<?xml version="1.0" encoding="utf-8"?>  
		   <iati-activities version="2.03" generated-datetime="2026-10-15T15:47:11">
		   <iati-activity last-updated-datetime="2026-10-15T15:47:11"
		   xml:lang="EN" default-currency="USD" hierarchy="01">
		   <iati-identifier>XI-IATI-WBTF-TF027862</iati-identifier>
		   <reporting-org ref="XI-IATI-WBTF" type="40">  
		   		   <narrative>World Bank Trust Funds</narrative>
		   </reporting-org>
		   <title>
		   <narrative>Nile Basin Initiative Trust Fund	   </narrative>
		   </title>
		   <description type="1">
		   <narrative>NA </narrative>
		   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XI-IATI-WBTF" type="40" role="4" >
       <narrative>World Bank Trust Funds </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-03"></activity-date><activity-date type="2"  iso-date= "2003-02-03"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2016-11-11"></activity-date> <contact-info type="3">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative>HIS-AFT:  Water Resource Management</narrative>
       </department>
       <person-name>
       <narrative>Mr Gustavo Saltiel</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010" 
	    vocabulary="1" percentage="18.63">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="14020" 
	    vocabulary="1" percentage="33.88">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14021" 
	    vocabulary="1" percentage="2.94">
       <narrative>+![cdata[Water supply - large systems]]+</narrative>
       </sector> <sector code="14022" 
	    vocabulary="1" percentage="0.01">
       <narrative>+![cdata[Sanitation - large systems]]+</narrative>
       </sector> <sector code="14030" 
	    vocabulary="1" percentage="11.99">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector> <sector code="14040" 
	    vocabulary="1" percentage="0.03">
       <narrative>+![cdata[River basins’ development]]+</narrative>
       </sector> <sector code="15110" 
	    vocabulary="1" percentage="1.34">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="16011" 
	    vocabulary="1" percentage="0.38">
       <narrative>+![cdata[Social protection and welfare services policy, planning and administration]]+</narrative>
       </sector> <sector code="21010" 
	    vocabulary="1" percentage="0.99">
       <narrative>+![cdata[Transport policy and administrative management]]+</narrative>
       </sector> <sector code="21040" 
	    vocabulary="1" percentage="0.46">
       <narrative>+![cdata[Water transport]]+</narrative>
       </sector> <sector code="22010" 
	    vocabulary="1" percentage="5.85">
       <narrative>+![cdata[Communications policy and administrative management]]+</narrative>
       </sector> <sector code="23010" 
	    vocabulary="1" percentage="0.75">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector> <sector code="23020" 
	    vocabulary="1" percentage="1.76">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23040" 
	    vocabulary="1" percentage="1.76">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector> <sector code="23210" 
	    vocabulary="1" percentage="4.99">
       <narrative>+![cdata[Energy generation, renewable sources - multiple technologies]]+</narrative>
       </sector> <sector code="23220" 
	    vocabulary="1" percentage="3.84">
       <narrative>+![cdata[Hydro-electric power plants]]+</narrative>
       </sector> <sector code="24040" 
	    vocabulary="1" percentage="0.49">
       <narrative>+![cdata[Informal/semi-formal financial intermediaries]]+</narrative>
       </sector> <sector code="31110" 
	    vocabulary="1" percentage="1.60">
       <narrative>+![cdata[Agricultural policy and administrative management]]+</narrative>
       </sector> <sector code="31120" 
	    vocabulary="1" percentage="0.69">
       <narrative>+![cdata[Agricultural development]]+</narrative>
       </sector> <sector code="31130" 
	    vocabulary="1" percentage="0.57">
       <narrative>+![cdata[Agricultural land resources]]+</narrative>
       </sector> <sector code="31140" 
	    vocabulary="1" percentage="2.28">
       <narrative>+![cdata[Agricultural water resources]]+</narrative>
       </sector> <sector code="31191" 
	    vocabulary="1" percentage="0.66">
       <narrative>+![cdata[Agricultural services]]+</narrative>
       </sector> <sector code="31220" 
	    vocabulary="1" percentage="0.04">
       <narrative>+![cdata[Forestry development]]+</narrative>
       </sector> <sector code="32161" 
	    vocabulary="1" percentage="0.28">
       <narrative>+![cdata[Agro-industries]]+</narrative>
       </sector> <sector code="33110" 
	    vocabulary="1" percentage="0.16">
       <narrative>+![cdata[Trade policy and administrative management]]+</narrative>
       </sector> <sector code="41030" 
	    vocabulary="1" percentage="0.00">
       <narrative>+![cdata[Bio-diversity]]+</narrative>
       </sector> <sector code="43010" 
	    vocabulary="1" percentage="3.63">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector> <sector code="74020" 
	    vocabulary="1" percentage="0.01">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="B03"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-03"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">191738127.10 </value>
       </budget><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1378110.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="FI-3">
       <narrative>Finland - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">15312612.19  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="SE-0">
       <narrative>Swedish International Development Cooperation Agency (SIDA)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16741090.56  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-3-1">
       <narrative>Denmark - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18191748.28  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="NO-BRC-971277882">
       <narrative>Norwegian Agency for Development Cooperation (NORAD)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">25289402.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="GB-GOV-1">
       <narrative>UK - Department for International Development (DFID)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">26116358.01  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF612001">
       <narrative>EU-Commission of the European Communities</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">35210121.25  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF509001">
       <narrative>Canada - Department of Foreign Affairs, Trade and Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">38640284.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510001">
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5901285.90  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="FR-3">
       <narrative>French Development Agency (Agence Française de Developpement)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">700000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="44000">
       <narrative>International Bank for Reconstruction and Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8257114.86  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF511001">
       <narrative>Norway - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1378110.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="FI-3">
       <narrative>Finland - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">15312612.19  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="SE-0">
       <narrative>Swedish International Development Cooperation Agency (SIDA)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16741090.56  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-3-1">
       <narrative>Denmark - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18191748.28  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="NO-BRC-971277882">
       <narrative>Norwegian Agency for Development Cooperation (NORAD)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">25289402.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="GB-GOV-1">
       <narrative>UK - Department for International Development (DFID)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">26116358.01  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF612001">
       <narrative>EU-Commission of the European Communities</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">35210121.25  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF509001">
       <narrative>Canada - Department of Foreign Affairs, Trade and Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">38640284.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510001">
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5901285.90  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="FR-3">
       <narrative>French Development Agency (Agence Française de Developpement)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">700000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="44000">
       <narrative>International Bank for Reconstruction and Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8257114.86  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF511001">
       <narrative>Norway - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P107350">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1084190.18  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074628">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">110103.87  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114467">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1102789.82  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076499">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11350522.62  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075948">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1139008.17  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P073460">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">116625.52  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116392">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">121314.75  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P108906">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">124796.66  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116745">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1284377.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P069785">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">131077.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075952">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1370216.64  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P110616">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">137767.14  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P120356">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">14132871.12  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075949">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">141893.89  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075945">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">152908.59  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116941">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">158096.77  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P070073">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">164193.21  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075948">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16469241.56  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">169535.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114466">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1701785.72  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114469">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">17078197.98  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116318">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">177091.57  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116318">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">188279.86  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P091099">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">200000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P069785">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2126333.17  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114467">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">21493.07  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P123204">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">220392.73  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118867">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">24000924.53  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P110616">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">245688.86  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075946">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2490271.22  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P091099">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2536677.95  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074628">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2576731.24  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P069786">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">25895.96  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075944">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">263456.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P144399">
       <narrative>SOUTH SUDAN</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2873905.97  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116595">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">289392.74  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103639">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">318160.89  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P115414">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">32710.53  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">35584.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P118665">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3609381.87  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116941">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3645791.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075952">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3717684.94  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114466">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3957617.59  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103518">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">40189.44  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075949">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4122565.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075947">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">429502.84  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103518">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">430462.53  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P111330">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4347079.04  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103639">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4546940.21  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116392">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4556181.57  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116745">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">46426.69  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075943">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">473302.50  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4774567.84  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P092334">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">537093.65  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116595">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5760000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075945">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">58002.98  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075947">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">606073.95  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P108906">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">635114.40  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P069786">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6507510.81  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P115414">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6791002.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075946">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">686552.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">694956.68  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P108859">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">722011.05  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P073460">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">74673.45  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P094268">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7604809.40  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">84209.26  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P096323">
       <narrative>ETHIOPIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">849699.80  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8990000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P070073">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">90015.07  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114469">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">913645.28  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P097363">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">91545.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P081564">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">9936118.92  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076499">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-P069785"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P069786"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P070073"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P073460"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P074628"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075941"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P075943"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P075945"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075946"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075947"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075948"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075949"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075952"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P076499"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P091099"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P096323"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P103518"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P103639"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P107350"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P108906"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P110616"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P111330"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P114466"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P114467"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P114469"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P115414"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P116318"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P116392"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P116595"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P116745"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P116941"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P117635"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P130694"  type="2"></related-activity>
   </iati-activity>	<iati-activity last-updated-datetime="2026-10-15T15:47:14"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P069785</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>NBI (Nile Basin Initiative) Facilitation</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Barbara A. Miller</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Water Resource Management Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">1484377.92 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1284377.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P069785">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">200000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P069785">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">200000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P069785">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1284377.92  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P069785">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:18"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P073460</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>ENSAP Multipurpose Program</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Barbara A. Miller</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Water Resource Management Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="42.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="15110"  vocabulary="1" percentage="4.00">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="21010"  vocabulary="1" percentage="4.00">
       <narrative>+![cdata[Transport policy and administrative management]]+</narrative>
       </sector> <sector code="23210"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Energy generation, renewable sources - multiple technologies]]+</narrative>
       </sector> <sector code="43010"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">1861019.22 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1139008.17  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P073460">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">722011.05  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P073460">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1139008.17  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P073460">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">722011.05  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P073460">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:22"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P074628</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>NBI-ISP NELSAP-CU Institutional Strengthening and Scaling Up</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Barbara A. Miller</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Water Resource Management Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="15110"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="21040"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Water transport]]+</narrative>
       </sector> <sector code="23210"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Energy generation, renewable sources - multiple technologies]]+</narrative>
       </sector> <sector code="43010"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">3620868.13 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1084190.18  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074628">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2536677.95  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074628">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2536677.95  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074628">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1084190.18  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074628">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:26"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075941</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>AFR RI-Regional Rusumo Falls Hydroelectric Project</narrative>
       </title>
       <description type="1">
       <narrative>The development objective of the Regional Rusumo Falls Hydroelectric Project is to increase the supply of electricity to the national grids of Rwanda, Tanzania and Burundi.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="CH-4" type="10" role="1" >
       <narrative>Swiss Agency for Development and Cooperation (SDC) </narrative>
       </participating-org><participating-org ref="DE-1" type="10" role="1" >
       <narrative>Federal Ministry for Economic Cooperation and Development (BMZ) </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="GB-GOV-13" type="10" role="1" >
       <narrative>United Kingdom - Department of Energy and Climate Change </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF072490" type="40" role="4" >
       <narrative>Energy Sector Management Assistance Program Multi Donor Fund - Successor to TF071398 </narrative>
       </participating-org><participating-org ref="TF073553" type="40" role="4" >
       <narrative>Energy Sector Management Assistance Program Umbrella 2.0 Multi-Donor Trust Fund </narrative>
       </participating-org><participating-org ref="TF502006" type="10" role="1" >
       <narrative>Germany - Ministry of Economics and Labour </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF516003" type="10" role="1" >
       <narrative>State Secretariat for Economic Affairs, SECO </narrative>
       </participating-org><participating-org ref="TF518001" type="10" role="1" >
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation </narrative>
       </participating-org><participating-org ref="TF518005" type="10" role="1" >
       <narrative>Italy - Ministry of Environment and Protection of Land and Sea </narrative>
       </participating-org><participating-org ref="TF521003" type="10" role="1" >
       <narrative>Spain - Ministry of Economy, Industry and Competitiveness </narrative>
       </participating-org><participating-org ref="TF527008" type="10" role="1" >
       <narrative>Luxembourg Ministry for Sustainable Development and Infrastructure </narrative>
       </participating-org><participating-org ref="TF530001" type="10" role="1" >
       <narrative>Austria - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF533001" type="10" role="1" >
       <narrative>Iceland - Ministry for Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF540021" type="10" role="1" >
       <narrative>Germany - Ministry for the Environment, Nature Conservation and Nuclear Safety </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="TF658014" type="10" role="1" >
       <narrative>Foreign Office </narrative>
       </participating-org><participating-org ref="TF710001" type="60" role="1" >
       <narrative>Rockefeller Foundation </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF790049" type="60" role="1" >
       <narrative>ClimateWorks Foundation </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2024-04-30"></activity-date><activity-date type="4"  iso-date= "2024-04-18"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Norah Kipwola</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>nkipwola@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="289">   <narrative>South of Sahara regional</narrative>
       </recipient-region> <sector code="16011"  vocabulary="1" percentage="9.00">
       <narrative>+![cdata[Social protection and welfare services policy, planning and administration]]+</narrative>
       </sector> <sector code="23220"  vocabulary="1" percentage="91.00">
       <narrative>+![cdata[Hydro-electric power plants]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2024-04-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">8595328.93 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">100000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072490">
       <narrative>Energy Sector Management Assistance Program Multi Donor Fund - Successor to TF071398</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">686552.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7604809.40  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">130000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities -  for January , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072490">
       <narrative>Energy Sector Management Assistance Program Multi Donor Fund - Successor to TF071398</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2022-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-495.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for June , 2022</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072490">
       <narrative>Energy Sector Management Assistance Program Multi Donor Fund - Successor to TF071398</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2023-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">75000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities -  for April , 2023</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF073553">
       <narrative>Energy Sector Management Assistance Program Umbrella 2.0 Multi-Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2024-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-537.45  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for April , 2024</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF073553">
       <narrative>Energy Sector Management Assistance Program Umbrella 2.0 Multi-Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075941">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7604809.40  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">778109.06  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3292.82  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of October , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1238.02  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2333.66  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">38138.62  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of January , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1763.04  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of March , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-3802.65  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of April , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">19857.05  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of May , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">22800.00  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of July , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">700.09  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of August , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1424.70  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4550.70  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">30007.02  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10283.84  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4847.56  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of January , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">513.45  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of February , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-3675.11  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of June , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">9272.80  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">42731.99  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">9553.12  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">13181.74  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2024-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-277.10  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of January , 2024</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF073553" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF072490" type="1"></related-activity><related-activity ref="44000-P075941" type="4"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2024-06-30" />
<target value="1240000.00">


																	</target>

																	<actual value="125000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Female beneficiaries
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2020-12-31" />
<target value="51.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Livelihood Improvements
</narrative></title> 
<baseline year="2010" iso-date="2010-11-30" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2010-11-30" />  <period-end iso-date="2023-03-31" />
<target value="50.00">


																	</target>

																	<actual value="14.40">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Annual Expert Panel environmental and social monitoring report disseminated and made publically available
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2023-03-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Power Plant Construction progress
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2024-06-30" />
<target value="Yes">


																	</target>

																	<actual value="ongoing">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
SPV Set-up and O&amp;M Operator selection
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="No O&amp;M Contractor"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2019-08-30" />
<target value="SPV operational and O&amp;M Contractor selected.">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
SPV Set and O&amp;M Operator Contracted
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2023-03-31" />
<target value="Yes">


																	</target>

																	<actual value="Ongoing">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Length of transmission lines constructed
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2023-03-31" />
<target value="372.00">


																	</target>

																	<actual value="333.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Rwanda
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2023-03-31" />
<target value="118.00">


																	</target>

																	<actual value="97.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Burundi
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2023-03-31" />
<target value="160.00">


																	</target>

																	<actual value="160.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Tanzania
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2023-03-31" />
<target value="94.00">


																	</target>

																	<actual value="76.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Length of transmission lines constructed (km)
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2024-06-30" />
<target value="372.20">


																	</target>

																	<actual value="333.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation Capacity of Hydropower constructed or rehabilitated under the project
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2024-06-30" />
<target value="80.00">


																	</target>

																	<actual value="54.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation Capacity of Hydropower constructed under the project
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2024-06-30" />
<target value="80.00">


																	</target>

																	<actual value="54.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation Capacity of Hydropower constructed or rehabilitated under the project
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2024-06-30" />
<target value="80.00">


																	</target>

																	<actual value="54.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation Capacity of Hydropower constructed under the project
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2024-06-30" />
<target value="80.00">


																	</target>

																	<actual value="54.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation Capacity of hydropower constructed under the project
</narrative></title> 
<baseline year="2013" iso-date="2013-04-19" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-04-19" />  <period-end iso-date="2019-08-30" />
<target value="448.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:30"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075943</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>3A-ENSAP Integrated Development of Eastern Nile (IDEN)</narrative>
       </title>
       <description type="1">
       <narrative>&quot;DON'T PUB DROP  1.    Why was code established and nature of the work In 1999, the Eastern Nile (EN) riparian's, including Egypt, Ethiopia and Sudan, agreed to establish an investment oriented program referred to as the Eastern Nile Subsidiary Action Program (ENSAP) under the framework of the Nile Basin Initiative (NBI).  In 2001, by the EN countries reached consensus that the first ENSAP 'project' , referred to as the Integrated Development of the Eastern Nile (IDEN) project, would &quot;&quot;initiate a regional, integrated, multipurpose development project through a first set of investments to confer tangible benefits# and demonstrate joint action.&quot;&quot;  This first set of agreed investments included 7 'subprojects: ' -  Irrigation &amp; Drainage -  Ethiopia-Sudan Interconnections -  Flood Preparedness and Early Warning -  Watershed Management -  EN Power Trade Investment studies -  EN Planning Model -  Baro-Akobo multipurpose water resources development The IDEN Facilitation code was established in FY02 to provide technical assistance to the EN Regional Technical Office (ENTRO), a newly formed sub-regional NBI project office for the Eastern Nile, and facilitate project preparation activities, as well as support institutional development to their nascent office.  In parallel to the Bank-executed IDEN Facilitation code, a PHRD grant of $1.5 million (2003-2007) was obtained for client-executed activities related to project preparation, particularly related to the EN Planning Model, Flood Preparedness, and the Ethiopia-Sudan Interconnection. Client-executed project preparation activities were also supplemented by GEF and NBTF-financed grants to ENTRO for watershed management and other IDEN activities.   Some projects, such as the Power Trade studies, where supported bilaterally by other Partners (i.e., AfDB). The IDEN Facilitation supported Bank staff (Bank, co-term, etc) and consultants, and related expenses (travel, workshops, technical consultancies, etc), required to facilitate dialogue and build consensus among the EN countries, assist in institutional development of ENTRO, and to support and review project preparation activities.  An integrated approach was required in the early years, the historic tensions among these countries, the need to build harmonized project preparation approaches for this new entity, and riparian preference. 2.    Why the code was closed As ENTRO matured and project preparation activities advanced, a decision was made to 'spin -off' IDEN 'subprojects' as individual projects, with individual preparation and/or lending codes.  As projects were ready and alternative funding mechanisms were put in place, all IDEN projects were 'spun off.' This included separate codes for investment oriented projects (and associated project preparation related activities), as well as for institutional strengthening (and associated 'facilitation' and institutional strengthening activities).  The IDEN Facilitation code was last used in FY05.&quot; </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF021330" type="40" role="4" >
       <narrative>Special Fund for Policy and Human Resources Development </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Barbara A. Miller</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Water Resource Management Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="60.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="23010"  vocabulary="1" percentage="20.00">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector> <sector code="43010"  vocabulary="1" percentage="20.00">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">1520264.70 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1473838.01  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075943">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">46426.69  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075943">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1473838.01  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075943">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">46426.69  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075943">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF021330" type="1"></related-activity><related-activity ref="44000-P075943" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:34"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075945</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP  Regional Power Trade</narrative>
       </title>
       <description type="1">
       <narrative>The development objective of the RPT project is to facilitate the development of regional power markets among the Nile Basin countries.  The long-term goal of the RPT project is to contribute to poverty reduction in the region by assisting the NBI countries in developing the tools for improving access to reliable, low cost, sustainably generated power.  Facilitating the development of a regional electricity market can play a key role in fostering cooperation among Nile Basin states and in ensuring that the resources of the Nile Basin are developed and managed in an integrated and environmentally sustainable manner.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="23020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">5901893.89 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">141893.89  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075945">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5760000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075945">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5760000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075945">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">141893.89  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075945">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:38"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075946</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP  Water Resources Planning &amp; Management</narrative>
       </title>
       <description type="1">
       <narrative>To enhance analytical capacity at a basinwide perspective to support the development, management, and protection of Nile Basin water resources in an equitable, optimal, integrated, and sustainable manner. The project focuses on two short-term outcomes: (i) increased joint and trans-boundary investments in the Nile Basin, and (ii) enhanced basin- wide capabilities and capacities based on best practices, and on trans-boundary issues in all themes and sectors.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14030"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">7036690.86 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">245688.86  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075946">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6791002.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075946">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6791002.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075946">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">245688.86  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075946">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:42"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075947</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP  Efficient Water Use for Agricultural Production</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Berina Uwimbabazi</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>buwimbabazi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14021"  vocabulary="1" percentage="30.00">
       <narrative>+![cdata[Water supply - large systems]]+</narrative>
       </sector> <sector code="43010"  vocabulary="1" percentage="70.00">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">4180567.98 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4122565.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075947">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">58002.98  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075947">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4122565.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075947">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">58002.98  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075947">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:46"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075948</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP Confidence Building and Stakeholder Involvement</narrative>
       </title>
       <description type="1">
       <narrative>To develop confidence in regional cooperation under the Nile Basin Initiative (NBI) and ensure full stakeholder involvement in the NBI and its projects  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF050887" type="40" role="4" >
       <narrative>Trust Fund for the Environmentally and Socially Sustainable Development </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="22010"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Communications policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">11531715.83 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11350522.62  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075948">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">164193.21  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075948">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">17000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF050887">
       <narrative>Trust Fund for the Environmentally and Socially Sustainable Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075948">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11350522.62  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075948">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">181193.21  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075948">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF050887" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:50"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075949</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP  Applied Training</narrative>
       </title>
       <description type="1">
       <narrative>The Applied Training Project (ATP) supports the SVP#s vision to improve water planning and management cooperatively in the basin by assisting in the development of human resources and institutional capacity building through:   * Strengthening capacity in selected subject areas of integrated water resources planning and management within the region in the medium term;  * Strengthening centers with the capacity to develop and deliver training programs in Integrated Water Resources Management (IWRM); and  * Expanding frequency and scope of basin interchange among water professionals involved in capacity building activities. </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14030"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">14173060.56 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">14132871.12  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075949">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">40189.44  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075949">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">14132871.12  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075949">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">40189.44  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075949">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:55"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075952</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP  Socio-economic Development and Benefit Sharing</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Berina Uwimbabazi</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>buwimbabazi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="60.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="23010"  vocabulary="1" percentage="20.00">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector> <sector code="43010"  vocabulary="1" percentage="20.00">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">3776868.90 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">131077.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075952">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3645791.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075952">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3645791.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075952">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">131077.90  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075952">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:47:59"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P076499</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP (Shared Vision Program) Facilitation</narrative>
       </title>
       <description type="1">
       <narrative>Strengthen the capacity of the NBI institutions to execute basin-wide programs, and ensure effective oversight and coordination of the NBI's Shared Vision Program.   The PDO was refined during the Project MTR (Dec 2006) to: (i) to ensure effective supervision of the Shared Vision Program (SVP) and coordination of the Nile Basin Initiative (NBI) projects/programs; and (ii) strenghten the capacity of the NBI to execute basin-wide programs. </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14030"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">11038908.74 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1102789.82  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P076499">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">9936118.92  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P076499">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">9936118.92  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076499">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1102789.82  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076499">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:03"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P091099</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>ENSAP Water Shed Project</narrative>
       </title>
       <description type="1">
       <narrative>The objective is to develop and implement a sustainable framework for the management of selected watershed within a framework of regional cooperation.  The overall development objective of the program is to develop and implement a sustainable framework for the management of selected watersheds within a framework of regional cooperation. This will be operationalized through enhancing the management of selected watersheds to improve standards of living of the population living within these watersheds in the Eastern Nile region; to reduce sediment transport and siltation of infrastructure, to improve agricultural productivity, and enhance vegetation cover and diversity. </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Herbert Acquay</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="40.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="43010"  vocabulary="1" percentage="60.00">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">2678551.08 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">188279.86  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P091099">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2490271.22  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P091099">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2490271.22  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P091099">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">188279.86  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P091099">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="44000-P091099" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:07"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P096323</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Tana &amp; Beles Integrated Water Resources Development</narrative>
       </title>
       <description type="1">
       <narrative>Develop enabling institutions and investments for integrated planning, management and development in the Tana and Beles Sub-basins for integrated water resources development.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF021330" type="40" role="4" >
       <narrative>Special Fund for Policy and Human Resources Development </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="ET">     <narrative>ETHIOPIA</narrative>
       </recipient-country> <sector code="14010"  vocabulary="1" percentage="21.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="14040"  vocabulary="1" percentage="58.00">
       <narrative>+![cdata[River basins’ development]]+</narrative>
       </sector> <sector code="31140"  vocabulary="1" percentage="21.00">
       <narrative>+![cdata[Agricultural water resources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">1076090.86 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">84209.26  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P096323">
       <narrative>ETHIOPIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">991881.60  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P096323">
       <narrative>ETHIOPIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">991881.60  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P096323">
       <narrative>ETHIOPIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">84209.26  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P096323">
       <narrative>ETHIOPIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF021330" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><related-activity ref="44000-P096323" type="4"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
development of community drinking water facilities in the project area
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="650.00">


																	</target>

																	<actual value="745.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Initial integrated basin management plans for Tana and Beles sub-basins developed and approved by key stakeholders (regional bureaus  and authorities, Basin Organizations, civil society organizations
</narrative></title> 
<baseline year="2008" iso-date="2008-05-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-01" />  <period-end iso-date="2016-07-31" />
<target value="2.00">


																	</target>

																	<actual value="2.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Increase in community infrastructure provided in targeted kebeles
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="80.00">


																	</target>

																	<actual value="61.50">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Land users adopting sustainable land management practices as a result of the project (number)
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="60000.00">


																	</target>

																	<actual value="43560.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of households adopting improved soil and water management practices in the project area.
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="30000.00">


																	</target>

																	<actual value="45850.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="219200.00">


																	</target>

																	<actual value="219200.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Female beneficiaries
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="50.00">


																	</target>

																	<actual value="50.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Community contribution in the total project costs (percentage)
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="15.00">


																	</target>

																	<actual value="17.58">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Soil Erosion Monitoring and Evaluation system developed and monitoring network in place
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="No soil and water monitoring system is in place in"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="M&amp;E system and network for soil erosion monitoring">


																	</target>

																	<actual value="NRM baseline survey completed. M&amp;E system and netw">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Initial integrated basin management plans for Tana and Beles sub-basins developed and discussed by key stakeholders (regional bureau s and authorities, Basin Organizations, civil society organizations
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="No water resource plans for Tana and Beles sub-bas"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="Sub-basin plans for Tana and Beles developed and d">


																	</target>

																	<actual value="Final Draft water resources management plans for e">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Tana and Beles Sub basin organizations are sufficiently equipped with knowledge base and analytical tools for integrated water resou rces planning and management
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="No Sub-basin organizations at the beginning of the"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="Interactive knowledge base products launched; know">


																	</target>

																	<actual value="Sub-basin organizations established, staffed and p">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Water resources monitoring network operational and information collected and used routinely
</narrative></title> 
<baseline year="2008" iso-date="2008-10-30" value="limited monitoring network in place"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-30" />  <period-end iso-date="2016-07-31" />
<target value="Enhanced HIS/BIS water resources monitoring networ">


																	</target>

																	<actual value="43 Hydrological monitoring stations established an">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Sub-basin organizations operational (With permanent heads appointed and core staff and approved basin plans in place)
</narrative></title> 
<baseline year="2008" iso-date="2008-10-30" value="no basin organizations exist"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-30" />  <period-end iso-date="2016-07-31" />
<target value="office buildings with adequate knowledge base, ana">


																	</target>

																	<actual value="Sub-basin organizations established, staffed and c">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Flood Management Information System developed and used routinely
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="No existing effective system for flood forecasting"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="Flood forecasting and early warning system in plac">


																	</target>

																	<actual value="First Radar in the Country delivered and installed">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Rehabilitation of internal community access paths and routes
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="5.00">


																	</target>

																	<actual value="126.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Treated eroded gully area
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="1000.00">


																	</target>

																	<actual value="1072.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Cultivated farm land area
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="44355.00">


																	</target>

																	<actual value="51408.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Farm area provided with improved irrigation supply through the rehabilitation of damaged small scale irrigation facilities
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="1000.00">


																	</target>

																	<actual value="1200.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Hillside degraded land area
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="16000.00">


																	</target>

																	<actual value="19523.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Land area where sustainable land management practices have been adopted as a result of the project
</narrative></title> 
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-29" />  <period-end iso-date="2016-07-31" />
<target value="83756.00">


																	</target>

																	<actual value="85026.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Cumulative area with improved natural resources management practices (soil conservation, afforestation, rain fed agriculture improvement etc.)  in the Ribb, Gumera and Jemma sub-watersheds
</narrative></title> 
<baseline year="2008" iso-date="2008-05-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-05-01" />  <period-end iso-date="2016-07-31" />
<target value="83756.00">


																	</target>

																	<actual value="85026.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:11"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P103518</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Eastern Nile Flood Prevention and Early Warning Project - Phase 1</narrative>
       </title>
       <description type="1">
       <narrative>The specific objective of FPEW I is to establish a regional institutional basis and to strengthen the existing capacities of the EN countries in flood forecasting, mitigation and management, promoting regional cooperation as well as to enhance the readiness of the EN countries to subsequent implementation of the subsequent phases of FPEW projects  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Anthony Nihal Fernando Warnakulasuriy</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="84.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="15110"  vocabulary="1" percentage="8.00">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="21010"  vocabulary="1" percentage="8.00">
       <narrative>+![cdata[Transport policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">4387120.43 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3957617.59  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P103518">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">429502.84  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P103518">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3957617.59  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103518">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">429502.84  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103518">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Detailed specification prepared for a regional flood forecast, warning and communication system.
</narrative></title> 
<baseline year="2007" iso-date="2007-06-19" value="None."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-19" />  <period-end iso-date="2010-06-18" />
<target value="Flood forecasting detailed design for the Eastern ">

																	<comment><narrative> 

																	on going will be completed shortly
	</narrative></comment> 

																	</target>

																	<actual value="Negotiation with consultants for the design and up">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
 Pilot flood preparedness emergency response activities trialed and assessed.
</narrative></title> 
<baseline year="2007" iso-date="2007-06-19" value="Nil"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-19" />  <period-end iso-date="2010-12-31" />
<target value="Pilot community development plans implementated an">

																	<comment><narrative> 

																	Evaluation reports have been completed and will be reviewed by the Bank team during the upcoming ICM mission.
	</narrative></comment> 

																	</target>

																	<actual value="Eight plans each in Ethiopia and Sudan have been p">

																	<comment><narrative>

																		ENTRO has engaged ORDA in Ethiopia and SRCS in Sudan to implement its suggestion of engaging independent consultants to track theeffectiveness of the pilot interventions in Ethiopia and Sudan during the 2010 flood season.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Regional Flood Coordination Unit established and resourced.	
</narrative></title> 
<baseline year="2007" iso-date="2007-06-19" value="Zero base"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-19" />  <period-end iso-date="2010-06-18" />
<target value="Regional Flood Coordination Unit established and r">


																	</target>

																	<actual value="The flood coordination unit has been established, ">

																	<comment><narrative>

																		Completed.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
2.3	Strengthen National Flood Forecast and Warning Systems in Egypt &amp; Sudan while initiate one in Ethiopia and initiate detailed design of Regional Flood Forecast, Warning and Communication System.
</narrative></title> 
<baseline year="2007" iso-date="2007-06-19" value="National Flood Forecasting Centers exist in Sudan "><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-19" />  <period-end iso-date="2009-06-30" />
<target value="Strengthened National Flood Forecast and Warning S">

																	<comment><narrative> 

																	Completed
	</narrative></comment> 

																	</target>

																	<actual value="#  National Flood Forecasting Centers in Egypt, Et">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Pilot flood preparedness and emergency response activities trialed.
</narrative></title> 
<baseline year="2007" iso-date="2007-06-19" value="Nil"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-19" />  <period-end iso-date="2010-12-31" />
<target value="Flood risk maps prepared. Development of community">

																	<comment><narrative> 

																	Pland prepared, evaluation process is ongoing and will be evaluated during then upcoming ICM mission.
	</narrative></comment> 

																	</target>

																	<actual value="Flood risk mapping:  Flood Risk Mapping consultanc">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Regional Flood Coordiantion Unit (RFCU) established and resourced.
</narrative></title> 
<baseline year="2007" iso-date="2007-06-19" value="Only a Regional Flood Coordinator (with additional"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-19" />  <period-end iso-date="2008-12-31" />
<target value="RFCU protocols and operational guidelines establis">

																	<comment><narrative> 

																	Completed
	</narrative></comment> 

																	</target>

																	<actual value="Regional Flood coordination unit has been establis">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:15"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P103639</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Eastern Nile Planning Model</narrative>
       </title>
       <description type="1">
       <narrative>The development objective of the ENPM Project is that countries in the Eastern Nile operationalize an improved decision support modeling framework to identify water-related investments and evaluate them in a regional context.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF071380" type="40" role="4" >
       <narrative>Integrated Land and Water Management for Adaptation to Climate Variability and Change (ILWAC) </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Nagaraja Rao Harshadeep</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>harsh@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="53.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14030"  vocabulary="1" percentage="47.00">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">5129019.35 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">289392.74  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P103639">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4347079.04  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P103639">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">492547.57  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071380">
       <narrative>Integrated Land and Water Management for Adaptation to Climate Variability and Change (ILWAC)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P103639">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4347079.04  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103639">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">781940.31  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P103639">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071380" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Planning Facilitation: Number of projects in Eastern Nile for which Investment Strategies are based on ENPM analysis
</narrative></title> 
<baseline year="2009" iso-date="2009-07-29" value="0.00"><comment>
					<narrative>None at beginning of project.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-07-29" />  <period-end iso-date="2012-12-31" />
<target value="1.00">

																	<comment><narrative> 

																	Key EN projects analyzed (at least one major joint multipurpose/national investment)
	</narrative></comment> 

																	</target>

																	<actual value="1.00">

																	<comment><narrative>

																		A range of joint multi-purpose project options were analyzed using ENPM tools (e.g. many sizing and cascade versions of Blue Nilemainstem dams).A number of investments of national significance were also analyzed (in a regional context wherever possible)relating to irrigation, watershed management, power systems, etc. to contribute to the development of investment strategies.TheENPM work has also helped shape the investments proposed under the Nile Cooperation for Results (NCORE) Project.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Strengthened Institutions:  Number of regional and national meetings facilitated by ENPM outputs
</narrative></title> 
<baseline year="2009" iso-date="2009-10-30" value="0.00"><comment>
					<narrative>None</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-10-30" />  <period-end iso-date="2012-12-31" />
<target value="4.00">

																	<comment><narrative> 

																	At least one (regional) and one each (national) meetings facilitated by ENPM outputs
	</narrative></comment> 

																	</target>

																	<actual value="12.00">

																	<comment><narrative>

																		There have been a number of well-attended workshops organized at regional and national level in Egypt, Ethiopia, Sudan, andrecently South Sudan.  Details provided in Project Completion Report.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Strengthened Institutions: Number of senior professionals in Regional and National Institutions using ENPM
</narrative></title> 
<baseline year="2009" iso-date="2009-10-30" value="0.00"><comment>
					<narrative>ENPM defined as knowledge base and tools developed as part of the project.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-10-30" />  <period-end iso-date="2012-12-31" />
<target value="10.00">

																	<comment><narrative> 

																	At least four (regional-level) and two each (national-level) are proficient in appropriate use of ENPM system tools
	</narrative></comment> 

																	</target>

																	<actual value="50.00">

																	<comment><narrative>

																		There are a number of professionals working in regional and national institutions that are using ENPM products.  This includesseveral professionals in NBI institutions, the 46 graduate students and young faculty involved in internship programs, faculty inkey universities in the EN, and government professionals.  Hundreds of professionals have so far attended workshops facilitated bythe ENPM.  In addition, ENTRO plans to continue to use these products in future workshops and in engaging regional, country, anddevelopment partner professionals.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Appropriate interfacing with other activities (especially NBI Nile DSS)
</narrative></title> 
<baseline year="2009" iso-date="2009-10-30" value="No"><comment>
					<narrative>Basic level discussions to synergize but many issues in coordination (especially with Nile DSS) still unclear.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-10-30" />  <period-end iso-date="2012-12-31" />
<target value="Yes">

																	<comment><narrative> 

																	Appropriate synergy of ENPM with other activites in the region.  In particular, synergy with Nile Basin DSS on software adaptersand use of DSS framework.
	</narrative></comment> 

																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Collaboration was very limited initially (e.g. to sharing knowledge bases, co-locating activities in-country, and helping on eachothers’ procurements) due to each project implementing a number of activities with separate multi-country teams (very large in thecase of the NileDSS) as planned on a very tight timeframe.  However, as the ENPM activities really picked up especially towards theend of the project, there was much more robust and meaningful collaboration.  This included co-financing key consultancies relatedto software development for additional NileDSS features, adapters for additional models to be added to the Nile DSS framework, ITequipment and software to EN countries, synergizing remote sensing procurement, and co-organizing training workshops.  This hasalso helped the NileSec and ENTRO to better agree on future knowledge, analysis, and partnership needs under the new NCORE project.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Institutional Capacity Strengthening: ENPM institutions operational
</narrative></title> 
<baseline year="2009" iso-date="2009-10-30" value="No"><comment>
					<narrative>Implementation not initiated.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-10-30" />  <period-end iso-date="2012-12-31" />
<target value="Yes">

																	<comment><narrative> 

																	- ENPM staffing with basic office/IT resources completed at ENTRO - ENPM staffing with basic office/IT resources completed atNational-level - Regional working group and national working groups operational - University Outreach Centers established -Structured stakeholder meetings and Trainings conducted/ facilitated by ENPM
	</narrative></comment> 

																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		At regional-level, the ENPM project has helped transform ENTRO into a credible center to provide regional knowledge and analyticalservices.  ENTRO now has the enabling skills, knowledge base, modeling tools, networks, partnerships, and outreach mechanisms to beable to engage a wide variety of stakeholders to help them make more informed decisions on issues and options that have regionalsignificance.   ENPM has also benefited other NBI activities (e.g. Nile DSS) and has helped shape the next generation of projects(e.g. NCORE) for the NBI.At national-level, the ENPM project has had mixed success.  The project has helped developed excellentpartnerships with Universities in the EN countries, helping Universities to establish better professional networks both within andacross countries, and to partner with a number of ENTRO activities.  The internship program established has been pioneering,helping a new generation of potential water professionals and leaders to acquire new skills, develop 
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Modeling Systems Development
</narrative></title> 
<baseline year="2009" iso-date="2009-10-30" value="No"><comment>
					<narrative>Fragmented models at national level or one-off modeling for regional studies Basic Nile DSS modules under development</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-10-30" />  <period-end iso-date="2012-12-31" />
<target value="Yes">

																	<comment><narrative> 

																	Models fully operational and applied to various appropriate spatial locations in the EN
	</narrative></comment> 

																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		A suite of ENPM modeling tools have been developed to analyze critical issues in the Eastern Nile.  These include Soil and WaterAnalysis Tool (SWAT), RIBASIM, RiverWare, HEC Suite, Mike Basin, NileDSS Platform, GAMS, etc.A number of Thematic (e.g. watershed,power, irrigation) and Sub-basin toolkits (for all EN sub-basins) have also been developed.Models related to flood forecastingwere enhanced under ENPM, particularly related to hydrologic modeling in the Lake Tana area and in Sudan.  Special studies alsocontributed to the use of analytical tools to examine dam break, surface and groundwater interactions using models such as Modflow,climate change, and water quality impacts on fisheries.The project achieved far more than the target of 3 projects to beevaluated.  ENPM tools have been used to evaluatea number of projects (ranging from about 4 dams for storage and hydropower on theBlue Nile and varying combinations and sizing options for each, a number of irrigated agriculture developmen
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Information Management Systems Developed
</narrative></title> 
<baseline year="2009" iso-date="2009-10-30" value="No"><comment>
					<narrative>Fragmented databases with limited accessibility</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-10-30" />  <period-end iso-date="2012-12-31" />
<target value="Yes">

																	<comment><narrative> 

																	- Systematic knowledge base developed - Appropriate data management interfaces used -State of Eastern Nile Report with finalizedOne System Inventory -Suite of interactive knowledge products
	</narrative></comment> 

																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		A comprehensive set of knowledge bases were organized into geodatabases.  A number of knowledge products (including interactivetoolkits, web portal, atlas, state of the basin report, etc.) and model interfaces have been developed.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:19"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P107350</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Water Resources Development</narrative>
       </title>
       <description type="1">
       <narrative>The Project Development Objective is to strengthen the management of national water resources and increase the yield from Corumana dam to augment water supply for the Greater Maputo Metropolitan Area.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF021330" type="40" role="4" >
       <narrative>Special Fund for Policy and Human Resources Development </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Pierre Francois-Xavier Boulenger</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Water Supply and Sanitation Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>pboulenger@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="MZ">     <narrative>MOZAMBIQUE</narrative>
       </recipient-country> <sector code="14020"  vocabulary="1" percentage="40.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14030"  vocabulary="1" percentage="40.00">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector> <sector code="14040"  vocabulary="1" percentage="10.00">
       <narrative>+![cdata[River basins’ development]]+</narrative>
       </sector> <sector code="74020"  vocabulary="1" percentage="10.00">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">745272.05 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P107350">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">745272.05  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P107350">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">745272.05  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P107350">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">231097.61  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P107350">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF021330" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><related-activity ref="44000-P107350" type="4"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
(AF/PPCR) Hydro-met stations in Limpopo River basin upgraded to monitor extreme events
</narrative></title> 
<baseline year="2013" iso-date="2013-09-27" value="2.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-27" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="16.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Investment studies for additional dam projects completed
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" />  <period-end iso-date="2017-12-15" />
<target value="4.00">


																	</target>

																	<actual value="3.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of other water service providers that the project is supporting
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="5.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
People provided with improved sanitation
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="660.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries from interventions flood management interventions
</narrative></title> 
<baseline year="2013" iso-date="2013-09-27" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-27" />  <period-end iso-date="2017-12-15" />
<target value="287100.00">


																	</target>

																	<actual value="300271.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
OLD Version of Indicator: People in project areas with access to Improved Water Sources
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="1095.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of agreements for international waterways reviewed and updated
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="2.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
River basins covered by water resources management plans
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="5.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" />  <period-end iso-date="2017-12-08" />
<target value="12.00">


																	</target>

																	<actual value="8.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
(AF) Dykes and levees rehabilitated to withstand a 1:50 year flooding in the Limpopo River basin
</narrative></title> 
<baseline year="2013" iso-date="2013-09-27" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-27" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="40.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Female beneficiaries
</narrative></title> 
<baseline year="2012" iso-date="2012-01-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-01-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="143050.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
(AF/PPCR): % of hrdo-climatic stations operational and reporting
</narrative></title> 
<baseline year="2011" iso-date="2011-12-15" value="23.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-12-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="70.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
% of hydro-climatic stations operations and reporting
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="23.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="70.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
(AF) Flood management studies integrating infrastructure planning applied in government decision making
</narrative></title> 
<baseline year="2013" iso-date="2013-09-27" value="Lack of studies developed and applied"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-27" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Studies inform decision making">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
(AF) Integrated Flood Management Decision Support System operating for Limpopo River basin
</narrative></title> 
<baseline year="2013" iso-date="2013-09-27" value="Lack of integrated flood management decision suppo"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-27" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Operating effectively in wet season">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Incremental reservoir yield available from Corumana Dam for GMMA
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" />  <period-end iso-date="2019-11-12" />
<target value="11.6">


																	</target>

																	<actual value="11.6">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
(AF) Macarretane barrage on the Limpopo River has functioning hydro-mechanical works, gate control system, and reinforced foundations
</narrative></title> 
<baseline year="2013" iso-date="2013-09-27" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-09-27" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Environmental management plan audited annually
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved safety monitoring system for Corumana Dam functioning
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Water license for Maputo Water Supply granted
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
National water storage capacity
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="77474.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" />  <period-end iso-date="2019-11-12" />
<target value="77714.00">


																	</target>

																	<actual value="77714.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Storage Capacity Corumana Dam
</narrative></title> 
<baseline year="2011" iso-date="2011-09-15" value="720.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-09-15" />  <period-end iso-date="2019-11-12" />
<target value="960.00">


																	</target>

																	<actual value="960.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:23"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P108906</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>NELSAP Regional Agricultural Trade and Productivity Project</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Sergiy Zorya</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Agriculture Economist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>szorya@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="289">   <narrative>South of Sahara regional</narrative>
       </recipient-region> <sector code="32161"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Agro-industries]]+</narrative>
       </sector> <sector code="32161"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Agro-industries]]+</narrative>
       </sector> <sector code="33110"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Trade policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">727388.70 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">121314.75  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P108906">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">606073.95  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P108906">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">606073.95  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P108906">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">121314.75  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P108906">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:27"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P110616</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Nile Basin Initiative Institutional Strengthening Project</narrative>
       </title>
       <description type="1">
       <narrative>The NBI has strengthened foundation for institutional sustainability, enhanced capacity, and harmonized corporate management to more effectively deliver programs and projects.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Clare Georgina Barrington</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Water Resources Mgmt. Spec.</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">25371141.17 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1370216.64  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P110616">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">24000924.53  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P110616">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">24000924.53  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P110616">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1370216.64  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P110616">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Value of proposals with funding secured
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="0.00"><comment>
					<narrative>No new proposals</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="30000000.00">


																	</target>

																	<actual value="15000000.00">

																	<comment><narrative>

																		Partially achieved.Total US$18.2mof which NELSAP-CU $5.2mENTRO $7.7m SEC $5.3m
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Transbounday investment projects attract financing
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="500000.00"><comment>
					<narrative>Some financing already gained with WB support</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="1000000.00">


																	</target>

																	<actual value="130000000.00">

																	<comment><narrative>

																		Exceeded target. Significant success particularly in NELSAP-CU for power interconnection and generation projects.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Information exchange on planned measures
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="0.00"><comment>
					<narrative>Information exchange done at TAC and COM meetings</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="4.00">


																	</target>

																	<actual value="3.00">

																	<comment><narrative>

																		Partially achieved.No notification since MTR. Rusumo Falls to notify early 2013. SEC drafted paper on current procedure.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
NBI Centres average % ISP annual workplan achieved (actual vs achieved)
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="50.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="80.00">


																	</target>

																	<actual value="78.00">

																	<comment><narrative>

																		Fully achieved.95% of workplan delivered.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
% core staff costs covered by non ISP sources
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="10.00"><comment>
					<narrative>Most staff funded by projects, poor institutional sustainability</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="50.00">


																	</target>

																	<actual value="25.00">

																	<comment><narrative>

																		Partially achieved.Some staff supported by GIZ. Plan for increasing member state contributions to cover the costs of staff agreedby NileCOM.  To be implemented next FY.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Level of stakeholder awareness of NBI activities
</narrative></title> 
<baseline year="2011" iso-date="2011-04-22" value="0.00"><comment>
					<narrative>Low level of awareness</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2011-04-22" />  <period-end iso-date="2012-12-31" />
<target value="70.00">


																	</target>

																	<actual value="70.00">

																	<comment><narrative>

																		Partially achieved.Baseline estimatedat 60% in 2009.  Current level of awareness 70%.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Quality of preparation for, execution of, and follow up from governance meetings
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="50.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="90.00">


																	</target>

																	<actual value="94.00">

																	<comment><narrative>

																		Fully achieved.94% satisfaction with NileTAC and NELTAC. ENSAPT not met since MTR.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Development of Nile Basin monitoring strategy including state of the basin indicators
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="0.00"><comment>
					<narrative>No basin wide monitoring or reporting on indicators</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Fully achieved. Monitoring strategy endorsed by NileTAC and will be implemented under new project.  First state of basin reportpublished using indicators as a basis.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Level of integration of DSS into WRM Unit at the NileSEC
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="0.00"><comment>
					<narrative>DSS under development by another project (WRPM).  WRM Unit not established.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Fully achieved. NileSEC has a dedicated DSS Unit within the WRM Department, NELSAP-CU has an analytical unit with dedicatedstaff,and ENTRO has a planning unit with DSS capability.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
NBI Centres average % ISP annual budget spent (actual vs planned)
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="50.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="80.00">


																	</target>

																	<actual value="95.00">

																	<comment><narrative>

																		Fully achieved.  Centres closely monitored spend and ensured fully budget utilisation.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strategy for institutional and financial sustainability presented to the Nile-COM.
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="No strategy existing or adopted."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-03-31" />
<target value="Strategy presented to Nile-COM.">


																	</target>

																	<actual value="Strategy approved by NileCOM.">

																	<comment><narrative>

																		Exceeded target. NileCOM approved strategy and under implementation.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Successful mainstreaming of all SVP projects
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="No"><comment>
					<narrative>SVP mainstreaming strategy developed</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Fully achieved.WRPM closure plan implemented on time and in full.  Outcomes mainstreamed satisfactorily.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Integration of project financing considerations into project identification and preparation
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="No"><comment>
					<narrative>Resource mobilisation not integrated into project cycle</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Fully achieved. Integration of project financing considerations is much improved.  NELSAP-CU have planned an investors conferenceto attract interest early in the project cycle.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
International best practice in project identification and preparation applied
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="No"><comment>
					<narrative>Lack of guidelines and quality assurance system for project development</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Fully achieved. International best practice is applied,  evidenced by attraction of investment financing, such as by NELSAP-CUfora regional power interconnections (US$356m from AfDB, KfW, Netherlands, JICA) and regional hydropower generation (US$440m fromIDA,AfDB, EIB, KfW).
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Water resources management and planning function operational
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="No"><comment>
					<narrative>No dedicated WRM function or unit at the NileSEC and SAPs</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Fully achieved.WRM Units operational in all 3 NBI Centres and DSS operations integrated at NileSEC.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Nile Basin Sustainability Framework and its key policies completed and presented for approval
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="No"><comment>
					<narrative>lack of common basin policies for application to NBI projects</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="Yes">


																	</target>

																	<actual value="No">

																	<comment><narrative>

																		Partially achieved. NBSF endorsed by NileCOM. Policies drafted.  Delays due to loss of key staff at SEC.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Core functions endorsed by governors
</narrative></title> 
<baseline year="2008" iso-date="2008-10-21" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-10-21" />  <period-end iso-date="2012-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Fully achieved.Core functions developed and endorsed by Nile TAC.  Significant as the core functions clarified what NBI does anddelineates roles and responsibilities between the three centres.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:31"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P111330</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Eastern Nile Watershed Management Project</narrative>
       </title>
       <description type="1">
       <narrative>The Global Environment Objectives are to increase the adoption by the Eastern Nile Countries of sustainable land and water management practices in selected micro-watersheds in the Eastern Nile Basin, and develop a framework for integrated and sustainable management of the Lake Nasser/Nubia sub-basin.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF050551" type="40" role="4" >
       <narrative>Global Environment Facility (GEF) - IBRD as Implementing Agency Projects Trust Fund </narrative>
       </participating-org><participating-org ref="TF071227" type="40" role="4" >
       <narrative>Trust Fund for Co-financing of the Eastern Nile Watershed Management Project, Sudan </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2016-06-30"></activity-date><activity-date type="4"  iso-date= "2016-06-29"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Edward Felix Dwumfour</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="45.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14030"  vocabulary="1" percentage="5.00">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector> <sector code="31120"  vocabulary="1" percentage="30.00">
       <narrative>+![cdata[Agricultural development]]+</narrative>
       </sector> <sector code="31220"  vocabulary="1" percentage="20.00">
       <narrative>+![cdata[Forestry development]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2016-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">15883872.61 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">430462.53  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P111330">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6788650.86  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071227">
       <narrative>Trust Fund for Co-financing of the Eastern Nile Watershed Management Project, Sudan</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P111330">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8664759.22  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF050551">
       <narrative>Global Environment Facility (GEF) - IBRD as Implementing Agency Projects Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P111330">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16592043.12  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P111330">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">430462.53  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P111330">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071227" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF050551" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
M&amp;E system is strengthened and functional
</narrative></title> 
<baseline year="2009" iso-date="2009-06-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-23" />  <period-end iso-date="2015-12-31" />
<target value="1.00">


																	</target>

																	<actual value="1.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Existence of a functional inter-ministerial coordinating committee or its equivalent (for Egypt &amp; Sudan)
</narrative></title> 
<baseline year="2009" iso-date="2009-06-23" value="1.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-23" />  <period-end iso-date="2015-12-31" />
<target value="2.00">


																	</target>

																	<actual value="2.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Key sectoral or thematic guidelines for integrated and sustainable management of the Lake Nasser/Nubia Sub-basin, which would constitue the framework, that are completed and adopted by the Ministry of
</narrative></title> 
<baseline year="2009" iso-date="2009-06-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-23" />  <period-end iso-date="2015-12-31" />
<target value="5.00">


																	</target>

																	<actual value="3.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
New information products (e.g. publications, CDs, status reports) developed to increase sharing of information on watershed management, including on best management practices, among the ripa
</narrative></title> 
<baseline year="2009" iso-date="2009-06-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-23" />  <period-end iso-date="2015-12-31" />
<target value="14.00">


																	</target>

																	<actual value="18.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Staff of national and regional institutions responsible for watershed management in the Eastern Nile countries whose technical competency is strengthened
</narrative></title> 
<baseline year="2009" iso-date="2009-06-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-23" />  <period-end iso-date="2015-12-31" />
<target value="190.00">


																	</target>

																	<actual value="421.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Systematic use of the Environmental and Social Management Framework to screen micro-project interventional before approval (percentage of micro-projects)
</narrative></title> 
<baseline year="2009" iso-date="2009-06-23" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-23" />  <period-end iso-date="2015-12-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Planned project activities are implemented
</narrative></title> 
<baseline year="2009" iso-date="2009-08-10" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-08-10" />  <period-end iso-date="2015-12-31" />
<target value="90.00">


																	</target>

																	<actual value="84.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Increase (%) in the average yields of dominant crops (Sorghum, Sesame or Cowpea)
</narrative></title> 
<baseline year="2009" iso-date="2009-08-10" value="750.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-08-10" />  <period-end iso-date="2015-12-31" />
<target value="70.00">


																	</target>

																	<actual value="129.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Area of agricultural landscape under sustainable land and water management practices
</narrative></title> 
<baseline year="2009" iso-date="2009-08-10" value="1500.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-08-10" />  <period-end iso-date="2015-12-31" />
<target value="40000.00">


																	</target>

																	<actual value="43718.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:35"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P114466</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Kagera River Basin Management Project</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Berina Uwimbabazi</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>buwimbabazi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="75.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="31140"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Agricultural water resources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">3887220.84 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">169535.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P114466">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3717684.94  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P114466">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3717684.94  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114466">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">169535.90  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114466">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:39"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P114467</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Sio-Malaba-Malakisi River Basin Management Project</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Berina Uwimbabazi</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>buwimbabazi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">2236437.04 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">110103.87  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P114467">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2126333.17  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P114467">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2126333.17  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114467">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">110103.87  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114467">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:42"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P114469</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Mara River Basin Management Project</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Berina Uwimbabazi</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>buwimbabazi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">1791800.79 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1701785.72  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P114469">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">90015.07  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P114469">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1701785.72  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114469">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">90015.07  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P114469">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:46"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P115414</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>NELSAP Regional Agricultural Trade and Productivity TA (Phase II)</narrative>
       </title>
       <description type="1">
       <narrative>To increase knowledge of Basin agriculture in NBI institutions to promote more efficient and sustainable use of water resources andeconomically viable investment in agriculture.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="31110"  vocabulary="1" percentage="46.00">
       <narrative>+![cdata[Agricultural policy and administrative management]]+</narrative>
       </sector> <sector code="31120"  vocabulary="1" percentage="18.00">
       <narrative>+![cdata[Agricultural development]]+</narrative>
       </sector> <sector code="31130"  vocabulary="1" percentage="9.00">
       <narrative>+![cdata[Agricultural land resources]]+</narrative>
       </sector> <sector code="31140"  vocabulary="1" percentage="8.00">
       <narrative>+![cdata[Agricultural water resources]]+</narrative>
       </sector> <sector code="31191"  vocabulary="1" percentage="19.00">
       <narrative>+![cdata[Agricultural services]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">6825671.70 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">318160.89  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P115414">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6507510.81  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P115414">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6507510.81  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P115414">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">318160.89  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P115414">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="250.00">


																	</target>

																	<actual value="350.00">

																	<comment><narrative>

																		Beneficiaries are regional project staff, Project Steering Committee, and other key officials in NBI Countries.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Virtual water for agriculture documented in nine basin countries and virtual water trade introduced as a tool for water resource decision making
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Concept poorly understood and proper virtual water estimates for Nile Basin countries do not exist</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Concrete illustrations of concept in Nile basin environment developed.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Positively received, requested follow-on training, provided.  Final report uploaded into the Nile IS and widely disseminated inallNBI Countries and internationally through a workshop at Stockholm International Water Week in August 2012.  Covered whole NBI.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Facilitating policies  and investments along selected transboundary agricultural trade corridors indicated
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Scattered information on transboundary trade issues</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Policy and investment options presented and disseminated.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Policies and potential investments identified, champions for continuing the work also committed to follow-up.  Final reportsvalidated and disseminated – including extra-output on livestock export potential to the Gulf.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Agricultural trade data and information base acquired and integrated into NBI-DSS
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Scattered and country-based information</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Agricultural trade data and information base established and plans for integrating it into the Nile IS/DSS developed.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Trade database complete for the 5 corridors studied and the virtual water/water footprint.  In final stages of creating meta-datafor integrating into Nile IS/DSS.  Water footprint already integrated.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Best practices on water harvesting and irrigation identified by the past NBI projects and other organizations disseminated in the basin
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Practices assembled but not user-friendly with limited dissemination</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Practices disseminated at country level by trainers.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Training well attended by all 7 countries – target audience was reached.  Report has been widely disseminated within the NBICountries.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
One report on water resources for irrigation produced for each of the six specified countries and disseminated through at least oneworkshop per country
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>No consistent information on irrigation potential available</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	One report on water resources for irrigation produced for each of the six specified countries and disseminated.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Good indication of how RATP fits into the progression of NBTF/Bank interventions as it goes from concept under EWUAP to RAPT tofollow-on work being planned under the NELSAP component of the new NCORE Project.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Agricultural database for major crops in nine countries and one information retrieval system established, integrated into DSS, and functioning
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Scattered unintegrated databases</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Agricultural database and information system established and plans for integrating it into the Nile DSS developed.
	</narrative></comment> 

																	</target>

																	<actual value="85.00">

																	<comment><narrative>

																		Indicator is overly ambitious and/or poorly defined.  Creating complete ag data bases for 10 countries is found to be beyond thescope of the consultancy and the project (budget/time/personal constraints).  The Project and consultants have agreed to createdatabase with sufficient information to validate the model.  The database can, and should be, augmented over time by the NBI andcountriesusing the model.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Model that includes supply and demand blocks for Nile basin agriculture developed and integrated into the Nile Basin DSS model
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Agricultural model in DSS is not developed</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Model and database established and plans for integrating it into the Nile DSS developed.
	</narrative></comment> 

																	</target>

																	<actual value="95.00">

																	<comment><narrative>

																		Model completed and under testing by RATP and DSS Team.  Consultant working closely with RATP and expected to finalize based ontesting results by December 21, 2012.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
One or more options identified for core agricultural functions of NBI and successor River Basin Organization, and consensus reachedon roles and functions
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Options for agriculture functions not properly defined</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Institutional options prioritized.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Report finalized and institutional options identified and prioritized for presentation to NBI Governance.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Analytical tools developed and information disseminated to promote agricultural trade in the Nile Basin
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Basin countries and institutions lack basic tools and knowledge</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Analytical tools and information developed and disseminated to promote agricultural trade in the Nile Basin.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Three commodity categories, 5 trade corridors studied. Uptake by commodity groups and RECS with commitment to further this work.Aseries of potential investments have been identified.  Virtual Water/water footprint study disseminated, to be launched oversummer2012, possibly at SIWA World Water Week – appears to have engaged non-water decision makers (Ministries of Finance, Planning,trade, etc. and private sector) in the water agenda.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Analytical tools developed and information disseminated to increase water use productivity in Basin agriculture
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Analytical tools are not adequate</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Model analysis &amp; database disseminated at region, country levels.
	</narrative></comment> 

																	</target>

																	<actual value="98.00">

																	<comment><narrative>

																		Ag model will be integrated into the Nile DSS both regionally and nationally.  The Irrigation Potential study, phase 1, builds onwork done under EWAP to provide more in-depth analysis of irrigation potential in seven NELSAP Countries and delivered it togovernments.  Phase 2 builds on that to prepare pre-feasibility studies of 34 schemes in those five countries.  There are alreadyregional and national plans to utilize this work for preparing future investments through the newly approved Nile Cooperation forResults (NCORE) Project.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Options for NBI agricultural agenda presented to the NBI bodies
</narrative></title> 
<baseline year="2009" iso-date="2009-11-11" value="0.00"><comment>
					<narrative>Agricultural functions not defined</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-11-11" />  <period-end iso-date="2012-12-31" />
<target value="100.00">

																	<comment><narrative> 

																	Options presented to NBI governing bodies.
	</narrative></comment> 

																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Options presented to NBI Governance in July 2012.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:50"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P116318</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP-Additional Grant Financing for the Water Resources Planning and Management Project - Phase II</narrative>
       </title>
       <description type="1">
       <narrative>The proposed financing would support the Nile Basin Initiative (NBI) to undertake Phase II activities that fulfill objectives outlined in the original Project Appraisal Document (Report No. 31989, April 2005). The development objective of the NBI SVP Water Resources Planning and Management (WRPM) project is to enhance analytical capacity from a basin-wide perspective to support the development, management, and protection of Nile Basin water resources in an equitable, optimal, integrated, and sustainable manner. Phase II will emphasize the development of a basin-wide Decision Support System (DSS) for water planning and management.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Clare Georgina Barrington</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Water Resources Mgmt. Spec.</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">17255289.55 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">17078197.98  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116318">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">177091.57  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116318">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">17078197.98  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116318">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">177091.57  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116318">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Percent of data required for DSS use received by WRPM project
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="70.00">


																	</target>

																	<actual value="85.00">

																	<comment><narrative>

																		Exceeded target.85% data received.  Significant achievement in context of historic lack of data sharing.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Precent of arrangements in place and operational at regional, sub regional and national levels
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="100.00">


																	</target>

																	<actual value="100.00">

																	<comment><narrative>

																		Fully achieved.Nile-SEC: 100%ENTRO: 100%NELSAP-CU: 100%Countries:  75% (7 out of 9 with good arrangements).
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
% completion of tasks within annual work plan
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="95.00">


																	</target>

																	<actual value="93.00">

																	<comment><narrative>

																		Fully achieved. Jan-Dec 2012 workplan was 93 % completed
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
% execution of annual budget
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="90.00">


																	</target>

																	<actual value="98.00">

																	<comment><narrative>

																		Fully achieved.Jan-Dec 2012 budget was 98% spent.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Use of Nile Basin DSS Initiated &amp; its sustainability beyond the project life ensured.
</narrative></title> 
<baseline year="2009" iso-date="2009-04-01" value="DSS design consultancy contract negotiated; Nile I"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-04-01" />  <period-end iso-date="2012-12-31" />
<target value="16 national &amp; 6 regional project cases on which th">


																	</target>

																	<actual value="Fully achieved. 18 national project cases prepare">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Enhanced capacity for successful preparation, planning, and management of joint/ cooperative projects.
</narrative></title> 
<baseline year="2009" iso-date="2009-04-01" value="PPM component successfully refined from Phase I wi"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-04-01" />  <period-end iso-date="2010-12-31" />
<target value="Capacity successfully in place to support large pr">


																	</target>

																	<actual value="Component closed as scheduled with outputs mainstr">

																	<comment><narrative>

																		Achieved.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved analytical capacity for water resources planning and management in the Nile basin.
</narrative></title> 
<baseline year="2009" iso-date="2009-04-01" value="NBI Countries cooperate in WRPM PSC. WRPM complete"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-04-01" />  <period-end iso-date="2012-12-31" />
<target value="Level of effectiveness of DSS operations in NBI Ce">


																	</target>

																	<actual value="Fully achieved.Assessed:- high in Nile-SEC, NELS">

																	<comment><narrative>

																		Substantial achievement considering context for implementation of the project.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Status of interim procedures for data sharing and operational guidelines
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="Yes">


																	</target>

																	<actual value="Yes">

																	<comment><narrative>

																		Fully achieved.Interim Procedures were approved by NileCOM and are in use to gain data needed for DSS.  Significant achievementincontext of historic lack of data sharing.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:55"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P116392</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>NELSAP Water Resources Development Program</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Berina Uwimbabazi</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>buwimbabazi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="21.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="14021"  vocabulary="1" percentage="30.00">
       <narrative>+![cdata[Water supply - large systems]]+</narrative>
       </sector> <sector code="15110"  vocabulary="1" percentage="5.00">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="21010"  vocabulary="1" percentage="5.00">
       <narrative>+![cdata[Transport policy and administrative management]]+</narrative>
       </sector> <sector code="31140"  vocabulary="1" percentage="39.00">
       <narrative>+![cdata[Agricultural water resources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">4663565.73 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">116625.52  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116392">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4546940.21  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116392">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4546940.21  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116392">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">116625.52  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116392">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:48:59"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P116595</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Eastern Nile First Joint Multipurpose Program Identification (JMP1 ID)</narrative>
       </title>
       <description type="1">
       <narrative>The objective of this Recipient-Executed Technical Assistance project is to assist the three Eastern Nile countries in examining joint water resources development possibilities on the Abbay/Blue and Main-stem Nile, taking economic, social and environmental sustainability issues into account in an integrated manner.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Eileen Rose Burke</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Water Resource Management Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>eburke@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="14020"  vocabulary="1" percentage="20.00">
       <narrative>+![cdata[Water supply and sanitation - large systems]]+</narrative>
       </sector> <sector code="14030"  vocabulary="1" percentage="20.00">
       <narrative>+![cdata[Basic drinking water supply and basic sanitation]]+</narrative>
       </sector> <sector code="23020"  vocabulary="1" percentage="15.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="15.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector> <sector code="31130"  vocabulary="1" percentage="15.00">
       <narrative>+![cdata[Agricultural land resources]]+</narrative>
       </sector> <sector code="31140"  vocabulary="1" percentage="15.00">
       <narrative>+![cdata[Agricultural water resources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">3410999.62 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2873905.97  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116595">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">537093.65  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116595">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2873905.97  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116595">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">537093.65  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116595">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
2c)  a roadmap for advancing  investment  and addressing critical issues for sustainable water resources development and managementin the Abbay/Blue and Mainstem Nile
</narrative></title> 
<baseline year="2009" iso-date="2009-06-08" value="None."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-08" />  <period-end iso-date="2012-12-31" />
<target value="Road map completed.">


																	</target>

																	<actual value="Roadmap under finalization.">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
2b)  Number of opportunities for capacity building for ENTRO and related agencies in the three countries
</narrative></title> 
<baseline year="2009" iso-date="2009-06-08" value="None."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-08" />  <period-end iso-date="2012-12-31" />
<target value="Four additional training   offered.">

																	<comment><narrative> 

																	Target for project completion met.
	</narrative></comment> 

																	</target>

																	<actual value="Four additional training   offered.">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
2a)  A well-conceived stakeholder involvement &amp; communication program
</narrative></title> 
<baseline year="2009" iso-date="2009-06-08" value="None."><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-08" />  <period-end iso-date="2012-12-31" />
<target value="Program implemented as per the SICAS Implementatio">


																	</target>

																	<actual value="SICAS created, revised and updated.  Last consulta">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
1c)  identification of potential nationally-implemented JMP1 Non-Anchor Projects, including irrig. modernization &amp; development, watershed management, floodplain management
</narrative></title> 
<baseline year="2009" iso-date="2009-06-08" value="None"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-08" />  <period-end iso-date="2012-12-31" />
<target value="All non-anchor investment study reports completed ">

																	<comment><narrative> 

																	Target will not be met at end of project.
	</narrative></comment> 

																	</target>

																	<actual value="Need for non-anchor projects Identified.   Non-anc">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
1b)  Study of the potential  Anchor Project and subsequent cascade development, taking into account economic, social and environment considerations, including reservoir filling and operating rule
</narrative></title> 
<baseline year="2009" iso-date="2009-06-08" value="None"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-08" />  <period-end iso-date="2012-12-31" />
<target value="Cascade Development Assessment and Sequencing Stud">


																	</target>

																	<actual value="Study of possible anchor project and cascade devel">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
a roadmap for a coordinated set of investments is identified at the end of the project
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="Road map completed">


																	</target>

																	<actual value="Roadmap under finalization.">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Eastern Nile governments have an improved knowledge base to sustainably develop and manage the resources of the Blue and Main-stem Nile
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative>None</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="Final Study completed and reports disseminated">


																	</target>

																	<actual value="Report on gaps and coordination of gap filling str">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
the SSEA provides a sound basis for understanding social and environmental considerations in projects within the potential JMP program
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" />  <period-end iso-date="2012-12-31" />
<target value="SSEA stage II completed and endorsed by IPoR.">

																	<comment><narrative> 

																	Target will not be met.
	</narrative></comment> 

																	</target>

																	<actual value="SSEA I in draft format.  SSEA process cancelled, a">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
(1a) a strategic social and environmental assessment (SSEA) of water resources development alternatives in the Blue-Main Nile;
</narrative></title> 
<baseline year="2009" iso-date="2009-06-08" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2009-06-08" />  <period-end iso-date="2012-12-31" />
<target value="No">

																	<comment><narrative> 

																	SSEA-Stage 2 report completed and stakeholders' comments incorporated
	</narrative></comment> 

																	</target>

																	<actual value="No">

																	<comment><narrative>

																		SSEA canceled.  Working paper assessing social and environmental issues at a scoping level completed.  Stakeholder comments notyet incorporated.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:49:02"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P116745</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>SVP-Additional Grant Financing Regional Power Trade - II</narrative>
       </title>
       <description type="1">
       <narrative>The development objective of the RPT project is to facilitate the development of regional power markets among the Nile Basin countries.  The long-term goal of the RPT project is to contribute to poverty reduction in the region by assisting the NBI countries in developing the tools for improving access to reliable, low cost, sustainably generated power.  Facilitating the development of a regional electricity market can play a key role in fostering cooperation among Nile Basin states and in ensuring that the resources of the Nile Basin are developed and managed in an integrated and environmentally sustainable manner.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="23210"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Energy generation, renewable sources - multiple technologies]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">4680978.23 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">124796.66  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116745">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4556181.57  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116745">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4556181.57  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116745">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">124796.66  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116745">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:49:06"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P116941</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>NELSAP Power Development Program</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2015-06-30"></activity-date><activity-date type="4"  iso-date= "2015-10-07"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr John Bryant Collier</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>jcollier@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="298">   <narrative>Africa regional</narrative>
       </recipient-region> <sector code="23210"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Energy generation, renewable sources - multiple technologies]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2015-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">3762290.46 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">152908.59  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116941">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3609381.87  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P116941">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3609381.87  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">152908.59  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116941">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:49:10"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P117635</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Kenya Water Security and Climate Resilience Project</narrative>
       </title>
       <description type="1">
       <narrative>(a) increase access to irrigation water for project beneficiaries and (b) enhance the institutional framework and strengthen capacity for water security and climate resilience in certain areas of the territory of the Recipient.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="CH-4" type="10" role="1" >
       <narrative>Swiss Agency for Development and Cooperation (SDC) </narrative>
       </participating-org><participating-org ref="DAC-1601" type="60" role="1" >
       <narrative>Bill and Melinda Gates Foundation </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF071044" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Water Partnership Program </narrative>
       </participating-org><participating-org ref="TF072053" type="40" role="4" >
       <narrative>Korea-World Bank Partnership Facility </narrative>
       </participating-org><participating-org ref="TF072701" type="40" role="4" >
       <narrative>Global Water Security and Sanitation Partnership Multi-Donor Trust Fund </narrative>
       </participating-org><participating-org ref="TF072744" type="40" role="4" >
       <narrative>Public Private Infrastructure Advisory Facility (PPIAF) Water and Sanitation in Sub-Saharan Africa Trust fund - Parallel of TF071565 </narrative>
       </participating-org><participating-org ref="TF073236" type="40" role="4" >
       <narrative>Japan-World Bank Program for Mainstreaming Disaster Risk Management in Developing Countries – Second Phase </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF516003" type="10" role="1" >
       <narrative>State Secretariat for Economic Affairs, SECO </narrative>
       </participating-org><participating-org ref="TF521003" type="10" role="1" >
       <narrative>Spain - Ministry of Economy, Industry and Competitiveness </narrative>
       </participating-org><participating-org ref="TF530001" type="10" role="1" >
       <narrative>Austria - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF537001" type="10" role="1" >
       <narrative>Korea - Ministry of Strategy and Finance </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="TF710001" type="60" role="1" >
       <narrative>Rockefeller Foundation </narrative>
       </participating-org><participating-org ref="US-GOV-1" type="10" role="1" >
       <narrative>United States Agency for International Development (USAID) </narrative>
       </participating-org><participating-org ref="XM-DAC-21-1" type="10" role="1" >
       <narrative>Irish Aid, Department of Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2025-12-30"></activity-date><activity-date type="4"  iso-date= "2026-01-15"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Irene Rehberger Bescos</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Water Resources Mgmt. Spec.</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>irehberger@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="KE">     <narrative>KENYA</narrative>
       </recipient-country> <sector code="31110"  vocabulary="1" percentage="22.00">
       <narrative>+![cdata[Agricultural policy and administrative management]]+</narrative>
       </sector> <sector code="31140"  vocabulary="1" percentage="56.00">
       <narrative>+![cdata[Agricultural water resources]]+</narrative>
       </sector> <sector code="74020"  vocabulary="1" percentage="22.00">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2025-12-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">3635818.49 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">150000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072744">
       <narrative>Public Private Infrastructure Advisory Facility (PPIAF) Water and Sanitation in Sub-Saharan Africa Trust fund - Parallel of TF071565</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">216049.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072053">
       <narrative>Korea-World Bank Partnership Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">23235.74  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF073236">
       <narrative>Japan-World Bank Program for Mainstreaming Disaster Risk Management in Developing Countries – Second Phase</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">324062.41  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071044">
       <narrative>Multi Donor Trust Fund for Water Partnership Program</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">32710.53  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3500000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072053">
       <narrative>Korea-World Bank Partnership Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">110000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities -  for September , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072701">
       <narrative>Global Water Security and Sanitation Partnership Multi-Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2022-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-704398.67  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for June , 2022</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072053">
       <narrative>Korea-World Bank Partnership Facility</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2022-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-369.21  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for November , 2022</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072701">
       <narrative>Global Water Security and Sanitation Partnership Multi-Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2022-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-15471.31  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for December , 2022</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF072744">
       <narrative>Public Private Infrastructure Advisory Facility (PPIAF) Water and Sanitation in Sub-Saharan Africa Trust fund - Parallel of TF071565</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1631508.09  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">237028.99  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">13926.03  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">9560.37  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for February , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">41070.20  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for May , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">58476.55  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for August , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">87497.38  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for September , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">109383.22  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for November , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2022-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">296123.09  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for April , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2022-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">311027.41  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for May , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">446290.93  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1927.95  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1206.38  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">421.68  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of January , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1810.82  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of February , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8871.21  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of March , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16914.06  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of April , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of May , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">31081.87  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of May , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">25774.34  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of June , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">172.34  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of August , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2661.31  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">25861.31  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3791.48  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-186.54  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of December , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">33184.15  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of December , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">41945.11  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of January , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">49273.35  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of February , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">34167.96  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of March , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">47854.55  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of April , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1746.84  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of May , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">84083.50  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of June , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-27415.58  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of August , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2022-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-14457.60  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of December , 2022</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5857.44  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of April , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-05-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5611.41  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of May , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2023-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11766.89  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of June , 2023</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P117635">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF072701" type="1"></related-activity><related-activity ref="44000-P117635" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF071044" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF072053" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF072744" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF073236" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of studies completed to advance investment pipeline
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="13.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of sub-catchment management plans developed
</narrative></title> 
<baseline year="2016" iso-date="2016-07-01" value="44.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2016-07-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="59.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of household water connections (new or rehabilitated) in Mombasa supported under the project
</narrative></title> 
<baseline year="2015" iso-date="2015-04-06" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-04-06" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="3700.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of farmers trained in improved agriculture practices (including irrigated agriculture)
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="400.00">


																	</target>

																	<actual value="2478.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of new or upgraded monitoring stations (hydrological, hydro-meteorological and ground water)
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="1.00">


																	</target>

																	<actual value="53.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Six Basin Plans Developed and Adopted
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="6.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of people with increased flood protection
</narrative></title> 
<baseline year="2015" iso-date="2015-04-15" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2015-04-15" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Farmers gaining access to new/improved irrigation and drainage services
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Mombasa water distribution
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="22200.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Capacity building of WRA and other sector institutions
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="516.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Agricultural activities (extension, training and inputs)
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="2478.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Flood Protection
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Irrigation
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="54000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Female beneficiaries
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Percentage of institutions mandated by the Water Act that have been established
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="92.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Project M&amp;E Established and Operational
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="NA"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="Not Established">


																	</target>

																	<actual value="M&amp;E System partially established">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Of which female
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0%"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="0">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Water Act, Sector Policy and Regulations adopted
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="Water Act in draft form with Ministry"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="Water Act submitted to Cabinet">


																	</target>

																	<actual value="The indicator has been achieved. Water Act was ado">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Water Resources Authority (WRA) Established and Operational
</narrative></title> 
<baseline year="2019" iso-date="2019-03-22" value="WRA not established"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2019-03-22" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="WRA established and operational">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Lower Nzoia flood forecasting and early warning system (FFEWS) upgraded and operational
</narrative></title> 
<baseline year="2013" iso-date="2013-03-30" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-03-30" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Lower Nzoia Irrigation Water User Association (LNIWUA) established and operational
</narrative></title> 
<baseline year="2013" iso-date="2013-07-24" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-07-24" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Length of flood protection structures (dykes) constructed/rehabilitated
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="15.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Land area (ha) under sustainable land and water management in Nzoia watershed
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="931.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Area provided with irrigation and drainage services (ha)
</narrative></title> 
<baseline year="2013" iso-date="2013-10-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-10-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T15:49:14"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P130694</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>AFCRI-Nile Cooperation for Results Project</narrative>
       </title>
       <description type="1">
       <narrative>The development objective for the proposed project is to facilitate cooperative water resource management and development in the Nile Basin.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="FR-3" type="15" role="1" >
       <narrative>French Development Agency (Agence Française de Developpement) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="NO-BRC-971277882" type="10" role="1" >
       <narrative>Norwegian Agency for Development Cooperation (NORAD) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF027862" type="40" role="4" >
       <narrative>Nile Basin Initiative Trust Fund </narrative>
       </participating-org><participating-org ref="TF071565" type="40" role="4" >
       <narrative>Public Private Infrastructure Advisory Facility (PPIAF) Water and Sanitation in Sub-Saharan Africa Trust fund </narrative>
       </participating-org><participating-org ref="TF071597" type="40" role="4" >
       <narrative>Cooperation in International Waters in Africa  (CIWA) Multi Donor Trust Fund </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510001" type="10" role="1" >
       <narrative>Netherlands - Ministry for Foreign Trade and Development Cooperation </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="US-GOV-1" type="10" role="1" >
       <narrative>United States Agency for International Development (USAID) </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-02-06"></activity-date><activity-date type="2"  iso-date= "2003-02-06"></activity-date><activity-date type="3"  iso-date= "2022-10-31"></activity-date><activity-date type="4"  iso-date= "2022-11-25"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Lars Anders Jagerskog</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Water Resources Mgmt. Spec.</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>ajagerskog@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="2"></activity-scope> <recipient-region code="289">   <narrative>South of Sahara regional</narrative>
       </recipient-region> <sector code="14010"  vocabulary="1" percentage="16.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="14010"  vocabulary="1" percentage="84.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-02-06"></period-start> 
       <period-end iso-date="2022-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">41524195.19 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1070534.11  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071597">
       <narrative>Cooperation in International Waters in Africa  (CIWA) Multi Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">132543.94  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071565">
       <narrative>Public Private Infrastructure Advisory Facility (PPIAF) Water and Sanitation in Sub-Saharan Africa Trust fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">16469241.56  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">23000000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071597">
       <narrative>Cooperation in International Waters in Africa  (CIWA) Multi Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">849699.80  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF027862">
       <narrative>Nile Basin Initiative Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">150000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities -  for September , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071597">
       <narrative>Cooperation in International Waters in Africa  (CIWA) Multi Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-145866.35  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for October , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071597">
       <narrative>Cooperation in International Waters in Africa  (CIWA) Multi Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1957.87  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for October , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071597">
       <narrative>Cooperation in International Waters in Africa  (CIWA) Multi Donor Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P130694">
       <narrative>South of Sahara, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">39265880.04  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3540.00  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for October , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">142090.00  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-78679.87  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for March , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2021-04-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-9454.96  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements cancellation/Adjustments ) -  for April , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2051111.40  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">33199.28  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of September , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">91289.41  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of October , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">27088.99  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of November , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-12-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1927.42  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of December , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-01-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities ( Cancellation/Adjustments ) -  for the month of January , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">58.32  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of June , 2021</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130694">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF071565" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF027862" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF071597" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Value (USD) of potential investment opportunities for regional water resource management or development advanced under this project
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="3400000000.00">


																	</target>

																	<actual value="6936000000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 3b4: Number of water related investment projects influenced by project
</narrative></title> 
<baseline year="2013" iso-date="2013-03-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-03-01" />  <period-end iso-date="2020-11-30" />
<target value="19.00">


																	</target>

																	<actual value="19.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 1b2: Number of registered users of DSS user community
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="210.00">


																	</target>

																	<actual value="247.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of Nile Basin tools, data and knowledge products of which are public
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="38.00">


																	</target>

																	<actual value="55.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 2b1: NELSAP-CU: Number of investment projects undergoing major study through this project
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="8.00">


																	</target>

																	<actual value="8.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 3a3: ENTRO: Number of website hits to improved ENTRO knowledge products and analytical tools
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="40000.00">


																	</target>

																	<actual value="48563.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 1a2: Nile-SEC: Number of Nile Basin tools, data and knowledge products made available
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="60.00">


																	</target>

																	<actual value="88.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of projected  beneficiaries from work influenced by this project (including investments to be implemented in future)
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="7500000.00">


																	</target>

																	<actual value="9124000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of cooperative decisions whose agreement is facilitated by this project
</narrative></title> 
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2012-07-31" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="74.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of  major national fora for dialogue between key stakeholders facilitated
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="20.00">


																	</target>

																	<actual value="52.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 2a2: NELSAP-CU: Number of knowledge products on priority sub-basin issues disseminated to key stakeholders
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="71.00">


																	</target>

																	<actual value="84.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 2a1: NELSAP-CU: Number of identified investment projects in power and water resource development approved for preparation by NELTAC
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="62.00">


																	</target>

																	<actual value="75.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 1a1: Number of major regional fora for dialogue between key stakeholders facilitated
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="51.00">


																	</target>

																	<actual value="82.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of people trained on trans-boundary issues
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="2600.00">


																	</target>

																	<actual value="3447.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="65000.00">


																	</target>

																	<actual value="71000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Percentage of which includes analysis related to gender
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="100.00">


																	</target>

																	<actual value="88.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Sub-component 3b1: ENTRO: Percentage of trainees who considered that the training will contribute to their work
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="85.00">


																	</target>

																	<actual value="95.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Percentage of key stakeholders who rate NBI services associated with this project to promote regional cooperation as “satisfactory”or higher
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2021-11-30" />
<target value="80.00">


																	</target>

																	<actual value="92.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Percentage of users of publically available NBI tools, data, or analysis associated with this project who rate services as &quot;satisfactory&quot; or higher
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="80.00">


																	</target>

																	<actual value="77.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Female beneficiaries
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="15.00">


																	</target>

																	<actual value="21.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Sub-component 3b3: Technical capacity for dam safety increased in the Eastern Nile
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="195">


																	</target>

																	<actual value="284">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Sub-component 3a2: Availability of real-time information and forecasts for improved flood management in South Sudan
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="None"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="Flood forecasting information available for South ">


																	</target>

																	<actual value="Yes.">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Sub-component 3b2: ENTRO: Dam safety framework and guideline made available
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Sub-component 1b1: Establishment of Water Resources Database at the Water Ministry in  South Sudan
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Sub-component 3a1: ENTRO: Improved Eastern Nile regional flood and drought forecasting system made operational
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2017-04-26" />
<target value="Yes">


																	</target>

																	<actual value="No">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Sub-component 3b5: ENTRO:  hectares of watershed management influenced by ENTRO services
</narrative></title> 
<baseline year="2013" iso-date="2013-01-01" value="185000.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2013-01-01" />  <period-end iso-date="2020-11-30" />
<target value="1824921.00">


																	</target>

																	<actual value="1769921.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity></iati-activities>