<iati-activities version="2.03" generated-datetime="2026-09-24T08:34:48"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P150028</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Transport Infrastructure Investment Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective is to improve the resilience and safety of land and maritime transport infrastructure for users ofproject roads, bridges and rural jetties and wharves.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Transport Infrastructure Investment Project for Fiji is to improve the resilience and safety of land and maritime transport infrastructure for users of project roads, bridges and rural jetties and wharves. The project would seek to prioritize investments in high poverty areas, including the poorer northern islands of Vanua Levu and Taveuni. This prioritization would be realized by including poverty factors in the multi-criteria analysis used for the selection of sub-projects. The projects is made up of three components. The first component (Improvement of existing road and maritime sector assets) funds works to repair, rehabilitate, reconstruct or upgrade selected existing roads, bridges and rural jetties and wharves. Safety improvements on selected roads, bridges, rural jetties and wharves including road safety furniture and replacement of existing and/or installation of new streetlights would also be carried out. Where possible and appropriate, road, bridge and/or jetty sub-projects would be geographically packaged to reduce costs, attract competent contractors and maximize local impact. Component 2 (Technical assistance) consists of support establishing and maintaining a project supervision team at Fiji Roads Authority (FRA) to oversee project implementation, financing design and supervision consultants, updating design and construction standards for roads and bridges, undertaking International Road Assessment Program (iRAP) surveys and road safety audits, and piloting the use of open contracting, including geotagging. Finally, Component 3 (Capacity building) provides a grant for initiatives to build government capacity across the transport sector. Areas of focus are expected to include planning, assessing and managing infrastructure projects for staff from various ministries and agencies, including FRA.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0019023"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0019024"><narrative>Fiji Roads Authority</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-12-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-03-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tawia Addo-Ashong</narrative></person-name><telephone>+1-202-473-1000</telephone><email>taddoashong@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002205247" />
            <name><narrative>Wema Creek</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.88353 177.80097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010942875" />
            <name><narrative>Wema</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.88723 177.81192</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002197685" />
            <name><narrative>Cuvu Harbour</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.13712 177.41551</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002198148" />
            <name><narrative>Suva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.14161 178.44149</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002198364" />
            <name><narrative>Sigatoka River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.1745 177.52004</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002198365" />
            <name><narrative>Sigatoka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.14307 177.50691</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002198934" />
            <name><narrative>Rararua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.96667 177.55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002199708" />
            <name><narrative>Ndreketi River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.55 178.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002199758" />
            <name><narrative>Draubuta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.92313 177.90032</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002201654" />
            <name><narrative>Narata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.09412 177.56241</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002201870" />
            <name><narrative>Nagalitala Creek</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.98901 177.58437</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002202050" />
            <name><narrative>Nadi River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.80652 177.36499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002202353" />
            <name><narrative>Nabouwalu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.25984 177.90209</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002203546" />
            <name><narrative>Mbutha Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.66667 179.85</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002204506" />
            <name><narrative>Lautoka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.61686 177.45049</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002204579" />
            <name><narrative>Lambasa River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.41667 179.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009881353" />
            <name><narrative>Viti Levu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.84512 178.01903</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011104092" />
            <name><narrative>Rukuruku District School</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.96071 177.54785</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011104341" />
            <name><narrative>Sigatoka Valley</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.02884 177.54701</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="21012" percentage="50" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="100.000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="8" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="8" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="25" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="8" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="8" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="25" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="25" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">958333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">958333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">239332.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">239332.20</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-239332</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">125000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">53387</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">607886</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">64204</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2401500</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">92982</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">97866</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">265509</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">120226</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">399989</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">377695</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">101918</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">2017776</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">155463</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">220563</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">148691</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">98103</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">131896</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">147890</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">120245</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">721177</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">350290</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">273347</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">509857</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">499540</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">149142</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">2465405</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1535609</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">518739</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">2243709</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">756786</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">1201825</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">359474</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">1012288</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">900129</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">2411746</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">1472688</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">125869</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">1805789</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2860140</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">728228</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">1208073</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">1154311</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">631358</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">1876079</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1565642</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">182102</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">1236021</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">1202303</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">586755</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">402260</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">696056</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">180730</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">664855</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">204243</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">337926</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">153351</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">664475</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">408035</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">454794</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">733731</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">230412</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">4336591</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-53387</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-64204</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-92982</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-97866</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-120226</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-129763</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-155463</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-148691</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-108205</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-92179</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-99099</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-124372</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-429138</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-817355</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1129784</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1279498</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1300783</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1216418</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1191597</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1003174</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-212074</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-268556</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-495442</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-694417</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-951674</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1197150</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1277347</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1358504</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1548270</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1548270</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1548270</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-19024"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150028"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P150028?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150028"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2015" iso-date="2015-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-12" />
<period-end iso-date="2024-06-26" />
<target value="250.00">
<comment><narrative>
The original target of 250 km was increased to 370 km during restructuring to align with GoF's shift in priorities. By project closing, the new target was exceeded.
</narrative></comment>
</target>
<actual value="370">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of roads with minimum 3-Star rating for vehicle occupants based on iRAP assessments.
</narrative></title>
<baseline year="2015" iso-date="2015-03-13" value="25.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-13" />
<period-end iso-date="2024-06-27" />
<target value="100.00">
<comment><narrative>
The baseline of 25km has come from the iRAP Fiji: Summary Report released in July 2014. The original target of 65 km was increased to 100 km during restructuring. By project closing, the new target was exceeded.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project designs consider gender issues
</narrative></title>
<baseline year="2015" iso-date="2015-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-12" />
<period-end iso-date="2024-06-24" />
<target value="100.00">
<comment><narrative>
The result is 93% and not 100% due to the older designs of the Solovi and Rabaraba subprojects, which did not initially include footpaths, a key feature benefiting women and vulnerable groups. While these subprojects have since been updated to include improved crossings for safer movement, especially for women and children, and enhanced flood resistance, they still lack specified footpaths. All other subprojects have considered gender issues from the start, and future contracts will continue to do so. As a result, the current figure remains at 93%.
</narrative></comment>
</target>
<actual value="93.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries aware of the Grievance Redress Mechanism (GRM) satisfied with its functioning
</narrative></title>
<baseline year="2015" iso-date="2015-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-12" />
<period-end iso-date="2023-06-26" />
<target value="85.00">
<comment><narrative>
Survey to be undertaken at ADB's project closing.
</narrative></comment>
</target>
<actual value="No data">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of FRA roads constructed to revised standards for resilience and safety.
</narrative></title>
<baseline year="2015" iso-date="2015-03-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-13" />
<period-end iso-date="2024-06-27" />
<target value="300.00">
<comment><narrative>
The original target of 100 km was increased to 300 km during restructuring to align with the GoF's heightened focus on road works. By project closing, the new target was exceeded.
</narrative></comment>
</target>
<actual value="382">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jetties/ wharves redesigned
</narrative></title>
<baseline year="2015" iso-date="2015-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-12" />
<period-end iso-date="2024-06-26" />
<target value="3.00">
<comment><narrative>
Same as above. The design of 3 jetties and 40 bridges are in progress. They are expected to be completed under ADB's loan extension of 2 years.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population having access to resilient and safe roads based on revised standards
</narrative></title>
<baseline year="2015" iso-date="2015-03-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-13" />
<period-end iso-date="2024-06-27" />
<target value="600,000.00">
<comment><narrative>
This indicator was introduced during restructuring with a target of 600,000 people. Kings Road and Queens Road serve the entire population of Viti Levu Island. By project closing, the target was exceeded.
</narrative></comment>
</target>
<actual value="700,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Detailed Designs completed for jetties/ wharves and ready to be procured
</narrative></title>
<baseline year="2015" iso-date="2015-03-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-13" />
<period-end iso-date="2024-06-27" />
<target value="3.00">
<comment><narrative>
This indicator was introduced during restructuring with a target of 3 jetties. The design of 3 jetties and 40 bridges are in progress. They are expected to be completed under ADB's loan extension of 2 years.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community assets constructed that benefit women.
</narrative></title>
<baseline year="2015" iso-date="2015-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-12" />
<period-end iso-date="2024-06-24" />
<target value="500.00">
<comment><narrative>
The number of community assets constructed that benefit women was initially targeted at 55 but was revised to 500 during the restructuring, given the GoF's shift in focus toward road assets. The project ultimately financed 1,012 such assets (streetlighting, guardrails, sidewalks, bus shelters, speed bumps, and pedestrian crossings), surpassing the revised target.
</narrative></comment>
</target>
<actual value="1012">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Street lights reinstated and/or installed new.
</narrative></title>
<baseline year="2015" iso-date="2015-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-12" />
<period-end iso-date="2023-06-26" />
<target value="450.00">
<comment><narrative>
The original target at appraisal was 5,000 streetlights, but it was reduced to 450 during restructuring after the GoF financed 5,000 streetlights with its own funds. The project would then finance 450. By project closing, the new target was exceeded.
</narrative></comment>
</target>
<actual value="533.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges redesigned
</narrative></title>
<baseline year="2015" iso-date="2015-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-12" />
<period-end iso-date="2024-06-24" />
<target value="40.00">
<comment><narrative>
This indicator was introduced during restructuring to replace the original one on bridges tendered, with a target of 40 bridges. By project closing, the design for 10 bridges was completed. The designs for the remaining 30 bridges, along with 3 jetties, are expected to be completed under ADB's 2-year loan extension.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P159297</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>P4: Pacific Regional Connectivity Program: Phase 3B, FJ Connectivity Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to reduce the cost and increase the availability of internet services in the Northern Division ofthe Borrower's territory.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Pacific Regional Connectivity Program Project for Fiji are to reduce the cost and increase the availability of internet services in the Northern Division of the Borrower's territory. There are three components to the project, the first component being Submarine Cable System. This component comprising the following elements: design, supply and installation of a submarine optical fiber cable to connect Vanua Levu to the main SSCC cable, including a marine survey, a cable manufacture and cable deployment; and  construction of a cable landing station and ancillary facilities in Savusavu, including acquisition and installation of onshore equipment. The second component is the Regulatory Technical Assistance. This will finance the provision of technical assistance to the FCC in relation to interconnection and access agreements, including the negotiations and implementation of regulatory instruments to ensure cost based and nondiscriminatory access to the cable infrastructure, support for cost analysis, tariff-setting and carriers rights and obligations. Finally, the third component is the Project Management and Administration. This will finance the provision of support to the Project management unit in MOC, including with respect to technical, procurement, financial management and safeguards aspects. The project's climate adaptation relevant investments are estimated to include the entirety of components 1, 2 and 3 related to connectivity, regulatory technical assistance, and project management. The expansion of optical fiber cable backbone networks in the Northern Division of Fiji and the establishment of non-discriminatory access agreements increase the portion of the population with fast, reliable and resilient communication services and in this way help build an inclusive and effective disaster early warning and response system.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0028683"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0028684"><narrative>Ministry of Communications</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-07-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-11-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-16"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-16"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Natasha Beschorner</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nbeschorner@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002198148" />
            <name><narrative>Suva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.14161 178.44149</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002198520" />
            <name><narrative>Savusavu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.77997 179.33636</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002205218" />
            <name><narrative>Republic of Fiji</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 178</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004036645" />
            <name><narrative>Koro Sea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 180</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009881353" />
            <name><narrative>Viti Levu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.84512 178.01903</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0010049428" />
            <name><narrative>Samoa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.5107 177.04473</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008740219" />
            <name><narrative>Naidi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.8 177.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006457351" />
            <name><narrative>Savusavu Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.80323 179.34099</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011104353" />
            <name><narrative>Savusavu Road</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.93901 177.26194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002197138" />
            <name><narrative>Vanua Levu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.55 179.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002200129" />
            <name><narrative>Ndaku Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.96667 178.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="21023" percentage="33" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="31" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="18" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="93.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="100" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="10" xml:lang="en"><narrative>ICT Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="97" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="100" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="100" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">229166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2021-12-16"/>
<value currency="USD" value-date="2021-12-16">337741.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2021-12-16"/>
<value currency="USD" value-date="2021-12-16">337741.31</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">5950000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-337741</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">14875</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">203129</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">873989</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1891332</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1288076</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">52867</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">510696</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">777294</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-14875</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-6228</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-10053</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-33219</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-67327</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-78534</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-66081</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-57768</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-25030</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-23105</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-21118</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-32752</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-114171</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-144420</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-158352</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-151046</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-136599</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-114274</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-106478</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-166484</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-218004</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-28684"><narrative>Ministry of Communications</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159297"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P159297?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159297"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Remote Locations having Emergency Communications Capability
</narrative></title>
<baseline year="2021" iso-date="2021-05-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-18" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to the Internet
</narrative></title>
<baseline year="2022" iso-date="2022-05-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-18" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cost-based interconnection rates for Savusavu cable, under nondiscriminatory pricing regime
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to the Internet - Female
</narrative></title>
<baseline year="2021" iso-date="2021-05-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-18" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="8.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to Internet Services (number of subscribers per 100 people)
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="138.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Available internet bandwidth for the Northern Division (Gbps)
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="1.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Retail price of internet services (residential, base plan US$/GB)
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="0.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.04">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory framework supports open access and nondiscriminatory pricing
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new community access sites created
</narrative></title>
<baseline year="2021" iso-date="2021-05-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-18" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="130000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Wholesale Internet bandwidth price at point of interconnection US$/Mbps/month
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="110.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory framework provides for open access to domestic optical fibre networks
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Fiber Optic Network Built (km)
</narrative></title>
<baseline year="2016" iso-date="2016-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P159774</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Post-Cyclone Winston Emergency Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[This Development Policy Operation is intended to support the government in its implementation of post-cyclone crisis response programs to ensure swift economic recovery while protecting the most vulnerable.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Post-cyclone Winston Emergency Development Policy Operation Project for Fiji is to support Fiji's recovery from the immediate impact of Cyclone Winston through a prioritized and sequenced recovery plan; and (ii) cushion the immediate impact of Cyclone Winston on the most vulnerable through the provision of disaster-responsive social protection. These correspond to the two pillars of the operation. Under the first pillar of the operation, the Government of Fiji (GoF)  has completed a comprehensive  Post Disaster Needs Assessment (PDNA) , as the basis for preparing a prioritized and sequenced recovery plan. Under the second pillar of the operation, the GoF has provided disaster-responsive social protection to cushion the immediate impact of the cyclone on the most vulnerable, and begun an evaluation of this initiative with a view to informing the design of a disaster responsive social protection framework for future natural disasters.  A development policy operation (DPO) was selected to assist Fiji, because of the need for quick-disbursing funds to help Fiji implement its recovery program in the coming fiscal year without crowding out other essential expenditure, because Fiji has the capacity to manage key aspects of its recovery program itself, and because it facilitates the close coordination of financing with the Asian Development Bank that Fiji specifically requested.   The GoF has used the PDNA as a basis for formulating a Disaster Recovery Framework (DRF) which sets out a prioritized and sequenced recovery plan for the medium term. The DRF will serve as a strategic management tool for the GoF to plan and implement its recovery effort over the next two years.  The GoF has reprioritized budgeted funds in the current fiscal year, to enable it to finance its immediate recovery expenditures in a timely manner, without crowding out other essential expenditure. This pillar of the operation is expected to support the effective planning and management of the recovery effort, including enhancing Fiji's disaster resilience for the future. The results indicators chosen for this pillar are the use of the DRF as a strategic planning and resource allocation tool, as indicated by the proportion of funds allocated in the FY2017 budget to recovery activities included in the DRF that are expended in FY2017, and the implementation of the DRF to enhance disaster resilience, as indicated by the strengthening of the building code in accordance with the DRF.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0029190"><narrative>Ministry of Economy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-06-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-06-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Virginia Ann Horscroft</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2198148" />
                <name><narrative>Suva</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-18.13683 178.42531</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="73010" percentage="50" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="19" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="19" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="19" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="19" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="19" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="19" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="57" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="25" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="19" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="19" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="19" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="19" xml:lang="en"><narrative>Finance for Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">50000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">50000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">125000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">49875000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-150533</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-495236</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-559667</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-598306</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-840778</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-917569</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-866333</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-685028</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-375667</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-263958</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-260667</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-266472</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-822002</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1349151</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1515213</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1528439</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1472265</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1211914</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1175203</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-990725</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1470000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-29190"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159774"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P159774?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159774"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P165276</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiscal Sustainability and Climate Resilience DPO</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ This Development Policy Operation is intended to support the government in its implementation of reforms to safeguard medium-term fiscal sustainability while creating an environment for private-sector led growth and building climate resilience.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The operation supports Fiji's reform effort to strengthen medium-term fiscal sustainability while undertaking structural reforms to improve the business climate and resilience to climate change. The proposed operation of US$15 million is the first in a programmatic series of two development policy operations (DPOs). At the request of the Government of the Republic of Fiji, the World Bank has worked closely with the Asian Development Bank (ADB) on the preparation of this operation. The ADB is expected to provide a similar level of financing through a Policy-Based Loan, using criteria that are consistent with the Bank's proposed operation. The operation follows the post-Cyclone Winston emergency DPO in 2016, which supported Fiji's recovery from the immediate impact of Winston through the formulation of a recovery plan and the provision of post-disaster social protection to the most vulnerable. The program development objective of the proposed DPO series is to support the government's effort to: (i) strengthen medium-term fiscal sustainability; (ii) improve the investment climate; and (iii) build climate resilience. Under the first pillar, the government is simplifying the tax system to encourage compliance and private-sector-led growth and strengthening the monitoring framework of fiscal risks associated with the country's sizeable state-owned enterprise (SOE) sector. Under the second pillar, the government is removing obstacles to Foreign Direct Investment (FDI) by updating the country's arbitration law to recognize and enforce overseas arbitration awards and improving the business climate by reducing costs of dealing with construction permits. Under the third pillar, the government is strengthening climate resilience of all new buildings by adopting more stringent building standards.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0034883"><narrative>Ministry of Economy</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2018-01-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-04-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Demet Kaya</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dkaya@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2198148" />
                <name><narrative>Suva</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-18.13683 178.42531</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="25010" percentage="38" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="32310" percentage="12" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="50" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="25" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="25" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="25" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="50" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="25" xml:lang="en"><narrative>Tax policy</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">15000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">15000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<capital-spend percentage="0" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165276"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P165276?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165276"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P168402</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Second Fiscal Sustainability and Climate Resilience DPO</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Development Objective of the Second Fiscal Sustainability and Climate Resilience DPO is to support the government's effort to: (i) strengthen medium-term fiscal sustainability; (ii) improve the investment climate; and (iii) build climate resilience.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The operation supports Fiji's reform effort to strengthen medium-term fiscal sustainability while undertaking structural reforms to improve the business climate and resilience to climate change. The operation is the second in a programmatic series of two development policy operations (DPOs), with a total of US dollar 64 million (US dollar 6 million from IBRD and US dollar 58 million equivalent1 from IDA, including US dollar 29 million from the Scale-Up Facility2). This is Fiji's first IDA-financed operation since the country gained access to IDA on July 1, 2019. The Program Development Objective of the DPO series is to support the government's effort to: (i) strengthen medium-term fiscal sustainability; (ii) improve the investment climate; and (iii) build climate resilience. The main risks to the proposed operation stem from Fiji's macroeconomic context and its vulnerability to climate related disasters. A sharper than anticipated slowdown in growth in Fiji's export markets and tourism sources, or disruptions to the global economy could deteriorate domestic macroeconomic conditions and threaten debt sustainability: Fiji faces a moderate risk of debt distress and this can only be reduced through continued fiscal consolidation and prudent public borrowing. Vulnerability to climate change also poses a risk. Another major natural disaster in the next few years could threaten macro stability and lead to slippages in the reform agenda as a large part of the bureaucracy would have to shift its attention to disaster recovery and reconstruction efforts. Measures supported by this proposed DPO to strengthen medium-term fiscal sustainability and build fiscal buffers will be an important element in mitigating macroeconomic risks. This DPO also supports several reforms, which are the direct responsibility of several line ministries, whose capacity may be stretched - and where understanding of budget support operations may be limited unlike the Ministry of Economy. However, appropriate training and technical assistance should serve to offset any such risk.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0038676"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0038675"><narrative>Ministry of Economy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2019-05-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-11-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-11-07"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-11-07"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Demet Kaya</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dkaya@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2198148" />
                <name><narrative>Suva</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-18.13683 178.42531</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="25010" percentage="43" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="19" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="43.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="7" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="7" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="14" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="14" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="14" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="14" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="43" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="43" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="43" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="29" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="29" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="43" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="29" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">159360.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">191168.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">107328.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">237440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">129280.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">277824.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">304320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">167552.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">364544.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">193216.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">398336.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">408384.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">209088.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">429120.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">217856.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">437504.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">428288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">210624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">423872.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">217472.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">456128.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">486208.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">247808.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">509952.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">266880.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">566016.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">593728.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">306816.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">642240.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">339328.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">713856.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">733504.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">374976.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">781888.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">412608.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">867648.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">899520.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">465856.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">977728.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">515840.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1085568.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1147008.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">597504.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1243200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">645568.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1348288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1419712.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">732288.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1500544.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">764736.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1575040.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1635392.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">836992.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1709568.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">874240.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1808896.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1864960.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">946048.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1912000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1930112.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">976512.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1983232.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1003776.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2025152.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1024704.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2079104.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2114944.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1069760.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2163264.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2195904.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1110272.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2245760.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1758848.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">159360.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">191168.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">107328.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">237440.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">129280.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">277824.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">304320.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">167552.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">364544.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">193216.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">398336.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">408384.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">209088.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">429120.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">217856.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">437504.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">428288.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">210624.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">423872.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">217472.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">456128.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">486208.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">247808.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">509952.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">266880.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">566016.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">593728.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">306816.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">642240.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">339328.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">713856.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">733504.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">374976.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">781888.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">412608.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">867648.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">899520.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">465856.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">977728.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">515840.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1085568.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1147008.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">597504.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1243200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">645568.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1348288.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1419712.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">732288.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1500544.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">764736.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1575040.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1635392.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">836992.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1709568.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">874240.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1808896.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1864960.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">946048.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1912000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1930112.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">976512.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1983232.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1003776.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2025152.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1024704.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2079104.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2114944.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1069760.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2163264.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2195904.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1110272.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2245760.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1758848.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-07"/>
<value currency="USD" value-date="2020-11-07">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-07"/>
<value currency="USD" value-date="2020-11-07">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-07"/>
<value currency="USD" value-date="2020-11-07">269907.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-07"/>
<value currency="USD" value-date="2020-11-07">269907.50</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">29000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">29000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">6000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">15000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">72500</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">28927500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">28730093</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">5985000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-72500</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-15000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-61073</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-129842</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-387151</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-240579</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-113054</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-33183</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-31893</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-111692</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-235673</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-237663</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-105048</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-32580</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-86173</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-102217</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-498027</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-944820</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-106766</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-178888</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-190133</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-104996</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1000500</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1052590</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-105066</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-201094</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-201045</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-103770</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1053237</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-909816</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-105183</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-163064</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-155174</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-108707</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-914688</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-810751</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-107193</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-128477</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-300000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-300000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-300000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-300000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-38675"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168402"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P168402?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168402"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement in the legal rights index of the Doing Business score for getting credit
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="The legal rights index is 5 (out of 12)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="The legal rights index is 6 (out of 12">
<comment><narrative>
&lt;p&amp;gt;Achieved, estimated to be a few points above targets based on regulatory reforms and what they cover&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Above 6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Accounting for the SOEs credit risk in decisions to on-lend and give guarantees
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="Decisions to on-lend and give guarantees do not take into account the SOE's credit risk."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2020-12-31" />
<target value="Decisions to on-lend and give guarantees are justified with explicit reference to the SOE's credit risk, as evidenced by the Minister for Economy's written approval in the case of on-lending and by the minutes of the cabinet decision in the case of guarantees">
<comment><narrative>
&lt;p&amp;gt;Result Indicator dropped&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Result Indicator dropped">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The average fiscal deficit (as a percentage of GDP)
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="4.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2021-07-31" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement in number/ ratio of registration of security interest on movable collateral are owned by women or women-owned businesses
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="Moveable property is not allowed to be used as collateral, with a disproportionate negative impact on women"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="25 percent of registration of security interest on movable collateral are owned by women or women-owned businesses">
<comment><narrative>
&lt;p&amp;gt;Achieved&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="28.0 percent of registration of security interest on movable collateral are owned by women-only, women majority or women-men equal owned businesses">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of a Cabinet level committee to provide oversight on climate resilient development outcomes.
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No such committee exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="Cabinet level committee established and functioning as demonstrated through meeting agenda and minutes of the meetings if publicly available">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="A Cabinet level committee to provide oversight on climate resilient development outcomes for the NCCP was not established.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The average time spent obtaining a construction permit
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="141 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2020-12-31" />
<target value="50% drop to 70.5 days">
<comment><narrative>
&lt;p&amp;gt;Result Indicator dropped&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Result Indicator dropped">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days to start a business
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="25.90">
<comment><narrative>
&lt;p&amp;gt;Not achieved (but progressed)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adherence of new single-story houses on native lands to the National Building Code - Fiji
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0 houses"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="At least 20 houses">
<comment><narrative>
&lt;p&amp;gt;Not achieved (but progressed)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7 houses">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Training material developed and used for improving capacity of building practitioners in rural areas.
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No systematic training"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="At least 100 practitioners, of which at least 25 percent are women, trained in five rural areas">
<comment><narrative>
&lt;p&amp;gt;Not achieved (but progressed)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="26 people trained, of which 12 percent women">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress on at least two objectives and strategies of climate resilient development outcomes reported to the National Climate Change Committee.
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No or limited reporting on climate-resilient development outcomes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="Reported progress on implementation of objectives and strategies including in transport and water sectors">
<comment><narrative>
&lt;p&amp;gt;Not achieved (not achieved in all the target sectors, but progressed)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Reported progress on Objective 1.4 and Objective 3.4, including transport sector">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guarantee Fees to Government Entities
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="Guarantee fees do not take account of the entity's credit risk"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="New guarantee fees will be based on the overall risk profile of the entity">
<comment><narrative>
&lt;p&amp;gt;Achieved. Exemptions for the criteria at the discretion of the minister.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="The 2019/20 government debt report by the Ministry of Economy mentions that the entities are charged guaranteed fees based on the overall risk profile of the entity. Exemptions may apply as advised otherwise by the Ministry of Economy in exceptional cases">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved building codes and standards are implemented and enforced
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="Updated building codes and standards not yet in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2020-12-31" />
<target value="To be specified during the preparation of the second operation in the series">

</target>
<actual value="Specified in the 2nd series">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The average number of expressions of interest from foreign investors received by Investment Fiji
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="697.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="732.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved. Target was a 5% increase, actual was 55% decrease.&lt;/p&amp;gt;

&lt;p&amp;gt;Note: Data for baseline&amp;nbsp;&amp;nbsp;is revised&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="297.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adherence of new single-story schools and houses on native lands to the National Building Code - Fiji
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="10 schools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="At least 30 schools">
<comment><narrative>
&lt;p&amp;gt;Not achieved (but progressed)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="26 schools">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cost spent starting a business
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="Based on the World Bank's Doing Business: starting a business takes on average 17.9 percent of per capita income"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2020-12-31" />
<target value="The average cost spent starting a business are reduced by 50 percent">
<comment><narrative>
&lt;p&amp;gt;Result Indicator dropped&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Result indicator dropped">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Fiscal risks arising from entities are reported
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="Not quantified or reported"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2020-12-31" />
<target value="Quantified and reported annually">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="The 2019/20 government debt report by the Ministry of Economy reports the risk profiles of publicly guaranteed liabilities">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P173558</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Recovery and Resilience First Development Policy Operation with a Catastrophe-Deferred Drawdown Option</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective is to: i) promote private sector-led economic recovery; ii) enhance climate, disaster and social resilience; and iii) strengthen debt and public financial management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Recovery and Resilience First Development Policy Operation with a Catastrophe-Deferred Drawdown Option in Fiji are to: i) promote private sector-led economic recovery; ii) enhance climate, disaster, and social resilience; and iii) strengthen debt and public financial management. The development policy operation supports the Government's efforts to address short- and long-term challenges associated with climate and disaster risk and impacts of COVID-19. Reforms under Pillar 1 aim to create an improved environment for private sector development and promote private sector-led economic recovery. Pillar 2 supports reforms to improve resilience to current and future climate change of coastal and marine areas, buildings and strengthen the effectiveness and efficiency of social protection programs. Pillar 3 supports measures to strengthen debt and public financial management. These reforms are closely aligned with current priorities of the 5- and 20-year National Development Plan.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0044946"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0044945"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-12-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-03-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-03-24"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-03-24"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Naomi Muthoni Mathenge</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nmathenge@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2198148" />
                <name><narrative>Suva</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-18.13683 178.42531</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="24010" percentage="32" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="18" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="17" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="17" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FK" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Capital Markets</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="14" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000322" percentage="14" xml:lang="en"><narrative>Payment &amp; markets infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="14" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="14" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="14" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="14" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="14" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="14" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000832" percentage="14" xml:lang="en"><narrative>Fisheries Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="29" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="14" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="14" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="14" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="14" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="14" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="14" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="14" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="14" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="29" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="14" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="14" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="14" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="14" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000333" percentage="14" xml:lang="en"><narrative>Infrastructure Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="29" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="29" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="14" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="14" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="14" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2027-03-24"/>
<value currency="USD" value-date="2027-03-24">145000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2027-03-24"/>
<value currency="USD" value-date="2027-03-24">145000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2027-03-24"/>
<value currency="USD" value-date="2027-03-24">10462264.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2027-03-24"/>
<value currency="USD" value-date="2027-03-24">10462264.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">10000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">110000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">25000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">62500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">24937500</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">109537736</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-62500</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-230594</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-91731</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-154611</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-400109</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-379453</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-237563</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-580111</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-381277</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-383594</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-779306</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-872859</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-378988</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-377498</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-867930</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-804776</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-381320</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-390726</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-730970</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-709249</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-393650</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-44945"><narrative>Ministry of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-44948"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173558"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173558?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173558"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator 3: Volume of foreign investment commitments
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="24,300,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="27,900,000.00">
<comment><narrative>
Exceeded. The baseline value of USD 24.3 million reflects the median investment commitments announced for Fiji between CY2015 and CY2019. The median value was used to correct for the high variance in annual commitments. As per fDi Markets and using the same methodology, median investment commitments between CY2015 and CY2024 is USD 45.7 million.
</narrative></comment>
</target>
<actual value="45,700,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 9: (i) external (FX) debt as percent of total public debt; and (ii) the number of instruments
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="(i) 26 percent (ii) 396"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2024-06-30" />
<target value="(i) 30 percent (+/-5%) (ii) 320">
<comment><narrative>
On Track. 
(i) FX debt remains slightly above the threshold of 30(+/-5) percent of total debt due to the increase in concessional financing during the COVID-19 pandemic. 

(ii) The reduction was due to the high number of instruments maturing during the period.
</narrative></comment>
</target>
<actual value="(i) 36.1 (ii) 348">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 10: Number of programs across budget agencies performing gender impact assessments and collecting sex-disaggregated data for monitoring and evaluation
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2024-06-30" />
<target value="35 out of 200">
<comment><narrative>
Exceeded. In the FY25 Budget, the Gender Responsive Planning and Budgeting (GRPB) has been rolled out to all ministries and departments with 53 programs altogether being assessed as part of the GRPB process.
</narrative></comment>
</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 7: Implementation plan for developing and piloting/testing impact-based multi-hazard early warning
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2024-06-30" />
<target value="Yes">
<comment><narrative>
On Track. The Government has reviewed hazard and impact tables and is engaging stakeholders through workshops. A World Bank mission is envisaged in Q1 2025 to support a needs assessment for Multi Hazard Early Warning Systems, including a stock take of current and planned support.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator 2: Number of outstanding corporate bond issuances
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
On Track. No corporate bonds were issued in FY24. Two issuances are in the pipeline.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 5: Share of 150 funded activities implemented by women community groups
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2023-06-30" />
<target value="50.00">
<comment><narrative>
Achieved. A total of 75 groups engaged and paid under the Jobs For Nature (JFN) project.
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 12: The annual revenue impact of the film rebate reduction
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2024-06-30" />
<target value="0.4 percent of GDP">
<comment><narrative>
Slow Progress. Effective August 1, 2023, film rebates are being issued under Government's expenditure and not through revenue refunds. This is because the Ministry of Trade, Cooperatives, Small and Medium Enterprises houses Film Fiji and administers film rebates as an expenditure item in its budget. This is merely a recalibration of a tax expenditure item from the revenue account to expenditure account. The reduction in film rebate is measured from the rebate issued in a year compared to the baseline value. For FY24, the reduction amounts to a negative 0.1 percent of GDP, implying an annual increase in the volume of the rebate while no data is available on the number of approved certificates to film projects/companies.
</narrative></comment>
</target>
<actual value="-0.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator 1: The annual volume of payments made electronically through the Real-Time Gross Settlement System
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="148,786.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="185,930.00">
<comment><narrative>
Exceeded. The increment is a result of the efficiencies introduced by straight through processing between commercial banks.
</narrative></comment>
</target>
<actual value="2,134,266.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator 1: The annual volume of payments made electronically through the Real-Time Gross Settlement System
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="148,786.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="185,930.00">
<comment><narrative>
The total number of RTGS payments has declined in line with the Reserve Bank of Fiji's National Payment System project of routing payments through EFTs and IFTs as opposed to RTGS.
</narrative></comment>
</target>
<actual value="612157">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 6:Percentage of import permits for steel reinforcement material being manufactured in accordance with the revised standard, or suitable equivalent standard
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="100.00">
<comment><narrative>
No progress reported for FY25.
</narrative></comment>
</target>
<actual value="Not reported">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 7: Implementation plan for developing and piloting/testing impact-based multi-hazard early warning
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2024-06-30" />
<target value="Yes">
<comment><narrative>
NDMO has an ongoing collaboration with the Coalition for Disaster Resilient Infrastructure (CDRI) where one of the key output is the formulation of a Roadmap for the Multi Hazard Common alerting Protocol which will ensure that warning messages are standardized across all hazards.
</narrative></comment>
</target>
<actual value="Ongoing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator 2: Number of outstanding corporate bond issuances
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="2.00">
<comment><narrative>
There was one issuance of wholesale corporate bonds in 2025, with the application received in February 2025 and approved in October 2025
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator 3: Volume of foreign investment commitments
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="24,300,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="27,900,000.00">
<comment><narrative>
July 2025 not reported
</narrative></comment>
</target>
<actual value="Not reported">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 4: Percentage of area within the national jurisdiction legally designated as Marine Protected Areas that contribute to climate resilience &amp; establishment of the Adaptation Registry
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="(i) 1 (ii) None"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2024-06-30" />
<target value="(i) 5 (ii) Established and made publicly available">
<comment><narrative>
No update was provided.
</narrative></comment>
</target>
<actual value="Not reported">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 5: Share of 150 funded activities implemented by women community groups
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2023-06-30" />
<target value="50.00">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 8: Share of social assistance programs that include gender-sensitive and disaster responsiveness criteria for determining assistance
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2024-06-30" />
<target value="50.00">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 9: (i) external (FX) debt as percent of total public debt; and (ii) the number of instruments
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="(i) 26 percent (ii) 396"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2024-06-30" />
<target value="(i) 30 percent (+/-5%) (ii) 320">
<comment><narrative>
(i) FX debt remains slightly above the threshold of 30(+/-5) percent of total debt due to the increase in concessional financing during the COVID-19 pandemic. 

(ii) Retail (Viti) bond considered as single instrument
</narrative></comment>
</target>
<actual value="(i) 35.2 (ii) 328">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 10: Number of programs across budget agencies performing gender impact assessments and collecting sex-disaggregated data for monitoring and evaluation
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2024-06-30" />
<target value="35 out of 200">
<comment><narrative>
2025 report not provided.
</narrative></comment>
</target>
<actual value="Not reported">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 11: The value added tax as percent of GDP
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="4.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2024-06-30" />
<target value="7.10">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="11.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 12: The annual revenue impact of the film rebate reduction
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2024-06-30" />
<target value="0.4 percent of GDP">
<comment><narrative>
Effective August 1, 2023, film rebates are being issued under Government's expenditure and not through revenue refunds. This is because the Ministry of Trade, Cooperatives, Small and Medium Enterprises houses Film Fiji and administers film rebates as an expenditure item in its budget. This is merely a recalibration of a tax expenditure item from the revenue account to expenditure account. The reduction in film rebate is measured from the rebate issued in a year compared to the baseline value. For FY24, the reduction amounts to a negative 0.1 percent of GDP, implying an annual increase in the volume of the rebate while no data is available on the number of approved certificates to film projects/companies.
</narrative></comment>
</target>
<actual value="0.0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 6:Percentage of import permits for steel reinforcement material being manufactured in accordance with the revised standard, or suitable equivalent standard
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2024-06-30" />
<target value="100.00">
<comment><narrative>
On Track. In FY24, 83 percent of the import permits issued to importers were in compliance with the applicable standards. Though 17 percent of the importers did not comply with the applicable standards, the line Ministry is working with the stakeholders to address the non-compliance issues to ensure a return to the targeted 100 percent compliance.
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 11: The value added tax as percent of GDP
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="4.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2024-06-30" />
<target value="7.10">
<comment><narrative>
Exceeded. The unification of VAT rates from 9 and 15 to 15 percent since August 1, 2023 has bolstered revenue collection from VAT together with the swift recovery from the COVID-19 pandemic.
</narrative></comment>
</target>
<actual value="10.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Results Indicator 4: Percentage of area within the national jurisdiction legally designated as Marine Protected Areas that contribute to climate resilience &amp; establishment of the Adaptation Registry
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="(i) 1 (ii) None"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2024-06-30" />
<target value="(i) 5 (ii) Established and made publicly available">
<comment><narrative>
(i) On Track. The Government through the Ministry of Environment, Waterways and Fisheries is currently gazetting 8.26 percent of the 30 percent MPA target.

(ii) Slow Progress. There is no progress made with the Adaptation Registry.
</narrative></comment>
</target>
<actual value="(i) 1 (ii) None">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator 8: Share of social assistance programs that include gender-sensitive and disaster responsiveness criteria for determining assistance
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2024-06-30" />
<target value="50.00">
<comment><narrative>
Exceeded. All social assistance programs include gender-sensitive and disaster responsiveness criteria for determining assistance.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P173903</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji COVID-19 Emergency Response Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To prevent, detect and respond to the threat posed by COVID-19 and strengthen national systems for public health preparedness in the Republic of Fiji.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project aims to prevent, detect and respond to the threat posed by COVID-19 and strengthen national systems for public health preparedness in Fiji by improving emergency preparedness and response, strengthening health systems and managing implementation and monitoring &amp; evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0045416"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0045416"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0045417"><narrative>Ministry of Health &amp; Medical Services</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-04-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Margareta Norris Harrit</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mharrit@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002205218" />
            <name><narrative>Republic of Fiji</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 178</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="48" xml:lang="en"/><sector vocabulary="1" code="12261" percentage="26" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="26" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="54.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="34" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="49" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="34" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="52" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">4565.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">4565.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">4565.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">371031.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">371031.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">158333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">42624.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">158272.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">158272.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">158272.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">69831.93</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">69831.93</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">6400000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-121468</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">95580</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">130313</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">209625</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">407110</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">513775</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">224173</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">31163</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">32523</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">7233</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">417312</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">47138</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">9645</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">160100</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">24333</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">37286</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">80978</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">38466</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">102956</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">85071</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">173829</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">80112</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">89215</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">213517</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">60660</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">82662</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">83942</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">542229</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">695648</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">270206</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">156875</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">147885</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">42279</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">261517</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">251722</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">144860</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">26310</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">103662</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">74152</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">261035</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-17823</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-69105</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-339</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3646</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-6798</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-8248</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-10625</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-15088</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-19997</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-22080</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-23659</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-24227</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-23787</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-45417"><narrative>Ministry of Health &amp; Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173903"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173903?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173903"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who expressed satisfaction with the project interventions, including on delivery and communication modalities
</narrative></title>
<baseline year="2020" iso-date="2020-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-01" />
<period-end iso-date="2023-05-31" />
<target value="80.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of suspected and diagnosed cases treated as per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-04-27" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-27" />
<period-end iso-date="2023-05-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of identified at-risk population investigated with laboratory testing for COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2023-05-31" />
<target value="95.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities with improved connectivity for case reporting and public health surveillance
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2023-05-31" />
<target value="35.00">

</target>
<actual value="56.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of identified at-risk population investigated with laboratory testing for COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2023-05-31" />
<target value="95.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who expressed satisfaction with the project interventions, including on delivery and communication modalities
</narrative></title>
<baseline year="2020" iso-date="2020-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-01" />
<period-end iso-date="2023-05-31" />
<target value="80.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health workers responding to surge receiving overtime and per diem payments
</narrative></title>
<baseline year="2020" iso-date="2020-04-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-27" />
<period-end iso-date="2023-05-31" />
<target value="100.00">

</target>
<actual value="401.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities with improved connectivity for case reporting and public health surveillance
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2023-05-31" />
<target value="35.00">

</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health workers responding to surge receiving overtime and per diem payments
</narrative></title>
<baseline year="2020" iso-date="2020-04-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-27" />
<period-end iso-date="2023-05-31" />
<target value="100.00">

</target>
<actual value="401.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities with access to improved health care waste management facilities
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2024-06-28" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of suspected and diagnosed cases treated as per approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-04-27" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-27" />
<period-end iso-date="2023-05-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities with access to improved health care waste management facilities
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2024-03-29" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system established to monitor COVID-19 preparedness and response plan (No/yes)
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2023-05-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system established to monitor COVID-19 preparedness and response plan (No/yes)
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2023-05-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P175206</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Social Protection COVID-19 Response and System Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[to mitigate the impact of the COVID-19 crisis on the income of the unemployed and underemployed, and to increase efficiency and adaptability of the social protection system of the Recipient.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Social Protection COVID-19 Response and System Development Project for Fiji is to mitigate the impact of the Coronavirus (COVID-19) crisis on the income of the unemployed and underemployed, and to increase efficiency and adaptability of the social protection system. This project has two components. 1) The first component, Cash transfers to the unemployed and underemployed affected by Coronavirus (COVID-19), aims to support cash payments to the FNPF beneficiaries who have lost their jobs or face reduced hours or reduced wages in the formal sector because of the Coronavirus (COVID-19) crisis. 2) The second component, Institutional strengthening, has the following three sub-components: (i) Developing an Adaptive Social Protection Strategy for Fiji; (ii) Strengthening Social Protection Delivery Systems; and (iii) Monitoring and Evaluation and Project Management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0047300"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0047301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2021-02-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-02-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Yuliya Smolyar</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jsmolyar@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002205218" />
            <name><narrative>Republic of Fiji</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 178</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="50" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="100" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="100" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="50" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="100" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="100" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="50" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="100" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="50" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">97940.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">11782472.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">22710266.04</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">9462704.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">649474.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">9516.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">50000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">48900000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2997302</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-3269784</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-720560</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-57951</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">97940</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">11782472</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">22710266</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">9462704</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">649474</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">9516</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">37483911</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">43557</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">29038</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">29038</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">29038</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">29038</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">29038</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">152626</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">70451</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">64744</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">61907</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">15555</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">221550</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">29038</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">138760</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">30779</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">21779</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">133756</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">179420</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">175588</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">98798</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">127484</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">83798</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">198847</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">589449</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">26377</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">79132</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">311945</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">246187</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">79132</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">87132</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">150156</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">118934</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">109336</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">381551</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">166903</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">247413</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">345597</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">180432</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">223525</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">256111</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">918068</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">436229</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">450855</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">87826</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-40713</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-5688</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-185470</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-155971</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-185486</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-157197</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-159661</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-142297</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-141757</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-158970</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-146152</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-159157</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-151297</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-161418</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-161935</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-165309</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-166546</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-168916</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47301"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175206"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175206?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175206"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed and underemployed who received cash transfers with the government top-ups from FNPF
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2021-07-29" />
<target value="60,000.00">

</target>
<actual value="68,864.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed and underemployed who received cash transfers with the government top-ups from FNPF
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2021-07-29" />
<target value="60,000.00">

</target>
<actual value="68,864.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adaptive Social Protection Strategy and action plans developed and adopted
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2024-07-29" />
<target value="Yes">
<comment><narrative>
The ASP Strategy &amp; Implementation Plan was approved by Cabinet on April 9,2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adaptive Social Protection Strategy and action plans developed and adopted
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2024-07-29" />
<target value="Yes">
<comment><narrative>
The ASP Strategy &amp; Implementation Plan was approved by Cabinet on April 9,2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed in formal and informal sectors because of COVID-19 crisis who received cash transfers directly paid by the Government of Fiji under the AF
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2022-07-29" />
<target value="340,671.00">

</target>
<actual value="536,271.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed in formal and informal sectors because of COVID-19 crisis who received cash transfers directly paid by the Government of Fiji under the AF
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2022-07-29" />
<target value="340,671.00">

</target>
<actual value="536,271.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries who received employment opportunities under the Jobs for Nature 2.0
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2025-07-29" />
<target value="14,000.00">

</target>
<actual value="12606">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries who received employment opportunities under the Jobs for Nature 2.0
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2025-07-29" />
<target value="14,000.00">

</target>
<actual value="12606">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Specific operational manual for the Stronger Together Program adopted by the Ministry of Economy
</narrative></title>
<baseline year="2020" iso-date="2020-11-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-29" />
<period-end iso-date="2024-07-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of the standard operating procedure (SOP) developed for an economic inclusion framework
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="Yes">
<comment><narrative>
Work in progress as reported by MWCSP. Ministry has recently hired 2 staff who are working on this.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of degraded sites restored and rehabilitated using nature-based solutions
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="200.00">

</target>
<actual value="222">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed in formal and informal sectors because of COVID-19 crisis who received cash transfers directly paid by the Government of Fiji under the AF
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2022-07-29" />
<target value="340,671.00">

</target>
<actual value="536,271.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adaptive Social Protection Strategy and action plans developed and adopted
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2024-07-29" />
<target value="Yes">
<comment><narrative>
The ASP Strategy &amp; Implementation Plan was approved by Cabinet on April 9,2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of stakeholders who received training throughout the cycle of Jobs for Nature 2.0
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="1,440.00">

</target>
<actual value="179">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries who received employment opportunities under the Jobs for Nature 2.0
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2025-07-29" />
<target value="14,000.00">

</target>
<actual value="12606">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of unemployed and underemployed whose application were processed and approved in five business days
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2021-07-30" />
<target value="90.00">

</target>
<actual value="95.00%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries who received employment opportunities under the Jobs for Nature 2.0 are social welfare beneficiaries
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="10.00">

</target>
<actual value="10.77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed and underemployed who received cash transfers with the government top-ups from FNPF
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2021-07-29" />
<target value="60,000.00">

</target>
<actual value="68,864.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of stakeholders who received training throughout the cycle of Jobs for Nature 2.0
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="1,440.00">

</target>
<actual value="179">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to wage payment to the beneficiaries of Jobs for Nature 2.0 resolved in a timely manner
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="80.00">

</target>
<actual value="93.10 %">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of the standard operating procedure (SOP) developed for an economic inclusion framework
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="Yes">
<comment><narrative>
Work in progress as reported by MWCSP. Ministry has recently hired 2 staff who are working on this.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries who received employment opportunities under the Jobs for Nature 2.0
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2025-07-29" />
<target value="14,000.00">

</target>
<actual value="12606">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed in formal and informal sectors because of COVID-19 crisis who received cash transfers directly paid by the Government of Fiji under the AF
</narrative></title>
<baseline year="2021" iso-date="2021-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-30" />
<period-end iso-date="2022-07-29" />
<target value="340,671.00">

</target>
<actual value="536,271.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of degraded sites restored and rehabilitated using nature-based solutions
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="200.00">

</target>
<actual value="222">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries who received employment opportunities under the Jobs for Nature 2.0 are social welfare beneficiaries
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="10.00">

</target>
<actual value="10.77">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of unemployed and underemployed whose application were processed and approved in five business days
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2021-07-30" />
<target value="90.00">

</target>
<actual value="95.00%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of unemployed and underemployed who received cash transfers with the government top-ups from FNPF
</narrative></title>
<baseline year="2020" iso-date="2020-03-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-25" />
<period-end iso-date="2021-07-29" />
<target value="60,000.00">

</target>
<actual value="68,864.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Specific operational manual for the Stronger Together Program adopted by the Ministry of Economy
</narrative></title>
<baseline year="2020" iso-date="2020-11-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-29" />
<period-end iso-date="2024-07-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to wage payment to the beneficiaries of Jobs for Nature 2.0 resolved in a timely manner
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2025-07-30" />
<target value="80.00">

</target>
<actual value="93.10 %">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adaptive Social Protection Strategy and action plans developed and adopted
</narrative></title>
<baseline year="2020" iso-date="2020-10-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-28" />
<period-end iso-date="2024-07-29" />
<target value="Yes">
<comment><narrative>
The ASP Strategy &amp; Implementation Plan was approved by Cabinet on April 9,2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P175543</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Recovery and Resilience Second Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective is to: i) promote private sector-led economic recovery; ii) enhance climate, disaster and social resilience; and iii) strengthen debt, public financial and fiscal management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0047724"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0047725"><narrative>Ministry of Economy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-07-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-03-25"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-03-25"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mehwish Ashraf</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mashraf3@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2198148" />
                <name><narrative>Suva</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-18.13683 178.42531</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15155" percentage="25" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="13" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="13" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="12" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="12" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="12" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="37.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="13" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="13" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="13" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="13" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000322" percentage="13" xml:lang="en"><narrative>Payment &amp; markets infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="13" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000832" percentage="13" xml:lang="en"><narrative>Fisheries Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="13" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="13" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="50" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="13" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="13" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="38" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000833" percentage="13" xml:lang="en"><narrative>Oceans</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="13" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="50" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="13" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="13" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="13" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="13" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="13" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-25"/>
<value currency="USD" value-date="2024-03-25">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-25"/>
<value currency="USD" value-date="2024-03-25">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-25"/>
<value currency="USD" value-date="2024-03-25">1278044.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-25"/>
<value currency="USD" value-date="2024-03-25">1278044.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">50000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">48721956</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-186637</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-1044214</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-1438527</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-191882</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-186684</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-1651365</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-1650713</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-185955</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-181575</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-1567508</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-1380873</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-188174</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-192436</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-1357928</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-47725"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175543"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175543?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175543"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P178694</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Tourism Development Program in Vanua Levu</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDOs) of Phase I MPA are to strengthen targeted infrastructure and essential services, increase coordination and private sector participation in tourism, and enhance environmental sustainability of tourism assets.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project is Phase I of a multiphase programmatic approach (MPA). The MPA is a comprehensive 3-phase tourism development program in Vanua Levu that will support the realization of Fiji's national development, private sector growth, and green growth plans. The program has two main aims: a) to improve the resilience and sustainability of the tourism industry, including short-term recovery and longer-term diversification and high-value growth; and b) to facilitate the execution of existing Government plans.  Phase I will set the foundations for sustainable tourism in Vanua Levu. It will directly tackle the major barriers to tourism growth, namely, the insufficient transport infrastructure and essential services, uncoordinated plans and institutions, and a cumbersome business environment. Phase I investments will identify and rollout: a) the upgrade of key infrastructure (for example, improving the configuration, coordination, and safety at Savusavu and Labasa airports) and selective no-regret investments in essential facilities (such as solid waste management, wastewater treatment, medical clinics, and renewable energy); b) support tourism master planning, sector and destination coordination activities, tourism MSME recovery and expansion to enhance services and products, access to finance, and skills development, particularly targeting women and youth, piloting public private partnership (PPP) approaches for further roll out; and c) institutional capacity building to support deeper engagements in subsequent phases.Phase II will put physical and social capital infrastructure in place, building on findings from the feasibility studies and Integrated Tourism Master Plan (IITMP) in Phase I to support viable and critical mid-size investments in infrastructure and essential services, especially to open new areas for tourism investment; deepen and expand tourism sector and destination coordination and institutionalize skills training, destination awareness, and access to finance for tourism private sector development and product development. It will scale up successful interim interventions and potentially make them permanent. Phase III will support the full rollout of the investments, coordination mechanisms and policy reforms identified in the sustainable tourism master plan. It will continue institutionalizing sector coordination and facilitating sustainable financing for tourism products to consolidate sector gains and growth. Building on the previous two Phases, this final Phase will see more longer-term outcomes, such as improved infrastructure connectivity, increased tourism revenue and tourism-related jobs, and increased community benefits from integrated tourism development in Vanua Levu.This A-ESRS considers the environmental and social risks associated with Phase I only.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0051944"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0055173"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0051945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-05-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Rajesh Rohatgi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rrohatgi@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>













<recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002198520" />
            <name><narrative>Savusavu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.77942 179.33564</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002201513" />
            <name><narrative>Nasasa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.38642 179.57133</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002202023" />
            <name><narrative>Nadogo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.43052 179.58592</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002202346" />
            <name><narrative>Nabua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.69101 179.49087</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002202352" />
            <name><narrative>Nabouwalu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.99745 178.69078</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002203546" />
            <name><narrative>Buca Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.66158 179.85625</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002204582" />
            <name><narrative>Labasa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.4332 179.36451</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002202643" />
            <name><narrative>Namalata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.91736 179.00921</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002201754" />
            <name><narrative>Nagigi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.80042 179.47808</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002199989" />
            <name><narrative>Dawara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.79866 179.01019</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002197726" />
            <name><narrative>Cogea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.82754 178.89867</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002196556" />
            <name><narrative>Votua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.66893 178.72075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002194861" />
            <name><narrative>Wairiki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.9274 178.66614</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002200747" />
            <name><narrative>Navakawau</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.99482 179.94722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002200867" />
            <name><narrative>Natuvu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.74444 179.15335</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002201116" />
            <name><narrative>Natewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.6 179.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004035826" />
            <name><narrative>Vidawa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.81744 -179.8667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0004036017" />
            <name><narrative>Naselesele</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.69794 -179.86791</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0012041678" />
            <name><narrative>Saqani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.34792 179.77339</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="33210" percentage="82" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YT" percentage="85.0000000" xml:lang="en"><narrative>FY17 - Tourism</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="35" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="8" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="80" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="35" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="35" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="35" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="35" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="35" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="35" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="37" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="37" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="35" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="80" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="35" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="80" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000073" percentage="100" xml:lang="en"><narrative>Cultural Heritage</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="35" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="80" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">429166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">429166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">550833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">550833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1079166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1079166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">49844978.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">49844978.58</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">61500000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">2170210</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1090274</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1484018</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1128819</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">2635800</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1357500</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1788400</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4528</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-13130</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-18876</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-28840</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-51945"><narrative>Ministry of Commerce, Trade, Tourism and Transport</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51946"><narrative>Labasa Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51947"><narrative>Fiji Roads Authority</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51948"><narrative>Water Authority Fiji</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51949"><narrative>Savusavu Town Council</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51950"><narrative>Ministry of Forestry</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51951"><narrative>Airports Fiji Limited</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51952"><narrative>Ministry of Fisheries</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-51953"><narrative>Ministry of Waterways and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="FJ-COA-54793"><narrative>Ministry of Tourism and Civil Aviation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178694"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178694?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178694"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Peopled trained on emergency preparedness
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="20.00">
<comment><narrative>
This indicator refers to training on emergency preparedness and response to tourist based on emergency preparedness operations manual and associated procedures that will be prepared as part of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Automated Weather Observation System (AWOS) installed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="2.00">
<comment><narrative>
Installation of AWOS at Labasa Domestic Airport and Savusavu Domestic Airport
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Whole-of-government Integrated Tourism Master Plan developed and endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
The indicator captures the completion of the integrated tourism master plan and the endorsement by Cabinet.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Peopled trained on emergency preparedness
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="20.00">
<comment><narrative>
This indicator refers to training on emergency preparedness and response to tourist based on emergency preparedness operations manual and associated procedures that will be prepared as part of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community-driven cityscape improvement works constructed in Savusavu and Labasa town centers
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
Cityscape enhancement works constructed in Savusavu and Labasa with a community-driven approach. Investment may include: traffic calming measures to reduce the operating speed of vehicles; constructing/rehabilitating safe walkways; installing safe crossings; modifications to the on-street parking layout; establishing a protected bike lane network including wayfinding signage and bicycle parking; creating and upkeeping green areas; building and maintaining public toilets; installing adequate signage and bins; introducing general clean-up and beautification programs; and outfitting a planned visitor information center in the new Savusavu market.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Automated Weather Observation System (AWOS) installed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="2.00">
<comment><narrative>
Installation of AWOS at Labasa Domestic Airport and Savusavu Domestic Airport
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs with improved tourism products and services
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="80.00">
<comment><narrative>
The Annual survey with beneficiary firms will gather data on the increase in the number and type of products and services being provided by MSMEs participating in project support activities. The results of the survey will be disaggregated by destination and beneficiaries: type of business, size of business, gender of owner. The survey will be carried out in year 2 after the first round of MSME activities are delivered
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new locally managed marine areas established in Vanua Levu
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="31.00">
<comment><narrative>
Number of new site-specifically designated as LMMA with plans including general management plans at community or village level resource and use plans for the LMMA.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sewerage Treatment Facility piloted and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
New household sewer connections, sewerage collection networks, and end-of-pipe treatment facilities constructed and in operation.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sites with management plans
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="10.00">
<comment><narrative>
Number of site-specific planning including General Management Plans at community or village level resource and use plans for the PA
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety features and climate resilience measures installed on the Labasa-Savusavu Road
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="95.00">
<comment><narrative>
Length of road safety features and climate resilience measures installed on the Labasa-Savusavu Road
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in destination marketing reach
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="50.00">
<comment><narrative>
The increase in the number of potential visitors in target markets with knowledge about the destinations in the project areas
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of tourism MSMEs with new or increased sales (gender-disaggregated)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="120.00">
<comment><narrative>
This indicator will assess the number of MSMEs supported by the project that have been able to obtain new or expanded sales to deliver tourism products and services to local hospitality businesses or directly to tourists
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with access to new or improved resilient infrastructure (air and road transport)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="56,000.00">
<comment><narrative>
This indicator measures the number of direct beneficiaries that experienced improved access to transport infrastructure and services (air and road transport) that have been built or rehabilitated through the project. Air transport infrastructure measurements will include both residents and tourists. The pre-COVID air passenger number in 2019 was around 32,000 for Labasa Domestic Airport and 2,000 for Savusavu Domestic Airport. The current traffic counts for the Labasa-Savusavu Cross Island Link Road are not available. It is assumed that around 60% of the visitors (20,000) arriving at Labasa Domestic Airport will travel on Cross Island Link Road to go to Savusavu Town.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Whole-of-government Integrated Tourism Master Plan developed and endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
The indicator captures the completion of the integrated tourism master plan and the endorsement by Cabinet.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Whole-of-government Integrated Tourism Master Plan developed and endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
The indicator captures the completion of the integrated tourism master plan and the endorsement by Cabinet.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with access to new or improved resilient infrastructure (air and road transport)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="56,000.00">
<comment><narrative>
This indicator measures the number of direct beneficiaries that experienced improved access to transport infrastructure and services (air and road transport) that have been built or rehabilitated through the project. Air transport infrastructure measurements will include both residents and tourists. The pre-COVID air passenger number in 2019 was around 32,000 for Labasa Domestic Airport and 2,000 for Savusavu Domestic Airport. The current traffic counts for the Labasa-Savusavu Cross Island Link Road are not available. It is assumed that around 60% of the visitors (20,000) arriving at Labasa Domestic Airport will travel on Cross Island Link Road to go to Savusavu Town.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with access to new or improved resilient infrastructure (air and road transport)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="56,000.00">
<comment><narrative>
This indicator measures the number of direct beneficiaries that experienced improved access to transport infrastructure and services (air and road transport) that have been built or rehabilitated through the project. Air transport infrastructure measurements will include both residents and tourists. The pre-COVID air passenger number in 2019 was around 32,000 for Labasa Domestic Airport and 2,000 for Savusavu Domestic Airport. The current traffic counts for the Labasa-Savusavu Cross Island Link Road are not available. It is assumed that around 60% of the visitors (20,000) arriving at Labasa Domestic Airport will travel on Cross Island Link Road to go to Savusavu Town.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new locally managed marine areas established in Vanua Levu
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="31.00">
<comment><narrative>
Number of new site-specifically designated as LMMA with plans including general management plans at community or village level resource and use plans for the LMMA.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new locally managed marine areas established in Vanua Levu
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="31.00">
<comment><narrative>
Number of new site-specifically designated as LMMA with plans including general management plans at community or village level resource and use plans for the LMMA.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of tourism MSMEs with new or increased sales (gender-disaggregated)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="120.00">
<comment><narrative>
This indicator will assess the number of MSMEs supported by the project that have been able to obtain new or expanded sales to deliver tourism products and services to local hospitality businesses or directly to tourists
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of tourism MSMEs with new or increased sales (gender-disaggregated)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="120.00">
<comment><narrative>
This indicator will assess the number of MSMEs supported by the project that have been able to obtain new or expanded sales to deliver tourism products and services to local hospitality businesses or directly to tourists
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with essential services provision (disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="80.00">
<comment><narrative>
This gender-disaggregated indicator measures the improvement of essential services (solid waste management,  wastewater management, road rehabilitation): as services improve, more residents and visitors will express satisfaction.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with essential services provision (disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="80.00">
<comment><narrative>
This gender-disaggregated indicator measures the improvement of essential services (solid waste management,  wastewater management, road rehabilitation): as services improve, more residents and visitors will express satisfaction.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of tourism MSMEs with new or increased sales (gender-disaggregated)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="120.00">
<comment><narrative>
This indicator will assess the number of MSMEs supported by the project that have been able to obtain new or expanded sales to deliver tourism products and services to local hospitality businesses or directly to tourists
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Labasa-Savusavu Domestic Airport Upgrades
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="2.00">
<comment><narrative>
Rehabilitation and construction of various ancillary infrastructure at Labasa Domestic Airport and Savusavu Domestic Airport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Whole-of-government Integrated Tourism Master Plan developed and endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
The indicator captures the completion of the integrated tourism master plan and the endorsement by Cabinet.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sewerage Treatment Facility piloted and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
New household sewer connections, sewerage collection networks, and end-of-pipe treatment facilities constructed and in operation.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people with access to new or improved resilient infrastructure (air and road transport)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="56,000.00">
<comment><narrative>
This indicator measures the number of direct beneficiaries that experienced improved access to transport infrastructure and services (air and road transport) that have been built or rehabilitated through the project. Air transport infrastructure measurements will include both residents and tourists. The pre-COVID air passenger number in 2019 was around 32,000 for Labasa Domestic Airport and 2,000 for Savusavu Domestic Airport. The current traffic counts for the Labasa-Savusavu Cross Island Link Road are not available. It is assumed that around 60% of the visitors (20,000) arriving at Labasa Domestic Airport will travel on Cross Island Link Road to go to Savusavu Town.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with essential services provision (disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="80.00">
<comment><narrative>
This gender-disaggregated indicator measures the improvement of essential services (solid waste management,  wastewater management, road rehabilitation): as services improve, more residents and visitors will express satisfaction.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rooftop solar panels installed on public buildings in Labasa and Savusavu
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
Installation of rooftop solar panels on Labasa Town Council Building, Savusavu Town Council Building, and Savusavu New Market
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community-driven cityscape improvement works constructed in Savusavu and Labasa town centers
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
Cityscape enhancement works constructed in Savusavu and Labasa with a community-driven approach. Investment may include: traffic calming measures to reduce the operating speed of vehicles; constructing/rehabilitating safe walkways; installing safe crossings; modifications to the on-street parking layout; establishing a protected bike lane network including wayfinding signage and bicycle parking; creating and upkeeping green areas; building and maintaining public toilets; installing adequate signage and bins; introducing general clean-up and beautification programs; and outfitting a planned visitor information center in the new Savusavu market.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sites with management plans
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="10.00">
<comment><narrative>
Number of site-specific planning including General Management Plans at community or village level resource and use plans for the PA
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New solid waste management facility for Savusavu constructed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
Implementation of an environmentally sound solid waste management facility for Savusavu. The existing dump site is rehabilitated. A leachate management system is in place.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Labasa-Savusavu Domestic Airport Upgrades
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="2.00">
<comment><narrative>
Rehabilitation and construction of various ancillary infrastructure at Labasa Domestic Airport and Savusavu Domestic Airport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of tourism and tourism-related MSMEs satisfied with the project interventions (disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="75.00">
<comment><narrative>
The Annual survey with beneficiary firms will gather data on the increase in the percentage of survey respondents who report being ‘satisfied’ or ‘very satisfied’ with their participation in, and outcomes of, their respective program (including responsiveness to feedback they provide). The results of the survey will be disaggregated by destination and beneficiaries: type of business, size of business, gender of owner. The target of 75 percent respondents being satisfied is expected for all groups. The survey will be carried out in year 2 after the first round of MSME activities are delivered
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety features and climate resilience measures installed on the Labasa-Savusavu Road
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="95.00">
<comment><narrative>
Length of road safety features and climate resilience measures installed on the Labasa-Savusavu Road
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government service providers benefiting from skills enhancement
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="50.00">
<comment><narrative>
Number of government service providers benefitting from the skills enhancement training/workshops. This component focuses on building the capacity of statutory bodies, such as FRA, WAF, and the National Trust of Fiji, to develop and manage sustainable and resilient infrastructure.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New solid waste management facility for Savusavu constructed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
Implementation of an environmentally sound solid waste management facility for Savusavu. The existing dump site is rehabilitated. A leachate management system is in place.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with essential services provision (disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="80.00">
<comment><narrative>
This gender-disaggregated indicator measures the improvement of essential services (solid waste management,  wastewater management, road rehabilitation): as services improve, more residents and visitors will express satisfaction.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs with improved tourism products and services
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="80.00">
<comment><narrative>
The Annual survey with beneficiary firms will gather data on the increase in the number and type of products and services being provided by MSMEs participating in project support activities. The results of the survey will be disaggregated by destination and beneficiaries: type of business, size of business, gender of owner. The survey will be carried out in year 2 after the first round of MSME activities are delivered
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new locally managed marine areas established in Vanua Levu
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="31.00">
<comment><narrative>
Number of new site-specifically designated as LMMA with plans including general management plans at community or village level resource and use plans for the LMMA.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in destination marketing reach
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="50.00">
<comment><narrative>
The increase in the number of potential visitors in target markets with knowledge about the destinations in the project areas
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of tourism and tourism-related MSMEs satisfied with the project interventions (disaggregated by gender)
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="75.00">
<comment><narrative>
The Annual survey with beneficiary firms will gather data on the increase in the percentage of survey respondents who report being ‘satisfied’ or ‘very satisfied’ with their participation in, and outcomes of, their respective program (including responsiveness to feedback they provide). The results of the survey will be disaggregated by destination and beneficiaries: type of business, size of business, gender of owner. The target of 75 percent respondents being satisfied is expected for all groups. The survey will be carried out in year 2 after the first round of MSME activities are delivered
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rooftop solar panels installed on public buildings in Labasa and Savusavu
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="Yes">
<comment><narrative>
Installation of rooftop solar panels on Labasa Town Council Building, Savusavu Town Council Building, and Savusavu New Market
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government service providers benefiting from skills enhancement
</narrative></title>
<baseline year="2023" iso-date="2023-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-26" />
<period-end iso-date="2029-06-30" />
<target value="50.00">
<comment><narrative>
Number of government service providers benefitting from the skills enhancement training/workshops. This component focuses on building the capacity of statutory bodies, such as FRA, WAF, and the National Trust of Fiji, to develop and manage sustainable and resilient infrastructure.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P180979</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Critical Bridges Resilience Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve the resilience of Fiji's road network to natural hazards and climate change with a focus on critical bridges.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project forms part of the Pacific Climate Resilient Transport Program (PCRTP) Series of Projects (SOP). PCRTP, which has four broad pillars that focus on increasing resilience in the transport sector through: (i) utilizing spatial and sector planning tools; (ii) investing in climate resilient infrastructure; (iii) strengthening the enabling environment; and, (iv) supporting post-disaster recovery. The activities proposed under the Project are aligned with these four broad pillars of support. The proposed US$226 million project will be jointly financed with Asian Development Bank (ADB) contributing a minimum of US$60 million and IBRD providing US$50 million. The Project Development Objective (PDO) is to: “Improve the resilience of Fiji's road network to natural hazards and climate change, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.”  The PDO will be achieved through the following proposed components: (i) Component 1: Spatial and Sector Planning Tools, (ii) Component 2: Climate Resilient Bridge Infrastructure Assets (replacement of ten bridges), (iii) Component 3: Strengthening the Enabling Environment through technical assistance and, (iv) Component 4: Contingent Emergency Response Component (CERC).Project typologies include construction works, technical assistance and a contingent emergency response component (CERC). Physical investments involve construction of new bridge structures and approaches to replace ten identified critical bridge assets across King's and Queen's Roads in Viti Levu. Replacement of the selected bridges will involve as a minimum, wider 2-lane carriageways, shoulders and pedestrian footpaths to improve the safety of all road users, increased hydraulic capacity by raising deck heights and increasing bridge lengths to better accommodate water levels and flows during flood events. The Transport Infrastructure Investment Project (TIIP), P150028, jointly financed by World Bank and Asian Development Bank (ADB) and approved in 2015, is helping address the backlog of bridge maintenance and its scope includes the detailed design for the reconstruction and upgrading of 40 of the most critical bridges, including the ten bridges that will be replaced under Component 2 of this project. Design works are underway and being prepared in accordance with the Environmental and Social Framework (ESF).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–P0055826"><narrative>Republic of Fiji</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-0055827"><narrative>Fiji Roads Authority</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-01-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-01-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tawia Addo-Ashong</narrative></person-name><telephone>+1-202-473-1000</telephone><email>taddoashong@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
360 Victoria Parade, Suva, Fiji, +679 310 0114, info@fijiroads.org

</narrative></mailing-address></contact-info><recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2198148" />
                <name><narrative>Suva</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-18.13683 178.42531</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="50" xml:lang="en"/><sector vocabulary="1" code="21021" percentage="50" xml:lang="en"/><sector vocabulary="1" code="21021" percentage="50" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="100.000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">699999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">699999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">699999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">700003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">458333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">458333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">366665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">366665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">366665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">366665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">366665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">366671.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">47741500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">47741500.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">6200000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-55827"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">18800000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-55827"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">25000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-55827"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">2258500</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-55827"><narrative>Fiji Roads Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180979"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180979?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180979"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of wage employees in project activities who are female
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of critical bridges newly constructed or rehabilitated with measures to improve resilience to natural hazards and climate change
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bridge and Jetty  maintenance inspection and prioritization program in place
</narrative></title>
<baseline year="2024" iso-date="2024-11-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-11" />
<period-end iso-date="2031-12-11" />
<target value="Yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Vulnerability Assessment and Resilient Transport Sector Strategy in use
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate informed asset management plan in use
</narrative></title>
<baseline year="2024" iso-date="2024-11-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-11" />
<period-end iso-date="2031-12-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between percentage of men and women employed in technical roles within FRA
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enabling environment solutions identified and implemented for enhanced climate resilience
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges with seismic resilient ground improvements
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges with increased hydraulic capacity
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges newly constructed or rehabilitated incorporating gender informed design features
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Vulnerability Assessment and Resilient Transport Sector Strategy in use
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bridge and Jetty  maintenance inspection and prioritization program in place
</narrative></title>
<baseline year="2024" iso-date="2024-11-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-11" />
<period-end iso-date="2031-12-11" />
<target value="Yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of critical bridges newly constructed or rehabilitated with measures to improve resilience to natural hazards and climate change
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of critical bridges newly constructed or rehabilitated with measures to improve resilience to natural hazards and climate change
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges with increased hydraulic capacity
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of critical bridges newly constructed or rehabilitated with measures to improve resilience to natural hazards and climate change
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified planning tools adopted and being used to improve the climate resilience of the road network
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges with seismic resilient ground improvements
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between percentage of men and women employed in technical roles within FRA
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-12" />
<period-end iso-date="2031-12-12" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="555,390">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on SEA and SH components of the Codes of Conduct
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contractor staff trained on SEA and SH components of the Codes of Conduct
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified planning tools adopted and being used to improve the climate resilience of the road network
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges newly constructed or rehabilitated incorporating gender informed design features
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2031-12-06" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate informed asset management plan in use
</narrative></title>
<baseline year="2024" iso-date="2024-11-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-11" />
<period-end iso-date="2031-12-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of wage employees in project activities who are female
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2031-12-14" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enabling environment solutions identified and implemented for enhanced climate resilience
</narrative></title>
<baseline year="2024" iso-date="2024-11-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-07" />
<period-end iso-date="2031-12-07" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-24T00:03:40" hierarchy="1"><iati-identifier>44000-P500609</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiji Growth and Resilience First Development Policy Financing with a Catastrophe Deferred Drawdown Option</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the Government of Fiji in its efforts to build fiscal, climate and disaster resilience, and the foundations for private sector development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Growth and Resilience First Development Policy Financing with a Catastrophe Deferred Drawdown Option (Cat DDO) is to support the Government of Fiji in its efforts to build fiscal, climate and disaster resilience, and the foundations for private sector development. The series supports the GoF in its efforts to build fiscal, climate, and disaster resilience, and the foundations for private sector development. Pillar 1 supports(i) enhancing revenue mobilization and building fiscal buffers; (ii) strengthening disaster preparedness; and (iii) securing energy supply and supporting energy transition. Pillar 2 supports (i) facilitating micro, small and medium enterprise (MSME) access to finance; (ii) streamlining the business environment; (iii) promoting the utilization of digital financial services; and (iv) unlocking productive potential of working-age population. The proposed program forms part of the GoF's first Joint Policy Matrix (JPM), coordinated by the Asian Development Bank (ADB) and the World Bank, comprising of 22 reforms across public financial management (PFM), sustainable economic growth, and climate and community resilience. The JPM is supported by Fiji's other development partners: Australia, European Union (EU), and New Zealand. These partners are providing technical assistance (TA) to support reform design, implementation, and monitoring.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="FJ–00005103"><narrative>Government of Fiji</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="FJ-COA-00005105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-06-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-06-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-07-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-07-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mehwish Ashraf</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mashraf3@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Ro Lalabalavu House 370 Victoria Parade Suva, Fiji, (679) 3307 011, info@finance.gov.fj

</narrative></mailing-address></contact-info><recipient-country code="FJ" percentage="100"><narrative xml:lang="en">FIJI</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2198148" />
                <name><narrative>Suva</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-18.13683 178.42531</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FK" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Capital Markets</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-15"/>
<value currency="USD" value-date="2027-07-15">125000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-15"/>
<value currency="USD" value-date="2027-07-15">125000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-15"/>
<value currency="USD" value-date="2027-07-15">29980494.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-15"/>
<value currency="USD" value-date="2027-07-15">29980494.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">24700000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">70300000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">70304838</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">24714668</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-323648</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-273099</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-275143</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="FJ-COA-5105"><narrative>Ministry of Finance, Strategic Planning, National Development and Statistics</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500609"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P500609?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500609"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
5. Share of low-risk businesses with reduced frequency of inspections and certificate renewal
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="100">
<comment><narrative>
This indicator is on track.  The National Occupational Health and Safety Services (NOHSS) has undertaken general workplace inspections of 1,847 workplaces to assess risk across all divisions and districts in Fiji. These inspections indicated that 1,109 (60%) workplaces were of low-risk nature of business.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7ii.b. Share of students meeting recommended physical activity guidelines: Boys
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="22.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="70">
<comment><narrative>
No progress reported against this indicator. It is however expected that the target will be met by the target date of July 2027.
</narrative></comment>
</target>
<actual value="Nil">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. Share of Micro, Small and Medium Enterprises (MSMEs) accessing financial services from a regulated financial institution
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="39"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="45">
<comment><narrative>
This indicator is on track.  The Reserve Bank of Fiji has confirmed the share of MSMEs accessing financial services from a regulated financial institution has increased from the baseline of 39 to 41 percent.
</narrative></comment>
</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1. Tax revenue (percent of GDP)
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="18.0 (FY22-FY23)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="23.1 (FY26-FY27)">
<comment><narrative>
This indicator has been achieved. The increase in the VAT rate from 9 percent to 15 percent in the FY24/25 budget was instrumental in raising the tax revenue to GDP.
</narrative></comment>
</target>
<actual value="23.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Share of population covered by divisional DRM Plans
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2027-07-14" />
<target value="20">
<comment><narrative>
This indicator has been over achieved. The Government of Fiji has completed the Western Division Disaster Risk Management Plan, which has been endorsed by the Disaster Risk Reduction Committee. The population of the Western Division is approximately 36% of the population of Fiji.
</narrative></comment>
</target>
<actual value="36">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
5. Share of low-risk businesses with reduced frequency of inspections and certificate renewal
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="100">
<comment><narrative>
This indicator is on track.  The National Occupational Health and Safety Services (NOHSS) has undertaken general workplace inspections of 1,847 workplaces to assess risk across all divisions and districts in Fiji. These inspections indicated that 1,109 (60%) workplaces were of low-risk nature of business.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Increase in volume of digital payments
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="35">
<comment><narrative>
This indicator has been exceeded, based on digital payment data for the payments processed by the RBF ATS system.
</narrative></comment>
</target>
<actual value="68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3. Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="182"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2027-07-14" />
<target value="220">
<comment><narrative>
This indicator remains unchanged from baseline.  No relevant prior actions were included in the first operation. The second operation provides for amendment to the Electricity Bill enabling private sector investment in renewable energy. This is expected to lead to an increase in renewable energy.
</narrative></comment>
</target>
<actual value="182">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7i. Share of students from early childhood to secondary school who are malnourished identified and referred for treatment and management
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="60">
<comment><narrative>
No progress reported against this indicator, though it is expected the target will be met by the close of the operation.
</narrative></comment>
</target>
<actual value="Nil">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7ii.a. Share of students meeting recommended physical activity guidelines: Girls
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2027-07-14" />
<target value="70">
<comment><narrative>
No progress reported against this indicator but it is expected that the target will be achieved by the target date of July 2027.
</narrative></comment>
</target>
<actual value="18.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7ii.b. Share of students meeting recommended physical activity guidelines: Boys
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="22.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="70">
<comment><narrative>
No progress reported against this indicator. It is however expected that the target will be met by the target date of July 2027.
</narrative></comment>
</target>
<actual value="Nil">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1. Tax revenue (percent of GDP)
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="18.0 (FY22-FY23)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="23.1 (FY26-FY27)">
<comment><narrative>
This indicator has been achieved. The increase in the VAT rate from 9 percent to 15 percent in the FY24/25 budget was instrumental in raising the tax revenue to GDP.
</narrative></comment>
</target>
<actual value="23.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Share of population covered by divisional DRM Plans
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2027-07-14" />
<target value="20">
<comment><narrative>
This indicator has been over achieved. The Government of Fiji has completed the Western Division Disaster Risk Management Plan, which has been endorsed by the Disaster Risk Reduction Committee. The population of the Western Division is approximately 36% of the population of Fiji.
</narrative></comment>
</target>
<actual value="36">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7ii.a. Share of students meeting recommended physical activity guidelines: Girls
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2027-07-14" />
<target value="70">
<comment><narrative>
No progress reported against this indicator but it is expected that the target will be achieved by the target date of July 2027.
</narrative></comment>
</target>
<actual value="18.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7i. Share of students from early childhood to secondary school who are malnourished identified and referred for treatment and management
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="60">
<comment><narrative>
No progress reported against this indicator, though it is expected the target will be met by the close of the operation.
</narrative></comment>
</target>
<actual value="Nil">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Increase in volume of digital payments
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="35">
<comment><narrative>
This indicator has been exceeded, based on digital payment data for the payments processed by the RBF ATS system.
</narrative></comment>
</target>
<actual value="68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. Share of Micro, Small and Medium Enterprises (MSMEs) accessing financial services from a regulated financial institution
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="39"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2027-07-13" />
<target value="45">
<comment><narrative>
This indicator is on track.  The Reserve Bank of Fiji has confirmed the share of MSMEs accessing financial services from a regulated financial institution has increased from the baseline of 39 to 41 percent.
</narrative></comment>
</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3. Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="182"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2027-07-14" />
<target value="220">
<comment><narrative>
This indicator remains unchanged from baseline.  No relevant prior actions were included in the first operation. The second operation provides for amendment to the Electricity Bill enabling private sector investment in renewable energy. This is expected to lead to an increase in renewable energy.
</narrative></comment>
</target>
<actual value="182">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>