and Regional Enhancement Program (WeCARE; P169880) implemented by the Local Government Engineering Department (LGED) in Bangladesh; and         
• Two transport projects implemented by the Department of Roads and the Department of Local Infrastructure Development in Nepal. 

ADPC has not provided evidence demonstrating that its recommendations have been incorporated into these projects.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with decision support systems and tools developed under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-13" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
81.7% of users expressed satisfaction with decision-support tools developed under the project, surpassing the 70% target. Feedback highlighted improved usability, accuracy, and timeliness of sectoral advisories in agriculture, transport, and disaster management. The result confirms that DSS products effectively responded to end-user needs and enhanced sectoral decision-making.
</narrative></comment>
</target>
<actual value="81.71">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government officials trained to apply climate resilient standards and data analytics in policies, planning and investments
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="2,370.00">
<comment><narrative>
3,179 officials trained (target: 2,370), across all focus countries, with ADPC accounting for 1158 and RIMES 2021. Training improved application of climate-risk screening, data analytics, and resilient design methods. The high turnout reflects strong institutional demand and effective coordination between ADPC and RIMES.
</narrative></comment>
</target>
<actual value="3247">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Districts receiving advisories issued by decision support systems developed under the project
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2025-08-13" />
<target value="30">

</target>
<actual value="153">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National/sectoral policies, manuals, guidelines, and plans supported to incorporate climate resilience
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="15.00">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with access to data, information, and/or analytics in Regional Resilience Data and Analytics Services (RDAS) platform
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
This represents the results of surveys undertaken in Bangladesh, Nepal, and Pakistan, in which at least ten officials from sectoral agencies per country and at least 2 officials from National Meteorological and Hydrological Services (NMHSs) per country submitted a response.
</narrative></comment>
</target>
<actual value="80.02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with access to data, information, and/or analytics in Regional Resilience Data and Analytics Services (RDAS) platform
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
Surveys in Bangladesh, Nepal, and Pakistan indicated 80.3% satisfaction among 36 officials from sectoral agencies and NMHSs. Satisfaction reflected improved accessibility, visualization, and reliability of hydromet data through the operational RDAS platform. The result demonstrates strengthened regional cooperation and information sharing for climate-risk screening and planning.
</narrative></comment>
</target>
<actual value="80.02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with access to data, information, and/or analytics in Regional Resilience Data and Analytics Services (RDAS) platform
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
This represents the results of surveys undertaken in Bangladesh, Nepal, and Pakistan, in which at least ten officials from sectoral agencies per country and at least 2 officials from National Meteorological and Hydrological Services (NMHSs) per country submitted a response.
</narrative></comment>
</target>
<actual value="80.02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with decision support systems and tools developed under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-13" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
81.7% of users expressed satisfaction with decision-support tools developed under the project, surpassing the 70% target. Feedback highlighted improved usability, accuracy, and timeliness of sectoral advisories in agriculture, transport, and disaster management. The result confirms that DSS products effectively responded to end-user needs and enhanced sectoral decision-making.
</narrative></comment>
</target>
<actual value="81.71">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with decision support systems and tools developed under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-13" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
This represents the result of a final survey undertaken in Bangladesh, Nepal, and Pakistan as follows: 
- 85.7% for Bangladesh (Flood Forecasting and Warning Center) 
- 77.6% for Nepal (Ministry of Agriculture and Livestock Development, Department of Livestock Services, Department of Roads, the National Disaster Risk Reduction and Management Authority) 
- 81.1% for Pakistan (Punjab Agriculture Department, Balochistan Agriculture Department, and the Ministry of Planning, Development, and Special Initiatives)
</narrative></comment>
</target>
<actual value="81.71">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sectoral investments supported to include climate risks and resilient design in select sectors
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-15" />
<target value="5.00">
<comment><narrative>
RIMES supported the Bangladesh Weather and Climate Services Regional Project (BWCSRP; P150220) by developing an audio broadcasting system for disseminating the agromet advisories generated under BWCSRP. The other projects being supported are: Bangladesh: - Climate Smart Agriculture and Water Management Project (P161534) - Western Economic Corridor and Regional Enhancement Program (P169880) in Bangladesh Nepal: - DoR Project - DoLI Project. Limited completion was due to delays in design finalization, extended approval timelines, and competing national priorities. However, the preparatory work strengthened technical capacity and established models for integrating climate risks into future infrastructure investments.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sectoral investments supported to include climate risks and resilient design in select sectors
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-15" />
<target value="5.00">
<comment><narrative>
RIMES supported the Bangladesh Weather and Climate Services Regional Project (BWCSRP; P150220) by developing an audio broadcasting system for disseminating the agromet advisories generated under BWCSRP.

ADPC has been preparing reports outlining recommendations to support the following investment projects:
• Climate Smart Agriculture and Water Management Project (CSAWMP; P161534) implemented by the Department of Agricultural Extension (DAE) in Bangladesh;        
• Western Economic Corridor and Regional Enhancement Program (WeCARE; P169880) implemented by the Local Government Engineering Department (LGED) in Bangladesh; and         
• Two transport projects implemented by the Department of Roads and the Department of Local Infrastructure Development in Nepal. 

ADPC has not provided evidence demonstrating that its recommendations have been incorporated into these projects.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gender-disaggregated data analytics developed that contributes to narrow the gender gap in climate change vulnerability
</narrative></title>
<baseline year="2020" iso-date="2020-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-13" />
<period-end iso-date="2025-08-13" />
<target value="4.00">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sectoral investments supported to include climate risks and resilient design in select sectors
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-15" />
<target value="5.00">
<comment><narrative>
RIMES supported the Bangladesh Weather and Climate Services Regional Project (BWCSRP; P150220) by developing an audio broadcasting system for disseminating the agromet advisories generated under BWCSRP. The other projects being supported are: Bangladesh: - Climate Smart Agriculture and Water Management Project (P161534) - Western Economic Corridor and Regional Enhancement Program (P169880) in Bangladesh Nepal: - DoR Project - DoLI Project. Limited completion was due to delays in design finalization, extended approval timelines, and competing national priorities. However, the preparatory work strengthened technical capacity and established models for integrating climate risks into future infrastructure investments.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National sectoral standards supported to incorporate climate resilience
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="5.00">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users in select sectors satisfied with access to data, information, and/or analytics in Regional Resilience Data and Analytics Services (RDAS) platform
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-13" />
<target value="70.00">
<comment><narrative>
Surveys in Bangladesh, Nepal, and Pakistan indicated 80.3% satisfaction among 36 officials from sectoral agencies and NMHSs. Satisfaction reflected improved accessibility, visualization, and reliability of hydromet data through the operational RDAS platform. The result demonstrates strengthened regional cooperation and information sharing for climate-risk screening and planning.
</narrative></comment>
</target>
<actual value="80.02">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-informed decision-making tools and systems developed/enhanced in focus countries
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-14" />
<target value="40.00">
<comment><narrative>
Six new DSSs and two enhanced existing ones have been completed.

Enhanced DSSs:      
- Bangladesh Flood Forecasting and Warning Centre's DSS (https://ffwc.gov.bd/admin/home)
- Nepal NAMIS / ADVISE for the Ministry of Agriculture and Livestock Development (http://advise.moald.gov.np/)

New DSSs:           
- Bangladesh NLAS for the Department of Livestock Services (https://nlas.dls.gov.bd/dashboard/home)
- Nepal NAVIGATE for the Department of Roads (https://navigate.dor.gov.np/)
- Nepal SATARK for the National Disaster Risk Reduction and Management Authority (https://satark.bipadportal.gov.np/)
- Pakistan ADVISE for Punjab and Balochistan Agriculture Departments 
- CLIM-PLANNeD for the Ministry of Planning, Development, and Special Initiatives (https://clima-planned.rimes.int/)

Eight mobile applications have been completed and available on Google:
Bangladesh: BAMIS, NLAS
Nepal: NAVIGATE, ADVISE, SATARK
Pakistan: Two ADVISEs and CLIM-PLANNeD
</narrative></comment>
</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government officials trained to apply climate resilient standards and data analytics in policies, planning and investments
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="2,370.00">
<comment><narrative>
ADPC: 1158
RIMES: 2021
</narrative></comment>
</target>
<actual value="3247">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A regional-level resilience data and analytics services platform (RDAS) developed and accessible
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="5.00">
<comment><narrative>
RDAS, a cloud-based, open-access, AI-enabled platform for storing, managing, processing, analyzing, visualizing, and reporting data to screen climate risks to inform investments, policies, and planning decisions for climate-smart development, was completed in December 2024.

The following summarizes the 5 milestones achieved:
Milestone 1: RDAS prototype completed in Dec 2021
Milestone 2: RDAS user interface created and available to be connected with existing/new DSSs since October 2022
Milestone 3: RDAS experimentally operational since October 2022
Milestone 4: RDAS has been connected to SAHF Knowledge Hub and DSSs supported by the project
• Linked to SAHF Knowledge Hub thru DataEx, which facilities connectivity to ECMWF forecast
• Provides observation/historical/forecast hydrometeorological datasets to various DSSs
Milestone 5: RDAS fully operational

The system can be accessed at https://rdas.live/
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Innovative resilient solutions crowd sourced through Climate Innovation Challenge and TechEmerge Resilience Challenge
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="31.00">
<comment><narrative>
7 solutions were crowdsourced for India under TechEmerge Resilience Challenge in collaboration with IFC. 16 solutions were crowdsourced for South Asian countries (except for Afghanistan) under the UKFCDO's PARCC Trust Fund. Another 16 solutions were crowdsourced through the Regional IDA grant.
</narrative></comment>
</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees in select sectors satisfied based on the relevance, coherence, effectiveness, impact, and sustainability of training
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-07-29" />
<target value="70.00">
<comment><narrative>
Post-training surveys conducted by both implementing agencies indicated high levels of participant satisfaction (84.6% for RIMES and 88% for ADPC) exceeding the target of 70%. Trainees emphasized the practical utility of the data platforms, climate-risk screening tools, and policy frameworks introduced. This achievement demonstrates that training investments translated into strengthened institutional capacity for climate-resilient planning across all participating countries.
</narrative></comment>
</target>
<actual value="86.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community-based organizations trained to plan, design and manage risk-informed community infrastructure
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="50.00">
<comment><narrative>
ADPC has trained 89 CBOs to plan, design, and manage risk-informed community infrastructure in Bangladesh (Agriculture and Transport), Nepal (Agriculture and Water), and Pakistan (Agriculture).
</narrative></comment>
</target>
<actual value="89">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community-based organizations trained to plan, design and manage risk-informed community infrastructure
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="50.00">
<comment><narrative>
ADPC has trained 89 CBOs to plan, design, and manage risk-informed community infrastructure in Bangladesh (Agriculture and Transport), Nepal (Agriculture and Water), and Pakistan (Agriculture). These figures surpassed the target of 50, demonstrting the extent the project mainstreamed gender and community engagement within climate-resilient planning processes
</narrative></comment>
</target>
<actual value="89">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilience guidelines for key sector(s) developed
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="14.00">

</target>
<actual value="12.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizens who have access to climate-resilient solutions tested under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-14" />
<target value="10,000.00">
<comment><narrative>
16 innovators from the private sector, academia, and CSOs are implementing climate-resilient solutions in South Asia, benefitting a total of 61,199 people based on the monitoring reports submitted by the innovators.
</narrative></comment>
</target>
<actual value="196437">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilience guidelines for key sector(s) developed
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="14.00">

</target>
<actual value="12.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizens who have access to climate-resilient solutions tested under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-14" />
<target value="10,000.00">
<comment><narrative>
16 innovators from the private sector, academia, and CSOs are implementing climate-resilient solutions in South Asia, benefitting a total of 196,437 people (36% women) based on the monitoring reports submitted by the innovators.
</narrative></comment>
</target>
<actual value="196437">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A regional-level resilience data and analytics services platform (RDAS) developed and accessible
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="5.00">
<comment><narrative>
RDAS, a cloud-based, open-access, AI-enabled platform for storing, managing, processing, analyzing, visualizing, and reporting data to screen climate risks to inform investments, policies, and planning decisions for climate-smart development, was completed in December 2024. The following summarizes the 5 milestones achieved: Milestone 1: RDAS prototype completed in Dec 2021 Milestone 2: RDAS user interface created and available to be connected with existing/new DSSs since October 2022 Milestone 3: RDAS experimentally operational since October 2022 Milestone 4: RDAS has been connected to SAHF Knowledge Hub and DSSs supported by the project • Linked to SAHF Knowledge Hub thru DataEx, which facilities connectivity to ECMWF forecast • Provides observation/historical/forecast hydrometeorological datasets to various DSSs Milestone 5: RDAS fully operational The system can be accessed at https://rdas.rimes.int/
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National/sectoral policies, manuals, guidelines, and plans supported to incorporate climate resilience
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="15.00">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Districts receiving advisories issued by decision support systems developed under the project
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2025-08-13" />
<target value="30">
<comment><narrative>
By project closing, 153 districts across Bangladesh, Nepal, and Pakistan were receiving advisories generated through DSSs developed under the project, five times the original target of 30 districts. The breakdown is as follows:
• Bangladesh (64 districts): agricultural and livestock advisories disseminated through the Bangladesh Agro-Meteorological Information System (BAMIS) and the National Livestock Advisory System (NLAS).
• Nepal (42 districts): road, disaster-preparedness, and agriculture advisories issued through NAVIGATE (Department of Roads), READY (NDRRMA), and NAMIS/ADVISE (MoALD).
• Pakistan (47 districts): advisories produced via ADVISE (Punjab Agriculture Department and Balochistan Agriculture College Directorate) and CLIM-PLANNeD (MoPDSI).

This strong performance resulted from the full operationalization of the RDAS platform and its linkages with national systems, enabling wider dissemination of early-warning products to local decision-makers and communities.
</narrative></comment>
</target>
<actual value="153">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National sectoral standards supported to incorporate climate resilience
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2025-08-13" />
<target value="5.00">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gender-disaggregated data analytics developed that contributes to narrow the gender gap in climate change vulnerability
</narrative></title>
<baseline year="2020" iso-date="2020-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-13" />
<period-end iso-date="2025-08-13" />
<target value="4.00">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizens who have access to climate-resilient solutions tested under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-14" />
<target value="10,000.00">
<comment><narrative>
16 innovators from the private sector, academia, and CSOs are implementing climate-resilient solutions in South Asia, benefitting a total of 196,437 people (36% women) based on the monitoring reports submitted by the innovators.
</narrative></comment>
</target>
<actual value="196437">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizens who have access to climate-resilient solutions tested under the project
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-08-14" />
<target value="10,000.00">
<comment><narrative>
16 innovators from the private sector, academia, and CSOs are implementing climate-resilient solutions in South Asia, benefitting a total of 61,199 people based on the monitoring reports submitted by the innovators.
</narrative></comment>
</target>
<actual value="196437">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees in select sectors satisfied based on the relevance, coherence, effectiveness, impact, and sustainability of training
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-07-29" />
<target value="70.00">
<comment><narrative>
A survey is being conducted at the end of every training event. The average satisfaction rate will be determined at the end of the project.
</narrative></comment>
</target>
<actual value="86.22">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees in select sectors satisfied based on the relevance, coherence, effectiveness, impact, and sustainability of training
</narrative></title>
<baseline year="2020" iso-date="2020-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-05" />
<period-end iso-date="2025-07-29" />
<target value="70.00">
<comment><narrative>
Post-training surveys conducted by both implementing agencies indicated high levels of participant satisfaction (84.6% for RIMES and 88% for ADPC) exceeding the target of 70%. Trainees emphasized the practical utility of the data platforms, climate-risk screening tools, and policy frameworks introduced. This achievement demonstrates that training investments translated into strengthened institutional capacity for climate-resilient planning across all participating countries.
</narrative></comment>
</target>
<actual value="86.22">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-27T00:41:31" hierarchy="1"><iati-identifier>44000-P171269</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Plastic free Rivers and Seas for South Asia</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen innovation and coordination of circular economy solutions to plastic pollution flowing into South Asian Seas]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Plastic Free Rivers and Seas for South Asia Project is to strengthen innovation and coordination of circular economy solutions to plastic pollution flowing into South Asian Seas. The Project has three components. Component 1. Supporting Competitive Block Grant Investments to Reduce Plastic Waste will identify, verify and invest in circular plastic economy solutions and facilitate the exchange of knowledge and awareness of these solutions. Subcomponent 1.1: Investing in Circular Solutions to Reduce Plastic Waste will support circular plastic economy solutions to reduce plastic waste by implementing a program of regional competitive block grant investments. Subcomponent 1.2: Promoting Knowledge Exchange and Awareness will facilitate the exchange of circular plastic economy knowledge between Eligible Regional Competitive Block Grant (RBG) Beneficiaries and selected South Asian countries and promotes awareness raising activities. 2. Leveraging Public and Private Sector Engagement and Solutions component will provide support to develop and/or improve national and regional plastic pollution mitigation strategies and action plans, policies and industry standards. Subcomponent 2.1: Enabling Policies, Standards, and Analytics will support the development of strategies, action plans, policies, and standards to harmonize plastic pollution mitigation measures through: (a) developing and implementing a multi-year plastic policy support program, working with leading universities and organizations; (b) developing a database for lifecycle analysis, data collection, and modeling related to plastic across selected industry value chains; and (c) supporting communication activities. Subcomponent 2.2: Enabling Regional Public and Private Engagement will support circular use of plastic in the economy through regional public-private collaboration and engagement in South Asia, including designing and organizing annual or more frequent meetings of representatives from public and private sector. 3. Strengthening Regional Integration Institutions component will strengthen regional organizations capacity to coordinate and to support their member-states to better deliver on solutions to mitigate plastic pollution that flows into rivers and seas across South Asia and transition to a more circular plastic economy. Subcomponent 3.1: Building South Asia Cooperative Environment Program's (SACEP's) Institutional Capacity will support SACEP's ability to convene and coordinate with regional organizations, line ministries and governments, including to uniformly collect, analyze and interpret pollution data will better inform policy and decision making support for investment planning, design and implementation. Subcomponent 3.2: Project Management will support SACEP in the implementation and overall management of the Project.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0041898"><narrative>The South Asia Cooperative Environment Programme (SACEP)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0041898"><narrative>The South Asia Cooperative Environment Programme (SACEP)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0041899"><narrative>South Asia Cooperative Environment Programme</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–P0041899"><narrative>South Asia Cooperative Environment Programme</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="8S-COA-0056274"><narrative>SACEP</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-05-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-05-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Siddharth Padmanabh Merchant</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sidmerchant@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-region code="679" percentage="100" vocabulary="1"><narrative xml:lang="en">South Asia, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001149361" />
            <name><narrative>Islamic Republic of Afghanistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>33 66</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001168579" />
            <name><narrative>Islamic Republic of Pakistan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>30 70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001210997" />
            <name><narrative>Bangladesh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>24 90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001269750" />
            <name><narrative>Republic of India</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>22 79</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001282028" />
            <name><narrative>Republic of Maldives</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.2 73</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001282988" />
            <name><narrative>Federal Democratic Republic of Nepal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>28 84</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001252634" />
            <name><narrative>Kingdom of Bhutan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>27.5 90.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="41020" percentage="55" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="45" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="28.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="3.00000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="13" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="16" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="34" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="16" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="18" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000833" percentage="18" xml:lang="en"><narrative>Oceans</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="94" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="5" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="9" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="22" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="9" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="22" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="22" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">81289.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">121730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">147186.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">171606.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">194694.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">218485.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">248455.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">275280.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">295149.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">153180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">318015.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">333592.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">348762.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">364006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">372701.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">384689.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">407518.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">441743.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">465682.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">241536.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">504347.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">536500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">568616.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">600547.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">628445.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">650941.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">673807.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">699596.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">715987.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">733340.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">374884.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">764568.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">782920.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">799089.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">825359.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">848965.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">863099.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">868760.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">893032.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">908202.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">453472.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">893809.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">889776.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">898508.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">892625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">876493.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">875975.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">872682.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">862174.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">847448.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">417730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">827801.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">819550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">811817.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">804639.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">797276.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">789173.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">781070.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">773226.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">765345.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1223109.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2405145.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2405145.60</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">37000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">93141</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">893837</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">151887</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2458052</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">817093</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">615749</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">218907</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">5123939</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">800000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">4329202</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">4119561</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">2099522</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">3406705</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">3300000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">4167259</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="8S-COA-56274"><narrative>SACEP</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171269"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P171269?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171269"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1.1: Regional Competitive Block Investments to Reduce Plastic Waste administered by SACEP (disaggregation by ‘under implementation’ and ‘completed’)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="20.00">
<comment><narrative>
indicator has been achieved. There are a total of 28 grants, out of which 21 are completed. There are 49 innovations within the plastic waste value chain across 12 RBGs and 16 IGs that have all achieved the final “Developed &amp; Tested” stage.

All 16 IGs have been completed. Out of 12 RBGs, 5 have been completed and 7 are under implementation as listed below:

Bangladesh: (2) BRAC, BPCL 
Maldives: (2) MACCS, SIGS
Bhutan: (2) GREENAWAY, BES 
Sri Lanka: (1) ICI

All RBGs are on track to be successfully completed by 31st December, 2025.
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR1.3: Share business development services to women (TA)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="30.00">
<comment><narrative>
End target achieved and exceeded. This includes ensuring that women have equal access to Shared Business Development Services, providing support to 2166 individuals, including 1388 women (64.08%), during the reporting period. These services encompassed: training and capacity building, infrastructure and technology support, regulatory and E&amp;S compliance support, market access and networking and financial support. The training and capacity building support covered several areas including developing alternative products (MACCS – Maldives, Tribhuvan – Nepal, Save a Life- Sri Lanka ); safe waste collection, transportation, processing; income generation from waste; basic accounting and financial management; gender sensitivity and inclusion; occupational health and safety (BPCL , Arannayk Foundation, Red Orange– Bangladesh, CREASION , BIOCOMP and DOKO – Nepal, Greener Way – Bhutan, ALTAS and OTIUM – Pakistan, NRC and INSEE - Sri Lanka); and developing recycled products (BRAC – Bangladesh)
</narrative></comment>
</target>
<actual value="64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.5: Annual convenings of regional organization heads, including government decision-makers to collaborate and coordinate on circular plastic economy policy solutions branded and operational
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="3.00">
<comment><narrative>
Target achieved. 

The following regional organization meetings were held and SACEP was in attendance as follows: (i) SACEP Governing Council meeting was held in Thimphu, Bhutan in June 2024 in which Ministers and secretaries of 8 SAR member countries were in attendance; (ii) COP29 in Baku, Azerbaijan in November 2024 ; (iii) INC-3 held in Busan, South Korea in November 2024; (iv) INC-5.2 held in Geneva, Switzerland, August 2025.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO3: SACEP's institutional capacity strengthened to drive results for plastic pollution reduction across the region
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
End target yet to be achieved. Under SACEP's institutionalized capacity, the construction of the new regional headquarters in Colombo 05, Sri Lanka, stands as a major achievement under this target. Designed as a center of excellence, it enhances SACEP's ability to host technical dialogues, training, and cross-country collaboration, thereby strengthening its long-term operational sustainability and regional leadership beyond the project period. This indicator also covers the development and implementation of an institutional capacity building assessment. The project has already begun implementing the preliminary recommendations from the Final Draft version of the assessment, slated to conclude by 30th November, 2025. The project has substantially achieved this target and demonstrates a clear, sustainable trajectory toward full achievement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.3: National policies  reviewed with recommendations for revisions and/or action plans (disaggregated country)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="16.00">
<comment><narrative>
End target achieved. 
A total of 16 policies across six countries were assessed to strengthen circular plastic economy approaches. These reviews are conducted by discussing these policies at the national roundtable discussion, such as what is the enforcement status, that are the implementation barriers etc.
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR2.1: Regional public and private engagement mechanism branded and operational
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
End target achieved. 
1.Regional Training Programme on Innovative Financing Options for Addressing Plastic Pollution in South Asia Region: A Journey to Extended Producer Responsibility, Plastic Credits and Results-based Financing held in Feb 17-18, Maldives 

2. Marine Litter consultations/focus group discussions held in Maldives, Sri Lanka, and Bangladesh. 
ML C

3 SAEF- South Asia Environment Forum by SACEP. (SACEP began hosting regular country-specific webinars featuring PLEASE project grantees covering various topics, including the state of plastic waste in South Asia,

Planned Activities 

1. 10 Marine litter consultations are planned to conduct in upcoming months
2. Regional workshop to develop road map for operationalizing EPR practices in South Asia (India)
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.4: Consultations on marine litter actions carried out with targeted people and/or organizations in participating countries
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="16.00">
<comment><narrative>
Six consultations on marine litter actions were held across Bangladesh, Maldives, and Sri Lanka, including two consultations at grantee sites in Bangladesh and Sri Lanka.

The remaining 10 consultations are in the pipeline and are expected to be completed by Q3 FY26.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3.1: Training and capacity building provided to SACEP staff across all project functions
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="24.00">
<comment><narrative>
End target yet to be achieved.

The project successfully delivered 22 trainings (95% completion), covering a wide range of topics such as procurement, financial management, marine plastic pollution, monitoring &amp; evaluation, and more, enhancing staff capacity.
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.2: Annual regional convening of public sector policy and decision makers with private sector representatives on sharing of PPP circular plastic economy solutions
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="4.00">
<comment><narrative>
End target achieved.  
The last regional convening,  the Private Sector Symposium, is scheduled to take place (where and when), where grantees will have the opportunity  to pitch their fundraising and scaling plans to a panel of investors. At the same time, the investor community will be sensitized to the region's potential for investable circular economy solutions.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Circular Plastic Economy Innovations developed and tested for application in participating South Asia countries
</narrative></title>
<baseline year="2020" iso-date="2020-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-27" />
<period-end iso-date="2025-06-30" />
<target value="30.00">
<comment><narrative>
End target achieved and exceeded. The achievement of &quot;Developed and Tested&quot; innovations under the PLEASE project takes place in the following stages; 1. Developing, 2. Developed, 3. Developed and Testing, 4. Developed and Tested.
Across the 12 RBGs and 16 IGs, a total of 49 innovations have reached the stage of being both &quot;Developed and Tested&quot;.
</narrative></comment>
</target>
<actual value="49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR1.4: Regional circular plastic economy innovations knowledge sharing hosted by SACEP operational
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
End target achieved. The PLEASE Project has successfully developed and operationalized knowledge sharing on Innovations in circular plastic economy at both national and regional levels. This was achieved through the organization of six national high-level roundtable discussions (four conducted within this reporting year), seven workshops for grantees (five conducted within this reporting year), a Youth Hackathon, and a Regional Roundtable Discussion held during this reporting year with participants from all eight project countries.

Active participated in major global and regional conferences, including the Asia-Pacific Forum on Sustainable Development (APFSD), and the Intergovernmental Negotiating Committee sessions (INC-3 in 2023 and INC-5 during this reporting year). Notably, the project hosted a side event at INC-5 focused on knowledge sharing in the areas of innovation, decent jobs, and inclusion.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1.5: People reached in plastic pollution and mitigation awareness campaigns (disaggregated by country and sex)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="10,000.00">
<comment><narrative>
End target achieved and exceeded. During the reporting period, the PLEASE project engaged 185,539 individuals through various activities designed to raise awareness about plastic pollution and its mitigation strategies.

The project held 6 national roundtable discussions, 7 workshops, 6 marine litter consultations, and a regional hackathon, drawing 1,414 participants from a diverse range of sectors, including government, private industry, academia, NGOs, UN entities, CBOs, youth groups, innovators, and fishing communities.
</narrative></comment>
</target>
<actual value="185,539">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1.2: Regional Competitive Block Grant Investments to Reduce Plastic Waste to women-owned enterprises or groups
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="8.00">
<comment><narrative>
End target achieved and exceeded. This indicator considers 1. Women-owned organizations (registered under a woman's name or consisting of a woman founder), 2. Women-led organizations (with women in decision-making roles or more than 51% women representation within the organization) and 3. Organizations that have collaborated with women-owned organizations or women's groups. As decision-making roles, CEO, President, Managing Director, or other executive roles have been considered.

Among the 28 organizations awarded with grants, 17 organizations fulfilled at least one of these criteria, comprising 03 Women-owned organizations, 12 Women-led organizations, and 02 organizations that collaborated with women-owned organizations or women's groups.
</narrative></comment>
</target>
<actual value="17 women owned organizations">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.4: Consultations on marine litter actions carried out with targeted people and/or organizations in participating countries
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="16.00">
<comment><narrative>
End target achieved. Sixteen consultations on marine and riverine litter actions were held across Bangladesh, Bhutan, Pakistan, Nepal, Maldives, and Sri Lanka.
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1.5: People reached in plastic pollution and mitigation awareness campaigns (disaggregated by country and sex)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="10,000.00">
<comment><narrative>
End target achieved and exceeded. During the reporting period, the PLEASE project engaged 185,539 individuals through various activities designed to raise awareness about plastic pollution and its mitigation strategies.

The project held 6 national roundtable discussions, 7 workshops, 6 marine litter consultations, and a regional hackathon, drawing 1,414 participants from a diverse range of sectors, including government, private industry, academia, NGOs, UN entities, CBOs, youth groups, innovators, and fishing communities.
</narrative></comment>
</target>
<actual value="241,400">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.3: National policies  reviewed with recommendations for revisions and/or action plans (disaggregated country)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="16.00">
<comment><narrative>
End target achieved. 
A total of 16 policies across six countries were assessed to strengthen circular plastic economy approaches. These reviews are conducted by discussing these policies at the national roundtable discussion along with undertaking nine technical assistances in all project member countries.
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR1.4: Regional circular plastic economy innovations knowledge sharing hosted by SACEP operational
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
The PLEASE Project has successfully developed and operationalized knowledge sharing on Innovations in circular plastic economy at both national and regional levels. This was achieved through the organization of six national high-level roundtable discussions (four conducted within this reporting year), seven workshops for grantees (five conducted within this reporting year), a Youth Hackathon, and a Regional Roundtable Discussion held during this reporting year with participants from all eight project countries.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR1.3: Share business development services to women (TA)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="30.00">
<comment><narrative>
This indicator measures the percentage of individual women who have received business development services through Regional Block Grants and Innovation Grants.

&quot;Share Business Development Service&quot; refers to the support provided to businesses with a focus on promoting gender equality and empowering women within the sector. This includes ensuring that women have equal access to Shared Business Development Services, providing support to 2,695 individuals, including 1,541 women (57.18%), during the reporting period. These services encompassed: training and capacity building, infrastructure and technology support, regulatory and environmental and social compliance support, market access and networking and financial support.
</narrative></comment>
</target>
<actual value="57">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.2: Annual regional convening of public sector policy and decision makers with private sector representatives on sharing of PPP circular plastic economy solutions
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="4.00">
<comment><narrative>
End target achieved. At INC-5, SACEP emphasized its commitment to support South Asian member states through a unified regional framework by submitting an Observer Statement and engaging in discussions on advancing circular plastic economy pathways. At COP-29, SACEP highlighted its flagship initiatives, strengthened partnerships through bilateral meetings and side events, and positioned regional collaboration as central to addressing escalating environmental challenges. The Private Sector Symposium and Hackathon engaged South Asian youth in innovative plastic pollution solutions and fund-raising. The Regional Roundtable discussions successfully advanced the project's goals by fostering partnerships, showcasing local innovations, and supporting long-term regional dialogue and impact.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1.2: Regional Competitive Block Grant Investments to Reduce Plastic Waste to women-owned enterprises or groups
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="8.00">
<comment><narrative>
End target exceeded. This indicator considers 1. Women-owned organizations
(registered under a woman's name or consisting of a woman founder), 2. Women-led
organizations (with women in decision-making roles or more than 51% women representation within the organization) and 3. Organizations that have collaborated with
women-owned organizations or women's groups. As decision-making roles, CEO, President,
Managing Director, or other executive roles have been considered.
Among the 28 organizations awarded with grants, 17 organizations fulfilled at least one of
these criteria, comprising 03 Women-owned organizations, 12 Women-led organizations,
and 02 organizations that collaborated with women-owned organizations or women's
groups.
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR3.1: Training and capacity building provided to SACEP staff across all project functions
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="24.00">
<comment><narrative>
End target achieved.

The project successfully delivered 24 trainings, covering a wide range of topics such as procurement, financial management, marine plastic pollution, monitoring &amp; evaluation, and more, enhancing staff capacity.
</narrative></comment>
</target>
<actual value="24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IR2.1: Regional public and private engagement mechanism branded and operational
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
End target achieved. 
1.Regional Training Programme on Innovative Financing Options for Addressing Plastic Pollution in South Asia Region: A Journey to Extended Producer Responsibility, Plastic Credits and Results-based Financing held in Feb 17-18, Maldives 

2. Marine Litter consultations/focus group discussions held in Maldives, Sri Lanka, and Bangladesh. 
ML C

3 SAEF- South Asia Environment Forum by SACEP. (SACEP began hosting regular country-specific webinars featuring PLEASE project grantees covering various topics, including the state of plastic waste in South Asia,

4. All planned Marine/Riverine litter consultations completed in Bhutan, Bangladesh, Nepal, Pakistan, Sri Lanka and Maldives. 

5. Regional workshop to develop road map for operationalizing EPR practices in South Asia completed

6. SAEF- South Asia Environment Forum by SACEP. (SACEP regularly hosting country-specific webinars featuring PLEASE project grantees covering various topics.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR1.1: Regional Competitive Block Investments to Reduce Plastic Waste administered by SACEP (disaggregation by ‘under implementation’ and ‘completed’)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="20.00">
<comment><narrative>
End target has been exceeded. All 28 grants are completed, which developed a total of 49 innovations within the plastic waste value chain. 

With the successful closure of most Regional Block Grants and all Innovation Grants, SACEP is facilitating
cross-fertilization, knowledge exchange and technology transfer between each grantee.
</narrative></comment>
</target>
<actual value="28">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO3: SACEP's institutional capacity strengthened to drive results for plastic pollution reduction across the region
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
End target achieved. Under SACEP's institutionalized capacity, the construction of the new regional headquarters in Colombo 05, Sri Lanka, stands as a major achievement under this target. Designed as a center of excellence, it enhances SACEP's ability to host technical dialogues, training, and cross-country collaboration, thereby strengthening its long-term operational sustainability and regional leadership beyond the project period. This indicator covers the development of an institutional capacity building assessment, which has already begun implementing the recommendations including (i) Amending Articles of Association which decentralizes the powers of the Governing Council down to the Secretariat, also streamlines decision-making processes within SACEP, (ii) Development of Procurement, Financial Management, Human Resources Manual, Prevention of Sexual Harassment Policy, (iii) upgrade of IT
systems design workflows, IT architecture, data flows, dashboard, data servers.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO3: SACEP's institutional capacity strengthened to drive results for plastic pollution reduction across the region
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="Yes">
<comment><narrative>
End target yet to be achieved. Under SACEP's institutionalized capacity, the construction of the new regional headquarters in Colombo 05, Sri Lanka, stands as a major achievement under this target. Designed as a center of excellence, it enhances SACEP's ability to host technical dialogues, training, and cross-country collaboration, thereby strengthening its long-term operational sustainability and regional leadership beyond the project period. This indicator also covers the development and implementation of an institutional capacity building assessment. The project has already begun implementing the preliminary recommendations from the Final Draft version of the assessment, slated to conclude by 30th November, 2025. The project has substantially achieved this target and demonstrates a clear, sustainable trajectory toward full achievement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Policies/standards /guidelines to promote a circular plastic economy harmonized and agreed by at least 3 countries at regional PPP convenings
</narrative></title>
<baseline year="2020" iso-date="2020-04-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-03" />
<period-end iso-date="2025-06-30" />
<target value="3.00">
<comment><narrative>
End target exceeded.

The following key topics have been discussed and agreed in the RTD sessions. (06 sessions, Bhutan, Bangladesh, Nepal, Sri Lanka, Pakistan, Maldives)
1. Extended Producer Responsibility (EPR), Regulations on single-use plastic phase-outs, 
2. Certification and standardization for recycled products, 
3. National plastic waste management strategy/action plan and 
4. Plastic credit.

The policies, regulations, and standards identified in the national high-level roundtable discussions have been further discussed and agreed in the regional high-level roundtable discussion to highlight commonalities across member countries. These have been integrated into strategy documents, action plans and roadmaps developed by the project to address plastic pollution prevention and management in the South Asia region (SAR). The goal is to identify shared requirements and build consensus among the countries in the region.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Policies/standards /guidelines to promote a circular plastic economy harmonized and agreed by at least 3 countries at regional PPP convenings
</narrative></title>
<baseline year="2020" iso-date="2020-04-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-03" />
<period-end iso-date="2025-06-30" />
<target value="3.00">
<comment><narrative>
End target achieved.

The following key topics have been discussed and agreed in the RTD sessions. (06 sessions, Bhutan, Bangladesh, Nepal, Sri Lanka, Pakistan, Maldives)
1. Extended Producer Responsibility (EPR), Regulations on single-use plastic phase-outs, 
2. Certification and standardization for recycled products, 
3. National plastic waste management strategy/action plan and 
4. Plastic credit.

The policies, regulations, and standards identified in the national high-level roundtable discussions have been further discussed and agreed in the regional high-level roundtable discussion to highlight commonalities across member countries. These have been integrated into strategy documents, action plans and roadmaps developed by the project to address plastic pollution prevention and management in the South Asia region (SAR). The goal is to identify shared requirements and build consensus among the countries in the region.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Circular Plastic Economy Innovations developed and tested for application in participating South Asia countries
</narrative></title>
<baseline year="2020" iso-date="2020-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-27" />
<period-end iso-date="2025-06-30" />
<target value="30.00">
<comment><narrative>
End target achieved and exceeded. The achievement of &quot;Developed and Tested&quot; innovations under the PLEASE project takes place in the following stages; 1. Developing, 2. Developed, 3. Developed and Testing, 4. Developed and Tested.
Across the 12 RBGs and 16 IGs, a total of 49 innovations have reached the stage of being both &quot;Developed and Tested&quot;.
</narrative></comment>
</target>
<actual value="49">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Circular Plastic Economy Innovations developed and tested for application in participating South Asia countries
</narrative></title>
<baseline year="2020" iso-date="2020-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-27" />
<period-end iso-date="2025-06-30" />
<target value="30.00">
<comment><narrative>
End target achieved and exceeded. The achievement of &quot;Developed and Tested&quot; innovations under the PLEASE project takes place in the following stages; 1. Developing, 2. Developed, 3. Developed and Testing, 4. Developed and Tested.
Across the 12 RBGs and 16 IGs, a total of 49 innovations have reached the stage of being both &quot;Developed and Tested&quot;.
</narrative></comment>
</target>
<actual value="49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IR2.5: Annual convenings of regional organization heads, including government decision-makers to collaborate and coordinate on circular plastic economy policy solutions branded and operational
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-06-30" />
<target value="3.00">
<comment><narrative>
Target achieved. 

The following regional organization meetings were held and SACEP was in attendance as follows: (i) SACEP Governing Council meeting was held in Thimphu, Bhutan in June 2024 in which Ministers and secretaries of 8 SAR member countries were in attendance; (ii) COP29 in Baku, Azerbaijan in November 2024 ; (iii) INC-3 held in Busan, South Korea in November 2024; (iv) INC-5.2 held in Geneva, Switzerland, August 2025.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Policies/standards /guidelines to promote a circular plastic economy harmonized and agreed by at least 3 countries at regional PPP convenings
</narrative></title>
<baseline year="2020" iso-date="2020-04-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-03" />
<period-end iso-date="2025-06-30" />
<target value="3.00">
<comment><narrative>
End target achieved.

The following key topics have been discussed and agreed in the RTD sessions. (06 sessions, Bhutan, Bangladesh, Nepal, Sri Lanka, Pakistan, Maldives)
1. Extended Producer Responsibility (EPR), Regulations on single-use plastic phase-outs, 
2. Certification and standardization for recycled products, 
3. National plastic waste management strategy/action plan and 
4. Plastic credit.

The policies, regulations, and standards identified in the national high-level roundtable discussions have been further discussed and agreed in the regional high-level roundtable discussion to highlight commonalities across member countries. These have been integrated into strategy documents, action plans and roadmaps developed by the project to address plastic pollution prevention and management in the South Asia region (SAR). The goal is to identify shared requirements and build consensus among the countries in the region.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:21:27" hierarchy="1"><iati-identifier>44000-P126193</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Second Phase of the APL on Strengthening Regional Cooperation for Wildlife Protection in Asia</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[To assist the participating governments of Bhutan and others to build or enhance shared capacity, institutions, knowledge and incentives to collaborate in tackling illegal wildlife trade and other selected regional conservation threats to habitats in border areas.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Second Phase of the Adaptable Program Lending (APL) on Strengthening Regional Cooperation for Wildlife Protection in Asia Project is to assist the participating governments of Bhutan and others to build or enhance shared capacity, institutions, knowledge and incentives to collaborate in tackling illegal wildlife trade and other selected regional conservation threats to habitats in border areas. There are three components to the project, the first component being capacity building for addressing the illegal trans-boundary wildlife trade. This component aims to bring about regional harmonization and collaboration in combating wildlife crime through strengthened legislative and regulatory frameworks, well-equipped specialized agencies and systems, as well as relevant training and awareness programs for staff across the range of agencies that contribute to the enforcement of wildlife laws and regulations. The second component is the promoting wildlife conservation in Asia. Finally, the third component is the project coordination and communication. This component will focus on project coordination and communications. Since project coordination and implementation will be carried out by Wildlife Conservation Division (WCD's) regular staff, with support from Department of Forest and Park Services (DOFPS) and the Ministry of Agriculture and Forests (MOAF), funding of project coordination and operating costs will be Royal Government of Bhutan (RGOB) contribution to the project. No project funds will be used for this purpose. However, financial support to Bhutan for regional coordination is required due to the need to closely coordinate regional activities among participating countries.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–ORP0006338"><narrative>Ministry of Finance, Royal Government of Bhutan</narrative></participating-org><participating-org role="2" xml:lang="en" ref="8S–ORP0006338"><narrative>Ministry of Finance, Royal Government of Bhutan</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="8S–ORP0006337"><narrative>Wildlife Conservation Division, Department of Forests and Park Services</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="8S–ORP0006337"><narrative>Wildlife Conservation Division, Department of Forests and Park Services</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-05-31">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2011-06-17">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2016-08-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2016-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Nathalie Weier Johnson</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>njohnson@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>





<recipient-region code="679" percentage="100" vocabulary="1"><narrative xml:lang="en">South Asia, regional</narrative></recipient-region><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0001252634" />
						<name><narrative>Kingdom of Bhutan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>27.5 90.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="41010" percentage="50" xml:lang="en"/><sector vocabulary="1" code="41030" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="94.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="96" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="96" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="4" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="96" xml:lang="en"><narrative>Biodiversity</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">27818.1300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">27818.1300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">27818.1400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">27818.1300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">27818.1300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">27818.1400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">41727.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">41727.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">41727.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">41727.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">41727.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">41727.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">51213.4700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">51213.4700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">51213.4600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">51213.4700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">51213.4700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">51213.4600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">76820.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">76820.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">76820.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">76820.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">76820.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">76820.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">39120.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">39120.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">39120.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">39120.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">39120.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">39120.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">58680.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">58680.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">58680.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">58680.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">58680.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">58680.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">22884.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">22884.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">22884.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">22884.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">22884.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">22884.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">34327.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">34327.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">34327.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">34327.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">34327.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">34327.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">8963.4000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">8963.4000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">8963.4000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">8963.4000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">8963.4000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">8963.4000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">8365.8400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">8365.8400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">8365.8400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">8365.8400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">8365.8400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">8365.8400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">27818.1300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">27818.1300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">27818.1400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">27818.1300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">27818.1300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">27818.1400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">41727.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">41727.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">41727.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">41727.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">41727.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">41727.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">51213.4700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">51213.4700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">51213.4600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">51213.4700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">51213.4700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">51213.4600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">76820.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">76820.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">76820.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">76820.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">76820.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">76820.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">39120.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">39120.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">39120.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">39120.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">39120.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">39120.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">58680.3000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">58680.3000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">58680.3000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">58680.3000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">58680.3000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">58680.3000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">22884.8000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">22884.8000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">22884.8000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">22884.8000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">22884.8000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">22884.8000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">34327.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">34327.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">34327.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">34327.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">34327.2000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">2250000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-6454</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">177231</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">24263</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">10295</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">24956</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">845683</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">162618</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">236742</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">564712</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-3953</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-677</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-834</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-2929</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-3889</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-3641</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-6167</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-7307</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-7236</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-7076</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-7499</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-7473</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-7229</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-7232</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-7185</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-7119</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-7412</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-7491</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-7403</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-6614</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-4628</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-6710</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-5833</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-5773</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4817</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3385</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-5483</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3186</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-98008</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-92835</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-91803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-93665</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-92527</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-92520</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-91706</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-94101</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-94913</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-95453</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126193"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126193?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126193"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2: Indicator 3: Improved  facilities for environmental education and interpretation
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="Yr 5 Visitor satisfaction surveys are conducted.">

</target>
<actual value="Facility improved with the construction of the information cum interpretation hall at the RBP.

A total of 14,408 total visitorsvisited in 2015 and in first six months of 2016, a total of 10,041 visited the RBP. There is an increase in trend of visitorsvisiting RBP.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3: Wildlife crime control institutions established  in the three participating countries.
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0.00"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional 1: Number of agreed research programs for regional wildlife management developed among participating countries.
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="3">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comp 1: Indicator 1: Strengthened  enforcement and effective control of illegal wildlife trade
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="Institutionalization of the information/ intelligence network as part of DOFPSs law enforcement system.">

</target>
<actual value="Upgrading of the Bhutan Forest Enforcement Database (BhuFED) has been completed and it has been formally launched. Data managers ofall protected areas and field divisions have been trained in the use of the BhuFED system.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4: Number of implemented pilot initiatives that address trans-boundary wildlife issues.
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0.00"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="3.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2: Indicator 4: Measures taken to reduce HWC.
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="Assessment of effectiveness of initiatives &amp; development of models for upscaling">

</target>
<actual value="Measure undertaken to reduce are as below:
1. Electric fencing
2. Insurance scheme
3. Quick response team">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1: Indicator 2: Improved record of trained staff vis--vis capacity for enforcement, trans-boundary coordination and responsiveness to wildlife crimes.
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="250 staff trained">

</target>
<actual value="935 staff trained">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional 2: Number of thematic meetings on wildlife crime and trans-boundary conservation issues among participating and other relevant countries
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="3">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5: Number of activities contributing to tiger conservation.
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0.00"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="5.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2: Indicator 1 - Better care and management of injured and rescued wildlife
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="No wildlife rescue centers in place"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="Two regional centers built, rehabilitation program being implemented">

</target>
<actual value="Target achieved through the establishment of :
1. Taba wildlife rescue and rehabilitation centre and 
2. Jigmeling wildlife rescuecentre. 

Number of animals rescued are as below:
2013- 81 animals rescued, treated and released

2014 - 64 animals rescued,treatedand released

2015 (till June 2016) - 67 animals rescued, treated and released.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Number of agreed knowledge products developed and shared among SAWEN countries on wildlife crime and/or wildlife conservation .
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0.00"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="15.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 1: A regional mechanism is developed and operational for addressing illegal wildlife trade and other conservation threats.
</narrative></title>
<baseline year="2011" iso-date="2011-05-20" value="0"></baseline>
<period>
<period-start iso-date="2011-05-20" />
<period-end iso-date="2016-08-31" />
<target value="One annual meeting held after statute approval">

</target>
<actual value="Two Annual meetings of the SAWEN secretariat have been held.">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>