<iati-activities version="2.03" generated-datetime="2026-09-30T10:55:04"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:36:40" hierarchy="1"><iati-identifier>44000-P173620</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Western Balkans Trade and Transport Facilitation Phase 2</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Proposed Development Objective is to reduce trade costs and increase transport efficiency in Montenegro]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Trade and transport facilitation are key elements of the Western Balkan countries efforts to deepening economic integration within the region and with the European Union. The TTFP supports coordinated policy actions, and targeted investments in infrastructure, digital solutions, and institutional strengthening that enhance trade and transport performance. It is implemented under a Multiphase Programmatic Approach (MPA) to ensure continuity and scalability across countries and phases. The TTFP Phase 2 for Montenegro supports measures to reduce trade costs by improving trade facilitation systems and enhancing transport efficiency, safety, and sustainability along key corridors and at critical nodes. The project includes a combination of investments, technical assistance and regulatory and institutional reforms and will primarily focus on the following key activities:1. Implementation of a National Single Window (NSW) to digitize and streamline trade procedures across border control agencies; 2. Improvement of railway level crossings (RLCs) to enhance operational safety and efficiency;3. Development of a Port Community System (PCS) to digitalize and streamline port logistics and information exchange among public and private stakeholders;4. Preparation of the National Transport Strategy and relevant sub-sectoral strategies to guide sector development and investment planning; 5. Preparation of supporting by-laws, technical guidelines, and analytical studies to strengthen the policy and regulatory framework for sustainable transport.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0045027"><narrative>Montenegro</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0045027"><narrative>Montenegro</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0045027"><narrative>Montenegro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7B-COA-0045028"><narrative>Montenegro Ministry of Transport</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-10-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-12-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Erik Nora</narrative></person-name><telephone>+1-202-473-1000</telephone><email>enora@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-region code="89" percentage="100" vocabulary="1"><narrative xml:lang="en">Europe, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003194884" />
            <name><narrative>Montenegro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.708678 19.37439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="33110" percentage="84" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000143" percentage="39" xml:lang="en"><narrative>Trade Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="17" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="45" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="16" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="45" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000142" percentage="51" xml:lang="en"><narrative>Trade Logistics</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="26" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="45" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="90" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="6" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="45" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="48" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="48" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="38" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="16" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="1" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="38" xml:lang="en"><narrative>ICT Solutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">675000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">13625745.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">13625745.23</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">15000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">38208</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1083500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">252547</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-38208</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-33372</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-38177</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-40732</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-39171</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-37857</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-45028"><narrative>Montenegro Ministry of Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173620"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173620?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173620"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of IT systems upgraded at the Port of Bar
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="2.00">
<comment><narrative>
The indicator will monitor the number of processes that have been digitalized
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time required to complete all transit formalities at the Port of Bar
</narrative></title>
<baseline year="2021" iso-date="2021-12-01" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-01" />
<period-end iso-date="2028-12-15" />
<target value="51.00">
<comment><narrative>
Total average time required to complete all transit formalities at the Port of Bar
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Rail Level Crossings improved for safety and efficiency
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="5.00">
<comment><narrative>
Added scope through additional financing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to export
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-12-15" />
<target value="5.50">
<comment><narrative>
average time to export
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female students and graduates recruited in 3 to 6 month paid internship programs in technical areas
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="4.00">
<comment><narrative>
Female students and graduates recruited in 6 month internship program in RCA, Port of Bar, and the Railway Infrastructure Company in the areas of IT, engineering, transport, logistics, and similar high-skilled technical roles
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improving capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of technical guideline for integrating climate resilience and mitigation considerations in the design, construction and maintenance of roads
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
The technical guidelines will be included under sub-component 2.3.4 Preparation of technical guidelines for the design, construction and maintenance of roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female customs inspectors recruited in the Revenue and Customs Agency
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="5.00">
<comment><narrative>
Female customs officials recruited in the Revenue and Customs Agency to work in the areas of inspection and risk management
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Montenegro
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="32,239,700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-12-15" />
<target value="29,015,731.00">

</target>
<actual value="32,239,700.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female customs officials recruited at managerial level in Revenue and Customs Agency
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="2.00">
<comment><narrative>
Female customs staff recruited at mid-managerial level within the Revenue and Customs Agency
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to import
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-12-15" />
<target value="11.00">
<comment><narrative>
Average time to import
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stakeholders reporting that the design/blueprint of the NWS is aligned with their needs and their contributions in the planning process (citizen engagement)
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Transport Strategy updated to include an action plan for decarbonizing the transport sector
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2018" iso-date="2018-10-01" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-01" />
<period-end iso-date="2028-12-15" />
<target value="28.00">
<comment><narrative>
Cost to export
</narrative></comment>
</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="183.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-12-15" />
<target value="165.00">
<comment><narrative>
Cost to import
</narrative></comment>
</target>
<actual value="183.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2028-04-15" />
<target value="221,052">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2028-04-15" />
<target value="221,052">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Montenegro
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="32,239,700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="29,015,731.00">

</target>
<actual value="32,239,700.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Montenegro
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="32,239,700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="29,015,731.00">

</target>
<actual value="32,239,700.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Montenegro
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="32,239,700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-12-15" />
<target value="29,015,731.00">

</target>
<actual value="32,239,700.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2018" iso-date="2018-10-01" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-01" />
<period-end iso-date="2028-04-15" />
<target value="28.00">
<comment><narrative>
Cost to export
</narrative></comment>
</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2018" iso-date="2018-10-01" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-01" />
<period-end iso-date="2028-04-15" />
<target value="28.00">
<comment><narrative>
Cost to export
</narrative></comment>
</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2018" iso-date="2018-10-01" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-01" />
<period-end iso-date="2028-12-15" />
<target value="28.00">
<comment><narrative>
Cost to export
</narrative></comment>
</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="183.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="165.00">
<comment><narrative>
Cost to import
</narrative></comment>
</target>
<actual value="183.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="183.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="165.00">
<comment><narrative>
Cost to import
</narrative></comment>
</target>
<actual value="183.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="183.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-12-15" />
<target value="165.00">
<comment><narrative>
Cost to import
</narrative></comment>
</target>
<actual value="183.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average container import dwell time at Ports
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="4.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2028-04-15" />
<target value="3.9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average container import dwell time at Ports
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="4.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2028-04-15" />
<target value="3.9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time required to complete all transit formalities at the Port of Bar
</narrative></title>
<baseline year="2021" iso-date="2021-12-01" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-01" />
<period-end iso-date="2028-12-15" />
<target value="51.00">
<comment><narrative>
Total average time required to complete all transit formalities at the Port of Bar
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Rail Level Crossings improved for safety and efficiency
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2028-04-15" />
<target value="22.00">
<comment><narrative>
Added scope through additional financing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Rail Level Crossings improved for safety and efficiency
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2028-04-15" />
<target value="22.00">
<comment><narrative>
Added scope through additional financing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improving capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improving capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to import
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="11.00">
<comment><narrative>
Average time to import
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to import
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="11.00">
<comment><narrative>
Average time to import
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public and private stakeholders integrated into the PCS
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2028-04-15" />
<target value="7.00">
<comment><narrative>
The indicator will monitor the number of processes that have been digitalized
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public and private stakeholders integrated into the PCS
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2028-04-15" />
<target value="7.00">
<comment><narrative>
The indicator will monitor the number of processes that have been digitalized
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to export
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="5.50">
<comment><narrative>
average time to export
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to export
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2028-04-15" />
<target value="5.50">
<comment><narrative>
average time to export
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Transport Strategy updated to include an action plan for decarbonizing the transport sector
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Transport Strategy updated to include an action plan for decarbonizing the transport sector
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms that benefit from reformed custom/border services
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms that benefit from reformed custom/border services
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of technical guideline for integrating climate resilience and mitigation considerations in the design, construction and maintenance of roads
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="Yes">
<comment><narrative>
The technical guidelines will be included under sub-component 2.3.4 Preparation of technical guidelines for the design, construction and maintenance of roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of technical guideline for integrating climate resilience and mitigation considerations in the design, construction and maintenance of roads
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="Yes">
<comment><narrative>
The technical guidelines will be included under sub-component 2.3.4 Preparation of technical guidelines for the design, construction and maintenance of roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stakeholders reporting that the design/blueprint of the NSW is aligned with their needs and their contributions in the planning process (citizen engagement)
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2028-04-15" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stakeholders reporting that the design/blueprint of the NSW is aligned with their needs and their contributions in the planning process (citizen engagement)
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2028-04-15" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female customs officials recruited at managerial level in Revenue and Customs Agency
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="2.00">
<comment><narrative>
Female customs staff recruited at mid-managerial level within the Revenue and Customs Agency
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female customs officials recruited at managerial level in Revenue and Customs Agency
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="2.00">
<comment><narrative>
Female customs staff recruited at mid-managerial level within the Revenue and Customs Agency
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female students and graduates recruited in 3 to 6 month paid internship programs in technical areas
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="10.00">
<comment><narrative>
Female students and graduates recruited in 6 month internship program in RCA, Port of Bar, and the Railway Infrastructure Company in the areas of IT, engineering, transport, logistics, and similar high-skilled technical roles
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female students and graduates recruited in 3 to 6 month paid internship programs in technical areas
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="10.00">
<comment><narrative>
Female students and graduates recruited in 6 month internship program in RCA, Port of Bar, and the Railway Infrastructure Company in the areas of IT, engineering, transport, logistics, and similar high-skilled technical roles
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms that benefit from reformed custom/border services
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female customs inspectors recruited in the Revenue and Customs Agency
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="5.00">
<comment><narrative>
Female customs officials recruited in the Revenue and Customs Agency to work in the areas of inspection and risk management
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female customs inspectors recruited in the Revenue and Customs Agency
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-04-15" />
<target value="5.00">
<comment><narrative>
Female customs officials recruited in the Revenue and Customs Agency to work in the areas of inspection and risk management
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:36:40" hierarchy="1"><iati-identifier>44000-P110910</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>South East Europe and Caucasus Catastrophe Risk Insurance Facility (Serbia and Macedonia)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program and Project Development Objective is to help increase access of homeowners, farmers, the enterprise sector, and government agencies to financial protection from losses caused by climate change and geological hazards.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the South East Europe and Caucasus Catastrophe Risk Insurance Facility Project for Europe and Central Asia is to help increase access of homeowners, farmers, the enterprise sector, and government agencies to financial protection from losses caused by climate change and geological hazards. There are two components to the project, the first component being participation in the Southeast Europe and the Caucasus (SEEC) Catastrophe Risk Insurance Facility (CRIF). The program will support Southeast Europe and Caucasus (SEEC) countries' efforts to join Europa Reinsurance Facility, Ltd. (Europa Re) by financing their membership contributions to the Facility. Europa Re, in turn, will facilitate the growth of catastrophe risk insurance markets in member countries. During the program's first phase (this project) the component will be financed by International Bank for Reconstruction and Development (IBRD) loans to FYR Macedonia and Serbia. During the program's second phase, this component will be financed by International Development Association (IDA) credits to Bosnia and Herzegovina and Georgia and an IBRD loan to Montenegro. Finally, the second component is the technical assistance. This component, financed by donor funds and implemented by Europa Re, includes: (i) risk mapping and modeling for participating countries; (ii) design and pricing of appropriate catastrophe risk insurance products; (iii) small weather monitoring stations to support parametric weather insurance; and (iv) technical assistance for regulatory and policy reforms to create an enabling market environment.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0002208"><narrative>Ministry of Economy</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0002208"><narrative>Ministry of Economy</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0002209"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0002209"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7B-COA-0002210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-11-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-03-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jose C. Joaquin Toro Landivar</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-region code="89" percentage="100" vocabulary="1"><narrative xml:lang="en">Europe, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006290252" />
            <name><narrative>Serbia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.81892 20.45998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783754" />
            <name><narrative>Republic of Albania</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41 20</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000718075" />
            <name><narrative>Republic of Macedonia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.666672 21.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="8" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="25" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000031" percentage="25" xml:lang="en"><narrative>Financial Stability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="20" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="24" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="100" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="8" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="100" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000311" percentage="25" xml:lang="en"><narrative>Financial Sector oversight and policy/banking regulation &amp; restructuring</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="120" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="8" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="8" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="24" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="120" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="8" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="20" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">5000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">5000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">5000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">2812500</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">2187500</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-12500</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-21311</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-12500</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-7486</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-34058</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-25139</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-28058</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-20189</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-25671</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-18351</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-23761</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-17633</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-23383</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-18351</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-23761</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-21467</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-26433</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-26542</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-34313</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-35267</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-39142</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-44496</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-48028</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-49264</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-51342</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-51372</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-59656</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-71552</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-75871</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-68764</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-51532</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-25345</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-16017</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-15052</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-14853</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-50547</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-83740</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-92489</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-91347</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-85815</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-68415</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-64382</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-52269</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-5000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-156500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-2210"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-2211"><narrative>Europa Reinsurance Facility, Ltd.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110910"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P110910?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110910"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CRIF Capital Amount
</narrative></title>
<baseline year="2011" iso-date="2011-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-03" />
<period-end iso-date="2015-12-31" />
<target value="12000000.00">

</target>
<actual value="9900000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of countries that implement the minimum regulatory and policy framework required for CRIF.
</narrative></title>
<baseline year="2011" iso-date="2011-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-03" />
<period-end iso-date="2015-12-31" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Grant Funding Mobilized.
</narrative></title>
<baseline year="2011" iso-date="2011-03-03" value="4500000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-03" />
<period-end iso-date="2013-12-31" />
<target value="12000000.00">

</target>
<actual value="11500000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in catastrophe insurance penetration
</narrative></title>
<baseline year="2011" iso-date="2011-03-03" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-03" />
<period-end iso-date="2015-12-31" />
<target value="15.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in catastrophe insurance penetration
</narrative></title>
<baseline year="2011" iso-date="2011-03-03" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-03" />
<period-end iso-date="2015-12-31" />
<target value="15.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fulfillment of technical preconditions for launch of products (per country)
</narrative></title>
<baseline year="2011" iso-date="2011-03-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-03" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:36:40" hierarchy="1"><iati-identifier>44000-P168862</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sava and Drina Rivers Corridors Integrated Development Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Objective of the Project (Phase I of the Program) is to improve flood protection and enhance transboundary water cooperation in the Sava and Drina Rivers Corridors.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the First Phase of the Sava and Drina Rivers Corridors Integrated Development Program Project for Bosnia and Herzegovina, Montenegro, and Serbia is to improve flood protection and enhance transboundary water cooperation in the Sava and Drina rivers corridors. The project comprises of four components. The first component, integrated management and development of the Sava river corridor will finance investments in renovation and upgrading of flood protection infrastructures to address the increasing risk of flooding due to climate change. It consists of following sub-components: (i) flood protection and environmental management; (ii) waterway improvements; and (iii) enhancement of ports facilities, services, and logistics. The second component, integrated management and development of the Drina river corridor will support multipurpose investments along the Drina to reduce the risk and potential impact of floods. It consists of following sub-components: (i) flood protection and environmental management; and (ii) integrated development of Drina watershed. The third component, project preparation and management will support: (a) preparation of phase II regional activities, and (b) operational costs, consultancies, non-consultancy services, and goods required for the establishment and operation of the national and entity project implementation units (PIUs). It consists of following sub-components: (i) project preparation; and (ii) institutional strengthening and project management. The fourth component, regional activities is key to strengthening of strategic regional dialogue and joint planning as well as sustainable management and development of the shared water resources in the Sava and Drina river basin, including building resilience to climatic shocks. It consists of following sub-components: (i) regional dialogue, project management, and coordination; and (ii) regional plans, studies, and strategies of basin-wide importance.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0039204"><narrative>Republic of Serbia Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0039204"><narrative>Republic of Serbia Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0039205"><narrative>Bosnia and Herzegovina Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0039205"><narrative>Bosnia and Herzegovina Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7B-COA-00011738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2019-11-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-08-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Martin Benedikt Albrecht</narrative></person-name><telephone>+1-202-473-1000</telephone><email>malbrecht@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





















<recipient-region code="89" percentage="100" vocabulary="1"><narrative xml:lang="en">Europe, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000787607" />
            <name><narrative>Novi Beograd</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.80556 20.42417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000792680" />
            <name><narrative>Belgrade</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.80401 20.46513</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003186886" />
            <name><narrative>Zagreb</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>45.81444 15.97798</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003194884" />
            <name><narrative>Montenegro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.75 19.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003202326" />
            <name><narrative>Republic of Croatia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>45.16667 15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003277605" />
            <name><narrative>Bosnia and Herzegovina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.25 17.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006290252" />
            <name><narrative>Serbia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.81892 20.45998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007581798" />
            <name><narrative>Kolubara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.26333 19.8875</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003203645" />
            <name><narrative>Šamac</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>45.05987 18.46756</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003196359" />
            <name><narrative>Ljubljana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>46.05108 14.50513</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003192409" />
            <name><narrative>Prijedor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.97991 16.71401</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003191281" />
            <name><narrative>Sarajevo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>43.84864 18.35644</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003190538" />
            <name><narrative>Republic of Slovenia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>46.08333 15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003188582" />
            <name><narrative>Tuzla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.53842 18.66709</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003186573" />
            <name><narrative>Zenica</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.20169 17.90397</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003243503" />
            <name><narrative>Popova Bara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>45.49444 18.80056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003276248" />
            <name><narrative>Jarak</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>45.24056 15.95972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21040" percentage="28" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="28" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="27" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="17" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="52.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="100" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000142" percentage="83" xml:lang="en"><narrative>Trade Logistics</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="31" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="31" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="3" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="83" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="100" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="83" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="83" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="83" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="83" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="31" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">657500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2091666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2091666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2321666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2321666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1257500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">657500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">586675.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">4637800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">11549500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">114739.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">661377.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">542100.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">48647381.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">48647381.67</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">85000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">32600000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">16300000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">40530000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">45518</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">586675</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">91174</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">231042</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">4637800</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">11549500</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">114740</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">661377</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">542100</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">441561</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">674485</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">2035194</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">0</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">112489</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">407236</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">99354</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">2650152</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">936605</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">1796697</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">5201409</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">898567</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">8216871</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1329615</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">2084700</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">291029</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">684034</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">1037500</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">271988</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">1100358</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">241235</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">931687</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">2344016</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">509822</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">595720</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">980405</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">285988</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">259367</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">2754913</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">4456963</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">998410</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">7711622</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">293400</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">257976</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">666146</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">728795</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">430519</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">436681</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">757702</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1681500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">0</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">8847383</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">352598</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-45518</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-91174</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-28586</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-231042</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-64820</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-92603</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-22301</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-80691</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-95591</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-19922</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-74538</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-132410</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-25561</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-86444</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-266827</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-34357</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-100737</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-357600</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-37258</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-148466</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-99354</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-342971</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-49487</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-48251</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-229474</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-309233</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-79316</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-50896</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-387048</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-440673</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-117481</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-128310</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-465577</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-397811</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-167576</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-115572</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-625257</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-422483</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-652293</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-636178</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-623719</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-96999</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1276928</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-180618</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1902939</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-267674</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1880507</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-11738"><narrative>Bosnia and Herzegovina Ministry of Communication and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39206"><narrative>Republic of Serbia Ministry of Agriculture, Forestry and Water Management</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39207"><narrative>Montenegro Ministry of Agriculture, Forestry and Water Management </narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39208"><narrative>Republika Srpska Ministry of Agriculture, Forestry and Water</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39209"><narrative>Republic of Serbia Ministry of Construction, Transport and Infrastructure</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-39210"><narrative>International Sava River Basin Commission</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56016"><narrative>FBiH Ministry of Agriculture, Water Management and Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-56017"><narrative>Brcko District</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168862"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P168862?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168862"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced monitoring/ data sharing protocols and schedules developed
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in development of data sharing protocols/schedules which are harmonized and agreed among the riparian countries/entities.

Several activities under Component 4 contribute to this indicator. Preparation is ongoing and the procurement process is expected to be launched soon.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by improved solid waste management
</narrative></title>
<baseline year="2023" iso-date="2023-07-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-06" />
<period-end iso-date="2026-07-30" />
<target value="31.50">
<comment><narrative>
Activities contributing to this indicator are under preparation, but have not yet been launched.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Freight throughput at the Sava river port of Sremska Mitrovica in Serbia
</narrative></title>
<baseline year="2020" iso-date="2020-03-02" value="234,465.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-02" />
<period-end iso-date="2026-01-30" />
<target value="300,000.00">
<comment><narrative>
Total tonnage throughput, inbound and outbound, handled at the port per year.&amp;nbsp;
</narrative></comment>
</target>
<actual value="234,465.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of embankments or dykes constructed or rehabilitated
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2027-11-15" />
<target value="30.00">
<comment><narrative>
This indicator measures the progress in construction or rehabilitation of the embankments or dykes at selected priority areas under the project.

Several contracts for embankment rehabilitation are currently under implementation across the project, but progress is still limited as some of the contractors have only recently mobilized and are therefore in the early phase of works, where work sites are being prepared and cleared, and cannot be classified as &amp;quot;rehabilitated&amp;quot; as per this indicator. Progress is ongoing, though.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator. Progress is reported for Republika Sprska.
</narrative></comment>
</target>
<actual value="16.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Priority regional investments prepared
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="5.00">
<comment><narrative>
This indicator measures the number of priority regional investments prepared for implementation under Phase II.&amp;nbsp;

The procurement process for preparation of technical documentation for several (3)&amp;nbsp;priority investments is ongoing, the works of which are to be financed under Phase II of SDIP. Others are at an idea stage to be discussed with the World Bank.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Priority regional investments prepared
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="5.00">
<comment><narrative>
This indicator measures the number of priority regional investments prepared for implementation under Phase II.&amp;nbsp;

The procurement process for preparation of technical documentation for several (3)&amp;nbsp;priority investments is ongoing, the works of which are to be financed under Phase II of SDIP. Others are at an idea stage to be discussed with the World Bank.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by improved solid waste management
</narrative></title>
<baseline year="2023" iso-date="2023-07-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-06" />
<period-end iso-date="2027-11-15" />
<target value="31.50">
<comment><narrative>
Activities contributing to this indicator are under preparation, but have not yet been launched.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of embankments or dykes constructed or rehabilitated
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2027-11-15" />
<target value="30.00">
<comment><narrative>
This indicator measures the progress in construction or rehabilitation of the embankments or dykes at selected priority areas under the project.

Several contracts for embankment rehabilitation are currently under implementation across the project, but progress is still limited as some of the contractors have only recently mobilized and are therefore in the early phase of works, where work sites are being prepared and cleared, and cannot be classified as &amp;quot;rehabilitated&amp;quot; as per this indicator. Progress is ongoing, though.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator. Progress is reported for Republika Sprska.
</narrative></comment>
</target>
<actual value="16.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Freight throughput at the Sava river port of Sremska Mitrovica in Serbia
</narrative></title>
<baseline year="2020" iso-date="2020-03-02" value="234,465.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-02" />
<period-end iso-date="2026-01-30" />
<target value="300,000.00">
<comment><narrative>
Total tonnage throughput, inbound and outbound, handled at the port per year.&amp;nbsp;
</narrative></comment>
</target>
<actual value="234,465.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waterway improved through demining
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2027-11-15" />
<target value="40.00">
<comment><narrative>
This indicator measures the length of waterway improved through demining activities to remove bottlenecks to navigation.&amp;nbsp;

The funding for this activity has recently been approved, and awaiting for ratification from Government. The demining works are under preparation in coordination with relevant local stakeholders.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual multi-national stakeholder workshops held
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="12.00">
<comment><narrative>
This indicator measures the progress towards trust building and improved governance among riparian countries, to highlight ongoing achievements of the project and build support for longer-term objectives.

Two multi-national workshop were held to date in May 2024and October 2024, in addittion to the
67th Session of the ISRBC (October 28, 2024, in BiH). Others are planned for the remainder of project implementation.&amp;nbsp;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual multi-national stakeholder workshops held
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-01-30" />
<target value="12.00">
<comment><narrative>
This indicator measures the progress towards trust building and improved governance among riparian countries, to highlight ongoing achievements of the project and build support for longer-term objectives.

Two multi-national workshop were held to date in May 2024and October 2024, in addittion to the
67th Session of the ISRBC (October 28, 2024, in BiH). Others are planned for the remainder of project implementation.&amp;nbsp;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="140,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="59771">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced monitoring/ data sharing protocols and schedules developed (Yes/No)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholders consulted (of which female) and engaged during planning and preparation of project interventions
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="1,200.00">
<comment><narrative>
This indicator will measure the level of citizen engagement through consultation in planning and preparation of project interventions

Citizen Engagement reporting: As part of the planning and preparation of various works to be carried out under the project, an estimate of 314 citizens have been consulted in the planning stage, considering both Rpa Sprska and Montenegro.&amp;nbsp;As preparation of further works continues, stakeholder consultations will be carried out as part of the applicable World Bank environmental and social standards.
</narrative></comment>
</target>
<actual value="500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waterway improved through demining
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="40.00">
<comment><narrative>
This indicator measures the length of waterway improved through demining activities to remove bottlenecks to navigation.&amp;nbsp;

The funding for this activity has recently been approved, and awaiting for ratification from Government. The demining works are under preparation in coordination with relevant local stakeholders.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced monitoring/ data sharing protocols and schedules developed
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in development of data sharing protocols/schedules which are harmonized and agreed among the riparian countries/entities.

Several activities under Component 4 contribute to this indicator. Preparation is ongoing and the procurement process is expected to be launched soon.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="165,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances responded and resolved within an agreed time frame
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="85.00">
<comment><narrative>
This indicator measures the efficiency of the GRM management by the PIUs. This is a beneficiary feedback indicator that responds to the Bank&amp;rsquo;s Citizen Engagement commitment.&amp;nbsp;

Citizen Engagement (CE) reporting: This indicator currently stands at 100% in Rpa Sprska and 75% in Montenegro.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waterway improved through demining
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2027-11-15" />
<target value="40.00">
<comment><narrative>
This indicator measures the length of waterway improved through demining activities to remove bottlenecks to navigation.&amp;nbsp;

The funding for this activity has recently been approved, and awaiting for ratification from Government. The demining works are under preparation in coordination with relevant local stakeholders.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholders consulted (of which female) and engaged during planning and preparation of project interventions
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="1,200.00">
<comment><narrative>
This indicator will measure the level of citizen engagement through consultation in planning and preparation of project interventions

Citizen Engagement reporting: As part of the planning and preparation of various works to be carried out under the project, an estimate of 314 citizens have been consulted in the planning stage, considering both Rpa Sprska and Montenegro.&amp;nbsp;As preparation of further works continues, stakeholder consultations will be carried out as part of the applicable World Bank environmental and social standards.
</narrative></comment>
</target>
<actual value="314.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-15" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="139050">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Flood monitoring and forecasting system upgraded in a participatory manner, publicly disclosed and adjusted based on citizen engagement
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in upgrading the Flood monitoring and forecasting system in a participatory manner that actively engages stakeholders not only in the formulation but in providing feedback on the system, and that will therefore provide timely, accurate and user-friendly flood forecasting. The level and quality of participation will be measured through beneficiary assessments to be undertaken during project implementation at mid-term and again prior to project closure.

Citizen Engagement (CE) reporting: The procurement process for the flood and drought monitoring and warning system has recently been launched and the contract is estimated to be awarded before the end of 2024. A first round of CE stakeholder consultations were carried out during the elaboration of the TOR for this activity with individual member countries of the ISRBC. Further CE consultations are planned as part of the implementation of the activity over the coming 18-24 months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholders consulted (of which female) and engaged during planning and preparation of project interventions
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="1,200.00">
<comment><narrative>
This indicator will measure the level of citizen engagement through consultation in planning and preparation of project interventions

Citizen Engagement reporting: As part of the planning and preparation of various works to be carried out under the project, an estimate of 314 citizens have been consulted in the planning stage, considering both Rpa Sprska and Montenegro.&amp;nbsp;As preparation of further works continues, stakeholder consultations will be carried out as part of the applicable World Bank environmental and social standards.
</narrative></comment>
</target>
<actual value="314.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Priority regional investments prepared
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="5.00">
<comment><narrative>
This indicator measures the number of priority regional investments prepared for implementation under Phase II.&amp;nbsp;

The procurement process for preparation of technical documentation for several (3)&amp;nbsp;priority investments is ongoing, the works of which are to be financed under Phase II of SDIP. Others are at an idea stage to be discussed with the World Bank.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances responded and resolved within an agreed time frame
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="85.00">
<comment><narrative>
This indicator measures the efficiency of the GRM management by the PIUs. This is a beneficiary feedback indicator that responds to the Bank&amp;rsquo;s Citizen Engagement commitment.&amp;nbsp;

Citizen Engagement (CE) reporting: This indicator currently stands at 100% in Rpa Sprska and 75% in Montenegro.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Flood monitoring and forecasting system upgraded in a participatory manner, publicly disclosed and adjusted based on citizen engagement
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in upgrading the Flood monitoring and forecasting system in a participatory manner that actively engages stakeholders not only in the formulation but in providing feedback on the system, and that will therefore provide timely, accurate and user-friendly flood forecasting. The level and quality of participation will be measured through beneficiary assessments to be undertaken during project implementation at mid-term and again prior to project closure.

Citizen Engagement (CE) reporting: The procurement process for the flood and drought monitoring and warning system has recently been launched and the contract is estimated to be awarded before the end of 2024. A first round of CE stakeholder consultations were carried out during the elaboration of the TOR for this activity with individual member countries of the ISRBC. Further CE consultations are planned as part of the implementation of the activity over the coming 18-24 months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of embankments or dykes constructed or rehabilitated
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="30.00">
<comment><narrative>
This indicator measures the progress in construction or rehabilitation of the embankments or dykes at selected priority areas under the project.

Several contracts for embankment rehabilitation are currently under implementation across the project, but progress is still limited as some of the contractors have only recently mobilized and are therefore in the early phase of works, where work sites are being prepared and cleared, and cannot be classified as &amp;quot;rehabilitated&amp;quot; as per this indicator. Progress is ongoing, though.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator. Progress is reported for Republika Sprska.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="140,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="59771">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-15" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="139050">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-15" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="139050">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="165,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="140,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="59771">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="165,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Waterway improved through demining
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="40.00">
<comment><narrative>
This indicator measures the length of waterway improved through demining activities to remove bottlenecks to navigation.&amp;nbsp;

The funding for this activity has recently been approved, and awaiting for ratification from Government. The demining works are under preparation in coordination with relevant local stakeholders.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="140,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="59771">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Priority regional investments prepared
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="5.00">
<comment><narrative>
This indicator measures the number of priority regional investments prepared for implementation under Phase II.&amp;nbsp;

The procurement process for preparation of technical documentation for several (3)&amp;nbsp;priority investments is ongoing, the works of which are to be financed under Phase II of SDIP. Others are at an idea stage to be discussed with the World Bank.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Flood monitoring and forecasting system upgraded in a participatory manner, publicly disclosed and adjusted based on citizen engagement
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in upgrading the Flood monitoring and forecasting system in a participatory manner that actively engages stakeholders not only in the formulation but in providing feedback on the system, and that will therefore provide timely, accurate and user-friendly flood forecasting. The level and quality of participation will be measured through beneficiary assessments to be undertaken during project implementation at mid-term and again prior to project closure.

Citizen Engagement (CE) reporting: The procurement process for the flood and drought monitoring and warning system has recently been launched and the contract is estimated to be awarded before the end of 2024. A first round of CE stakeholder consultations were carried out during the elaboration of the TOR for this activity with individual member countries of the ISRBC. Further CE consultations are planned as part of the implementation of the activity over the coming 18-24 months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances responded and resolved within an agreed time frame
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2027-11-15" />
<target value="85.00">
<comment><narrative>
This indicator measures the efficiency of the GRM management by the PIUs. This is a beneficiary feedback indicator that responds to the Bank&amp;rsquo;s Citizen Engagement commitment.&amp;nbsp;

Citizen Engagement (CE) reporting: This indicator currently stands at 100% in Rpa Sprska and 75% in Montenegro.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced monitoring/ data sharing protocols and schedules developed
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in development of data sharing protocols/schedules which are harmonized and agreed among the riparian countries/entities.

Several activities under Component 4 contribute to this indicator. Preparation is ongoing and the procurement process is expected to be launched soon.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual multi-national stakeholder workshops held
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-01-30" />
<target value="12.00">
<comment><narrative>
This indicator measures the progress towards trust building and improved governance among riparian countries, to highlight ongoing achievements of the project and build support for longer-term objectives.

Two multi-national workshop were held to date in May 2024and October 2024, in addittion to the
67th Session of the ISRBC (October 28, 2024, in BiH). Others are planned for the remainder of project implementation.&amp;nbsp;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced monitoring/ data sharing protocols and schedules developed
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in development of data sharing protocols/schedules which are harmonized and agreed among the riparian countries/entities.

Several activities under Component 4 contribute to this indicator. Preparation is ongoing and the procurement process is expected to be launched soon.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by improved solid waste management
</narrative></title>
<baseline year="2023" iso-date="2023-07-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-06" />
<period-end iso-date="2027-11-15" />
<target value="31.50">
<comment><narrative>
Activities contributing to this indicator are under preparation, but have not yet been launched.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of embankments or dykes constructed or rehabilitated
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="30.00">
<comment><narrative>
This indicator measures the progress in construction or rehabilitation of the embankments or dykes at selected priority areas under the project.

Several contracts for embankment rehabilitation are currently under implementation across the project, but progress is still limited as some of the contractors have only recently mobilized and are therefore in the early phase of works, where work sites are being prepared and cleared, and cannot be classified as &amp;quot;rehabilitated&amp;quot; as per this indicator. Progress is ongoing, though.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator. Progress is reported for Republika Sprska.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional tourism master plan for the Sava and Drina Corridor that includes the establishment of a forum for women-headed SMEs is developed and endorsed..
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator monitors the development and endorsement of Master Plans for Nautical tourism and Ecotourism, including the establishment of a forum for women-headed SMEs to ensure their participation in the development of these plans.

The procurement process for the consultancy to elaborate this master plan has recently been launched and is expected to be awarded in the coming months.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
River basin management plan reflecting integrated measures updated and endorsed by countries
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in updating of the River Basin Management Plan to support integrated water resources management and subsequently endorsed by the countries.

The updated Sava River Basin Management Plan reflecting integrated measures was approved and endorsed by countries on the 9th Meeting of the Parties (MoP) to the FASRB, held in Zagreb, Republic of Croatia on December 9, 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual multi-national stakeholder workshops held
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="12.00">
<comment><narrative>
This indicator measures the progress towards trust building and improved governance among riparian countries, to highlight ongoing achievements of the project and build support for longer-term objectives.

Two multi-national workshop were held to date in May 2024and October 2024, in addittion to the
67th Session of the ISRBC (October 28, 2024, in BiH). Others are planned for the remainder of project implementation.&amp;nbsp;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by flood risk mitigation measures under the project
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="165,000.00">
<comment><narrative>
This indicator measures the area under reduced risk from adverse flooding (i.e. 1 in 100-year flood event) due to improved infrastructure supported under the project.

Several contracts for river regulation, embankment rehabilitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected by improved solid waste management
</narrative></title>
<baseline year="2023" iso-date="2023-07-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-06" />
<period-end iso-date="2026-07-30" />
<target value="31.50">
<comment><narrative>
Activities contributing to this indicator are under preparation, but have not yet been launched.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Flood monitoring and forecasting system upgraded in a participatory manner, publicly disclosed and adjusted based on citizen engagement
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in upgrading the Flood monitoring and forecasting system in a participatory manner that actively engages stakeholders not only in the formulation but in providing feedback on the system, and that will therefore provide timely, accurate and user-friendly flood forecasting. The level and quality of participation will be measured through beneficiary assessments to be undertaken during project implementation at mid-term and again prior to project closure.

Citizen Engagement (CE) reporting: The procurement process for the flood and drought monitoring and warning system has recently been launched and the contract is estimated to be awarded before the end of 2024. A first round of CE stakeholder consultations were carried out during the elaboration of the TOR for this activity with individual member countries of the ISRBC. Further CE consultations are planned as part of the implementation of the activity over the coming 18-24 months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional tourism master plan for the Sava and Drina Corridor that includes the establishment of a forum for women-headed SMEs is developed and endorsed..
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional tourism master plan for the Sava and Drina Corridor that includes the establishment of a forum for women-headed SMEs is developed and endorsed..
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2026-07-30" />
<target value="Yes">
<comment><narrative>
This indicator monitors the development and endorsement of Master Plans for Nautical tourism and Ecotourism, including the establishment of a forum for women-headed SMEs to ensure their participation in the development of these plans.

The procurement process for the consultancy to elaborate this master plan has recently been launched and is expected to be awarded in the coming months.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-15" />
<target value="270,000.00">
<comment><narrative>
This indicator measures the number of people who face reduced flooding risk and are protected against 1 in 100 years flood event due to improved infrastructure supported under the project.&amp;nbsp;

Several contracts for river regulation, embankment rehabiitation, etc. are awarded and works are ongoing. However, the current status of the indicator is still 0, since it requires a minimum progress of works to be able to define an area (and a number of people) as &amp;quot;protected&amp;quot; from floods.&amp;nbsp;

Civil works are advancing in Republika Sprska, Serbia and Montenegro that will contribute to this indicator.
</narrative></comment>
</target>
<actual value="139050">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional tourism master plan for the Sava and Drina Corridor that includes the establishment of a forum for women-headed SMEs is developed and endorsed..
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances responded and resolved within an agreed time frame
</narrative></title>
<baseline year="2020" iso-date="2020-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-31" />
<period-end iso-date="2027-11-15" />
<target value="85.00">
<comment><narrative>
This indicator measures the efficiency of the GRM management by the PIUs. This is a beneficiary feedback indicator that responds to the Bank&amp;rsquo;s Citizen Engagement commitment.&amp;nbsp;

Citizen Engagement (CE) reporting: This indicator currently stands at 100% in Rpa Sprska and 75% in Montenegro.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholders consulted (of which female) and engaged during planning and preparation of project interventions
</narrative></title>
<baseline year="2020" iso-date="2020-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-14" />
<period-end iso-date="2027-11-14" />
<target value="1,200.00">
<comment><narrative>
This indicator will measure the level of citizen engagement through consultation in planning and preparation of project interventions

Citizen Engagement reporting: As part of the planning and preparation of various works to be carried out under the project, an estimate of 314 citizens have been consulted in the planning stage, considering both Rpa Sprska and Montenegro.&amp;nbsp;As preparation of further works continues, stakeholder consultations will be carried out as part of the applicable World Bank environmental and social standards.
</narrative></comment>
</target>
<actual value="500">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:36:40" hierarchy="1"><iati-identifier>44000-P162043</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Western Balkans Trade and Transport Facilitation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Proposed Development Objective is to reduce the trade costs and increase transport efficiency in Albania, North Macedonia, and Serbia]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Trade and Transport Facilitation Project for Western Balkans is to reduce the trade costs and increase transport efficiency in Albania, North Macedonia, and Serbia. The project comprises of four components. The first component, facilitating movement of goods across the Western Balkans focuses on: (a) the adoption and implementation of the national single window (NSW); (b) the improvements of border crossing points and crossing points in selected trade corridors; and (c) the implementation of electronic data interchange (EDI). The second component, enhancing transport efficiency and predictability will focus on: (a) the adoption of an intelligent transport system (ITS) and corridor performance monitoring, and (b) the improvement of railway level crossings (RLC). The third component will support the implementation of commitments to improve market access in services and foster regional investments. The fourth component will support project implementation units (PIU) and provide additional technical support, including for policy coordination, operating costs, and monitoring and evaluation of the program.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0031451"><narrative>Ministry of Finance  (Albania)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0031454"><narrative>Ministry of Finance (North Macedonia)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="7B–P0031455"><narrative>Ministry of Finance (Serbia)</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="7B-COA-00006503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2017-08-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-04-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-11-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-11-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ruvejda Aliefendic</narrative></person-name><telephone>+1-202-473-1000</telephone><email>raliefendic@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<contact-info type="2">
<mailing-address><narrative>
DËSHMORËT E KOMBIT”, N0.3, Tirana

</narrative></mailing-address></contact-info>

<recipient-region code="89" percentage="100" vocabulary="1"><narrative xml:lang="en">Europe, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000718075" />
            <name><narrative>Republic of Macedonia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41.66667 21.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000783754" />
            <name><narrative>Republic of Albania</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>41 20</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006290252" />
            <name><narrative>Serbia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.81892 20.45998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003277605" />
            <name><narrative>Bosnia and Herzegovina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>44.25 17.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003194884" />
            <name><narrative>Montenegro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.75 19.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000732800" />
            <name><narrative>Republic of Bulgaria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.66667 25.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000831053" />
            <name><narrative>Republic of Kosovo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>42.58333 20.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="33120" percentage="38" xml:lang="en"/><sector vocabulary="1" code="21040" percentage="17" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="17" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="16" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="11" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000142" percentage="41" xml:lang="en"><narrative>Trade Logistics</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000143" percentage="4" xml:lang="en"><narrative>Trade Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="11" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="41" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="4" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="11" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="41" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="11" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="13" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="11" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="41" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="4" xml:lang="en"><narrative>Regional Integration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2166666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-15"/>
<value currency="USD" value-date="2027-11-15">59460285.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-15"/>
<value currency="USD" value-date="2027-11-15">59460285.80</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">20000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">72161</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1114800</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">96998</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">48897</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">1080250</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">347040</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">789215</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">380664</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">270138</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">118916</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">36405</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">117049</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">1059000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">3268350</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">284625</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">519035</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1449833</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">568988</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">2188890</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">436682</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">681760</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">490323</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1752290</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">899560</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">312091</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">299745</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">611497</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">608731</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">2951884</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1138181</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">2247281</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1933949</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1569877</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">794607</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-72161</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-96998</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-48897</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-35271</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-81246</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-52837</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-52177</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-38973</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-30539</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-28345</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-37393</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-51946</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-49951</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-36654</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-27131</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-24464</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-43813</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-32730</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-32771</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-46085</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-27723</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-50211</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-52956</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-65564</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-63483</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-118874</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-87355</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-96651</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-98266</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-128197</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-90377</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-110413</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-118646</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-96146</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-88783</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-166685</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-104684</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-94226</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-153064</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-159833</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-95100</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-127751</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-62811</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-62956</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-133889</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-93557</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-300701</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-133722</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-169946</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-304150</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-166060</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-309610</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-323065</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-212779</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-360512</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-492113</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-715148</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-499535</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-302207</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="7B-COA-31452"><narrative>Ministry of Construction, Transport and Infrastructure (Serbia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-31453"><narrative>Ministry of Transport and Communication (North Macedonia)</narrative></receiver-org><receiver-org xml:lang="en" ref="7B-COA-6503"><narrative>Ministry of Economy, Culture and Innovation (MoECI)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162043"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P162043?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162043"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-13" />
<target value="Yes">
<comment><narrative>
Partially completed. 
A comprehensive review of the national legal and regulatory framework has been finalized, covering country-specific commitments under CEFTA AP5 and AP6, the EU Acquis, and the WB6 Common Regional Market Action Plan related to trade facilitation.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="25.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="24.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms that benefit from reformed custom/border services
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-11-15" />
<target value="600.00">
<comment><narrative>
This calculation includes data from North Macedonia. 
Detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Deployment of Intelligent Traffic Systems (ITS)
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="3.00">
<comment><narrative>
ITS procurement in process.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cargo inspected by border agencies
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="15.00">
<comment><narrative>
physically inspected cargo: 47%
scanned 25%
Data for North Macedonia only.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="36.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="27.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="27.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cargo inspected by border agencies
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="15.00">
<comment><narrative>
physically inspected cargo: 47%
scanned 25%
Data for North Macedonia only.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cargo inspected by border agencies
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-15" />
<target value="15.00">
<comment><narrative>
physically inspected cargo: 47%
scanned 25%
Data for North Macedonia only.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cargo inspected by border agencies
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="15.00">
<comment><narrative>
physically inspected cargo: 47%
scanned 25%
Data for North Macedonia only.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="36.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="27.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="27.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stakeholders reporting that the design/blueprint of the NWS is aligned with their needs and their contributions in the planning process (citizen engagement)
</narrative></title>
<baseline year="2023" iso-date="2023-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-07" />
<period-end iso-date="2025-12-15" />
<target value="80.00">
<comment><narrative>
Citizen's engagement was conducted by an awareness campaign event for the implementation of the NSW Project, was held in February 2024, attended by, among others, representatives of the business community. They were informed about the progress of the project and the next steps in its implementation. The event saw total attendance of over 90 participants, including members from various economic sectors such as manufacturers, exporters, freight forwarders and transporters and was well covered by the media in the country.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Deployment of Intelligent Traffic Systems (ITS)
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2025-12-14" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms that benefit from reformed custom/border services
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-11-15" />
<target value="600.00">
<comment><narrative>
This calculation includes data from North Macedonia. 
Detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="25.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="24.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of recommended border regulations that are adopted
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-13" />
<target value="3.00">
<comment><narrative>
COMPLETED. On November 14th, 2022, the Governments of Albania and of North Macedonia signed the following two protocols for the implementation of the Border Agreement between the two countries signed in June 2021
the Protocol on Joint Border Controls at the BCP in Kjafasan/Qafe Thane was signed by the Ministers of Interior of Albania and North Macedonia, and the Protocol on the establishment of the joint BCP in Kjafasan/Qafe Thane was signed by the Ministers of Finance and Directors of Customs of Albania and North Macedonia.

The Protocol on Infrastructure at the BCP in Kjafasan/Qafe Thane was adopted on July 27, 2023, and the One-Stop shop operation at this BCP started in July 2023.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="36.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-15" />
<target value="27.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="27.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-13" />
<target value="Yes">
<comment><narrative>
Partially completed. 
A comprehensive review of the national legal and regulatory framework has been finalized, covering country-specific commitments under CEFTA AP5 and AP6, the EU Acquis, and the WB6 Common Regional Market Action Plan related to trade facilitation.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Deployment of Intelligent Traffic Systems (ITS)
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2025-12-14" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of recommended border regulations that are adopted
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-13" />
<target value="3.00">
<comment><narrative>
COMPLETED. On November 14th, 2022, the Governments of Albania and of North Macedonia signed the following two protocols for the implementation of the Border Agreement between the two countries signed in June 2021
the Protocol on Joint Border Controls at the BCP in Kjafasan/Qafe Thane was signed by the Ministers of Interior of Albania and North Macedonia, and the Protocol on the establishment of the joint BCP in Kjafasan/Qafe Thane was signed by the Ministers of Finance and Directors of Customs of Albania and North Macedonia.

The Protocol on Infrastructure at the BCP in Kjafasan/Qafe Thane was adopted on July 27, 2023, and the One-Stop shop operation at this BCP started in July 2023.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-13" />
<target value="Yes">
<comment><narrative>
Partially completed. 
A comprehensive review of the national legal and regulatory framework has been finalized, covering country-specific commitments under CEFTA AP5 and AP6, the EU Acquis, and the WB6 Common Regional Market Action Plan related to trade facilitation.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="25.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="24.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-27" value="36.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-27" />
<period-end iso-date="2027-11-15" />
<target value="27.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="27.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stakeholders reporting that the design/blueprint of the NWS is aligned with their needs and their contributions in the planning process (citizen engagement)
</narrative></title>
<baseline year="2023" iso-date="2023-06-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-05" />
<period-end iso-date="2027-11-15" />
<target value="80.00">
<comment><narrative>
Citizen's engagement was conducted by an awareness campaign event for the implementation of the NSW Project, was held in February 2024, attended by, among others, representatives of the business community. They were informed about the progress of the project and the next steps in its implementation. The event saw total attendance of over 90 participants, including members from various economic sectors such as manufacturers, exporters, freight forwarders and transporters and was well covered by the media in the country.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation and adoption of Transport/ITS Strategy in Serbia and North Macedonia
</narrative></title>
<baseline year="2019" iso-date="2019-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-14" />
<period-end iso-date="2027-11-14" />
<target value="2">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Deployment of Intelligent Traffic Systems (ITS)
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2025-12-14" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stakeholders reporting that the design/blueprint of the NWS is aligned with their needs and their contributions in the planning process (citizen engagement)
</narrative></title>
<baseline year="2023" iso-date="2023-06-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-05" />
<period-end iso-date="2027-11-15" />
<target value="80.00">
<comment><narrative>
Citizen's engagement was conducted by an awareness campaign event for the implementation of the NSW Project, was held in February 2024, attended by, among others, representatives of the business community. They were informed about the progress of the project and the next steps in its implementation. The event saw total attendance of over 90 participants, including members from various economic sectors such as manufacturers, exporters, freight forwarders and transporters and was well covered by the media in the country.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stakeholders reporting that the design/blueprint of the NWS is aligned with their needs and their contributions in the planning process (citizen engagement)
</narrative></title>
<baseline year="2023" iso-date="2023-06-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-05" />
<period-end iso-date="2027-11-15" />
<target value="80.00">
<comment><narrative>
Citizen's engagement was conducted by an awareness campaign event for the implementation of the NSW Project, was held in February 2024, attended by, among others, representatives of the business community. They were informed about the progress of the project and the next steps in its implementation. The event saw total attendance of over 90 participants, including members from various economic sectors such as manufacturers, exporters, freight forwarders and transporters and was well covered by the media in the country.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation and submission to Parliament of Public Roads Law with ITS (North Macedonia/Serbia)
</narrative></title>
<baseline year="2019" iso-date="2019-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-12" />
<period-end iso-date="2027-11-12" />
<target value="2.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation and submission to Parliament of ITS Law (North Macedonia)
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-12-15" />
<target value="1.00">
<comment><narrative>
ITS Law has been prepared and adopted on November 28, 2023.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation and adoption of Transport/ITS Strategy in Serbia and North Macedonia
</narrative></title>
<baseline year="2019" iso-date="2019-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-14" />
<period-end iso-date="2027-11-14" />
<target value="2">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation and submission to Parliament of Public Roads Law with ITS (North Macedonia/Serbia)
</narrative></title>
<baseline year="2019" iso-date="2019-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-12" />
<period-end iso-date="2027-11-12" />
<target value="2.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-15" />
<target value="25.00">
<comment><narrative>
This is a conservative assessment as only the values for North Macedonia are updated in the calculation of the average time

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="24.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of recommended border regulations that are adopted
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="3.00">
<comment><narrative>
COMPLETED. On November 14th, 2022, the Governments of Albania and of North Macedonia signed the following two protocols for the implementation of the Border Agreement between the two countries signed in June 2021
the Protocol on Joint Border Controls at the BCP in Kjafasan/Qafe Thane was signed by the Ministers of Interior of Albania and North Macedonia, and the Protocol on the establishment of the joint BCP in Kjafasan/Qafe Thane was signed by the Ministers of Finance and Directors of Customs of Albania and North Macedonia.

The Protocol on Infrastructure at the BCP in Kjafasan/Qafe Thane was adopted on July 27, 2023, and the One-Stop shop operation at this BCP started in July 2023.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation and adoption of Transport/ITS Strategy in Serbia and North Macedonia
</narrative></title>
<baseline year="2019" iso-date="2019-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-14" />
<period-end iso-date="2027-11-14" />
<target value="2">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation and submission to Parliament of Public Roads Law with ITS (North Macedonia/Serbia)
</narrative></title>
<baseline year="2019" iso-date="2019-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-12" />
<period-end iso-date="2027-11-12" />
<target value="2.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of recommended border regulations that are adopted
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-13" />
<target value="3.00">
<comment><narrative>
COMPLETED. On November 14th, 2022, the Governments of Albania and of North Macedonia signed the following two protocols for the implementation of the Border Agreement between the two countries signed in June 2021
the Protocol on Joint Border Controls at the BCP in Kjafasan/Qafe Thane was signed by the Ministers of Interior of Albania and North Macedonia, and the Protocol on the establishment of the joint BCP in Kjafasan/Qafe Thane was signed by the Ministers of Finance and Directors of Customs of Albania and North Macedonia.

The Protocol on Infrastructure at the BCP in Kjafasan/Qafe Thane was adopted on July 27, 2023, and the One-Stop shop operation at this BCP started in July 2023.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms that benefit from reformed custom/border services
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-11-15" />
<target value="600.00">
<comment><narrative>
This calculation includes data from North Macedonia. 
Detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms that benefit from reformed custom/border services
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="600.00">
<comment><narrative>
This calculation includes data from North Macedonia. 
Detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="Yes">
<comment><narrative>
Partially completed. 
A comprehensive review of the national legal and regulatory framework has been finalized, covering country-specific commitments under CEFTA AP5 and AP6, the EU Acquis, and the WB6 Common Regional Market Action Plan related to trade facilitation.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average freight transport time on targeted corridors
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="11.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to import
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="374.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="338.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="374.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2025-12-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cost to export
</narrative></title>
<baseline year="2017" iso-date="2017-12-30" value="295.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-30" />
<period-end iso-date="2027-11-15" />
<target value="261.00">
<comment><narrative>
sum of costs in all three countries.

detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="355.26">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2025-12-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
</narrative></title>
<baseline year="2017" iso-date="2017-12-28" value="224,392,589.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-28" />
<period-end iso-date="2027-11-15" />
<target value="201,059,449.00">
<comment><narrative>
detailed M&amp;E analysis ongoing. Details available in autumn 2025
</narrative></comment>
</target>
<actual value="224,392,589.00">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>